PREFACE Asset Creation Group (ACG) was created in Distribution projects under NR T&D CAPEX. H conforming to the quality standards and guideli of this handbook is to create a document on the Electrical, Mechanical, Substations-Projects, H quality write-ups for their respective wings whic The handbook contains activity wise Quality A wings separately. It has a total of 21 nos. QAP been vetted by M/s. Bureau Veritas. They were QAP format and suggest changes/ modific incorporated in this handbook. The finalized documents have also b departmental Preparer, Issuer and Approvers of the respective QAPs. We hope, these QAPs and QCCs will serve as a reference document and time, it will be a record for future, which will be subject to yearly revision fo Sujit Kumar Pathak General manager Construction Department
the year 2010 to ensure timely and quality execution of Substation and Historically, the department, like the other departments of CESC, has been ines of execution which were not laid down till date. The primary objective e subject. To make it happen, each wing of the department, namely, Civil, HT-Projects and HT-Construction, has taken the initiative to prepare the ch have finally been collated and published in this handbook. Action Plan (QAP) and Quality Control Checklist (QCC) for each individual P and 30 nos. QCC. The QAP documents prepared by the department has e given the scope to peruse the contents of all the QAPs, standardize the cations/ additions/ alterations as necessary, which have finally been been signed by the auditing company as the Reviewer alongside the d guideline to all the officers & employees of the department. At the same or necessary updation and control.
1. INTRODUCTION This Quality Handbook has been prepared as a general guideline for the Q Civil, Electrical, Mechanical, Substations-Projects, HT-Projects and HT-C this manual are based on the Company Guidelines, Technical Standards, The contract documents take precedence over this Manual and in the e charge/Undersigned for any clarification. Users of this manual are invited to submit comments or to suggest cha changes, if appropriate, may be incorporated into future revisions. 1
Quality Control of various types of works executed by different wings (i.e., Construction) of Asset Creation Group (ACG). The Checklists included in Departmental SOPs and Best Work Practices, etc. event of any perceived conflict reference is to be made to the Project-in- anges. These should be directed to the Technical CFT of ACG, so that ____________________ GENERAL MANAGER CONSTRUCTION DEPARTMENT 1
2. PURPOSE AND SCOPE 2.1 GENERAL The purpose of this document is to provide a structured approach to Qu works are being carried out in accordance with the requirements of the Sp Contractor is carrying out adequate surveillance a suite of checklists hav execution activities and are intended to be used on a daily basis during su These checklists are seen as the first stage of development of the Quality manual as Specifications are reviewed and incorporated in the system. For Project Works, specific QAP(s) along with responsibility matrix in lin Project-in-Charge. It is to be mutually agreed upon and jointly signed by Execution-in-charge before starting of the activities. Any third-party quality audit will be an addition to the set Quality Action P and/or the Execution-in-charge 2.2 REFERENCES As noted above the checklists form an integral part of Quality Contr Documentation for the project. Other documentation that will need to be re • Special Conditions of Contract • Construction Drawings • The Contractors Work Method Statements and Quality Control Doc • Material Data Sheet • Relevant Standards 2.3 RESPONSIBILITIES In accordance with Quality Actions Plans attached herewith, the Executio staff delegated with this responsibility will use the checklists included completed on a regular basis, preserved at site and submitted along w Execution-in-charge. 2
