Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore Rama Rimawi Portfolio_organized

Rama Rimawi Portfolio_organized

Published by rama rimawi, 2020-08-13 19:31:10

Description: Rama Rimawi Portfolio_organized

Keywords: ma portfolio

Search

Read the Text Version

imageReadingPo r t f o l i oinspiration concedespignt landscape Design process Rama Rhimi Architecture2020 images



Architecture Portfolio NEAR 511 Department of Architecture Birzeit University 2020

Content

1 Residential Project 2017 Tourist 2 Hotel 2017 Archeology 3 Museum 3D SHOT FROM SOUTH 3D SHOT FROM EAST 2018 ELEVATION DETAIL 4 Vocational School Palestinian3D SHOT FROM WEST 2018 Archive 2019 3D SHOTS 5 Creative Hub 6 Reception & Caffe 2019 Healing 7 Park (Sport Area) 2020 Rehabilitation 8 Centre For Children In Sreet 2020

About Name Rama Rhimi Date of Birth 26-Aug-1997 Address Beit-Rima Ramallah Palestine EMail [email protected]

Education: 2014-2015 High School Certification (Tawjihi) D r.Q a sim Al- rimawi Secondar y Girls School 2015-2020 Birzeit University Architectural Engineering (Design Specification) Language: Arabic - Mother language English - Good Experience: 2019 Benaa Engineering Consulting Office Summer Traning Design Software Skills: Autocad Rhino V-Ray Lumion Indesign Illustrator

1 Residential Project Design 3 (Project 1) - 2017 (Ramallah) A project aimed to construct a residence Guest 1 Prives Area Guest 3 for three married brothers and their parents. Hall House The idea was to create a shared space House General 3 between them, mainly through a strong 1 Area movement component that links all parts Parents o f t h e proj e ct together. House Entrance House 2 Guest 2 In Elevation In Plan



Site Plan Ground floor

First floor Secand floor





2 Tourist Hotel Design 3 (Project 2) - 2017 (Al-tira) Building Sup Parts Entrance Atractive Point Garden Entrance Circulation Parking Sup Entrance Rooms Basment Garden Offfices Circulation Rooms Cafe Reciption Entrance Garden Ground Garden Circulation GYM Resturant Rooms Hall Garden First

Site Plan

Basment Floor Ground floor First floor

Room Detail Reception Detail Elevation Detail

North Elevation South Elevation East West Elevation Elevation

Section A-A Section B-B

3 Archeology Museum Design 4 - 2018 (Al-tira) Partner : Yara Mardi This project was established over an antique area. The most important method was to choose a construction system in the area above the monuments at specific points so that it does not negatively affect the monuments below the museum. As well as the corridors of movement over the monuments and between the blocks of the most important elements in the project.



-03.00 -02.00 -03.00 +01.00 +01.00 +- 00.00 -01.00 -02.00 +- 00.00 -.85 -02.00 +02.00 +01.00 -01.00 +04.90 +- 00.00 +- 00.00 +01.50 +04.00 slope +04.70 1% +04.70 slope slope 1% 1% slope 1% slope +1%20.00 +06.00 +20.00 +11.20 slope slope slope 1% 1% 1% +15.60 slope slope +15.60 1% 1% slope slope 1% 1% +11.20 +15.60 Site Plan A B C D EF G H I J K LM N O BQ R S T UV W X Y Z A1 B1 C1 D1 E1 F1 0.9023 0.2744 0.8835 0.9058 0.9058 3.7000 2.7239 3.7000 3.6966 3.7034 3.2448 3.5199 2.0697 1.8238 6.8122 2.5602 3.4000 3.7000 1.6947 1.6475 2.7216 1.3362 1.0120 2.2321 3.2500 3.7000 2.7000 2.7000 5.7000 0.2379 a 0.2415 1 2 2.5864 3 0.2372 0.1805 0.7314 4 2.7856 5 6 2.2185 7 8 4.5934 9 0.1433 10 0.7136 3.7331 11 4.3034 b12 4.3034 +06.70 b +06.70 13 +06.70 4.0032 14 15 4.0032 16 3.8121 Ground floor a

