Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore HBOOK - ARTE - rev0

HBOOK - ARTE - rev0

Published by marcus.angelo, 2016-01-15 10:53:33

Description: HBOOK - ARTE - rev0

Search

Read the Text Version

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

AS350B2 / H125 Hbook 2016 – rev0

Chapter Section ATA Title Task number Task Title MOD Climatic Condition Description MPN PN Maintenance Frequency Limit Ref Documentation H/H CONDIÇÃO ROTEIRO OBS Subject Mode Manual05-20-00 TIME 05/21/00/604/000/000 Check before the Note: Operations can be - Periodic BFF AMM 05-40-00, 6-9 0,5 X V LIMITS/MAINTENANCE first flight of the day carried out by a crew member. CHECKS (BFF) - Optional VC equipments TIME Turnaround check Note: Operations can be carried out by a crew05-20-00 LIMITS/MAINTENANCE 05/21/00/606/000/000 (TA) - Optional member. - Periodic TA AMM 05-40-00, 6-5 0,5 X V VC CHECKS equipments05-20-00 TIME Check after the last Note: Operations can be - Periodic ALF AMM 05-40-00, 6-10 0,5 X V LIMITS/MAINTENANCE 05/21/00/607/000/000 flight of the day carried out by a crew (ALF) - Optional member. CHECKS equipments VC05-20-00 TAIL ROTOR 64/10/00/000/000/070 Tail rotor blade (ALF) PRE MOD 075580 Visual check. - Periodic ALF AMM 05-40-00, 6-6 0,3 AMS V05-20-00 POWER PLANT PRE MOD 073453 VC05-20-01 Power plant air Visual check of the05-20-01 intake (ALF) 71/00/00/000/000/010 attachments. - Periodic ALF AMM 05-40-00, 6-6 0,3 AMS V05-20-0205-20-02 VC05-21-0005-21-00 Check for erosion. In the event of intensive operation in heavily sand-laden areas, all the necessary Sand-laden and/or measures should be ROTOR (S) 62/10/20/601/000/020 Main rotor blade dust-laden taken to ensure - Periodic 10FH AMM 62-11-00, 6-3 0,7 ATM V atmosphere optimum operation of the aircraft, if necessary, by shortening the suggested intervals. GVI Check for erosion. In the event of intensive operation in heavily sand-laden areas, all the necessary Sand-laden and/or measures should be AS350B2 / H125 TAIL ROTOR 64/10/00/000/000/220 Tail rotor blade dust-laden taken to ensure - Periodic 10FH AMM 64-10-00, 6-1 0,3 ATM V Hbook 2016 – rev0 atmosphere optimum operation of the aircraft, if necessary, by shortening the suggested intervals. GVI TIME Note: Operations can be LIMITS/MAINTENANCE 05/21/00/000/000/000 P-Check carried out by a crew - Periodic 10FH// AMM 05-40-00, 6-7 0,7 X V CHECKS 7D member. GVI TIME Note: Operations can be LIMITS/MAINTENANCE 05/21/00/000/000/010 P-check - Optional carried out by a crew - Periodic 10FH// AMM 05-40-00, 6-8 0,3 X V CHECKS equipments 7D member. GVI Freon air Visual inspection of the 150FH/ conditioning system /12M AIR CONDITIONING 21/51/20/000/000/025 system. - Periodic AMM 21-51-10, 6-1 1 OP V GVI ROTOR DRIVE (S) 63/10/00/000/000/060 Flexible coupling Visual check. - Periodic 150FH/ AMM 63-11-00, 6-18 1 X V

























05-25-00 EQUIPMENTS AND 25/69/10/401/000/000 Life-raft testing, cylinder 206994-0 - - Periodic 6M CMM 25-69-71 1,5 OP V FURNISHINGS05-25-00 weighing. 17149-1 704A41811012 - V EQUIPMENTS AND AS21-5-7 704A41811029 V05-25-00 FURNISHINGS DI|FT|WGH S1609-6 704A41811027 - V05-25-00 - V05-25-00 EQUIPMENTS AND Cylinders to be proof 330A87-1310- - - V05-25-00 FURNISHINGS 04 - V05-25-00 tested by the -05-25-00 EQUIPMENTS AND - V FURNISHINGS manufacturer or by an V05-25-00 - EQUIPMENTS AND approved workshop. V05-25-00 FURNISHINGS - V05-25-00 Intervals counted from -05-25-00 EQUIPMENTS AND - V05-25-00 FURNISHINGS 25/69/10/401/000/020 Cylinder the date of the last - Periodic 60M AMM 25-69-10, 4-1 2 OP V05-25-00 - V05-25-00 EQUIPMENTS AND proof test. -05-25-00 FURNISHINGS -05-25-00 Fitted to the -05-25-00 EQUIPMENTS AND -05-25-00 FURNISHINGS assemblies: MP/N -05-25-00 - FIRE PROTECTION 206994-0, 210155-X. FUEL SYSTEM NPT FUEL SYSTEM 25/80/00/000/000/007 Load release unit Inspection and test. Periodic 24M//5 AMM 25-92-00, 6-1 2 OP HYDRAULIC POWER hook 00SC 25-91-01, 5-1 1,5 OP GVI|RIG|FT HYDRAULIC POWER 25/81/00/000/000/060 Control mechanical Functional test. Periodic 7D AMM HYDRAULIC POWER release HYDRAULIC POWER FT LANDING GEAR Frame, 1400 kg cargo Check for elongation of swing 25/81/11/000/000/005 PRE MOD 072820 holes. Periodic 100FH AMM 25-91-01, 6-1 1,5 AMS PRE MOD 075601 // GVI POST MOD 075606 25/81/11/000/000/010 Load release unit PRE MOD 074239 Check and test. Periodic 24M//5 AMM 25-91-01, 6-1 2 OP hook 00SC GVI|RIG|FT 25/81/12/000/000/020 Onboard load Sand-laden and/or Clean and check. Periodic 1M CMM 25-50-99 1 OP release unit dust-laden CLN|GVI atmosphere OPH = Operating hours Onboard load logged with underslung 24M//3 release unit 50OPH 25/81/12/000/000/040 loads. Periodic AMM 25-91-01, 6-1 1 OP Check and test. GVI|RIG|FT Weigh the cylinders. - CMM 26-21-99 = MP/N P2H, MP/N H1. Cabin fire - CMM 26-22-99 = MP/N CMM 26-21-99 extinguisher Periodic 6M CMM 26-22-99 26/22/00/000/000/020 H1-code 0150101A, 26-24-04 0,5 OP CMM MP/N H1-0150101S. - CMM 26-24-04 = MP/N H1-10AIR, MP/N H1-10. WGH 28/00/00/502/000/010 Fuel tank Tropical and damp Fungus treatment. Periodic 3M MTC 20.08.06.401 1 OP Periodic 96M AMM 28-91-00, 4-1 2 OP atmosphere SVC Checking the electrical 28/92/00/000/000/000 Ferry fuel tank bonding. DI Drain and fill. 29/00/00/000/000/000 Hydraulic system Servicing of the stainer Periodic 3000FH AMM 29-00-00, 3-3 3 X //48M AMM 29-00-00, 3-6 and the filter. DRN Drain and fill. 29/00/00/000/000/010 Hydraulic system Salt-laden Servicing of the stainer Periodic 3000FH AMM 29-00-00, 3-3 3 OP //24M AMM 29-00-00, 3-6 atmosphere and the filter. DRN AS350B2 / H125 29/10/10/302/000/020 Accumulator - Yaw Check. Periodic 150FH/ AMM 29-00-00, 3-5 3 AMS Hbook 2016 – rev0 compensator /6M 11 AMS DI 29-10-00, 8-1 10 X 28 X Single hydraulic Replacement. 5000FH 32-11-00, 5-1 DS //72M 32-11-00, 6-2 29/10/10/404/000/000 generation system - Periodic AMM 32-11-00, 6-1 32-11-00, 6-3 Hose 32-11-00, 6-4 32/00/00/000/000/010 Landing gear shock Detailed check. Periodic 5400FH AMM absorber DI|FT Periodic 5400FH AMM AMM LANDING GEAR 32/13/00/601/000/010 Skid landing gear Detailed check. AMM DI|FT AMM LIGHTING SYSTEM 33/45/03/000/000/020 Searchlight SPECTROLAB SX16. Periodic 300FH AMM 33-45-03, 6-2 2 OP Check. LIGHTING SYSTEM 33/45/03/000/000/030 Searchlight CLN|DI Periodic 100FH AMM 33-45-03, 6-1 1 OP Periodic 1M AMM 35-00-00, 6-1 1,5 OP OXYGEN 35/30/01/000/000/020 Oxygen cylinder SPECTROLAB SX16. Check. GVI Installation check. DI|CLN Star SAFIRE II.




Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook