Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore Architecture Portfolio

Architecture Portfolio

Published by manghaniparag, 2017-02-14 06:59:07

Description: Portfolio of 5 years of architecture academic work.

Keywords: architecture,portfolio,student work,design

Search

Read the Text Version

ARCHITECTURE PORTFOLIO

PRESENTAs an Architect you design for thePASTwith an awarness of theFUTfoUr a REwhich is essentiallyUNKNOWN -NORMAN FOSTER

REJUVENATION OF MIND, BODY AND SOUL 1 11 LAVASA, MAHARASHTRA, INDIA 17 THESIS PROJECT 19 HOUSING REDEVELOPMENT 24 ABHYUDAYA NAGAR, MUMBAI 28 FOURTH YEAR PROJECT 31 CONVENTION CENTRE 36 38 PARSIK HILL, KHARGHAR, MUMBAI FOURTH YEAR PROJECT SUB DISTRICT HOSPITAL DAHANU THIRD YEAR PROJECT VOCATIONAL CENTRE KHARGHAR, NAVI MUMBAI THIRD YEAR PROJECT RESORT MASOORIE SECOND YEAR PROJECT GUEST HOUSE, GAZEBO, YOGA HALL MUMBAI FIRST YEAR PROJECT ORCHID HOTEL LANE BEAUTIFICATIONPHOTOGRAPHY, SKETCHES, B. TECH. DRAFTED SHEETS

1 REJUVENATION OF

SITE PLAN AT ROOF LEVEL 2

3 SITE PLAN AT GROUND LEVEL

CONCEPT AND ZONING 4 THE SITE IS ZONED ON THE BASIS OF ITS CONTOUR SLOPES, THE FUNCTIONS AND THE CIRCULATION OF THE ACTIVITIES. THE BUILDING TYPES ARE DIVIDED AS PER THREE MAIN ZONES; ONE, THE ZONE ADJACENT TO THE 3M WIDE BAMBOO GROOVE ROAD (THE ONLY ROAD ACCESS TO THE SITE). TWO, THE CENTRAL ZONE IS THE FOCUS POINT WHICH ARE THE MEDITATION HALLS. THREE, THE EAST ZONE IS THE RESIDENTIAL ZONE FOR THE VISITORS AND THE USERS.THE SITE IS ABUTTING A SECONDARY LAKE, SO THE BUILDING STRUCTURES ARE ALIGNED SYMMETRICALLY TO THE CENTRAL AXIS WHICH IS DIRECTED TO LAKE. ALSO TO THE NORTH BOUNDARY IS AN ENVELOP OF MOUNTAIN RANGES HENCE ACHIEVING A SCENIC VIEW ALLAROUND.THE DESIGN IS ADAPTED ON THE CONCEPT OF CHAKRAS. THE CHAKRAS ARE THE ENERGYFORCES IN THE HUMAN BODY WHICH CONNECTS US WITH THE UNIVERSE AND THE FORCESAROUND US. THE MOTIVE OF THE CENTER IS TO ENHANCE AND ACHIEVE THESE FORCES .THE MEDITATION HALL IS THUS LOCATED ON THE CENTRAL FOCUS AND DESIGNED IN THE BASICGEOMETRICAL SHAPES OF THE CHAKRA, i.e. THE CIRCLES, TRIANGLES, HEXAGONES AND THECOMBINATION OF THE ABOVE.THE MAIN BLOCK IS DESIGNED IN A WAY THAT IT ENCOMPASSES AROUND THE MEDITATION HALLSLEADING THE FOCUS TO IT.THUS IT TOGETHER FORMS AS THE “EYE” OF THE CHAKRAAND DOME BEING THE CORNEA. TREATMENT ZONE GREEN COVER MEDITATION HALLS WATER BODIES SINGLE OCCUPANCY TWIN OCCUPANCY SUITESBUILT FOOTPRINT OPEN SPACES CIRCULATION

5 MEDITATION HALL

6ADMIN - FACULTY BUILDING

SECTION - ELEVATION 7ELEVATION VIEW

8 SINGLE OCCUPANCIES TWIN OCCUPANCIESSUITES RESIDENTIAL

9 CASE STUDIES AND ANALYSIS

10LIVE MODELCONTOUR MODEL

11 HOUSING

SITE PLAN 12

13SALEABLE

14

LUXURY15 TERRACE PLAN PLAN @ 3,6,9.. PLAN @ 2,5,8.. PLAN @ 1,4,7.. STILT PLAN

REHAB 16

C17 ONVENTION CENTRE SITE PLAN FRONT ELEVATION

18 FRONT ELEVATIONVIEW

19 SUB-DISTRICT HOSPITAL

20SITE PLAN

21

GROUND FLOOR PLAN FIRST FLOOR PLAN 22PLANS

23

24

25 ROOF PLAN GROUND FLOOR PLAN SITE PLANS

26 ADMIN BUILDINGPLAN - TYPES WORKSHOPS DORMITORIES

27

RESORT 28

29

30 SITE SECTIONMAIN BLOCK AMENITIES ROOMS

31FIRST YEAR GAZEBO

32

33 ELEVATIONS SECTIONS YOGA HALL

34GUEST HOUSE

35

ORCHID HOTEL STREET reDESIGN 36 ISSUES • Pedestrian walkway absent. • Because the hotels park their cars along the road there is less space for the cabs to be parked. • Main traffic and crowd after Transit hotel. • Road narrows after Transit hotel. • Space provided for 10 cabs to be parked, but only 8 cabs can be parked presently. • Water logging upto half feet during monsoon. • 2 street lamps on the whole stretch. • condition of the road is very poor. • Entrance polluted with traffic and smoke. • Foul smell in dumping area/ garbage pick up area. CHANGE PEOPLE WANT THERE. • Sitting area for taxi drivers. • Footpath on one side. • Legal parking on side. • More lighting for safety puposes. • Waterline behind the cad parking area is open, which needs to b closed. • Public toilets for cab drivers.PLAN OF STREET TRAFFIC MAPPING

37PART3 PART4 PART5 PART2 DIFFERENT PART PLANS OF THE STREET SHOWING VARIOUS PROBLEM ZONES AND ISSUES PART 1

PILE FOUNDATION WAFFLE SLAB 38 KING POST CINEMA BALCONYBASEMENT- RETAINING WALL FLAT SLAB BUILDING CONSTRUCTION DRAFTED SHEET

39 FIRST YEAR GRAPHICS

40

41 PHOTOGRAPHY


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook