CURRENT PROJECTS↑ View north-west from the receptioncourtyard towards the main entrance of theproposed Physical Education Centre.                                                            49
DESIGN ENGINE ARCHITECTS \ SCHOOLS↑ View south across Kingsgate Park towards  Norman Road                                             Support Services (SSB)                                         St. Cross Roadthe proposed Physical Education Centre.                                                                                                                                       Antrim House→ Southern Campus masterplan diagram.                     Kingsgate Road              Sports Hall                              Swimming Pool                                            Sports Pavilion                                                                      Residential                   Physical Education Centre50                                                                    Science School                              (PEC)                       Kingsgate Park                                                                                                                 Fitness                                                                                      DT extension                                                                                                    ‘Mill’ (refurbished)                                                                                                                         Sanatorium
1  CURRENT PROJECTS                                                                                    51                                                        21↗ View from the spectator zone across thepool towards Kingsgate Park2↗ View from the PEC entrance acrossreception towards the swimming pool, themain reception is on your right with viewsdown into the sports halls on the left.3→ Model shot showing an overview of theproject.                                                        3
DESIGN ENGINE ARCHITECTS \ SCHOOLSDESIGN,TECHNOLOGY& ENGINEERINGCENTRESTOWE SCHOOL, BUCKINGHAMA series of 4 workshops and design studiossupported by central circulation, gallery spine.The aim of the new Design, Technology           The workshops are supported to oneand Engineering Centre is to provide            side by storage spaces and niches foracademic and vocational training for            equipment requiring exhaust andpupils who will contribute significantly to      extraction and serviced via a prep roomthe UK’s drive for creativity and expertise     and stores situated at the end of building.in manufacturing, Product Design and            The gallery circulation spine allows theArchitecture.                                   workshops and studios to be built inFollowing an invited competition that           phases finally connected together wheninvolved a review of two potential sites        this space is enclosed by its roof.within the school estate, we were asked         As a device to filter and diffuse roof lightto progress with proposals to replace the       from above, a continuous cross laminatedexisting facilities in their current location.  timber coffered roof shell spans across allThis required a phased approach that            the spaces.would allow the continued operation of          A colonnaded veil finished in ceramicthe faculty during the build.                   cladding continues around the parklandWe were keen to fuse the processes of           facing elevations. This results in a layeringdesigning and making ensuring that              and rhythm to the elevations designed todesign studios had a close and visible          have empathy with the historic buildingsrelationship to the workshops. A simple         on the Stowe estate.plan arrangement places a series of             The roof is accessible as an exhibition4 workshops to one side of a central            space, commanding spectacular viewcirculation and gallery spine, and design       across the famous estate.studios to the other separated by glasspartitions.                                                → Workshops and design studios supported                                                by central circulation, gallery spine.52
CURRENT PROJECTS                        53
DESIGN ENGINE ARCHITECTS \ SCHOOLS                                                                                                                                                               ↑ Visualisation of the south approach.                                                                                                                                                               1↗ Visualisation of the north entrance                                                                                                                                                               approach.                                                                                                                                                               2↗ Visualisation of the roof terrace with                                                                                                                                                               exhibition space.                                                                                                                                                               3→ Workshops and design studios                                                                                                                                                               supported by central circulation, gallery                                                                                                                                                               spine.54
1  CURRENT PROJECTS                                     2                          553
DESIGN ENGINE ARCHITECTS \ SCHOOLSLA MARE DECARTERET SCHOOLGUERNSEYA replacement of the existing La Mare de CarteretHigh School and Primary School in Guernsey’sCastel parish.56
CURRENT PROJECTS                                                  Having successfully delivered the award-                                                  winning Les Beaucamps High School in                                                  2013, Design Engine fought off strong                                                  local and international competition to                                                  win a new commission from the States of                                                  Guernsey Education Department (now                                                  the Committee for Education Sport &                                                  Culture): the replacement of the existing                                                  La Mare de Carteret High School and                                                  Primary School in Guernsey’s Castel                                                  parish.                                                  The new development on the La Mare                                                  de Carteret site will provide a total gross                                                  building area of 13,478 m² comprising:                                                  • Replacement High School facilities for                                                    either 600 or 960 11-16 age pupils.                                                  • Replacement two-form entry Primary                                                    School facilities for up to 420 pupils                                                    aged 4-11.                                                  • Replacement co-provisioned Pre-school                                                    accommodation for 32 children aged 3-4.                                                  • County/national competition level                                                    indoor sports facilities within the                                                    schools’ new sports facilities.                                                  • Relocated Communication and Autism                                                    Support Service facilities within the two                                                    schools.                                                  • Community facilities for families and the                                                    wider community within the schools and                                                    sports buildings.↑Visualisation of the entrance approach           2021from the car park with access to the mainschool from a bridge over the lake.               COMPLETIONOUR ROLE: Architecture | Interiors | Landscaping  54.5MCLIENT: States Education DepartmentPROJECT MANAGER : Jones Lang LaSalle              CONTRACT VALUECOST CONSULTANT : Gardiner & TheobaldSTRUCTURAL ENGINEER: Buro Happold                 13470M²SERVICES ENGINEER: Buro HappoldMAIN CONTRACTOR: TBC                              AREABUILDING CONTROL: States of GuernseyACOUSTIC CONSULTANT: Hoare LeaLANDSCAPE CONSULTANT: Coe DesignFIRE CONSULTANT: Buro Happold                                                                  57
DESIGN ENGINE ARCHITECTS \ SCHOOLS                                                                                                                                                               ↑ Campus plan of high school, primary                                                                                                                                                               school and community sports centre.                                                                                                                                                               ← Sketch of internal courtyard.58
CURRENT PROJECTS↑ Sketch of high school from playing fields.  Following the Les Beaucamps High School↓ Pattern diagram detailing the overall       precedent the practice has adoptedconcept of the scheme.                        courtyard plan forms for both primary                                              and secondary schools, in order to create↑ Works in pattern and relief precedent       external rooms within and betweenimages - Ben Nicholson and Paul Klee          buildings, creating contrasts between                                              extrovert and active spaces and those that                                              are more introvert and tranquil, allowing                                              more private spaces to be discovered.                                              Materials for the project have been                                              selected to have a tonal match with                                              the coastal context around La Mare De                                              Carteret: brickwork with variation in                                              blend to ensure a high level of visual                                              texture, bronze cladding which echoes the                                              coastal granites to the west of the site and                                              facades including wall surfaces of coloured                                              ceramics taking their cue from the colours                                              of Guernsey fishing boats.                                              The project received planning consent in                                              November 2016.                                                                                                                          59
DESIGN ENGINE ARCHITECTS \ SCHOOLS60
COMPLETED PROJECTS   Their approach is endlessly   patient, responsive and   supportive. They fully engage   with their client team,   teasing out the multiple   and sometimes conflicting   aspirations. On top of this   they are great fun to work   with: good humoured,   unpretentious and very   likeable.              — Derek Neale, Director of Education, States of Guernsey61 61
DESIGN ENGINE ARCHITECTS \ SCHOOLS                                                                                                                           Design Engine Architects Limited                                                                                                                                       The Studios, Coker Close                                                                                                                                          Winchester, SO22 5FF                                                                                                                                              +44(0)1962 890111                                                                                                                                      [email protected]                                                                                                                                      www.designengine.co.uk                                                                                                                               Winchester \ London \ Exeter62
                                
                                
                                Search
                            
                             
                    