ACP-100 JIRA ADMINISTRATION  Add it to the workflow scheme for the project.  Add a condition to the Create transition to prevent people from leaving Area blank on creation. Answer: C Question: 99 You are tidying up a JIRA project and find that the following two issue types are being used.  Task  Assignment They seem very similar and you would like to remove one issue type from the project if it is not needed. This means you would need to convert all existing Assignment issues in the project into Task issues. Which project configurations would you check to see if it is necessary to keep the two as separate issue types? (Choose three.) A. Field Configurations B. Permissions C. Field Contexts D. Workflows E. Issue Security Levels Answers: A, C, E Question: 100 One of your users leaves the organization. You want to deactivate the user's account for security reasons. The user created a number of filters that are shared and used on some dashboards. What should you do with the user's old filters? A. Delete the filters so that JIRA makes copies to keep the dashboards working. B. Identify a user using the filter on a dashboard and change ownership to that user. C. Move the filters to team ownership. D. Do nothing because deactivating the account transfers filter ownership to the JIRA Administrator. Answer: B DUMPSBOOK.COM 50

ACP-100 JIRA ADMINISTRATION Question: 101 Your company has been successfully using JIRA for a few years, but the ability to collaborate has been limited by a proprietary document repository and online document sharing. Identify the three advantages you would gain from an integration with Confluence. (Choose three.) A. using JOL to create filters that include Confluence information B. bidirectional linking between JIRA issues and Confluence documentation C. the ability to add JIRA Dashboard gadgets to Confluence pages to allow dialogue around the information D. Creating JIRA issues automatically from selected Confluence text E. single sign-on (SSO) via the Confluence Internal Directory F. using your existing JIRA project roles in Confluence Spaces Answers: B, C, D Question: 102 Your company is expanding into other Countries. One of your international users complains that a project key is a rude word in one of the local languages. You explain the problem to your existing users, so they are expecting to see changes. What change do you make? A. Create a localized translation for the project key. B. Create a new project and key, move the issues, and remove the old project. C. Edit the project, changing the project key to something inoffensive. D. Change the project name so that the default key is regenerated. Answers: C Question: 103 The Release Manager is having problems caused by inconsistent naming of versions across projects. He would like to use a more consistent naming convention. The developers do not know the naming convention and are happy to let the Release Manager rename versions when they get the names Wrong. The projects all use the Default Permission Scheme. DUMPSBOOK.COM 51

ACP-100 JIRA ADMINISTRATION Which action would allow the Release Manager to update the versions in the projects? A. Change the Manage Versions permission in the permission scheme. B. Add the Release Manager to the Administrators project role. C. Change the Workflow to allow the Release Manager to update versions. D. Add the Release Manager to the developer role. Answers: B Question: 104 The project manager asks for your help tracking the progress of work via epics across the company's various projects. Which course of action should you take? A. Add the Two-Dimensional Filter Statistics gadget filtered on epics with Project as the x- axis and Status as the y-axis. B. Add a condition on the Create transition that assigns all epics to the project manager. C. Create a new project and Bulk Change > Move All Epics. D. Add the Issues in Progress gadget to a dashboard with a Global Filter for all epics. Answers: A Question: 105 Your organization has a JIRA project for managing work on a software development project. As the team has grown, two groups have formed within it, working on different tasks. To help bring more focus to the Work being conducted, the team has requested a second) IRA project to split the team's Work into two. Which set of schemes can likely be shared between the two projects? A. Resolution and Notification B. Workflow and Custom Field C. Custom Field and Issue Security D. Issue Type and Sub-task E. Notification and Workflow Answers: C DUMPSBOOK.COM 52

ACP-100 JIRA ADMINISTRATION Question: 106 One of your teams is maintaining and updating an application that has grown into several distinct modules. The modules are on different release cycles. The team is struggling to track the versions of the modules, because they have similar numbering Schemes. Which action would you recommend? A. Split the project into several projects, one for each module. B. Split the modules into separate Components. C. Create a new Version field for each module. D. Define an issue type for each module. Answers: B Question: 107 Bob wants to create a JQL filter to display issues that meet the following criteria:  Issues that are a rolling list of all tasks that have been resolved in the past nine days  Issues that are unresolved  Issues he has permission to view Which JQL query will provide Bob that list? A. Updated <= 9d AND resolution = unresolved OR resolution = Unresolved ORDER BY updated B. Updated >= -9d AND resolution = unresolved OR resolution = Unresolved ORDER BY updated C. Updated >= -9d AND resolution = unresolved and resolution = Unresolved ORDER BY updated D. Updated <= 9d AND resolution = unresolved OR resolution = Unresolved ORDER BY updated E. Updated <= 9d AND resolution = unresolved or resolution = Unresolved ORDER BY updated Answers: B DUMPSBOOK.COM 53

ACP-100 JIRA ADMINISTRATION Question: 108 Several of your users complain that they are receiving emails about issues they have no interest in that are not even in their projects. What is the most likely cause of this problem? A. Someone has subscribed a group to a shared filter. B. They have accidentally watched the issues listed. C. A Workflow has been configured to send too many emails to groups D. A project has been set up to subscribe its users to change notifications. Answers: A Question: 109 A product owner needs to modify a number of issues in his projects. He wants to use the Bulk Move feature to move issues from one project (Source) to another project (Target), but he has some questions about it. Which statement about this bulk operation will be true? A. Issue links to and from the moved issues will display the source project key until the target project is re-indexed. B. Although the issue key changes, issues can be found by their old and new keys. C. Users in the target project cannot use the moved issues unless they are users in the source project. D. If the issue type schemes in the projects are not the same, JIRA will offer to add the missing issue types to the target. E. If they make a mistake, they can undo the move for any issue that has not been updated since the move. Answer: B Question: 110 Which CSV import will Work as expected? A. IssueType, Summary, FixVersion, FixVersion, FixVersion, Component, Component bug, \"First issue\", v1, , , Component1, bug, \"Second issue\", v2, , , Component1, Component2 bug, \"Third issue\", v1, v2, v3, Component1, DUMPSBOOK.COM 54

ACP-100 JIRA ADMINISTRATION B. IssueType, Summary, FixVersion, FixVersion, FixVersion, Component, Component bug, \"First issue\", v1, , Component1, bug, \"Second issue\", v2, , , Component1, Component2 bug, \"Third issue\", v1, v2, v3, Component1, C. IssueType, Summary, FixVersion, FIXVersion, FiXVersion, Component, Component bug, \"First issue\", v1, , , Component 1, bug, \"Second issue\", v2, , , ‘ Component1, Component2 bug, \"Third issue\", v1, v2, v3, Component1, D. IssueType, Summary, FixVersion, FIXVersion, FiXVersion, Component, Component bug, \"First issue\", v1, , , Component1, , bug, \"Second issue\", v2, , , Component1, Component2, bug, \"Third issue\", v1, v2, V3, Component1, , Answer: A Question: 111 Dorothy, the support manager, asks you for help. Currently, the Due Date is always required on all issue types in her project. She would like to have Due Date required only when a Support issue is entering the Escalated status. View the Exhibit, which shows the Workflow used only by the Support issue type. DUMPSBOOK.COM 55

ACP-100 JIRA ADMINISTRATION You start by creating an Escalation Screen with the Due Date field. Which next steps will meet Dorothy's needs? A.  A use the Escalation screen on the Escalate and Not Fixed transitions and make screen required. • Add a Condition to the transitions that issue type equals Support.  Make Due Date optional for all issue types. B.  Use the Escalation Screen on the Escalate transition. • Add a Fields required validator to the transition and require Due Date.  Make Due Date required only for the Support issue type. C.  Create a Field Configuration for the Escalation transition and require Due Date. • Make Due Date required on the Support issue type.  Make Due Date optional on all other issue types. D.  Use the Escalation Screen on the Escalate and Not Fixed transitions. • Add a Fields required validator to both transitions and require Due Date.  Make Due Date optional for all issue types. Answer: D Question: 112 Your organization has a Program Management Office (PMO) that reviews work after the analysis and design phases, in order to evaluate an idea's business value. The PMO office will either accept or reject the design. • The PMO committee meets only as needed; members do not otherwise log into JIRA regularly. • You have been asked to ensure that the committee becomes aware of JIRA issues that are ready for their review. As your first step, you create a PMO group in JIRA, Which next step(s) will best meet this business requirement? A. Step 2: Create a custom event notification with the PMO group as a member in the scheme. DUMPSBOOK.COM 56

ACP-100 JIRA ADMINISTRATION Step 3: Change the event on the relevant transition in the Workflow to the custom event. B. Step 2: Add a post function to the relevant transition in the workflow to notify the PMO group. Step 3: Remove the PMO group from all other notifications in the notification scheme. C. Step 2: Add the PMO group to the Transition notification in the notification scheme. D. Step 2: Add the PMO group as Watchers to all issues. E. Step 2: Assign the issues to the PMO group, Answer: A Question: 113 You are the manager of a band called Charlie and the Atlassians. You would like to start using JIRA. You identified three types of Work that your band does; you would like to know if each type of Work should be a Standard Issue Type, Sub-task. Issue Type, Version, or Component. The types of Work are: Song • A Song will go through several phases such as jamming, recording, and mastering. • A Song may need to be associated with multiple Albums. Album, a collection of Songs • You must be able to indicate when an Album is released. • You must be able to easily merge two Albums together into a single collection of Songs. Video • A Video will need to indicate what stage of Work it is in (e.g. post-production). • You should be able to create a Video only in association with an existing Song. Which describes the JIRA feature you should you use for each work type? A.  Song: Sub-task. Issue Type • Album: Standard Issue Type  Video: Sub-task. Issue Type B.  Song: Standard Issue Type • Album: Version  Video: Sub-task. Issue Type DUMPSBOOK.COM 57

ACP-100 JIRA ADMINISTRATION C.  Song: Version • Album: Standard Issue Type  Video: Version D.  Song: Standard Issue Type • Album: Version  Video: Component E.  Song: Sub-task. Issue Type • Album: Standard Issue Type  Video: Version F.  Song: Sub-task. Issue Type • Album: Standard Issue Type  Video: Component Answer: B Question: 114 Your organization would like to convert its standalone JIRA instance to Data Center. After reading the documentation, you know that Data Center requires a particular network configuration. What should you recommend prior to the move to Data Center? A. Run a network stack trace to confirm the network configuration. B. Set up a test instance of Data Center to confirm the network configuration. C. Ping the current JIRA server from multiple subnets to make sure it can be reached. D. Confirm the company's network attached storage uses a storage type Compatible with Data Center. Answer: B Question: 115 Helga is the Training Coordinator for your company. She uses a JIRA project for classroom scheduling requests. Classrooms are set up as project components. Each time a classroom is requested, a caterer is automatically assigned to that room to provide beverages and snacks. DUMPSBOOK.COM 58

ACP-100 JIRA ADMINISTRATION The problem is that caterers are contractors and frequently change from week to week. Helga keeps bothering you to make sure new classroom requests are instantly assigned to the right caterer. How can you best resolve this issue? A. Automatically assign new requests to Helga so she can assign them to the right Caterer. B. Set up a personal filter subscription for Helga that runs every minute when room requests are created. C. Make Helga the project administrator. D. Make Helga a Jira-administrator so she can Create or deactivate users in the Jira- caterers group. E. Give Helga the Assignable User permission. F. Give Helga the schedule Issues permission. Answer: C Question: 116 Jan asked you to create a new select List custom field called Department for his project MCAS. You created the field in the morning. In the afternoon, Jan notes that his JIRA dashboard is not showing the field correctly. He asks you to help him troubleshoot. View the Exhibit to see Jan's entire dashboard:  The first gadget shows 26 issues in the project by Status.  The second gadget shows that there are three issues that have the new Department field set.  The last gadget shows \"No Data Available.\" The filter query for that gadget is \"project=MCAS and Department is empty.” DUMPSBOOK.COM 59

ACP-100 JIRA ADMINISTRATION Why does Jan's gadget say \"No Data Available\"? A. You created the field Department but did not re-index the MCAS project. B. The field context on the Department field was not set to allow empty values. C. Jan does not have the proper Browse permissions, D. The JQL query for the filter is not valid. E. There is issue security on the issues, F. The field is marked Optional in the Field Configuration. Answer: B Question: 117 A new team lead tells you that his developers close issues that aren't complete and should not be closed. 1. He wants to allow only the three QA analysts and himself to close issues. 2. All other transitions can remain available to all users. The project description is as follows: • The project uses the standard shared software development workflow and default roles and permissions. • There is an existing group for developer in the Developer's Project Role. • Only the team lead should be able to modify versions and components. • There is an existing group for QA analysts in the User's Project Role. The project's workflow is shown: DUMPSBOOK.COM 60

ACP-100 JIRA ADMINISTRATION Which two actions should you perform to address this request? A. Add a condition that specifies that the Administrators Project Role can execute the done transition. B. Add a condition that specifies that the Reviewers Project Role can execute the done transition. C. Create a Project Role for Reviewers. Create a group called reviewers that includes QA and the team lead and add it to a Project Role called Reviewers. D. Add the team lead to the Users Project Role. E. Create a group called reviewers that includes QA and the team lead, and add it to the Administrators Project Role. F. Add a condition that specifies that the Users Project Role can execute the done transition. Answer: B, C Question: 118 Your company has a single JIRA production instance that has been running well for a year. You want to set up a second non-production instance, but first you need to convince your manager to budget for the hardware. You decide to present your manager with a list of advantages. Which four abilities would be gained by adding a non-production JIRA instance? (Choose four.) A. Test API client access to JIRA from remote applications 61 B. Assess changes to Permissions and Security C. Evaluate the impact of changes to custom fields and project schemes D. Step through the upgrade process and discover potential problems DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION E. Export changes to custom fields and project schemes F. Practice the rollback of Bulk Changes Answer: A, B, C, D Question: 119 You are using the Upgrade Wizard to install the latest version of JIRA. Partway through the process, your upgrade hangs. Your window of time for the upgrade is rapidly closing, and you decide to rollback. Which two of the newly created directories/files will need to be deleted to complete the rollback? (Choose two.) A. JIRA Audit Log B. JIRA Home Directory C. JIRA Service Entries D. JIRA Installation Directory E. JIRA Import Directory F. JIRA Export Directory Answer: B, D Question: 120 You make a change to a field's searcher settings and JIRA recommends a re-index. You don't want to run a full reindex yet, so you schedule it for a more convenient time. Which of these problems is NOT related to the state of the index? A. You may get errors when running a JQL search using the field you changed. B. Searches using the field you changed may not return any results. C. You may get errors when running a simple search using the field you changed. D. Searches returning issues using the field you changed will display incorrectly in the issue navigator. Answer: A Question: 121 Users have begun reporting that they aren't receiving email notifications as usual. You know there have been no changes to notification schemes. Which series of steps should you take to troubleshoot this problem? DUMPSBOOK.COM 62

ACP-100 JIRA ADMINISTRATION A. Remove groups from the notification schemes and re-add them, enable the audit log, and resend the email in the queue. B. Check the Outgoing Mail settings, enable the Outgoing Mail debug log, and contact your email administrator. C. Restart JIRA, check the JIRA Knowledge Base for similar issues, and file a support ticket with Atlassian. D. Run the log scanner, post to Atlassian Community, and file a support ticket With Atlassian. Answer: B Question: 122 You are concerned that your atlassian-jira.log file is not recording enough information. If the level is currently set to warn on a particular package, which two options will provide additional data? (Choose two.) A. Warn -> Debug B. Warn -> Error C. Warn -> Info D. Warn -> Fatal Answer: A, C Question: 123 Which two statements regarding JIRA Cloud are true? (Choose two.) A. Cloud requires less administration than Server. B. Cloud can be integrated with other Atlassian Applications, whether Server or Cloud. C. Cloud offers the same macros and plugins as Server. D. Cloud has no limits on bandwidth, data storage, or attachment storage. E. Cloud allows you to use any user directory that Works with Server. Answer: A, B Question: 124 A project owner has a user who cannot move issues through the workflow in a project, because the workflow transition does not appear. Another user can progress issues. The profiles for both users show that they are in the same groups. DUMPSBOOK.COM 63

ACP-100 JIRA ADMINISTRATION What is causing the problem? A. The workflow validators do not allow that user to progress the issues. B. The user is not in a role that passes the workflow conditions in the project. C. The user is disabled in the user directory but is still a member of the project. D. The user has not been granted the global ability to transition issues. Answer: B Question: 125 A medical clinic has decided to use JIRA. Their project will allow patients to file medical complaints. The requirements for the project are as follows:  Members of Group (Jira-patients) must be able to see only their own complaints.  Members of Group (medical-board) must be able to see all complaints. Based only on these requirements, which combination of two configurations would work for this project? (Choose two.) A. Browse Projects and Create Issues. B. In the permission scheme, add Group (Jira-patients) and Group (medical-board) to Browse Projects and Create Issues. C. In the permission scheme, add Reporter and Group (anonymous) to Browse Projects and Create Issues. D. Implement Issue Security with three levels: (#1) Group (Jira-patients), (#2) Reporter, and (#3) Group (medical-board). E. Implement Issue Security with one level: (#1) Reporter and Group (medical-board). F. Implement Issue Security with two levels: (#1) Reporter and (#2) Group (medical-board). Answer: B, F Question: 126 Your security team has noticed that JIRA is not enforcing strong passwords and asks you to enable stricter rules. What effect will this have? A. Users will be forced to pass CAPTCHA tests until they have set a strong password. B. Users with Weak passwords will be forced to change them on next login. DUMPSBOOK.COM 64

ACP-100 JIRA ADMINISTRATION C. All users will be sent a password reset email. D. Only new users and users who change their passwords will have the rules enforced. Answer: D Question: 127 Your organization recently added a new JIRA instance. It will be used both for communicating with external Customers and managing internal project Work. The instance is publicly accessible from the Internet, and you want to make sure that only authorized users can view their appropriate issues. What are three ways to help ensure JIRA access security? (Choose three.) A. Browse the instance without authenticating to verify issue access. B. Disable all incoming email handlers. C. Disable public account signup. D. Enable the Public Access security scheme. E. Browse the instance with test accounts to verify issue access. Answer: A, C, E Question: 128 Your human resources team is using JIRA to handle personal information in a JIRA project. They would like to start tracking Complaints made about individual employees. The project permissions currently allow all users to see the issues. In the case of complaints about employees, HR needs to limit the visibility to HR and the person making the complaint. How would you achieve this? A. Create a new project for Complaints, B. Create a new permission scheme that only allows the reporter and HR to see the issue. C. Create a Workflow that hides issues by status. D. Create an issue security scheme to hide the complaints if set as private. Answer: D DUMPSBOOK.COM 65

ACP-100 JIRA ADMINISTRATION Question: 129 You just inherited a poorly configured JIRA. This morning you learned that an inexperienced user accidentally deleted hundreds of issues. Which two steps should you take to prevent this problem from happening again in the future? (Choose two.) A. Enable Whitelist and substitute Jira--users with a more limited group. B. Remove Project Role (Jira-users) from Bulk Delete global permission. C. Work with Project Administrators to refine Delete Issue permissions in their projects. D. Work with Project Administrators to set appropriate workflow conditions on Delete Issue. E. Substitute Jira-users with a more limited group in Bulk Change global permission. F. Enable CAPTCHA on issue deletion. Answer: C, E Question: 130 You administer JIRA at a small company that manufactures tricycles. There are two tricycle design teams, the Montagues and the Capulets.  Both tricycle design teams previously shared a JIRA project.  You split them into two separate projects, MONT and CAP.  You also created a group for each team (montagues and capulets). Your requirements are as follows:  Each tricycle design team should be able to transition issues in their own project only.  Other users will also temporarily need to transition issues in the projects.  You will need to add more tricycle design projects to JIRA in the future when new design teams are formed.  Your project configuration should be scalable with a minimum amount of Work on your part. Which solution meets all these requirements? A. 1. Edit the workflow to restrict all transitions to the Developer's role. 2. Add montagues to the Developers role in the MONT project and capulets to the Developers role in the CAP project. 3. Project administrators will update group membership as needed. DUMPSBOOK.COM 66

ACP-100 JIRA ADMINISTRATION B. 1. Give the transition permission to the Developer's role. 2. Add montagues to the Developers role in the MONT project and capulets to the Developers role in the CAP project. 3. Project administrators will update role membership as needed. C. 1. 1. Create a different permission scheme for each project -- one that gives the transition permission to montagues and one that gives it to capulets. 2. Add montagues to the Developers role in the MONT project and capulets to the Developers role in the CAP project. 3. Project administrators will update group membership as needed. D. 1. Create a new workflow for each project -- one that restricts all transitions to the montagues and one that restricts them to the capulets. 2. Add montagues and capulets to the Developers role in both projects. 3. Project administrators will update role membership as needed. Answer: B Question: 131 You are configuring a new JIRA instance for customers to report bugs in your company's products. New users should be allowed to create their own accounts. Which action should you take to secure JIRA? A. Set Password Policy to Secure and enable Blacklist. B. Enable Spam bot timeouts under General Configuration. C. Set Mode to Private and enable CAPTCHA on signup. D. Set Mode to Private. E. Set Password Policy to Secure and enable CAPTCHA on signup. Answer: E Question: 132 A project administrator wants some fields to be required on a JIRA issue. However, when the issue is first created, the users will not have all of the data needed to populate these fields. She is not satisfied with your proposed solution of using validators, because the required fields would not have a red asterisk next to them indicating that the information is required. DUMPSBOOK.COM 67

ACP-100 JIRA ADMINISTRATION Which additional configuration can you use to address this request? A. Use a transition screen to capture the required information at the appropriate transition. B. Modify the Workflow scheme to require the field at the appropriate transition. C. Modify the field configuration context to require the field at the appropriate transition. D. Use a post function to add an asterisk to the fields' names at the appropriate transition. Answer: A Question: 133 You refresh your JIRA Server testing environment, then you create and test a new workflow for one of your projects. The workflow uses a post function to set the Assignee to be the Current User, when transitioning from To Do to In Progress. You export the workflow as a JIRA Workflow Bundle, and you import it to the production environment. However, the post function does not work in production. What explains this problem? A. During export, you failed to check the box to Include Workflow Attributes and Properties. B. The post function needs to be enabled in the Workflow Editor. C. Post functions cannot be exported with Workflows. D. Production did not have a mapped status for To Do or a transition to In Progress, so the import failed to include the post function. Answer: D Question: 134 Match the Workflow item with its function. Connection with development tools Choose an item. Prerequisite to a transition Choose an item. Happens at the same time as a transition Choose an item. Automates data entry or notifications Choose an item. DUMPSBOOK.COM 68

ACP-100 JIRA ADMINISTRATION Answer: 69 DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION  Triggers – transition JIRA issues when certain events occur in a connected development tool, such as Atlassian's Bitbucket or Stash.  Conditions – check that a transition should be performed by the user.  Validators – check that any input to the transition (for example, by a user) is valid, before the transition is performed.  Post functions – carry out additional processing, after a transition is performed.  Properties – are key-value pairs that can be used to further customize transitions. Question: 135 One of your teams has been reviewing their process, and they want to change their project's workflow. This workflow is used by that project only. Which three changes can you make if you use Draft mode to edit the workflow? (Choose three.) DUMPSBOOK.COM 70

ACP-100 JIRA ADMINISTRATION A. remove a step B. remove a transition C. remove all incoming transitions into a step D. change the endpoint of a transition E. change the linked status for a step to another status Answer: B, C, D Question: 136 A user says he cannot see the Approve workflow transition on a given issue. What are three possible reasons the user cannot see this transition? (Choose three.) A. The user does not have the Approve Issues global permission. B. The user does not have the Transition Issues permission in the relevant project permission scheme. C. There is no Approve transition in the workflow for the current status of the issue. D. The Approve transition has a \"User in Group\" condition that is not met by the user. E. A validator on the Approve transition says \"Only users with Administer Projects permission can execute this transition.\" F. Approve is not set as a common transition in the workflow. Answer: B, C, D Question: 137 Your development team has a workflow status for \"Ready for QA\". Several individuals involved in this testing are not part of the team, and they would like to receive email notifications when issues reach this status. How should you configure JIRA to satisfy this request? A. 1. Configure the notification scheme to notify the QA testers group for this event. 2. Configure a Workflow transition post function to fire the custom event. B. 1. Add a \"Ready for QA\" condition to the workflow transition. 2. Configure the notification scheme to notify the QA testers group when the condition is passed. DUMPSBOOK.COM 71

ACP-100 JIRA ADMINISTRATION C. 1. Add a Custom event \"Ready for QA\" to the notifications scheme. 2. Assign a Workflow trigger to notify the QA testers group when the custom event is fired. D. 1. Create a group for QA testers. 2. Add a workflow transition post function to set the Assignee field to the QA testers group. 3. Configure the notification scheme to notify the QA testers group. Answers: A Question: 138 Your operations team has a project dedicated to collecting fault reports from clients. When something goes wrong, it is common to get many clients reporting the same error. To keep things simple, the operations team will select one of these issues and resolve the rest as duplicate reports. The team is using a default JIRA project setup and would like to set a resolution and close duplicates more quickly. As their JIRA administrator, what would you recommend? A. Add a new transition for Duplicates, without a screen but with a listener set up to catch the resolve event and set the Resolution. B. Add a new transition for Duplicates, without a screen but with a post function that sets the resolution to duplicate. C. Include a validator to check the Resolution the user selects on the resolve screen. D. Change the resolution options on the Resolve screen to limit it to selecting Duplicate only. Answers: A Question: 139 What steps should you take to create and activate a new workflow and a new workflow scheme? A. 1. Create a new workflow or copy an existing workflow. 2. Create a new workflow scheme or copy an existing Workflow scheme. DUMPSBOOK.COM 72

ACP-100 JIRA ADMINISTRATION 3. Associate Workflow with issue type. 4. Associate workflow scheme with project. B. 1. Copy an existing Workflow. 2. Move workflow from inactive to active. 3. Associate workflow scheme with project. C. 1. Create a new workflow. 2. Move Workflow from inactive to active. 3. Associate workflow with project. D. 1. Create a new workflow or copy an existing workflow. 2. Create a new workflow scheme or copy an existing Workflow scheme. 3. Associate workflow scheme with project. 4. Move workflow scheme from inactive to active. Answers: A Question: 140 You have been given the following flow diagram to implement as a workflow in JIRA: You will use the Open status for newly created issues and the Procurement status as the second status in your workflow. Design and Logistics will be two components in the project, with Daryl and Sanjay set as the respective Component Leads. After discussing the flow with the project manager, you have outlined the following additional requirements:  Daryl and Sanjay must receive notifications when they have issues to approve. 73 DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION  Users in the Project Role (Reviewers) can approve an issue for procurement regardless of the component set on the issue.  The Reporter and the Assignee can both reject Open issues.  When procurement begins, the Phase custom field must be set to Mauve. Which two configurations must be included in the Approve transition between the Open and Procurement statuses? (Choose two.) A. a condition for Project Role (Reviewers) B. a transition screen with the Resolution field C. a post function to set the Phase field to Mauve D. a custom event that notifies the Component Lead E. validators that ensure the Component and Phase fields are not empty F. a transition screen with the Phase field Answers: C, D Question 141 A project lead wants to conduct historical trend analysis, but she is worried that older issues are being updated in a way that inhibits their comparison. She wants to take a snapshot of the data in her project at regular intervals so she can compare different periods. Which tool should she use to meet this need? A. System Export B. Issue Filter Export to CSV C. JQL Results Snapshot D. Project Export Answer: B Question 142 You have inherited a JIRA instance where a number of issues are in Closed status but do not have the Resolution set. This is causing problems with reporting, as all these issues are being displayed as Unresolved. How can you correct this problem and make sure all Closed issues are truly resolved? DUMPSBOOK.COM 74

ACP-100 JIRA ADMINISTRATION A. 1. Create a new workflow with status for Closed and Resolved. 2. Create a transition from Closed to Resolved with a post function to update the Resolution field to Resolved. 3. Identify issues that need to be resolved and Bulk Change. 4. Transition Issues using the newly created transition. B. 1. In the existing workflow, and a looping transition from Closed to Closed. 2. Add a post function to set the Resolution. 3. Identify issues that need to be resolved and Bulk Change. 4. Transition issues using the newly created transition. C. 1. In the existing workflow, add a transition from Closed to Resolved. 2. Add a post function to update the issue field to Resolved. 3. Identify issues that need to be resolved to Bulk Change. 4. Edit issues using the new field value of Resolved. D. 1. Select the issues that need to be resolved and Bulk Change. 2. Edit the Closed field to Resolved. 3. Perform a second Bulk Change operation to Transition Issues. 4. Use the Created vs Resolved dashboard gadget to verify that all selected issues have been resolved. Answer: C UNRESOLVED showing up as a Resolution for Resolved issues When using the Issue Navigator to find issues, the Resolution status of Unresolved appears twice. DUMPSBOOK.COM 75

ACP-100 JIRA ADMINISTRATION For JIRA 4.1.x the statuses with the non-red Unresolved status are items that are using the custom added Unresolved status Cause This is caused when a custom Resolution status of Unresolved is added under Administration >> Issues >> Resolutions. When an issue is opened in JIRA, the default is that the Resolution field is empty - the term Unresolved is a system term that means the Resolution field has no value. Only when the Resolution field has no value does it appear with the system default Unresolved. All issues are considered unresolved until the Resolution field is given a value. Solutions: Workflow Method If a duplicate resolution status appears in the Issue Navigator, remove it via the following steps: 1. Modify the workflow to add a loop transition for affected status. In the transition, add an Update Issue Field post function to set the Resolution field to None. 1. For this step you'll want to add a Transition in your Open step that will lead back to the Open step 2. That is the step where you will need to assign the Update Issue Field post function to set Resolution to None 2. In the issue navigator, search for the issues with the Resolution set to unresolved. (i.e. the custom unresolved status or whichever one shows up black and not in all caps) One way to make the distinction a little easier between the resolutions is to change the Unresolved status to a different name 3. Do a bulk transition using the transition set in step 1. 4. If necessary, repeat the above steps for each affected status. 5. Revert the changes made in step 1 to clean up the workflows. 6. Remove the unresolved status listed under Administration >> Issues >> Issue Attributes >> Resolutions Script Runner Method (third party add-on) This is an alternate method to clear resolutions on tickets 1. Install the Script Runner add-on 2. Build a search for all issues that are using the user created unresolved status 3. Save search as a filter 4. Navigate to Add-ons, scroll down to SCRIPT RUNNER and select Built-in Scripts 5. Select the Bulk Fix Resolutions, use the saved filter, and select none as the new resolution. DUMPSBOOK.COM 76

ACP-100 JIRA ADMINISTRATION 6. Remove the unresolved status listed under Administration >> Issues >> Issue Attributes >> Resolutions Question 143 Your organization has a Service Level Agreement (SLA) stating that customer service representatives will follow up on inquiries by the end of the next business day. You created a custom Date Time Picker field named “Follow up by”. Now you need to build an issue filter to display all sub-tasks where the “Follow up by” date is either (i) by the end of the next business day or (ii) has passed and is overdue. Which completion to your JQL statement below meets this requirement? issuetype = Sub-task AND… A. (“Follow up by” <=now(1d)) B. (“Follow up by” <= now(24h)) C. (“Follow up by” >=startofday() OR “Follow up by” >=endOfDay(-1)) D. (“Follow up by” <= now() OR “Follow up by” <= 24h) E. (“Follow up by” <= OR “Follow up by” <= endOfDay(1)) Answer: Question 144 Your new company Jira and the Chief Security Officer interviews you on ways to enforce company-wide security standards in Jira. Which four features do you describe to her? (Choose four.) A. Category permissions B. Global permissions C. Issue Security Levels D. Comment visibility E. Project permissions F. Field permissions Answer: DUMPSBOOK.COM 77

ACP-100 JIRA ADMINISTRATION Question 145 You needed to replace the legacy Jira group all-staff-europe with a newly group. You created the new group and you migrated all users to the new group. Then you deleted the legacy group. Which four problems might users report after the change? (Choose four.) A. Users are not able to perform bulk changes operations B. Workflow transitions are hidden from certain users. Workflow transitions are hidden from certain users C. Filter subscriptions send out errors instead of issues statistics D. Comments that were restricted to the legacy group are lost E. Filter results return an incorrect number of issues F. Users are not able to log in to Jira anymore Answer: Question 146 User Lily (username: lilbp) reopened a number of issues on Monday and Tuesday and has since lost track of them. The workflow transition she used is highlighted in the included workflow diagram. This transition unset the Resolution field value. What JQL search will most accurately find the issues that the she reopened this week? 78 DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION A. resolution is EMPTY AND resolution was EMPTY BY lilby AFTER -2d B. status was Reopened BY lilbp AFTER statOFWeek() C. resolution = Unresolved AND resolution changed BY lilbp AFTER statOfWeek() D. status = Reopened AND assignee was lilbp AND updated > -2d E. status changed TO Reopened BY lilbp AFTER startOFWeek() Answer: Question 147 A project administrator needs to modify a number of issues in his project and wants to use the Edit Bulk Operation. What does he need to know about performing the Edit Bulk Operation? (Choose all that apply.) A. Bulk Changes are limited to the same actions a user can perform on individual issues in the project B. Bulk change notifications summarizing the changes will be sent to all watchers C. Adding values to the Version(s) fields will overwrite existing values D. Once a Bulk Change has been initiated from a filter, a user can deselect issues from the list and add new ones E. Bulk edits are recorded in issue history with a note of the filter that was used Answer: Question 148 Your Jira Server instance has had problems with its index lately, which have caused confusion. System administrators are investigating the potential causes, but your manager has asked you to do whatever you can to mitigate risk to related to the index and keep it in good shape. Which two options below will help? (Choose two.) A. Enable index recovery to periodically take snapshots of the index B. Ask a system administrator to move the Jira index to network file storage (NFS) for better performance and recovery C. Grant the Project Index permission to Project Leads and Project Administrators D. Ensure that the other Jira administrators are aware of the need for a manual re-index after certain configuration changes DUMPSBOOK.COM 79

ACP-100 JIRA ADMINISTRATION Answer: Question 149 The HR team wants these HR-related tasks to be managed in JIRA:  Onboarding employees  Offboarding employees  HR legal  Hiring new staff  Disciplinary They have these requirements:  Each of these tasks use a different and very specific process  Each process gathers different data for reporting needs  Only members of the HR team can access anything that involves disciplinary and legal matters How should you configure Jira to fulfil these requirements? A. 1. One HR project 2. One HR issue type scheme 3. Five new issue types 4. One issue-level security scheme to restrict access to legal and disciplinary tasks 5. Five new workflows B. 1. One HR project 2. Use the issue type scheme that the finance team uses 3. Create five new issue types 4. Use field-level security to limit access to sensitive data 5. Use simplified workflows for each new issue type C. 1. Two HR projects; HR and HR Restricted 2. Two HR issue type schemes, one per project 3. Use the default Jira Core issue types 4. Use components to link HR tasks across projects 5. Use the default Jira Core workflows D. 1. Three HR projects; HR, HR Legal, HR Disciplinary 80 2. Three HR issue type schemes, one per project DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION 3. Five new issue types 4. Use components to link HR tasks across projects 5. Five new workflows Answer: Question 150 The company portfolio manager has asked for your help with a Jira report. She is pulling issue types from a variety of projects into a query sorted by Status; but she’s frustrated that she can only sort the Status column alphabetically, not aggregated by Status Category. Which option will allow you to help her? A. Add the Status Category column to the Issue Navigator B. Replace all the custom statuses used with standard Jira statuses C. Reorder statuses on the administrative Status page D. Reorder statuses on the administrative Statuses page Answer: Question 151 View the Exhibit showing components and versions within the SconesUK project. Which three statements are true? (Choose three.) A. A single issue can be categorized under the components Database, Search, and the 81 Storefront B. Version 1.0 and 2.0 can be merged DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION C. Issues can be automatically assigned to Andrew Jackson when the version is 3.0 D. Issue can be automatically assigned to Param Reddy when the component is Search E. Version 3.0 cannot be released until Version 2.0 is released F. Database and User Interface components can be archived Answer: Question 152 You have a project that has grown too large, and the owners which to split it into several smaller projects. They need a method to make it clear that the projects are related, especially when it comes to finding issues. How would this be achieved? A. Create a project field for projects to group them together B. Link the projects with the URLs project field C. Create a custom field that can hold the groups of projects D. Create a project category and put the projects into it Answer: Question 153 Which three project settings are searchable in the Issue Navigator? A. Project Name B. Project Category C. Project Description D. Project Schemes E. Project Key F. Project URL Answer: Question 154 Your organization is upgrading to the newest version of JIRA at the same time as you are making significant changes to your server configuration. Several issues cannot be resolved in the time windows available, and you need to do a rollback. DUMPSBOOK.COM 82

ACP-100 JIRA ADMINISTRATION Which three backups should you make sure are available before you begin the rollback? (Choose three.) A. JIRA SMTP Mail Server B. JIRA External Users Directory C. JIRA Installation Directory D. JIRA Database E. JIRA Home Directory Answer: Question 155 After a recent upgrade to your JIRA system, one of the add-ons your organization depends on is not working reliably. Which two methods can you use to debug and resolve this issue? (Choose two.) A. Ask the system administrator to set package com.atlassian to Trace loggin level B. Ask the system administrator for Catalina.out logs and inspect for stact traces C. Ask the system administrator to enable the SQL log D. Ask the system administrator to add the add-on to the logger E. Ask the system administrator to set the logging level to FATAL on all package names, under Logging & Profiling Answer: Question 156 Your JIRA instance was recently upgraded, and you have begun to experience OutOfMemoryErrors. Which three steps should you take to troubleshoot and correct this issue? (Choose three.) A. Ask the System Administrator to verify old and new memory configurations B. Recommend that the System Administrator restart JIRA C. Disable outgoing mail D. Check current memory usage on the System Info page E. Increase memory by 5 – 10 GB and check if the issue is resolved F. Ping the server on the port where JIRA is running to verify network connection Answer: DUMPSBOOK.COM 83

ACP-100 JIRA ADMINISTRATION Question 157 You use your JIRA instance to collaborate with many different clients.  Each client has their own JIRA project  Your permission scheme allows clients to view issues in their own project only The differentiate your users, you set up the following groups:  Jira-users; includes all of your users, clients, and internal staff  Internal-staff; includes only your internal staff  Client1, client2, client3, etc.: includes each client’s each client’s own group of users While your clients are happy to collaborate with your, they do not want their user account information shared with other clients. How can you prevent clients from seeing one another’s user information? A. Under default user preferences, set User Accounts to Private B. Limit the Browser Users global permission to the Internal-staff group C. Limit the group context for each client group (client1, client2, etc.) to that client’s project D. Using a different Issue Security Scheme for each client project, set a default security level that includes that project’s client group and the internal-staff group E. Only allow clients to have the Assignable User permission in their own projects F. Disable the “Share account details” flag in the general configuration Answer: Question 158 Which two actions will increase the security of your JIRA instance? (Choose two.) A. Limit the number of JIRA Administrators in your instance B. Run JIRA as a privileged user account (e.g., root on Linux, Adminsitrator or Windows) C. Increase the timeout for Secure Administrator sessions (i.e., websudo) D. Use JIRA’s internal database instead of an external database E. Remove the jira-users group from the Create Shared Objects global permission F. Set the signup mode to Private Answer: DUMPSBOOK.COM 84

ACP-100 JIRA ADMINISTRATION Question 159 All projects in your JIRA currently use a single permission scheme based on the default. You have this new requirement:  The list of users and groups who can set the Assignee should be different from the list of users and groups who can be the Assignee  Project Administrators should maintain these lists for their own projects What is the best way to accomplish this? A. Create new project roles called Assign Issues and Assignable Users. Add them to the corresponding permissions in the current permission scheme B. Put only Project Role (Administrators) in the Assign Issues and Assignable User permissions of the current permission scheme C. Add workflow transitions with transitions screens and conditions that only allow Project Role (Administrators) to execute the Assign operation D. Remove Assignee from all screens. Put a condition on the Assign operation and set it to Project Role (Administrators) only E. Create and associate new permission schemes for each project. Let project administrators modify the relevant permissions as needed Answer: Question 160 A team was formed, and they needed a new JIRA project. You created the project and you reused the schemes from an existing project. Members of the new team report that they cannot transition issues to a particular status. Which two configurations should you examine to troubleshoot this problem? (Choose two.) A. Permission Scheme B. Workflow Scheme C. Global Permissions D. Workflow Statuses E. Workflow Transitions F. Issue Security DUMPSBOOK.COM 85

ACP-100 JIRA ADMINISTRATION Answer: Question 161 The director of R&D has requested that a few projects be archived. The information still has intellectual property implications, but work has been suspended and the project needs to be unavailable for all but the R&D leadership. How would you achieve this? A. Change the project category to Archived and add a group for R&D leadership to the admin role B. Remove all users and groups from project roles C. Create a new Archive project and Bulk Change > Move all the issues to it D. Create a permission scheme with only the Browse permission set for a group representing the R&D leadership Answer: Question 162 Many of your users are complaining that they receive too many JIRA notifications, but there are certain groups that need to receive critical email notifications. One example of this is a project lead being notified if there is a complaint from a customer. The workflow for the project includes an Escalate transition and an Escalated status to indicate issues that require the project lead’s attention. How can you reduce overall notifications but facilitate notification of critical information? A. 1. In the notification scheme, change all notifications to All Watchers and Current Assignee 2. Add a post function to the Escalate transition to send a notification to the project lead 3. Add a property to the Escalate transition to prevent sending notifications to all Watchers and Current Assignee 4. Remove the Generic event from Escalate transition B. 1. In the notification scheme, change all notifications to All Watchers and Curent Assignee 2. Create a new event named Escalation Notice 3. Add the new event to the Escalate transition DUMPSBOOK.COM 86

ACP-100 JIRA ADMINISTRATION 4. Add the new event to the notification scheme and set the role to Project Lead C. 1. In the notification scheme, change all notifications to All Watchers and Current Assignee 2. In the notification scheme, add the Project Lead role to the Generic Event notification D. 1. In the notification scheme, change all notifications to All Watchers and Current Assignee 2. Create an issue security scheme for issues that need to be escalated 3. Modify the notification scheme to notify the project lead on issue security level change Answer: Question 163 Your organization has switched to an authenticated SMTP server. After you have reconfigured the mail server in your JIRA instance, you notice you are receiving “Mail Relay” errors. What is the first thing you should do? A. Check your log files for “Out of Memory” errors B. Verify that you have specified username and password in the SMTP Mail Server configuration C. Verify that you have set up a Form address for outgoing email D. Make sure you have imported the SMTP server certificate E. Make sure a second copy of JIRA is not downloading and deleting email messages Answer: Question 164 Your developers have asked for a simple way to allow customers to create JIRA issues without needing to log in to JIRA or even know how to use it. You arrange to get an email inbox set up for this and configure a Create or Comment email handler. DUMPSBOOK.COM 87

ACP-100 JIRA ADMINISTRATION What are two implications of setting up such a handler? (Choose two.) A. Emails will be removed from the inbox B. Issues will be created in projects depending on the domain of the sender C. Attachments with unusual characters in their names will be ignored D. The sender of the email will be recorded as the Assignee on the issue E. Emails sent with high priority will comment and increase the priority field of the issue F. Emails with an issue key in the subject will create comments on that issue Answer: Question 165 You have taken a job with a large multinational corporation that is using JIRA to track many types of activity. Your new boss tells you that a common complaint about JIRA is that users are struggling to find the administrators and help with questions, changes, and training. Which setting should you update in General Configuration to improve the situation? A. Set up the Administrator Project to link to your JIRA Support project B. Change the footer text to provide an email address they can use C. Enable the Administrator’s email visibility so users have contact details for you D. Add a friendly message to the Contact Administrators form Answer: Question 166 The directors in your company have asked you to create a shared dashboard to show the status of all director strategic priorities that span multiple projects. They have asked that the filters for the dashboard itself have restricted access. How should the filters be shared? A. with the Director role B. with each individual director C. with the Director project D. with the Director group Answer: DUMPSBOOK.COM 88

ACP-100 JIRA ADMINISTRATION Question 167 The Human Resources department wants to implement a new request workflow. Their requirements say that the request can be canceled at any time, but only by the reporter and Human Resources managers. Identify the best way to implement this requirement. A. 1. Add transitions from all statuses to the Canceled status 2. Create a Canceled transition screen 3. Set screen permissions to Reporter and hr-managers group only B. 1. Add a global transition to the Canceled status 2. Add the Permission Condition and set the permission to Close Issues 3. Add Reporter and hr-managers group to the Close Issues permission C. 1. Add a new resolution value called Canceled 2. Add a Permission Validator to the Close Issues transition 3. Add Reporter and hr-managers group to the Close Issues permission D. 1. Add common transitions from all statuses to the Canceled status 2. Add the User Permission Validator 3. Add Reporter and hr-managers group to the Close Issues permission Answer: Question 168 Your organization is planning to move to JIRA. Your organization uses a complex business process to handle materials for manufacturing. The workflow diagram for the current process has 30 steps. You and the business analyst agree that the 30 steps are divided approximately evenly across these 3 areas:  ordering  receiving  distribution Select the design specification that would meet the business’s need. DUMPSBOOK.COM 89

ACP-100 JIRA ADMINISTRATION 90 Three issue types:  Ordering  Receiving  Distribution Sub-task issue type: A.  Sub-Task Three sub-task workflows:  Ordering  Receiving  Distribution Issue Type: Materials Sub-task issue types:  Ordering  Receiving  Distribution B. One workflow used by all issue types, with these statuses:  To Do  In Progress  Done Issue Type: Materials Sub-task issue types:  Ordering  Receiving  Distribution C. Issue Type: Materials Sub-task issue types:  Ordering DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION  Receiving  Distribution Four workflows, one for each issue type D. Issue Type: Materials Single workflow with these statuses:  Ordering  Receiving  Distribution Answer: Question 169 One of your project administrator has a requirement that several fields that must be filled out before an issue is closed. The assignee will not have all of the required information when the issue is first created. Which two features should you use to meet this requirement? (Choose two.) A. Transition Screen B. Properties C. Conditions D. Field Configuration E. Validators Answer: Question 170 View the Exhibits showing a condition in Workflow1 and a validator in Workflow2. Based only on the above, which two statements are true? (Choose two.) 91 DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION A. In both workflows, the condition or validator must be located on the Close Issues transition B. In Workflow1, users without Close Issues permission will see the transition but will not be able to execute it C. In Workflow1, only users with Close Issues permission will see the transition D. In Workflow2, only users with Close Issues permission will see the transition E. In both workflows, you can never use the condition and validator together F. In Workflow2, users without Close Issues permission will see the transition but will not be able to execute it Answer: Question 171 A user says she can see the Ready for Testing transition but cannot successfully execute it. Why can’t the user execute this transition? A. A Validator on the workflow transition requires the user to be in the Developer role B. The status property of in Progress prevents the Developer role from executing the transition C. A Condition on the transition requires the user to be in the Developer role D. The status property of Code Review prevents the Developer role from executing the transition Answer: Question 172 A change request has been submitted for a workflow that is used by all of your organization’s JIRA projects. DUMPSBOOK.COM 92

