SPA ATLANTIS PETER DUARTE - LEVI BERGSMA - JUN LI XIANG
SITE PLAN DEVELOPMENT
MATRIXOBC DIAGRAM BUILDING OCCUPANCY
DEMOLITION + FRAMING PLAN SECOND FLOORLegend: Legend:FRR + Travel Distance Typical Demolition +Framing Plan 1 HR FRR BUILDING OCCUPANCY 1 HR FRR OTB Glazing 2 HR FRR Comm. Kitchen 2 HR FRR Property Line Travel Distance
DEMOLITION + FRAMING PLANS
CONSTRUCTION ASSEMBLIES
2
GROUND FLOOR LIFE SAFETY PLAN SECOND FLOOR LIFE SAFETY PLANTHIRD FLOOR LIFE SAFETY PLAN FOURTH FLOOR LIFE SAFETY PLAN BUILDING OCCUPANCYLegend: Legend:FRR + Travel Distance Typical Demolition +Framing Plan 1 HR FRR 1 HR FRR OTB Glazing 2 HR FRR Comm. Kitchen 2 HR FRR Property Line Travel Distance
FIFTH FLOOR LIFE SAFETY PLAN BASEMENT LIFE SAFETY PLANROOF TOP LIFE SAFETY PLAN FOURTH FLOOR LIFE SAFETY PLAN BUILDING OCCUPANCYLegend: Legend:FRR + Travel Distance Typical Demolition +Framing Plan 1 HR FRR 1 HR FRR OTB Glazing 2 HR FRR Comm. Kitchen 2 HR FRR Property Line Travel Distance
SPA AtlantisFRONT ELEVATION
LEFT-SIDE ELEVATION
RIGHT-SIDE ELEVATION
AB DC E F
SECTION DETAILS
SPA POOL
MASSAGE ROOM
Search
Read the Text Version
- 1 - 30
Pages: