Asiatan Payments Report After Water Filter System Before Note: Unfiltered water carries seeds of weeds. Note: Expectation, reduce a lot seeds of weeds. By STEPS Consultoria
Asiatan Payments Report After Seedbeds Infraestructure Before Note: Bad infrastructure situation, with risks and Note: Revamp Infrastructure and more security. low productivity By STEPS Consultoria
Asiatan Payments Report After Rustification Yard Expansion Before Note: To meet increased demand for production space. Note: New Yard with great drainage and stockage capacity of 20.000 seedlings By STEPS Consultoria
Asiatan Payments Report After Water Drain Infrastructure Before Note: Bad drained yard with Risk in the operation Note: New Rustification Yard with great drainage. By STEPS Consultoria
Asiatan Payments Report After Chemical Products Store House Before Note: The Chemical Products Store House needed the painting. Note: The Chemical Products House was properly painted. By STEPS Consultoria
Asiatan Payments Report After Seed Treatment Shed Before Note: The Seed Treatment area with insufficient Note: The Seed Treatment area expanded with a working space. new shed. By STEPS Consultoria
Asiatan Payments Report After Water Sprinklers maintenance Before Note: The water sprinklers are essential in the nursery Note: About 100 (above 60%) water sprinklers have been and needed repair or replacement. repaired or replaced. By STEPS Consultoria
Asiatan Payments Report After Automated Irrigation and Fertilization Before Note: Fertilization was done entirely manually Note: The Irrigation and Fertilization Process with low productivity (at least 8 people). was automated with high level to productivity (only 1 person needed). By STEPS Consultoria
Asiatan Payments Report After Shading Nursery Safe Way Before Note: Unsafe condition during transit inside the Note: Eliminated Unsafe condition, facilitating shading nursery. the movement of people. By STEPS Consultoria
Asiatan Payments Report *In Progress Increase of Water Storage Tanks After Before Note: Low water storage with small water Note: Installation of 4 new Tanks to increase the capacity autonomy (max. 1,5 days). for Water Storage with 40%. By STEPS Consultoria
Asiatan Payments Report SAAE Water Pump House – New Infrastructure *In Progress Before After Note: Bad infrastructure situation with risks of the Water unplanned Stoppage operation. Control Panel Note: The external Water Pump House will be automated and increase capacity storage of 10m3 to 40m3. By STEPS Consultoria