A B C D EF G H I J K LM N O BQ R STUV W X Y Z A1 B1 C1 D1 E1 F1 0.9023 0.2744 0.8835 0.9058 0.9058 3.7000 2.7239 3.7000 3.6966 3.7034 3.2448 3.5199 2.0697 1.8238 a6.8122 2.5602 3.4000 3.7000 1.6947 1.6475 2.7216 1.3362 1.0120 2.2321 3.2500 3.7000 2.7000 2.7000 5.7000 0.2379 0.2415 1 +11.30 2 2.5864 3 0.2372 0.1805 0.7314 4 2.7856 5 6 2.2185 7 8 4.5934 +11.30 9 0.1433 10 0.7136 3.7331 11 4.3034 b12 4.3034 +11.30 b 13 +11.30 +11.30 +11.30 14 4.0032 +11.30 15 4.0032 +11.30 16 3.8121 a First floor A B C D EF G H I J K LM N O BQ R ST UV W X Y Z A1 B1 C1 D1 E1 F1 0.9023 0.2744 0.8835 0.9058 0.9058 3.7000 2.7239 3.7000 3.6966 3.7034 3.2448 3.5199 2.0697 1.8238 6.8122 2.5602 3.4000 3.7000 1.6947 1.6475 2.7216 1.3362 1.0120 2.2321 3.2500 3.7000 2.7000 2.7000 5.7000 0.2379 0.2415 a 1 2 2.5864 3 0.2372 0.1805 0.7314 4 2.7856 5 6 2.2185 7 8 4.5934 +11.30 9 0.1433 10 0.7136 3.7331 11 4.3034 b b12 4.3034 13 4.0032 +15.90 +15.90 4.0032 14 3.8121 +15.90 15 16 +15.90 +11.30 +15.90 Secand floor a

North Elevation South Elevation East Elevation

West Elevation Section A-A Section B-B

4 Vocational School Design 5 - 2018 (Beitunia) Partner : TKEaCsHaNmICOAtLhCmOaLnLEGE DESIGN BEITUNIA INDUSTRIAL AREA HIGH TECHNOLOGY COLLEGE HHTT The industrial school included majors required in the area. It is Hi Tech so we tried to reflect the nature of disciplines on design

3D SHOT FORTHE WHOLE PROJEYT 3D SECTIONAL MODEL

Site Plan 3D SHOT FROM EAST ELEVATION DETAIL

4 1 4 -25.00 -25.00 -25.00 -25.00 -25.00 -25.00 1 -27.50 -25.00 -30.00 -30.00 -32.50 -35.00 -35.00 Ground floor -35.00 1 vertical circulation element 2 horizontal circulation or lobby 3 lab 4 inbetween space 5 private rooms 6 survices and WC 3D SHOT FROM SOUTH -20.00 -20.00 -20 -25.00 -20.00 -20.00 -20.00 -20.00 -25.00 -25.00 -25.00 -27.50 -25.00 -30.00 -30.00 -32.50 -35.00 -35.00 -35.00 First 1 vertical circulation element 2 horizontal circulation or lobby 3 lab 4 inbetween space 5 private rooms 6 survices and WC floor 3D SHOT FROM WEST

-15.00 -15.00 4 4 -15.00 -15.00 -15.00 -15.00 -15.00 -15.00 -15.00 -17.5.00 -17.5.00 -20.00 -15.00 -20.00 -25.00 -20.00 -25.00 -25.00 -15.00 -27.50 -25.00 -30.00 -30.00 -32.50 -35.00 1 vertical circulation element -35.00 2 horizontal circulation or lobby -35.00 3 lab Secand 4 inbetween space 5 private rooms 6 survices and WC floor 1 -10.00 1 -10.00 lobby 1 -10.00 -10.00 -10.00 -10.00 -15.00 3 5 -15.00 -10.00 -15.00 -15.00 4 12 6 -10.00 -17.5.00 2 -10.00 -17.5.00 -25.00 -20.00 -10.00 1 -10.00 -20.00 1 vertical circulation element 2 horizontal circulation or lobby 3 lab 4 inbetween space 5 private rooms 6 survices and WC Third floor

-5.00 -5.00 -5.00 -5.00 -5.00 -10.00 -5.00 -5.00 -10.00 -20.00 -25 Fourth floor 1 vertical circulation element 2 horizontal circulation or lobby 3 lab 4 inbetween space 5 private rooms 6 survices and WC 00.00 00.00 00.00 -5.00 00.00 00.00 storage 0.00 0.00 -10.00 -10.00 -5.00 -5.00 1 vertical circulation element 2 horizontal circulation or lobby 3 lab 4 inbetween space 5 private rooms 6 survices and WC Fifth floor

North Elevation South Elevation East Elevation

West Elevation SECTIONS SCALE 1:200 SECTIONS SCALE 1:200 SECTION A-A SCALE 1:200 Section A-A SECTION A-A SCALE 1:200 SECTION B-B SCALE 1:200 SECTION B-B SCALE 1:200 Section B-B

5 Palestinian Archive Design 6 - 2019 (Bayt Hanini) Partner : Kasam Othman The Palestinian Archives (King Hussein Palace and its surroundings) represent Palestinian identity and history. In our project, the design aims to give the visitor an experience during his movement in the spaces of movement through the display of exhibits. architectural form development EXPERIENCE STORIES AND EMOTIONS HELP SAVE MEMORIES WE CHOOSE THIS WAY TO BE THE TOOL EXPERIENCE EXPERIENCE GALLARY IS THE BEST WAY TO JOIN THE INTERTAINMENT . APPROACH TO THE SITE

3D SHOTS

SITE PLAN SCALE 1:500 courtyard 00.00 - 5.00 4.00 00.00 4.00 +10.00 00.00 00.00 - 5.00 - 5.00 - 5.00 - 5.00 - 6.00 3D SHO - 7.00 -8.00 - 9.00 - 10.00 - 11.00 - 12.00 NORTH ELEVATION - 13.00 SCALE 1:500 -15.0 - 14.00 Site Plan grond f loor courtyard scale 1:200 - 5.00 WESR ELEVATION SCALE 1:500 - 5.00 +- 0.00 - 5.00 +- 0.00 +- 0.00 SOUTH ELEVATION gift shop SCALE 1:500 - 5.00 - 5.00 - 5.00 Ground floor NORTH ELEVATION

f irst f loor scale 1:200 4.00 4.00 00.00 00.00 00.00 - 5.00 - 5.00 - 5.00 TS First floor -8.0 Secand floor

f irst under ground f loor courtyard gallary scale 1:200 -8.00 - 5.00 workshops education survices gallary INTERNET INTERNET - 5.00 - 5.00 - 5.00 - 5.00 - 5.00 - 5.00 - 5.00 gallary - 7.00 - 6.00 - 5.00 - 5.00 First Undergrond floor second under ground f loor scale 1:200 -8.0 Secand Underground floor

NorthNORTH ELEVATION Elevation SCALE 1:500 WestWESR ELEVATION Elevation SCALE 1:500 SouthSOUTH ELEVATION Elevation SCALE 1:500 NORTH ELEVATION East ElevationSCALE1:500 the ring elevation NORTH ELEVATION detail SCALE 1:100

The Ring Elevation the ring elevation NORTH ELEVATION archeive elevation dNetaoil rth Elevation Detail SCALE 1:100 Archive ElevationSCALE1:100 section a-a scale 1:200 Section A-A section b-b scale 1:200 Section B-B

N N N N

6 Creative Hub (Reception & Caffe) Interior Design - 2019 INDUSTRIAL MOOD There’s a sense of unfinished rawness in many of the elements, and it’s not uncommon to see exposed brick, ductwork and wood. High ceilings, old timber and dangling metal light fixtures with sparse functional furniture. Colour scheme derived from the primary materials of wood and metals. material &theme The color tone synchronizes with white-gray color from cement blended with wood color and black color from steel frames. Plain and rough cement background brings Lavender plants: Spider plant: the unexplainable brightness and highlights Peace lily: interior furniture. Potts: vegetation Interior design includes a wide range of styles, but all styles make use of the interior greenery. Countless research has found that plants make us happier, more productive and healthier. Snake plant: Plants add life: greenery adds life to space.Plants add colors without competing with other colors: the color scheme you use does not matter, and the plants will always work although generally green, they do not conflict with other colors.

+4.00 Ceiling Detail +0.00 Concreat slab 1.30 Metal skeleton for timber hold -1.00 0.70 +7.00 +0.00 1.20 +3.00 A space where the extensions and ventilation extensions are made in 0.70 Timber to cover 2.5 Second Floor +0.00 +4.00 Ground floor First Floor +0.00 1.30 1 -1.00 0.70 6.00 m +0.00 1.20 1 0.70 2.5 +0.00 +0.00 kitchen lighting plan Wating area 1.30 Cafe Light was used whose power is proportional to its purpose, 0.70 Reception and at the same time it does not distract the person in the vacuum. 4 4 212.00 m -1.00 +0.00 1.20 0.70 +0.00 1.30 3 2.5 -1.00 0.70 2+0.00 +0.00 1.20 Seating area: LED light Reception & kitchen: small for better comfort and visibility. white light. 0.70 4000k 3200k 2.5 +0.00 3 Ground Floor Plan Ventilation system Exhaust Opening Electric Generator: Section A-A Speed of the airflow,inside of shaft,grow fasteras the flow runs towords the top of the building.Insted of air pressure reducerfor cutting downexcessive pressure of the higher stories,sogeneratorsreduse pressure and generate energy. Ventilation Damper 1. Cladding panels 2. Ventilation space 3. Facade insulation 4. Aluminium brackets and rails, supporting structure 5. Structural wall

Metal: 1 Details a long-term application that bears long-term transport and use. The external elevation 2 The enternal elevation 1 23 34 Fabric: It is used for chairs because it is more comfortable for prolonged use. The type used is easy to clean and lasts 4 a long time. Staire details Solid wood : Solid hardwood flooring is all wood and comes 5/8 to 3/4 inches thick. Because it’s solid wood, it can be sanded and refinished many times.



7 Healing Park (Sport Area) Advanced Design - 2020 (Qalandya) Partner : Kasam Othman








Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook