PEMBANGUNAN MASJID AL-ISHLAH PALIMA - SERANG PANITIA PEMBANGUNAN MASJID AL-ISHLAH PALIMA - SERANG YPI TUNAS HARAPAN ILAHI CIPONDOH – KOTA TANGERANG

h LEMBAR PENGESAHAN PROPOSAL PEMBANGUNAN MASJID AL-ISHLAH PALIMA - SERANG PANITIA PEMBANGUNAN MASJID AL-ISHLAH PALIMA - SERANG Pimpinan PMDI SERANG Ketua Panitia, K.H. Nirwan Nazaruddin, Lc. M.I.S. H. Taufik Sumiarta , S.IP. Mengetahui, Ketua YPI THI Capt. H. Purbolaksito pmdi.sch.id

h ‫ﺑﺳم ﷲ اﻟرﺣﻣن اﻟرﺣﯾم‬ Nomor : 01/PPM-PMDI/YPI THI/XI/22022 Tangerang, 31 Oktober 2022 Lampiran Hal : 1 (satu) berkas : Proposal Pembangunan Masjid Al-Ishlah Palima - Serang Kepada yang terhormat, Bapak/ Ibu/ Sdr/i para Sahabat Dermawan Di - Tempat. ‫اﻟﺳﻼم ﻋﻠﯾﻛم ورﺣﻣﺔ ﷲ وﺑرﻛﺎﺗﮫ‬ Segala puji hanya untuk Allah atas segala limpahan nikmat dan karunia yang diberikan. Shalawat dan salam semoga tercurahkan kepada Nabi Muhammad ‫ﷺ‬. Bersama ini kami sampaikan proposal pembangunan Masjid Al-Ishlah Palima - Serang. Besar harapan kami agar B apak/ Ibu/ Sdr/i para sahabat dermawan menjadi bagian dalam pembangunan masjid ini. Rasulullah ‫ ﷺ‬pernah bersabda : “Siapa yang membangun masjid karena Allah walaupun hanya selubang tempat burung bertelur atau lebih kecil, maka Allah bangunkan baginya (rumah) seperti itu pula di surga”. (HR. Ibnu Majah no. 738). Atas perhatian dan kebaikannya kami ucapkan terima kasih, jazakumullah ahsanal jaza’ wa baraka fikum jami’an. ◌‫َ◌واﻟ ﱠﺳ َﻼ◌ ُ◌م َ◌ﻋَﻠ◌ْ◌ﯾ ُ◌ﻛْ◌م َ◌و َ◌ر ْ◌ﺣ َ◌ﻣ ُﺔ◌ ِ◌ﷲ َ◌وَﺑ◌ َ◌ر َ◌ﻛﺎ ُﺗ◌ ُﮫ‬ Hormat kami, Ketua Panitia, H. Taufik Sumiarta , S.IP. pmdi.sch.id

A. LATAR BELAKANG Pesantren adalah Lembaga Pendidikan di mana Kiyai sebagai sentral figur dan masjid sebagaititik pusat yang menjiwainya. Keberadaan masjid tidak dapat dipisahkan dari berjalannya proses pendidikan di pesantren. Pondok Modern Darul Ishlah (PMDI) adalah pesantren yang baru dirintis secara swadaya yang tentunya membutuhkan biaya yang cukup besar untuk melengkapi seluruh infrastuktur yang dibutuhkan, seperti asrama, ruang belajar, sarana olahraga, masjid dan sarana lainnya. Alhamdulillah, untuk pembangunan tahap pertama, beberapa ruang kelas dan kamar santri sudah dalam proses finishing, sedangkan bangunan masjid masih dalam tahap perencanaan. Harapannya, masyarakat Islam bisa memberikan donasinya demi terbangunnya sarana vital yang dibutuhkan oleh PMDI, yaitu masjid. Berdonasi (infaq) untuk pembangunan masjid adalah amalan yang menguntungkan bagi seorang muslim, khususnya untuk kebahagiaan hidup di alam kubur juga alam akhirat, karena pahalanya akan terus mengalir selama masjid yang dibangun tersebut dimanfaatkan untuk sarana ibadah dan thalabul ‘ilmi. B. DASAR PELAKSANAAN Program infaq pembangunan masjid Al-Ishlah Palima - Serang ini merujuk pada banyak dalil dari ayat- ayat suci al-Qur’an dan hadits-hadits Rasulullah‫ﷺ‬, di antaranya: 1. Surat al-Baqarah ayat 245 yang artinya: “Barangsiapa meminjami Allah dengan pinjaman yang baik maka Allah melipatgandakan ganti kepadanya dengan banyak. Allah menahan dan melapangkan (rezeki) dan kepada-Nyalah kamu dikembalikan”. 2. Surat al-Munafiqun ayat 10 yang artinya: “Dan belanjakanlah sebagian dari apa yang telah Kami berikan kepadamu sebelum datang kematian kepada salah seorang di antara kamu; lalu ia berkata: \"Ya Rabb -ku, mengapa Engkau tidak menangguhkan (kematian)ku sampai waktu yang dekat, yang menyebabkan aku dapat bersedekah dan aku termasuk orang-orang yang saleh?\" 3. Dari Abu Hurairah berkata bahwa Rasulullah ‫ ﷺ‬bersabda: “Apabila seorang anak Adam (manusia) meninggal dunia, maka terputuslah segala (pahala) amal kebaikannya kecuali tiga perkara; sedekah jariyah, ilmu yang bermanfaat baginya dan anak shalih yang selalu mendoakannya”. (HR Muslim, Hadis No 3084) 4. Dari Jabir bin ‘Abdillah , Rasulullah ‫ ﷺ‬bersabda: “Siapa yang membangun masjid karena Allah walaupun hanya selubang tempat burung bertelur atau lebih kecil, maka Allah bangunkan baginya (rumah) seperti itu pula di surga.” (HR. Ibnu Majah no. 738. Al-Hafizh Abu Thahir mengatakan bahwa sanad hadits ini shahih) C. NAMA KEGIATAN Penggalangan Dana Infaq Pembangunan Masjid al-Ishlah Palima -Serang. D. MAKSUD DAN TUJUAN pmdi.sch.id

Keberadaan Masjid al-Ishlah ini nantinya diharapkan dapat menunjang efektifitas proses pendidikan di PMDI, demi terbentuknya mentalitas santri yang bertaqwa kepada Allah dan cinta kepada bangsanya. Sebab masjid merupakan sarana yang dulu dimanfaatkan oleh Rasulullah ‫ ﷺ‬untuk menggembleng para sahabatnya sehingga mereka menjadi manusia-manusia yang shalih dan berakhlak mulia. Masjid, sebagaimana yang diungkapkan sebelumnya, adalah sarana vital di sebuah pesantren, yang berfungsi tidak hanya sebagai syi’ar, tetapi juga untuk penempaan karakter para santri agar mere ka berkepribadian islami, tangguh, disiplin dan E. RENCANA LOKASI Kampung Jalupang Wetan, Desa Sindangheula, Kecamatan Pabuaran, Kabupaten Serang F. RENCANA ANGGARAN P EMBANGUNAN MASJID Terlampir G. DESIGN PEMBANGUNAN MASJID Terlampir H. PAKET INFAQ PEMBANGUNAN MASJID AL-ISHLAH Panitia pembangunan Masjid al-Ishlah menawarkan paket infaq dengan rincian pilihan sebagai berikut: 1. Paket Infaq 1: Rp. 500.000 - Rp. 1.000.000,- 2. Paket Infaq 2: Rp. 1.100.000 – Rp. 5.000.000,- 3. Paket Infaq 3: Rp. 5.100.000 – Rp. 20.000.000,- 4. Infaq tanpa batas . Panitia pembangunan juga menerima sumbangan dalam bentuk bahan material yang dibutuhkan dalam pembangunan masjid ini. I. SUMBER DANA: Pembangunan ini dibiayai oleh dana yang bersumber dariinfaq para orang tua siswa baru setiap tahunnya di YPI THI, juga dari infaq/ sedekah kaum muslimin. J. TATA CARA BERINFAQ Dana i nfaq untuk pembangunan Masjid al -Ishlah ini dapat disetorkan secara tunai ataupun transfer, dengan rincian sebagai berikut: 1. Tunai melalui kasir YPI THI. 2. Scan barcode infaq pembangunan Masjid al-Ishlah di kasir YPI THI 3. Transfer melalui rekening Bank BSI Nomor 1322 02 2022 a/n Pondok Modern Darul Ishlah Setelah melakukan transfer, donator dapat mengkonfirmasi setorannya melalui SMS/Whatsapp ke nomor handphone 0819-9220-2229 a/n Surono. 4. Setelah dana infaq diterima, pihak panitia akan mengeluarkan surat tanda terima infaq Pembangunan Masjid Al-Ishlah Palima – Serang. pmdi.sch.id

K. PANITIA PEMBANGUNAN MASJID AL-ISHLAH PALIMA - SERANG Penasehat : Capt. H. Purbolaksito K.H. Nirwan Nazaruddin, Lc. M.I.S. H. Asep Mulyawan, M.Pd. Ketua : H. Taufik Sumiarta , S.IP. Sekretaris : Surono Abdurrahman, S.E. Bendahara : Ayom Djatmiko, S.Pd.I Humas dan Tehnis lapangan Koordinator : H. Bambang Purhadi, ST. Anggota : 1. Heri Ramadinsyah, S.Pd.I 2. Anhar Rizqonnur Siddiq, Amd. Kom., S.Pd. L. PENUTUP Demikianlah proposal ini kami buat dengan sebenar -benarnya sebagai bahan acuan bagi para donatur dan masyarakat Islam secara umum. Semoga Allah mencatatnya sebagai amalan yang terbaik disisi - Nya. Ajarakumullah fima anfaqtum wa baraka fima abqaitum. PANITIA PEMBANGUNAN MASJID AL-ISHLAH PALIMA - SERANG Pimpinan PMDI Serang, Ketua Panitia, K.H. Nirwan Nazaruddin, Lc., M.I.S. H. Taufik Sumiarta Mengetahui, Ketua YPI THI Capt. H. Purbolaksito pmdi.sch.id

RENCANA ANGGARAN BIAYA REKAP No 209/PJM/XII/2022 BIAYA Tanggal 13 Desember 2022 MASJID JAMI' DARUL ISHLAH PALIMA SPESIFIKASI Lokasi SERANG - BANTEN NO. URAIAN PEKERJAAN JUMLAH % TOTAL A PEKERJAAN PERSIAPAN 359,000,000.00 5.13% Rp 6,999,000,405.01 B PEKERJAAN TANAH DAN PASIR 17,800,464.83 0.25% Rp 6,999,000,000.00 C PEKERJAAN STRUKTUR BETON Mutu K-300/Fc 25 Mpa (INCLUDE PEMBESIAN, BEKISTING DAN B 36.53% D PEKERJAAN PASANGAN DAN PLESTERAN 2,556,729,200.00 15.51% E PEKERJAAN PELAPIS LANTAI DAN DINDING 1,085,224,884.00 7.96% F PEKERJAAN PLAFOND 8.77% G PEKERJAAN PINTU DAN JENDELA 557,169,400.00 1.87% H PEKERJAAN PENGECATAN 613,881,248.00 3.53% I PEKERJAAN KUBAH DAN MINARET 130,965,000.00 9.96% J PEKERJAAN RAILLING DAN LAIN-LAIN 246,848,842.50 1.62% K PEKERJAAN SANITAIR 697,278,500.00 0.88% L INSTALASI AIR BERSIH 113,650,000.00 0.23% M INSTALASI AIR KOTOR 1.02% N INSTALASI AIR PEMBUANGAN 61,274,000.00 1.21% O INSTALASI LISTRIK 15,992,915.00 1.89% P INSTALSI SOUND SYSTEM 71,454,300.00 0.87% Q PEKERJAAN ELEKTRIKAL PANEL 84,878,000.00 0.68% R INSTALASI LIGHTNING PROTECTION 132,137,736.68 0.34% S INSTALASI POMPA MASJID 60,748,652.25 1.75% TOTAL BIAYA PEKERJAAN 47,361,600.00 100.00% 24,080,968.52 DIBULATKAN 122,524,693.23 Tangerang, 13 Desember 2022 Diajukan Oleh, PT. Precisindo Jaya Mandiri Bambang Purhadi, ST pmdi.sch.id

PROYEK PEMBANGUNAN RAB Msjid Jami' Darul Ishlah Palima RENCANA ANGGARAN BIAYA SERANG - BANTEN No. ITEM PEKERJAAN SPESIFIKASI VOL SAT HARGA SATUAN JUMLAH I PEKERJAAN BANGUNAN UTAMA A PEKERJAAN PERSIAPAN 1 Pengukran bowplank 520.00 m' Rp 80,000.00 Rp 41,600,000.00 2 Pembersihan site 600.00 m2 Rp 10,000.00 Rp 6,000,000.00 3 Penyediaan air kerja 18.00 bln Rp 3,500,000.00 Rp 63,000,000.00 4 Penyediaan listrik kerja 18.00 bln Rp 2,500,000.00 Rp 45,000,000.00 5 Gudang dan Direksi keet 1.00 unit Rp 25,000,000.00 Rp 25,000,000.00 6 Barak pekerja 1.00 unit Rp 15,000,000.00 Rp 15,000,000.00 7 Pagar pengaman dari seng tinggi 1,8m 100.00 m' Rp 234,000.00 Rp 23,400,000.00 8 Laporan Analisa Struktur 1.00 ls Rp 25,000,000.00 Rp 25,000,000.00 9 Dokumentasi, Pelaporan dan asbuildrawing 18.00 bln Rp 5,000,000.00 Rp 90,000,000.00 10 Mobilisasi dan demobilisasi material dan pekerja 50.00 ls Rp 500,000.00 Rp 25,000,000.00 TOTAL PEKERJAAN PERSIAPAN Rp 359,000,000.00 B PEKERJAAN TANAH DAN PASIR 1 Galian pilecap dan tie beam 64.80 m3 Rp 85,000.00 Rp 5,508,000.00 43.47 m3 Rp 34,000.00 Rp 1,477,866.67 2 Urugan tanah kembali 19.26 m3 Rp 291,516.00 Rp 5,614,598.16 520.00 m2 Rp 10,000.00 Rp 5,200,000.00 3 Urugan pasir bawah pilecap dan tie beam 17,800,464.83 Rp 4 Pemadatan tanah eksisting TOTAL BIAYA PEKERJAAN TANAH C PEKERJAAN STRUKTUR BETON Mutu K-300/Fc 25 Mpa (INCLUDE PEMBESIAN, BEKISTING DAN BETON) LANTAI 1 1 Mobilisasi dan demobilisasai 1.00 ls Rp 15,000,000.00 Rp 15,000,000.00 205,200,000.00 2 Tiang Pancang 250 mm metode pancang drop hammer 720.00 m' Rp 285,000.00 Rp 7,800,000.00 3 Pemotongan kepala tiang 120.00 titik Rp 65,000.00 Rp 23,000,000.00 4 PDA test 2.00 ttk Rp 11,500,000.00 Rp 3,391,200.00 19,593,600.00 5 Lantai kerja bawah pile cap 43.20 m2 Rp 78,500.00 Rp 85,536,000.00 6 Lantai kerja bawah tie beam 249.60 m2 Rp 78,500.00 Rp 5,544,000.00 7 Pekerjaan PileCap (PC1) 6,415,200.00 Beton fc' = 25 MPa Readymix , Besi D 13 17.28 m3 Rp 4,950,000.00 Rp 336,600,000.00 8 Pekerjaan PileCap (PC2) 396,900,000.00 Beton fc' = 25 MPa Readymix , Besi D 13 1.12 m3 Rp 4,950,000.00 Rp 27,011,250.00 9 Pekerjaan PileCap (PC3) 26,136,000.00 Beton fc' = 25 MPa Readymix , Besi D 13 1.30 m3 Rp 4,950,000.00 Rp - - 10 Pekerjaan tie-beam 77,220,000.00 Beton fc' = 25 MPa Readymix , Besi D 13 68.00 m3 Rp 4,950,000.00 Rp 11 Pekerjaan kolom 600x600mm (K1) Beton fc' = 25 MPa Readymix , Besi D 16 75.60 m3 Rp 5,250,000.00 Rp 12 Pekerjaan kolom 350x350mm (K2) Beton fc' = 25 MPa 5.15 m3 Rp 5,250,000.00 Rp 13 Pekerjaan kolom 200x600mm (K3), Pintu Utama Beton fc' = 25 MPa 5.28 m3 Rp 4,950,000.00 Rp kg Rp - Rp Besi Beton m2 Rp - Rp Bekisting Multiplek 14 Pekerjaan ornamen beton 20x600mm Beton fc' = 25 MPa 15.60 m3 Rp 4,950,000.00 Rp - LANTAI 2 1 Pekerjaan kolom 600x600mm (K1) Beton fc' = 25 MPa Readymix , Besi D 16 43.20 m3 Rp 5,250,000.00 Rp 226,800,000.00 5.15 m3 Rp 5,250,000.00 Rp 27,011,250.00 2 Pekerjaan kolom 450x450mm (K2) 5,250,000.00 Rp 30.30 m3 Rp 5,250,000.00 Rp 159,075,000.00 Beton fc' = 25 MPa Readymix , Besi D 16 1.60 m3 Rp 8,400,000.00 3 Pekerjaan Balok 300x500mm (B1) Beton fc' = 25 MPa 4 Pekerjaan Balok 200X400mm (B2) Beton fc' = 25 MPa 12 Pekerjaan Plat lantai 50.40 m3 Rp 5,250,000.00 Rp 264,600,000.00 Beton fc' = 25 MPa LANTAI DAK 2.16 m3 Rp 5,250,000.00 Rp 11,340,000.00 1 Pekerjaan kolom 120x300mm (K1) 3.57 m3 Rp 3.57 m3 Rp 5,250,000.00 Rp 18,742,500.00 Beton fc' = 25 MPa 3.84 m3 Rp 2 Pekerjaan Balok 250X400mm (B6) 0.51 m3 Rp 5,250,000.00 Rp 18,742,500.00 9.18 m3 Rp Beton fc' = 25 MPa 6.54 m3 Rp 5,250,000.00 Rp 20,160,000.00 4 Pekerjaan balok 150X350mm (B9) 19.68 m3 Rp 72.00 m3 Rp 5,250,000.00 Rp 2,677,500.00 Beton fc' = 25 MPa 5 Pekerjaan Balok 200x400mm (BA1) 5,250,000.00 Rp 48,195,000.00 Beton fc' = 25 MPa 5,250,000.00 Rp 34,335,000.00 6 Pekerjaan Balok 200X350mm (BA2) 5,250,000.00 Rp 103,303,200.00 Beton fc' = 25 MPa 7 Pekerjaan Balok 300X600mm (BA3) 5,250,000.00 Rp 378,000,000.00 Beton fc' = 25 MPa 8 Pekerjaan Balok 300x600mm (KS2) Beton fc' = 25 MPa 9 Pekerjaan Plat lantai Beton fc' = 25 MPa 10 Pekerjaan Plat Topi Beton Beton fc' = 25 MPa TOTAL BIAYA PEKERJAAN STRUKTUR Rp 2,556,729,200.00 D PEKERJAAN PASANGAN DAN PLESTERAN bata merah oven ukuran 230 x 110 x 55 mm 512.73 m2 Rp 125,500.00 Rp 64,347,615.00 PEKERJAAN DINDING LT 1 1,025.46 m2 Rp 95,800.00 Rp 98,239,068.00 1 Pasangan dinding bata merah 1Pc:5Ps 95,000.00 Rp 75,249,500.00 2 Plesteran dinding + acian 1Pc:5Ps 792.10 m' Rp 47,500.00 Rp 29,792,000.00 3 Kolom praktis dan ring praktis 627.20 m' Rp 29,070.00 Rp 4 Openingan 240.00 m' Rp Rp 6,976,800.00 5 Pekerjaan Tali Air 201.60 m2 Rp 433,500.00 87,393,600.00 6 Finish Kolom Bata tempel terakota Ex BataGapit + Coating pmdi.sch.id

PROYEK PEMBANGUNAN RAB Msjid Jami' Darul Ishlah Palima RENCANA ANGGARAN BIAYA SERANG - BANTEN SPESIFIKASI VOL SAT HARGA SATUAN JUMLAH No. ITEM PEKERJAAN bata merah oven ukuran 230 x 110 x 55 mm 241.22 m2 Rp 125,500.00 Rp 30,273,110.00 PEKERJAAN DINDING LT 2 482.44 m2 Rp 95,800.00 Rp 46,217,752.00 1 Pasangan dinding bata merah 1Pc:5Ps 449.00 m' Rp 95,000.00 Rp 42,655,000.00 2 Plesteran dinding + acian 1Pc:5Ps 47,500.00 Rp 3 Kolom praktis dan ring praktis 3.42 m' Rp Rp 162,450.00 3 Openingan 179.20 m2 Rp 433,500.00 77,683,200.00 4 Finish Kolom Bata tempel terakota Ex BataGapit + Coating bata merah oven ukuran 230 x 110 x 55 mm 398.59 m2 Rp 125,500.00 Rp 50,023,045.00 PEKERJAAN DINDING LT DAK 797.18 m2 Rp 95,800.00 Rp 76,369,844.00 1 Pasangan dinding bata merah 1Pc:5Ps 387.50 m' Rp 95,000.00 Rp 36,812,500.00 2 Plesteran dinding + acian 1Pc:5Ps 47,500.00 Rp 3 Kolom praktis dan ring praktis 9.60 m' Rp Rp 456,000.00 4 Openingan 134.19 m2 Rp 110,000.00 14,760,900.00 5 Screeding lantai 397.50 m2 Rp 875,000.00 Rp 347,812,500.00 PEKERJAANNORNAMEN KRAWANGAN GRC 1 Clading GRC Motiv islami Rp 1,085,224,884.00 TOTAL BIAYA PEKERJAAN ARSITEKTUR granite tile 600 mm x 600 mm ex ,roman setara, motif t 480.0b0 m2 Rp 335,000.00 Rp 160,800,000.00 E PEKERJAAN PELAPIS LANTAI DAN DINDING 54,500.00 Rp 19,620,000.00 granite tile 100 mm x 600 mm ex ,roman setara, warna h 360.00 m Rp 54,500.00 Rp 19,511,000.00 LANTAI 1 Rp 22,680,000.00 1 Finish lantai ruang sholat granite tile 100 mm x 600 mm ex ,roman setara, motif t 358.0b0 m' Rp 315,000.00 Rp 9,450,000.00 2 Finish border shaf sholat 315,000.00 Rp 18,020,000.00 3 Skirting/plin HT 300 x600 ex roman setara 72.00 m2 Rp 265,000.00 Rp 74,750,400.00 5 Trap tangga utama 268,500.00 6 Trap tangga teras HT 300x600mm UNPOLISH 30.00 m2 Rp 7 Finish Lantai Tempat Wudhu 8 Dinding Tempat Wudhu HT 60 x60 ex roman setara 68.00 m2 Rp HT 60 x60 ex roman setara 278.40 m2 Rp pmdi.sch.id

PROYEK PEMBANGUNAN RAB Msjid Jami' Darul Ishlah Palima RENCANA ANGGARAN BIAYA SERANG - BANTEN SPESIFIKASI VOL SAT HARGA SATUAN JUMLAH No. ITEM PEKERJAAN granite tile 600 mm x 600 mm ex ,roman setara, motif t 312.0b0 m2 Rp 335,000.00 Rp 104,520,000.00 LANTAI 2 54,500.00 Rp 10,464,000.00 1 Finish lantai sholat granite tile 100 mm x 600 mm ex ,roman setara, warna h 192.00 m2 Rp 54,500.00 Rp 7,194,000.00 2 Finish border shaf sholat Rp 3 Skirting/plin granite tile 100 mm x 600 mm ex ,roman setara 132.00 m' Rp 229,500.00 110,160,000.00 4 Finish lantai Dak Kanopy Waterproff 480.00 m2 Rp TOTAL BIAYA PEKERJAAN PELAPIS LANTAI DAN DINDING Rp 557,169,400.00 F PEKERJAAN PLAFOND ex jayaboard 312.00 m2 Rp 117,300.00 Rp 36,597,600.00 LANTAI 1 21.71 m2 Rp 865,000.00 Rp 18,779,150.00 1 Plafond gypsum tebal 9 mm rangka holow galvalum 20.00 m2 Rp 865,000.00 Rp 17,300,000.00 2 GRC Cetak + motif lubang pattern islami 21.00 m' Rp 865,000.00 Rp 18,165,000.00 3 GRC motif islam area tempat wudhu 29.40 m' Rp Rp 4 GRC motif islam area mihrab 92,500.00 Rp 2,719,500.00 5 Drop Ceilling 495.80 m' Rp 26,500.00 13,138,700.00 6 Shadow line LANTAI 2 ex jayaboard 356.56 m2 Rp 117,300.00 Rp 41,824,488.00 1 Plafond gypsum tebal 9mm rangka holow galvalum 267.35 m2 Rp 865,000.00 Rp 231,261,210.00 2 Fasad GRC Cetak + motif lubang islami 865,000.00 Rp 3 Fasad Miring GRC Cetak + Rangka besi 54.00 m2 Rp Rp 46,710,000.00 4 Drop Ceilling 68.00 m' Rp 92,500.00 Rp 6,290,000.00 5 Shadow line 192.40 m' Rp 26,500.00 5,098,600.00 LANTAI DAK 224.20 m2 Rp 785,000.00 Rp 175,997,000.00 1 Fasad lengkung GRC Cetak + rangka besi TOTAL BIAYA PEKERJAAN PLAFOND Rp 613,881,248.00 G PEKERJAAN PINTU DAN JENDELA ex alexindo, ukuran 900x3000 mm, kaca clear 8mm 4.00 unit Rp 5,250,000.00 Rp 21,000,000.00 1 PA01 Rp 4,750,000.00 Rp 9,500,000.00 2 PA02 ex alexindo, ukuran 830x3000 mm, kaca clear 8mm 2.00 unit Rp 3,500,000.00 Rp 3 PA03 Rp 3,750,000.00 Rp 31,500,000.00 4 PB 01 ex alexindo, ukuran 750x2200 mm 9.00 unit Rp 3,045,000.00 Rp 7,500,000.00 5 JA 01 Rp 6,090,000.00 6 JA 02 ex alexindo, ukuran 850x1450 mm 2.00 unit Rp 650,000.00 Rp 6,500,000.00 7 JF 01 g Rp 19,950,000.00 Rp 9 logo tulisan AR ROYYAN ex alexindo, ukuran 750x2900 mm, kaca clear 6mm 2.00 unit Rp 25,600,000.00 Rp 19,950,000.00 10 Pintu besi manhole 25,600,000.00 TOTAL BIAYA PEKERJAAN PINTU DAN JENDELA ex alexindo, ukuran 600x600 mm, kaca clear 5mm 10.00 unit 3,325,000.00 Rp H PEKERJAAN PENGECATAN Rp 3,325,000.00 ex alexindo, ukuran 8314x2900 mm 1.00 unit 130,965,000.00 LANTAI 1 1 Cat dinding exterior stainless steel back light , total tinggi 80 cm dan panjan 4 m L1.00 b dunit 2 Cat dinding interior 3 Cat plafond interior besi hollow 60x40 ukuran 1000x1200 mm dan plat teba 2 m 1.00 unit 4 Skiimcoat untuk topi beton dan tangga 5 Waterproofing ex dulux / setara 352.00 m2 Rp 45,000.00 Rp 15,840,000.00 ex dulux / setara 928.00 m2 Rp 30,500.00 Rp 28,304,000.00 ex dulux / setara 312.00 m2 Rp 30,500.00 Rp 55,000.00 Rp 9,516,000.00 ex sika / setara 21.00 m2 Rp 87,500.00 Rp 1,155,000.00 187.92 m2 Rp 16,442,562.50 LANTAI 2 ex dulux / setara 512.00 m2 Rp 45,000.00 Rp 23,040,000.00 1 Cat dinding exterior ex dulux / setara 928.00 m2 Rp 30,500.00 Rp 28,304,000.00 2 Cat dinding interior ex dulux / setara 366.96 m2 Rp 30,500.00 Rp 11,192,280.00 3 Cat plafond interior ex dulux / setara 189.00 m3 Rp 95,000.00 Rp 17,955,000.00 4 Cat Dome motif awan ex sika / setara 87,500.00 Rp 5 Waterproofing 31.00 m2 Rp 2,712,500.00 LANTAI DAK, KUBAH DAN MENARA ex sika / setara 661.00 m2 Rp 87,500.00 Rp 57,837,500.00 1 Waterproofing ex dulux / setara 267.00 m2 Rp 65,000.00 Rp 17,355,000.00 2 Cat kubah exterior ex dulux / setara 181.00 m2 Rp 95,000.00 Rp 17,195,000.00 3 Cat menara exterior TOTAL BIAYA PEKERJAAN PENGECATAN Rp 246,848,842.50 I PEKERJAAN KUBAH DAN MINARET 267.12 m2 Rp 750,000.00 Rp 200,340,000.00 A. KUBAH GRC 189.97 m2 Rp 700,000.00 Rp 132,979,000.00 1 GRC Kubah luar + Makara 650,000.00 Rp 2 GRC Kubah dalam ( Dome ) 41.45 m Rp 650,000.00 Rp 26,942,500.00 4 GRC Lisplang Kubah Luar 37.68 m Rp Rp 24,492,000.00 5 GRC Lisplang Kubah Dalam 1,122.00 kg Rp 27,500.00 Rp 30,855,000.00 6 Rangka pipa galvanized 4inch x 2.3mm 1,006.00 kg Rp 27,500.00 Rp 27,665,000.00 7 Rangka pipa galvanized 3inch x 2.0mm 29.00 Btg Rp 575,000.00 Rp 16,675,000.00 8 Roll rangka pipa galvanized 4inch x 2.3mm 33.00 Btg Rp 450,000.00 Rp 14,850,000.00 9 Roll rangka pipa galvanized 3inch x 2.0mm 12.00 bh Rp 1,250,000.00 Rp 15,000,000.00 3,500,000.00 10 Baseplat 150x150x10mm 1.00 bh Rp 3,500,000.00 11 Mahkota kubah GRC B. MENARA GRC 13.5M diatas Lt. 2 66.57 m2 Rp 750,000.00 Rp 49,927,500.00 1 Kolom mitif zigzag 29,437,500.00 2 kolom cover menara 39.25 m2 Rp 750,000.00 Rp 15,000,000.00 3 Kubah menara 64,680,000.00 4 Rangka WF 1.00 unit Rp 15,000,000.00 Rp 15,455,000.00 5 Rangka UNP 17,050,000.00 6 Rangka siku WF 150 x 75 x 5 x 7mm, zincromated 2,352.00 kg Rp 27,500.00 Rp 12,430,000.00 7 Rangka siku UNP 100 x 50 x 6mm, zincromated 70 x 70 mm, zincromated 562.00 kg Rp 27,500.00 Rp 50 x 50mm, zincromated 620.00 kg Rp 27,500.00 Rp 452.00 kg Rp 27,500.00 Rp TOTAL BIAYA PEKERJAAN ATAP Rp 697,278,500.00 J PEKERJAAN RAILLING DAN LAIN-LAIN tinggi 4 M besi hollow 40x40 mm 38.00 m' Rp 750,000.00 Rp 28,500,000.00 1 Railing selasar 5 x 5 kombinasi plat strip fin cat Hitam doff 24.00 m' Rp 750,000.00 Rp 18,000,000.00 2 Railing tangga utama hollow 5 x 5 kombinasi plat strip fin cat Hitam doff 38.00 m' Rp 750,000.00 Rp 28,500,000.00 3 Railing void hollow 5 x 5 kombinasi plat stripfin cat Hitam doff 18.00 m' Rp 550,000.00 Rp 4 Tangga monyet 23.00 m' Rp 1,250,000.00 Rp 9,900,000.00 5 Grill stainless steel tempat wudhu 28,750,000.00 pmdi.sch.id

PROYEK PEMBANGUNAN RAB Msjid Jami' Darul Ishlah Palima RENCANA ANGGARAN BIAYA SERANG - BANTEN No. ITEM PEKERJAAN SPESIFIKASI VOL SAT HARGA SATUAN JUMLAH TOTAL BIAYA RAILLING Rp 113,650,000.00 K PEKERJAAN SANITAIR TOTO CW 633 8.00 bh Rp 2,150,000.00 Rp 17,200,000.00 1 Pasangan Closed Duduk include jet washer TOTO Full Set U57 4.00 bh Rp 2,750,000.00 Rp 11,000,000.00 2 Pasangan Urinoar TOTO LW647CJT1 4.00 bh Rp 2,397,000.00 Rp 3 Pasangan Wastafel Y 20 JC 28.00 bh Rp 9,588,000.00 4 Pasangan Kran Dinding Hn508p 20.00 bh Rp 229,500.00 Rp 6,426,000.00 5 Pasangan floor drain KM / WC RD aluminium 3 inch merk lokal 33.00 bh Rp 205,000.00 Rp 4,100,000.00 6 Pasangan roof drain toto A100 3.00 unit Rp 250,000.00 Rp 8,250,000.00 7 Partisi urinoir 1,570,000.00 Rp 4,710,000.00 Dia. 2,5\", Rucika 61,274,000.00 TOTAL BIAYA SANITAIR Dia. 2\", Rucika Rp L INSTALASI AIR BERSIH Dia. 1 1/2\", Rucika Dia. 1\", Rucika 95.00 m' Rp 54,700.00 Rp 5,196,500.00 1 Pipa PVC AW Dia. 1/2\", Rucika 120.00 m' Rp 36,700.00 Rp 4,404,000.00 2 Pipa PVC AW m' Rp 29,070.00 Rp 3 Pipa PVC AW Cap. 5 m3 30.00 m' Rp 18,590.00 Rp 872,100.00 4 Pipa PVC AW Dim. (l)1m x (w)1m x (d)3,5m - by Civil 70.00 m' Rp 13,450.00 Rp 1,301,300.00 5 Pipa PVC AW Dia. 4\" 165.00 Lot Rp 749,765.00 Rp 2,219,250.00 6 Accessories Dia. 6\" Lot Rp 1,250,000.00 Rp 7 Material Support 1.00 749,765.00 TOTAL BIAYA INSTALASI AIR BERSIH Dia. 6\", Rucika 1.00 Rp 1,250,000.00 M INSTALASI AIR KOTOR Dia. 4\", Rucika 15,992,915.00 1 Septictank Dia. 3\", Rucika 2 Sumur Resapan 2.00 Unit Rp 21,654,500.00 Rp 43,309,000.00 3 Pipa PVC AW 18 Watt c/w Housing Ex Philips atau setara 2.00 Unit Rp 4,440,150.00 Rp 8,880,300.00 4 Pipa PVC AW 5 Watt Ex Philips atau setara 50.00 m' Rp 128,500.00 Rp 6,425,000.00 5 Accessories 5 Watt Ex Philips atau setara 25.00 m' Rp 285,600.00 Rp 7,140,000.00 6 Material Support 3 Watt Ex Philips atau setara 1.00 Lot Rp 2,450,000.00 Rp 2,450,000.00 TOTAL BIAYA INSTALASI AIR KOTOR Outdoor Ex Philips atau setara 1.00 Lot Rp 3,250,000.00 Rp 3,250,000.00 N INSTALASI AIR PEMBUANGAN Indoor Ex Philips atau setara Rp 1 Pipa PVC AW 71,454,300.00 2 Pipa PVC AW E31-1-2AR-WE ex Clipsal 3 Pipa PVC AW E32-1-2AR-WE ex Clipsal 120.00 m' Rp 285,600.00 Rp 34,272,000.00 4 Accessories E426-16S-WE ex Clipsal 200.00 m' Rp 128,500.00 Rp 25,700,000.00 5 Material Support lampu ex Jembo 180.00 m' Rp 15,606,000.00 TOTAL BIAYA INSTALASI AIR PEMBUANGAN lampu Logo masjid ex Jembo Lot Rp 86,700.00 Rp O INSTALASI LISTRIK switch ex Jembo 1.00 Lot Rp 2,450,000.00 Rp 2,450,000.00 1 Downlight LED stop kontak ex Jembo 1.00 6,850,000.00 Rp 6,850,000.00 2 Up Light LED Power Panel Control Pompa Masjid 84,878,000.00 3 Up Light LED Sorot Logo Masjid Rp 4 Wall Washer CR-15 U ex TOA 5 LED Strip ZP-2240 ex TOA 120.00 ttk Rp 185,006.25 Rp 22,200,750.00 6 Indirect Lamp T5 SS-10 Ch ex TOA 89.00 bh Rp 222,007.50 Rp 19,758,667.50 2.00 bh Rp 222,007.50 Rp ZM-520 ex TOA 8.00 bh Rp 148,005.00 Rp 444,015.00 ZM380 AS ex TOA 70.00 m Rp 102,123.45 Rp 1,184,040.00 ex TOA 126,096.75 Rp 7,148,641.50 ZS-648R ex TOA 142.00 Pcs Rp 17,905,738.50 ZH 662 T ex TOA 7 Single Switch c/w Inbowdus 13.00 ttk Rp 35,521.20 Rp 461,775.60 8 Double Switch c/w Inbowdus Incoming 13.00 bh Rp 48,841.65 Rp 634,941.45 9 Outlet Stop Kontak Dinding Panel Control Hydrant 11.00 bh Rp 41,441.40 Rp 455,855.40 10 Kabel Instalasi NYM 3x1.5mm² c/w Conduit Panel Control Pompa 220.00 ttk Rp 177,606.00 Rp 39,073,320.00 11 Kabel Instalasi NYM 3x1.5mm² c/w Conduit Stop Contact & Spare 177,606.00 Rp 355,212.00 12 Kabel Instalasi NYM 4x1.5mm² c/w Conduit Lighting & Spare 2.00 ttk Rp 192,406.50 Rp 5,002,569.00 13 Kabel Instalasi NYM 3x2.5mm² c/w Conduit 26.00 ttk Rp 192,406.50 Rp 2,116,471.50 14 Kabel Instalasi NYFGBY 4x10mm² 11.00 ttk Rp 136,164.60 Rp 5,855,077.80 15 Accessories 43.00 Mtr Rp 3,180,220.44 Rp 3,180,220.44 15 Material Support 6,360,440.99 Rp 6,360,440.99 TOTAL BIAYA INSTALASI AIR LISTRIK 1.00 Lot Rp 132,137,736.68 P INSTALSI SOUND SYSTEM 1.00 Lot Rp Rp 1 Cabinet Rak & Accessories 2 Power Amplifier 1.00 Unit Rp 4,588,155.00 Rp 4,588,155.00 3 Speaker Selectror 1.00 Unit Rp 9,620,325.00 Rp 9,620,325.00 1.00 Unit Rp 11,840,400.00 Rp 11,840,400.00 4 Microphone 1.00 Unit Rp 1,406,047.50 Rp 1,406,047.50 5 Microphone Meja 1.00 Unit Rp 1,332,045.00 Rp 1,332,045.00 6 Stand Microphone 1.00 Unit Rp 7 Ceilling Speaker 3 Watt 22.00 Unit Rp 962,032.50 Rp 962,032.50 8 Speaker Corong 60 Watt 4.00 Unit Rp 370,012.50 Rp 8,140,275.00 9 Installasi Kabel Sound 30.00 Titik Rp 2,590,087.50 Rp 10,360,350.00 10 Accessories 1.00 Lot Rp 296,010.00 Rp 8,880,300.00 11 Material Support 1.00 Lot Rp 1,206,240.75 Rp 1,206,240.75 TOTAL BIAYA INSTALASI SOUND SYSTEM 2,412,481.50 Rp 2,412,481.50 Q PEKERJAAN ELEKTRIKAL PANEL 60,748,652.25 1 Panel SDP Masjid Rp - Panel Box 1.00 Lot Rp 29,601,000.00 Rp 29,601,000.00 - MCCB 3P (250A) 36 KA 1.00 unit - MCCB 3P (160A) 36 KA 1.00 pcs - MCCB 3P (50A) 36 KA 1.00 pcs - MCB 1P 6KA 16A 1.00 pcs - MCB 1P 6KA 10A 5.00 pcs - Curent Transformator 7.00 pcs - Voltmeter 3.00 pcs - Amperemeter 1.00 pcs 3.00 pcs pmdi.sch.id

PROYEK PEMBANGUNAN RAB Msjid Jami' Darul Ishlah Palima RENCANA ANGGARAN BIAYA SERANG - BANTEN No. ITEM PEKERJAAN SPESIFIKASI VOL SAT HARGA SATUAN JUMLAH - Volt Selector Switch Incoming 1.00 pcs - Fuse P. Booster 1, P. Booster 2 & Spare 3.00 pcs - Pilots LED 220VAC 3.00 pcs - Busbar R. 150m 1.00 lot - Material for Assembling T : 6 Meter 1.00 lot 2 Panel Control Pompa Masjid Cap. 10 m3 (Fibre), ex Biorich/setara 1.00 Lot Rp 17,760,600.00 Rp 17,760,600.00 Ex grundfos 1.00 unit 47,361,600.00 - Panel Box 1.00 pcs 4.00 pcs - MCCB 3P (50A) 36 KA 2.00 pcs 2.00 pcs - MCB 3P 6 KA 16A 4.00 pcs 6.00 pcs - Contactor 6.00 pcs 1.00 lot - Thermal Overload Relay 1.00 lot - Push Button NO/NC Rp - Pilots LED 220VAC - Fuse - Busbar - Material for Assembling TOTAL BIAYA ELEKTRIKAL PANEL R INSTALASI LIGHTNING PROTECTION 1 Lightning Protection ( R = < 2 Ohm ) 1.00 Unit Rp 7,400,250.00 Rp 7,400,250.00 1.00 Unit Rp 3,700,125.00 Rp 3,700,125.00 2 Lightning Pole 6.00 Btg Rp 5,772,195.00 3.00 pcs Rp 962,032.50 Rp 3 Copper Grounding rod 5/8\" L=3 m 25.00 Mtr Rp 14,800.50 Rp 44,401.50 15.00 Pcs Rp 2,590,087.50 4 Jointing ring copper rod 5/8\" 1.00 Unit Rp 103,603.50 Rp 1.00 Titik Rp 37,001.25 Rp 555,018.75 5 Cable BC 70 mm² 1.00 Lot Rp 962,032.50 1.00 Lot Rp 962,032.50 Rp 1,480,050.00 6 PVC conduit dia 25 mm 1,480,050.00 Rp 525,602.76 1,051,205.51 7 Grounding box Case Iron 525,602.76 Rp 24,080,968.52 1,051,205.51 Rp 8 Drilling Cost Rp 9 Accessories 10 Material Support TOTAL BIAYA INSTALASI LIGHTNING PROTECTION S INSTALASI POMPA MASJID 1 Water Tank 1.00 Lot Rp 48,070,000.00 Rp 48,070,000.00 2.00 Unit Rp 18,975,000.00 Rp 37,950,000.00 2 Pompa Distribusi - Capacity : 10-13 m3/h - Head : 28 m - Power : 1,5 Kw, 380 V 3 Foot klep : Dia. 2.5\" ex kitz/onda 1.00 Unit Rp 2,072,070.00 Rp 2,072,070.00 : Dia. 2,5\" x 6 m - ex Galvanis 1.00 Pcs Rp 1,998,067.50 Rp 1,998,067.50 4 Pipa GLV medium : Dia. 2.5\" - ex Galvanis 3.00 Pcs Rp : Dia. 2.5\" ex kitz/onda 1.00 Pcs Rp 192,406.50 Rp 577,219.50 5 Elbow drat GLV : Dia. 2\" ex kitz/onda 4.00 Pcs Rp 2,220,075.00 Rp 2,220,075.00 : Dia. 2\" ex kitz/onda 2.00 Pcs Rp 3,848,130.00 6 Gate valve : Dia. 2\" ex kitz/onda 2.00 Pcs Rp 962,032.50 Rp 2,220,075.00 : Dia. 2\" ex Tozen 4.00 Pcs Rp 1,110,037.50 Rp 1,835,262.00 7 Gate valve : Dia. 4\"-1/2\" , 10 Bar ex Wika 1.00 Pcs Rp 2,664,090.00 : 0,5 - 8 Bar , ex fanal 1.00 Pcs Rp 917,631.00 Rp 1,332,045.00 8 Check valve : Dia. 2\" 2.00 Pcs Rp 666,022.50 Rp 1,850,062.50 : Dia. 4\" 1.00 Lot Rp 1,332,045.00 Rp 9 Strainer : Dia. 2,5\" ex kitz/onda 4.00 Pcs Rp 1,850,062.50 Rp 444,015.00 1.00 Lot Rp 222,007.50 Rp 2,960,100.00 10 Flexible Joint 1.00 Lot Rp 2,960,100.00 Rp 8,880,300.00 2,220,075.00 Rp 1,201,060.58 11 Pressure Gauge 1,201,060.58 Rp 2,402,121.15 2,402,121.15 Rp 122,524,693.23 12 Pressure Switch Rp 13 Water mur 14 Pump Header GLV medium 15 Ball valve 16 Accessories 17 Material Support TOTAL BIAYA INSTALASI POMPA MASJID pmdi.sch.id