ACP-100 JIRA ADMINISTRATION Currently, a post function in the workflow changes the assignee to a particular person once a status is reached. Now that person has left the company, and your need to change the assignee in that post function. Which two methods will modify the shared workflow to meet this change request? (Choose two.) A. Copy the workflow, modify the post function on the copy, test it, and then remove the old workflow and rename the copy to the same name as the original workflow B. Copy the workflow, modify the post function on the copy, test it, and then modify the workflow scheme to add the name workflow and associate it with the issue type C. Modify the post function, then publish the workflow D. Modify the workflow scheme to deactivate the workflow, modify the post function, and then reactivate the workflow in the workflow scheme E. Modify the post function, then change the workflow from Inactive to Active Answer: Question 173 View the Exhibit showing the Time-Off Request workflow. Once a request has been Approved, it is considered resolved in JIRA, but it waits in the system until the requested time-off period has passed before it is set to Done. Select the appropriate behavior of Resolution in this workflow. 93 DUMPSBOOK.COM

ACP-100 JIRA ADMINISTRATION A.  The Time Taken transition should set the Resolution value automatically  The Modify Time transition should automatically clear the Resolution B.  The Approve transition should set the Resolution value automatically  Resolution should never be cleared C.  The Approve and Deny transitions should set the Resolution value automatically  The Modify Time transition should automatically clear the Resolution D.  The Approve transition should prompt the user for the Resolution value  The Time Taken transition should reset the Resolution to Done E.  The Time Taken transition should set the Resolution value automatically  The Modify Time transition should automatically set the Resolution to Reopened Answer: Question 174 You have an existing customer service project which has several required fields. You recently added a sub-task issue type, which have fewer fields on its screen A user receives an error when attempting to create a sub-task. The error is displayed below. DUMPSBOOK.COM 94

ACP-100 JIRA ADMINISTRATION Identify the cause and solution for this problem. A. The field security for the inquiry Type field was set. Change the field configuration to let this user see that field. B. The field configuration scheme for the Edit screen operation doesn’t have the Inquiry Type field on it. Edit the field configuration scheme. C. The same field configuration is used for both tasks and sub-tasks. Create a new field configuration for sub-tasks D. Changes to the screen weren’t saved when fields were added. Edit the screen and save the changes Answer: Question 175 You’re the new JIRA administrator at XYZ Corp. A user complains that Issue Navigator is returning the wrong data. His JQL query was “Resolved > startOfDay(),” but the results show issues where the Resolution displays “Unresolved”. DUMPSBOOK.COM 95

ACP-100 JIRA ADMINISTRATION Inspect his search: How should you fix JIRA? A. Put the Resolution field on the required transition screens. B. Resolve the issues again C. Delete the custom Resolution value “Unresolved.” D. Reopen the issues E. Add a Validator to require the Resolution field when transitioning to Resolved or Closed F. Add the Resolution field to the Edit screen for the project(s) Answer: Question 176 One of your teams has notices a spelling mistake in the name of an issue type. What should you do before correcting the name of the issue type? A. Warn users that saved filters using the issue type will not be able to find the issue type after the change B. Warn users that dashboard gadgets that refer to the issue type in their configuration will need to be updated with the corrected name C. Update the issue type schemes to refer to the new name D. Update the workflow schemes for the issue type to use the new name Answer: DUMPSBOOK.COM 96

ACP-100 JIRA ADMINISTRATION Question 177 While testing an add-on in a staging instance of JIRA, you notice some odd behavior. You are unsure if the behavior is being caused by the add-on you are testing, a different add-on, or JIRA itself. Which three features of the Universal Plugin Manager (UPM) can you use to narrow down the specific cause of the behavior? (Choose three.) A. enable/disable add-ons B. the Action Required filter C. enter Safe Mode D. enable/disable modules E. JIRA update check F. UPM settings Answer: Question 178 You want to create an issue collector for Task issue types in a specific project using the Raise a Bug template, but you find that the template is not selectable on the Add Issue Collector form. The Custom option for templates shows as the only valid option. What is preventing you from using the Raise a Bug template? A. Tasks in that project have a field required by a Field Configuration B. You have specified a default Reporter for the issue collector C. You do not have the Create Shared Objects global permission D. You have not installed the Issue Collector Templates add-on E. The Raise a Bug template is only available to Bug issue types Answer: Question 179 A new employee asks for your help with JIRA emails. The employee works on several projects, and the volume of JIRA notifications is excessive. Which two adjustments to the user’s User Profile will remedy this problem? (Choose two.) A. Unassign as Project Lead B. Disable Autowatch DUMPSBOOK.COM 97

ACP-100 JIRA ADMINISTRATION C. Unassign as Component Lead D. Set “My Changes” to “Do not notify me”. E. Unsubscribe from Filters Answer: Question 180 The United Nations wants to use JIRA to track human rights violations across the world. View the map showing counties per continent. Their requirements are listed below:  There will be eight projects: one per continent  Based on the Default Permission Scheme, wherever Project Role (Users) appears, this should be all nations  Based on the Default Permission Scheme, wherever Project Role (Developers) appears, this should be only the nations of a particular continent DUMPSBOOK.COM 98

ACP-100 JIRA ADMINISTRATION  Based on the Default Scheme, wherever Project Role (Administrators) appears, this should be only jira-administrators  Use the JIRA Internal Directory  There will be many users per nation, but they will rarely change  You must be able to find issue crated by users of a particular nation  Use the simplest solution A.  Create national groups (e.g., jira-germany, jira-china, etc.)  Create eight continental permission schemes  Add the appropriate national groups to the Create Issues permission of each scheme B.  Create eight continental project roles (e.g., Project Role (Asia), etc.)  Create eight continental permission schemes  Replace Project Role (Developers) with the appropriate continental role in each continental permission scheme C.  Create national groups (e.g., jira-germany, jira-china, etc.)  Create eight continental project roles (e.g., Project Role (Asia), etc.)  Create a copy of the Default Permission Scheme  Replace Project Role (Developers) with the appropriate continental role D.  Create national groups (e.g., jira-germany, jira-china, etc.)  Add the appropriate national groups to Project Role (Developers) of each project  Use the default Permission Scheme for all projects Answer: Question 181 During a CSV import, which field will cause an issue import to fail if the value in that field does NOT map to an existing field option? A. Resolution B. Affects Version/s C. Component/s D. Priority DUMPSBOOK.COM 99