uality Control of various works executed by ACG and to ensure that the pecification. In order to do this and provide documentary evidence that the ve been prepared. These checklists form the backbone of surveillance of upervision of the works. y Control Manual and further Checklists are envisaged to be added to the ne with those attached herewith is to be prepared under the guidance of y the Contractor’s Representative, Third Party Quality Auditor (if any) and Plan and it will not reduce the scope of Quality Checks by the Contractor rol and the completed checklists will form the majority of the Quality eferred to will included: cumentation on-in-charge will delegate responsibilities for surveillance of the work. The in this document as an aid to inspecting the works. Checklists will be with the Work Measurement Sheet during Progressive/Final Billing to the 2
STANDARD QUALITY FOR CIVIL WORK IN QAP No. QAP/Tech/Civil Work Sl. No. Item Category Type / Method of Check AB C D 1 Survey 1.1 Reference Pillars/Co-ordinates / Critical Dimensional check with a calibrated (by an Levels of Benchmarks agency) Auto-level/Total Station Instrumen 2 Excavation in foundations and trenches 2.1 Excavation with proper side Major Visual/Dimensional Checks using client's slopes suited to site conditions, Drawings. Shoring, Dewatering, managing underground service lines, if any. 2.2 Necessary preparation of bed for Major Visual/ Physical Checks PCC, maintaing the specified level. 2.3 Shoring of excavated area Major Visual/Physical Check maintaining proper access 3 Back filling in foundation and trenches 3.1 Ensuring proper level and Critical Visual/ Physical Checks compaction 4 PCC / lean concrete in plinth/below foundation 4.1 Checking layout, line and level & Minor Visual & Dimensional Check dimension of PCC area. 4.2 Laying of PCC after duly Critical Visual/ Dimensional/ Mixing Proportion che establishing the mixing methodology 5 Form work 5.1 Fixing and positioning in location Major Visual/ Dimensional/ Level/ Verticality chec shuttering/form works and QCC/Tech/Formwork and Staging supports, preventing slurry leakage etc. in correct alignment, dimension as per the working drawings. 5.2 Staging and scaffolding Major Visual/ Dimensional/ Level/ Verticality chec QCC/Tech/Formwork and Staging 3
Y ASSURANCE PLAN STATION BUILDING rk; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark check acceptance norms Record Furnished I E F G H n accredited 100% Client's Drawings IR Yes nt. 100% Client's Drawings / Tech. - No Documents & Specification 100% Client's Drawings / Tech. - No Specification - No - No Client's Drawings / Tech. JMR Yes Specification - Yes 100% Client's Drawings / Tech. Yes Specification ecks 100% Client's Drawings / Tech. cks as per 100% Specification Client's Drawings / Tech. Specification 100% Client's Drawings/ Tech. IR/QCC Specification cks as per 100% Client's Drawings/ Tech. IR/QCC Yes Specification / IS:456 - 2000 3
STANDARD QUALITY FOR CIVIL WORK IN QAP No. QAP/Tech/Civil Work Sl. No. Item Category Type / Method of Check 6 Rebar work 6.1 Quality check as per the Critical Visual/ Dimensional/ /Material Testing specification 6.2 Preparation, submission and Critical Visual/ Dimensional/ Calculation checks. approval of BBS in line with approved drawings. 6.3 Rebars shall be properly stacked Major Visual Check and protected against weather effects. 6.4 Checking and fixing in place Major Visual/ Dimensional/ Level/ Verticality/ Fixi metal inserts/ bolts as per QCC/Tech/RCC Pre Pour Card drawing. 6.5 Checking of rebars layout before Major Visual/ Dimensional/ Level/ Verticality chec any casting programme QCC/Tech/RCC Pre Pour Card including cover blocks, chairs, anchorage, spacer bars, lapping rebars etc. 7 Concreting 7.1 Preparation of Method Critical Ensuring availability/ arrangement for all n Statement for the Concreting and equipment for concreting including pro including testing of ingredients sampling and testing for quality checks like FA, CA & Cement etc. as per the approved Test Plan 7.2 Preparation and check of Major Visual Check/ Physical verification temporary arrangement of staging, chute, walkway, required machineries etc. 7.3 Mixing, pouring and placement Major Visual/ Dimensional/ Level/Verticality chec of concrete including admixture QCC/Tech/RCC Pre Pour Card & compaction by mechanical vibrator. 7.4 Checking of Slump at site. Major Visual/ Dimensional/ Level/Verticality chec QCC/Tech/RCC Pre Pour Card 4
Y ASSURANCE PLAN STATION BUILDING rk; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark Record Furnished check acceptance norms 100% Client's Drawings/ Tech. Manufactur Yes 100% Yes 100% Specification / IS:1786 -2008 ers Test No Certificates / Test Results Client's Drawings/ Tech. BBS Specification/ IS:2502 - 1963, SP:34 - 1987 & other relevant codes Client's Guideline --- ity as per 100% Client's Drawing / Tech. IR/QCC Yes cks.as per Specification IR/QCC Yes 100% Client's Drawing, Tender Specification (Cl. 3.16) necessary tools 100% Tech. Specification & BOQ Approved Yes ovisions for Method Statement 100% Tech. Specification & BOQ - No cks as per 100% Tech. Specification & BOQ IR/QCC Yes cks as per 100% Tech. Specification/ IS:456 - IR/QCC Yes 2000 4
STANDARD QUALITY FOR CIVIL WORK IN QAP No. QAP/Tech/Civil Work Sl. No. Item Category Type / Method of Check 7.5 Sampling of concreting in cube Major Visual/ Dimensional checks as per QCC/T moulds Pour Card 7.6 Check of Final Position, Major Visual/ Dimensional Check as per QCC/T Verticality & Alignment of anchor Pour Card Bolts. 7.7 Repairs to the rough patch, Major Visual Check as per QCC/Tech/RCC Post honey comb or uneven surfaces within 24 hours after deshuttering as per approved Method statement 7.8 Curing of Concrete Major Visual Check as per QCC/Tech/RCC Post 8 Brick masonry work 8.1 Quality check of the ingredients Major Visual/ Dimensional/ /Material Testing as per the approved Test Plan 8.2 Mixing and preparation of Major Visual Check/Field Test as per QCC/Tech cement mortar 8.3 Hacking of surface, soaking of Major Visual Check as per QCC/Tech/Brickwork bricks, pointing of brick work 8.4 Checking of bond, joints, Major Visual/ Dimensional Check as per QCC/T thickness, true line, levels, verticality 8.5 Check for curing Major Visual Check as per QCC/Tech/Brickwork 9 Plastering Work 9.1 Quality check of the ingredients Major Visual/ Dimensional/ /Material Testing as per the approved Test Plan 9.2 Surface preparation like Major Visual Check as per QCC/Tech/Plastering raking/chipping, removal of loose mortar and micro concreting at RCC and BW joints and wetting surface. 9.3 Preparation of cement mortar Critical Visual Check/Field Test as per QCC/Tech as per specification(addition of water proofing additives, if specified) and laying in place 5
Y ASSURANCE PLAN STATION BUILDING rk; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark Record Furnished check acceptance norms Yes IR/QCC & Tech/RCC Pre 100% Tech. Specification/IS:456 - Cube Yes Tech/RCC Pre 2000 (Cl .no. 12.2.2) Register 100% Client's Drawings/ Tech. IR/QCC Specification t Pour Card 100% Tech. Specification/ as per QCC/ Yes methodology agreed upon Approved Method Statement t Pour Card 100% Tech. Specification/ IS:456 - IR/QCC Yes 2000 (Cl- 13.5) 100% Tech. Specification/IS:456 - Test 2000 Certificates /Brickwork 100% Tech. Specification / BOQ IR/QCC Tech/Brickwork 100% Tech. Specification/ IS:456 - IR/QCC 2000 IR/QCC 100% Tech. Specification k 100% Tech. Specification IR/QCC 100% Tech. Specification /IS 456 Test Yes Certificates g 100% Tech. Specification IR/QCC Yes /Plastering 100% Tech. Specification IR/QCC Yes 5
STANDARD QUALITY FOR CIVIL WORK IN QAP No. QAP/Tech/Civil Work Sl. No. Item Category Type / Method of Check 9.4 Checking of alignment Critical Visual/ Dimensional Check as per QCC/T thickness, verticality 9.5 Curing Major Visual Check as per QCC/Tech/Plastering 10 Flooring work (in situ finishes) 10.1 In situ finishes: Major Visual/ Dimensional/ Level Check as per QCC/Tech/Flooring 1. Integral finish to concrete base. a) level b) curing c) Surface finish. 10.2 Patent stone: Visual/ Dimensional/ Level Check as per QCC/Tech/Flooring a) under bed thickness b) under bed mix proportion c) Topping mix proportion. d) Finish. e) Curing. 10.3 Metallic hardener like ironite Major Visual/ Dimensional/ Level Check as per finish/ chapdur: QCC/Tech/Flooring a) Thickness. b) Material quality. c) Topping mix proportion. d) Under bed thickness and level. 11 Wood work /steel/ aluminium doors and windows 11.1 Checking of Material (approval Major Visual/ Dimensional/ Level Check of make) 11.2 Checking of dimensional Major Visual/ Dimensional/ Level Check tolerance, workmanship, Gap in between window /door frame, plumb and alignment of frames 11.3 Checking of glazing Work. 11.4 Door and window Fittings. 6
Y ASSURANCE PLAN STATION BUILDING rk; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark Record Furnished check acceptance norms IR/QCC Yes Tech/Plastering 100% Tech. Specification g 100% Tech. Specification IR/QCC Yes 100% Tech. Specification IR/QCC Yes 100% Tech. Specification IR/QCC Yes 100% Tech. Specification IR/QCC Yes 100% Tech. Specification & Test -- No Certificate -- No 100% Tech. Specification No No 100% Tech. Specification 100% Tech. Specification 6
STANDARD QUALITY FOR CIVIL WORK IN QAP No. QAP/Tech/Civil Work Sl. No. Item Category Type / Method of Check 12 Tiles fixing (walls & floor) Major Visual/ Dimensional/ Level Check as per 12.1 Tiles fixing (walls & floor)-(i) QCC/Tech/Flooring Batch no & age of delivered Major 13 materials like tile adhesives, Major Manufacturers Specification / Expiry Date/ 13.1 grouts etc. per QCC/Tech/Painting 13.2 (ii) Pattern of laying, line, level & Major Visual Check as per QCC/Tech/Painting a finishing and also preserve the Major 13.3 finished surface Major Visual Check as per QCC/Tech/Painting a 14 Painting Critical 14.1 Check delivered goods are fresh Visual Check 14.2 by reading Batch no & age 15 Approval of the means of Visual Check 15.1 painting like brush, roller or spray and do a trial for Visual / Dimensional /NDT checks for weld conforming to the desired QCC/Tech/Structural Fabrication shade/colour (finish), no of QCC/Tech/Structural Erection Acopaptrso,pthriiactkenpersespeatrca.tion of QCC/Tech/Painting and Coating surface. Roof water proofing Preparation of a Method Statement furnishing the process and materials details. Ponding test after completion of water proofing works to check for any seepage. Structural Steel Works Approval of fabrication drawings, checking dimension of sub- assembly, cutting of the section, layout of sub-assembly, layout of final assembly, joint preparation, welding quality & thickness, painting of fabricated work and erection sequence, alignment, levels, locations, orientation & field welding for erection work. 7
Y ASSURANCE PLAN STATION BUILDING rk; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark Record Furnished check acceptance norms 100% Tech. Specification IR/QCC Yes / Visual Check as 100% Manufacturers Test IR/QCC Yes and Coating Certificate /BOQ IR/QCC Yes 100% Tech. Specification / BOQ and Coating 100% Tech.Specification IR/QCC Yes 100% Tech.Specification 100% Tech.Specification Approved Yes Method Yes Statement IR/QCC ding as per 100% Tech. Specification IR/QCC Yes 7
STANDARD QUALITY FOR CIVIL WORK IN QAP No. QAP/Tech/Civil Work Sl. No. Item Category Type / Method of Check 16 False ceiling work 16.1 Line, level & profile / materials/ Major Visual/ Dimensional/Level checks finishing of false ceiling 17 Railing work 17.1 Level, Alignment & Profile Major Visual/ Dimensional/Level checks Pattern of railing work including finishing & painting 18 Plumbing Work- Services 18.1 Alignment of Plumbing pipes Major Visual/ Dimensional/Level checks Pressure test and smoke test Type of Joint in C.I/G.I/ UPVC CPVC pipe 18.2 Sanitary fittings & Waste water Major Visual/ Dimensional/Level checks line. 19 RCC Piles 19.1 Pile Location, Rig Positioning Critical Visual/ Dimensional Check as per QCC/T and Tremie pipes 19.2 Checking of reinforcement Critical Visual/ Dimensional Check as per QCC/T 19.3 Bentonite Gravity test Critical Inspection through Hydrometer as per QCC Piling 19.4 Concrete Pour Checks Major Visual/ Dimensional Check as per QCC/T 20 Timber Piles 20.1 Length and Diameter Critical Visual/ Dimensional Check 20.2 Painting of ballahs as per BOQ Critical Visual Check specs 21 Final Documentation 21.1 Final Documentation Critical Documentation for records: i) Stage Inspection Reports & Test Certific ii) CESC Standard Checklist (QCC/Tech/E iii) HOTO Checklist iv) As-Built Single Line Diagram. Note: This QAP shall be read along with PO and Technical Specifications. Any additional ins Prepared by: Dy. Manager (Civil) Approv 8
Y ASSURANCE PLAN STATION BUILDING rk; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark Record Furnished check acceptance norms 100% Client's approved drawings/ IR/QCC No BOQ Yes 100% Tech. Specification/BOQ - 100% Tech. Specification/BOQ JMR Yes 100% Tech. Specification/BOQ JMR Yes Tech/RCC Piling 100% Client's Drawings/BOQ IR/QCC Yes Yes Tech/RCC Piling 100% Client's Drawings/BOQ IR/QCC Yes C/Tech/RCC 100% Tech. Specification IR/QCC Yes Yes Tech/RCC Piling 100% Client's Drawings/BOQ IR/QCC Yes 100% Client's Drawings/BOQ JMR Yes 100% Tech. Specification/BOQ JMR 100% CESC guidelines - cates Electrical Wiring) spection test shall be performed as deemed appropriate. ved by: GM (Con) Issued by: Manager (Civil) 8
STANDARD QUALITY FOR STRUCTURAL WORK QAP No. QAP/Tech/Structural W Sl. No. Item Category Type / Method of Che AB CD 1 Pre-Fabrication activities Major Outsource calibration 1.1 Review of calibration certificate of Major Welding machine/ outsource calibration instruments/ testing equipments 1.2 Field calibration (if applicable) 2 Incoming naterial inspection Major Mechanical & Chemical properties 2.1 Structural steel sections 3 Welding Major Mechanical & Chemical properties 3.1 Welding electrode 3.2 WPS/ PQR Critical Verification establishment 3.3 Welder's performance qualification Critical Verification / Qualification 3.4 Preparation and approval of Major Review fabrication drawing Major Visual 4 Fabrication activities Major Visual/ Measurement 4.1 Material Major Visual/ Measurement 4.2 Checking of straightness/warping of rolled sections 4.3 Dimension and fit-up checks 9
Y ASSURANCE PLAN K IN STATION BUILDING Work; Rev: 00; Dated: 26.03.2022 eck Extent of Reference document and Format of Records to Remark Record be Furnished check acceptance norms EF G HI 100% T.C. verification - Calibration 100% T.C. verification report - Calibration report 100% T.C. verification along with - MTC identification 100% As per manufacturing test - MTC 100% certificate WPS/PQR Document verification As per IS 100% 7307, WPQ Document verification part1/ 100% Approved As per the drawing approved ASME IX drawing by CESC Limited As per IS 7307, part1/ ASME IX - 100% As per the drawing approved - MTC 100% Abys CpeErStCheLdimraitweidng approved Checklist As per 20% Checklist by CESC Limited As per As per the drawing approved Checklist Checklist by CESC Limited 9
STANDARD QUALITY FOR STRUCTURAL WORK QAP No. QAP/Tech/Structural W Sl. No. Item Category Type / Method of Che 4.4 Check for welding Major Visual/ Measurement 4.5 Preparation of surface prior to Major Visual/ Measurement application of primer and painting 4.6 Application of paint Major Review 4.7 Checking of primer and paint Major Visual/ Measurement/ Checking of DFT 4.8 Identification/marking by hard Major Visual punch 5 Erection 5.1 Check for alignment, straightness, Critical Visual/ Measurement as per verticality, orientation of members 5.2 Fastening of erection Major Visual bolts/connection bolts 5.3 Check for site welds Major Visual 6 Painting 6.1 Check delivered goods are fresh Major Manufacturers Specification / Expiry Dat by reading Batch no & age per QCC/Tech/Painting 6.2 Approval of the means of painting Major Visual Check as per QCC/Tech/Painting like brush, roller or spray and do a trial for conforming to the desired shade/colour (finish), no of coats, thickness etc. 6.3 Appropriate preparation of surface. Major Visual Check as per QCC/Tech/Painting 7 Galvanization 7.1 Check thickness of Galvanization Major Material Test using coating thickness me as per QCC/Tech/Painting and Coating Note: This QAP shall be read along with PO and Technical Specifications. Any additional ins Prepared by: Dy. Manager (Civil) Appro 1
Y ASSURANCE PLAN K IN STATION BUILDING Work; Rev: 00; Dated: 26.03.2022 eck Extent of Reference document and Format of Records to Remark Record be Furnished check acceptance norms 20% As per the drawing approved Checklist As per Checklist 20% 20% by CESC Limited 20% As per the drawing approved Checklist As per 20% by CESC Limited Checklist In compliance with Checklist As per Manufacturer's technical Checklist data sheet In compliance with Checklist As per Manufacturer's technical Checklist data sheet As per the drawing approved Checklist As per by CESC Limited Checklist 50% As per the drawing approved Checklist As per 50% by CESC Limited Checklist 50% As per the drawing approved Checklist by CESC Limited As per As per the drawing approved Checklist Checklist by CESC Limited As per Checklist te/ Visual Check as 100% Manufacturers Test IR/QCC Yes g and Coating Certificate /BOQ IR/QCC Yes 100% Tech. Specification / BOQ g and Coating 100% Tech.Specification IR/QCC Yes IR/QCC Yes easuring instrument Random Tech. Specification / BOQ spection test shall be performed as deemed appropriate. oved by: GM (Con) Issued by: Manager (Civil) 10
STANDARD QUALITY FOR CIVIL MATER QAP No. QAP/Tech/Civil Material Ins Sl. No. Material Reference Specification/Codes Basis of Acceptance 1 Check for Cement 1.1 Chemical & Physical IS:455-1989 Visual Check/ Manufacturer's Test properties Certificate (MTC). Manufacturing dat should not be older than two months at the time of use. 2 Check for Coarse Aggregate 2.1 Size & grading IS:383-2016 2.2 Water Absorption Visual/ Testing (at Site/ Test Certificate from CESC-approved 2.3 Specific Gravity IS:383-2016 Testing Agency) 2.4 Flakiness Index Visual/ Testing (at Site/ Test Certificate from CESC-approved 2.5 Bulk Density IS:383-2016 Testing Agency) 3 Check for Fine Aggregate Visual/ Testing (at Site/ Test Certificate from CESC-approved 3.1 Size & grading IS:383-2016 Testing Agency) 3.2 Water Absorption Approved Brand in sealed conditions and well within the expiry date. 3.3 Specific Gravity IS:383-2016 Site Test Report 3.4 Bulk Density IS:383-2016 Site Test Report 3.5 Deleterious Materials IS:383-2016 Visual/ Testing (at Site / Test Certificate from CESC-approved 3.6 Silt & Clay Content IS:383-2016 Testing Agency) 4 Check for Water 4.1 pH value IS:456-2000 4.2 Limits of acidity IS:456-2000 4.3 Limits of alkalinity IS:456-2000 Percentage of solids. Chlorides. Suspended 4.4 matter. Sulphates. IS:456-2000 Inorganic solids. Organic solids. 5 Check for Admixture 5.1 pH Value 5.2 Chlorides IS:9103 5.3 Specific Gravity 6 Check for Bentonite 6.1 Sp. Gravity of Fresh IS: 2911 (Part-1/Sec-2) Bentonite 6.1 Sp. Gravity of IS: 2911 (Part-1/Sec-2) Contaminated Bentonite 7 Check for Bricks 7.1 Compressive Strength 7.2 Water Absorption IS: 1077: 1992 / IS 3495:1992 7.3 Efflorescence 7.4 Physical Dimension 1
Y ASSURANCE PLAN RIAL INSPECTION spection; Rev: 00; Dated: 26.03.2022 Quantum/Frequency Inspection Agency Remarks ate For each manufacturer- CESC / Third Party In case of any dispute, CESC will reserve the right to s specific consigment delivered conduct requisite tests as per the relevant codal at site provisions for any consignments at CESC-approved Testing Agency & cost thereof shall be borne by the vendor, if the results are unsatisfactory. Results of the tests shall be binding on all concerned. Cost of consequent remedial measures, if any, shall have to be borne by the vendor. For each consigment of up CESC / Third Party to 500 cu ft delivered at site CESC / Third Party CESC / Third Party CESC / Third Party CESC / Third Party For each consigment of up CESC / Third Party to 500 cu ft delivered at site CESC / Third Party CESC / Third Party CESC / Third Party CESC / Third Party CESC / Third Party For any structural concrete CESC / Third Party casting over 50 Cum. CESC / Third Party CESC / Third Party CESC / Third Party s For each manufacturer- CESC / Third Party specific consigment delivered CESC / Third Party at site CESC / Third Party For each operation CESC / Third Party For each operation CESC / Third Party For each manufacturer- CESC / Third Party specific consigment delivered CESC / Third Party at site CESC / Third Party CESC / Third Party 11
STANDARD QUALITY FOR CIVIL MATER QAP No. QAP/Tech/Civil Material Ins Sl. No. Material Reference Specification/Codes Basis of Acceptance 8 Check for Steel Reinforcement (Fe 500) 8.1 Chemical & Physical IS:1786-2008 Visual Check/ Manufacturer's Test properties Certificate (MTC) 9 Check for Concreting Mix Design Calculation and Batch 9.1 Ready Mix Concrete 9.2 Nominal Mix IS: 2911 (Part-1/Sec-2), IS: 456-2000, Report (to be furnished by the IS: 10262 & SP: 23. manufacturer). Time elapsed betwee charging at plant and pouring at site to be restricted to 3 hours. IS:456-2000/Specifications laid down Appropriate/ approved Batch Box of in BOQ uniform size and good conditions to be used for mixing. 9.3 Slump Check IS: 2911 (Part-1/Sec-2), IS: 1199 Site Checking / Concrete Pour Card 9.4 7 Days' Cube Compressive IS: 456-2000, IS: 516 Results of Cube Test done at Site/ Strength Check CESC-approved Lab 28 Days' Cube IS: 456-2000, IS: 516 Results of Cube Test done at Site/ 9.5 Compressive Strength CESC-approved Lab Check 10 Check for APP membrane 10.1 Material ASTM D6222/D6222M and Visual Check/ Manufacturer's Test D6223/D6223M Certificate (MTC). Note: This QAP shall be read along with PO and Technical Specifications. Any additional inspection test sh Prepared by: Dy. Manager (Civil) 1
Y ASSURANCE PLAN RIAL INSPECTION spection; Rev: 00; Dated: 26.03.2022 Quantum/Frequency Inspection Agency Remarks For each manufacturer- CESC / Third Party In case of any dispute, CESC will reserve the right to specific consigment delivered conduct requisite tests as per the relevant codal at site provisionsfor any consignments at CESC-approved Testing Agency & cost therof shall be borne by the vendor, if the results are unsatisfactory. Results of the tests shall be binding on all concerned. Cost of consequent remedial measures, if any, shall have to be borne by the vendor. en For consignment deliverd at CESC / Third Party site by each Transit Mixer. f CESC / Third Party o For each site mixing batch For each site mixing batch / CESC / Third Party d consignment deliverd at site by RMC agency. As per IS: 456-2000 CESC / Third Party As per IS: 456-2000 CESC / Third Party CESC / Third Party hall be performed as deemed appropriate. Approved by: GM (Con) Issued by: Manager (Civil) 12
STANDARD QUALITY FOR CONSTRUCTION OF ELECTRICA QAP No. QAP/Tech/Electrical Wi Sl. No. Item Category Type / Method of Check AB CD 1 Electrical Equipment Major Visual check for Type / Make / Model / Ratin BOM/Packing List etc. 1.1 Verification including Loose Items. Electrical major items like i) Physical and Dimension check. 1.2 LTACDB/ LDB/ PDB/ Main Major ii) Document Verification / Manufacturer Tes switch/ MCCB etc. review 2 Installation of Electrical equipment 2.1 Installation of major electrical Major Visual check/ measurement equipment 2.2 Conduit material and Major Visual check/ measurement installation Major Visual check/ measurement 2.3 Wiring material and installation Termination (glands, lugs, Major Visual check/ measurement 2.4 correctness, tightness, TB condition etc) 3 Earthing associated with Electrical installation 3.1 Earthing arrangement Major Visual Check for Double Earth connection 4 Signage 4.1 Signage/ Identification Major Visual Checks for adequate signage 5 Site Acceptance Test Visual Check & Measurement of the followin test/parameters: i) Continuity Test 5.1 Site Acceptance Test Critical ii) Functional test / logic test for DCELP iii) IR Values iv) Lux Level 1
Y ASSURANCE PLAN AL WIRINGS IN STATION BUILDING iring; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format Records to Remark of be Furnished check acceptance norms Record EF GH I ng/ Dimension 1 per Lot Purchase Order / Technical IR/QCC Yes specification / Packing List Yes st Certificate 100% Purchase Order/ Approved IR/QCC drawing / Technical No specification No No 100% Approved Spec/ drawing/ -- No 50% SOP -- 50% -- Approved Spec/ drawing/ 100% SOP -- Approved Spec/ drawing/ SOP Approved Spec/ drawing/ SOP 100% Approved drawing -- No 100% Approved drawing -- No ng 100% Internal Specification/ IR/QCC Yes Approved drawing 13
STANDARD QUALITY FOR CONSTRUCTION OF ELECTRICA QAP No. QAP/Tech/Electrical Wi Sl. No. Item Category Type / Method of Check ABC D 6 Final Documentation Documentation for records: i) Stage Inspection Reports & Test Certificat 6.1 Final Documentation Critical ii) CESC Standard Checklist (QCC/Tech/Ele iii) HOTO Checklist iv) As-Built Single Line Diagram. Note: This QAP shall be read along with PO and Technical Specifications. Any additional Prepared by: DM (Con) Approved by: GM (Con) 1
Y ASSURANCE PLAN AL WIRINGS IN STATION BUILDING iring; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format Records to Remark of be Furnished check acceptance norms Record EF GH I tes 100% CESC guidelines -- Yes ectrical Wiring) l inspection test shall be performed as deemed appropriate. Issued by: SDM (Con) Reviewed by: BVIL 14
STANDARD QUALITY A CONSTRUCTION OF STATION EARTHING QAP no. QAP/Tech/Earthing Work LP Sl. No. Item Category Type / Method of Check ABC D 1 Before Installation 1.1 Soil Resistivity Major Visual Check of Test Certificates & Review of from Testing Department 1.2 Earthing Calculation Major Review of Earthing Calculations based on site & system configuration 1.3 Earth Grid Design & Major Review Drawing 1.4 BOM Verification Major Visual check & Measurement for GI Flats/ CI P Copper Cable 2 Electrical Earthing Execution & LA System 2.1 Earth Pit Resistance Major Measurement for Earth Resistance of individu & overall grid 3 Installation / Laying of Earthgrid 3.1 Earth Pit Major Visual Check. 3.2 Inter connection of Earth Major Visual checks for continuity. Pits 3.3 Weld Quality Major Visual check. Corrosion Protection 3.4 (Galvanization, SS bolts Major Visual check. etc) 4 For Earthing associated with LA System 4.1 Earth Pit / Grid / Risers Major Visual Check for dedicated Earth pit, earth grid risers Earth pit at nearest point 4.2 from riser. Minimum joints Major Visual Check or bends in earth riser/ runner 1
ASSURANCE PLAN FOR G AND LIGHTNING PROTECTION SYSTEM P System; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark check acceptance norms Record Furnished EF GH I Test report 100% IS 3043 IR/QCC Yes e conditions 100% IS 3043/ IEEE 80 IR/QCC Yes Pipes/ 100% Approved Drawing IR/QCC Yes 100% Approved Specification IR/QCC Yes ual electrode 100% IS/ Tech Specs/ Approved IR/QCC Yes drawing/ IS 3043 100% IR/QCC Yes 100% Approved drawing/ IS IR/QCC Yes 100% 3043 IR/QCC Yes Approved drawing Yes Approved drawing/ CESC Guideline 100% CESC Guideline IR/QCC d and earth 100% Approved drawing IR/QCC Yes 100% Approved drawing IR/QCC Yes 15
STANDARD QUALITY A CONSTRUCTION OF STATION EARTHING QAP no. QAP/Tech/Earthing Work LP Sl. No. Item Category Type / Method of Check ABC D 5 Signage 5.1 Signage/ Identification of Major Visual Checks for adequate Sinage (Purpose, Earth Pits Value, Date of testing). 6 Site Acceptance Test after Installation of Earthing & LA System Visual Check & Measurement for following Te Parameters: 6.1 Site Acceptance Test Critical i) Completeness ii) Continuity Test iii) Earth Resistance 7 Final Documentation Documentation for records: i) Stage Inspection Reports & Test Certificates 7.1 Final Documentation Critical ii) CESC Standard Checklist (QCC/Tech/Earth iii) HOTO Checklist iv) As-Built drawing Note: This QAP shall be read along with PO and Technical Specifications. Any additional Prepared by: DM (Con) Approved by: GM (Con) 1
ASSURANCE PLAN FOR G AND LIGHTNING PROTECTION SYSTEM P System; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark I check acceptance norms Record Furnished EF GH , Earth 100% IS 3043/ CESC Guideline IR/QCC Yes ests/ 100% Approved drawing / Test IR/QCC Yes Reports / CESC Guidelines s 100% CESC Guidelines -- Yes hing Work) l inspection test shall be performed as deemed appropriate. Issued by: SDM (Con) Reviewed by: BVIL 16
STANDARD QUALITY FOR FABRICATION AND FIXING OF CON QAP no. QAP/Tech/Control Cable Tra Sl. No. Item Category Type / Method of Check ABC D 1 Before Installation 1.1 Cable Tray Design & Major Visual Check. Drawing 1.2 Hot Dip Galvanized Cable Visual Check for GI Coating & Uniformity. Tray Major Measurement of coating thickness & Review certificates 2 Cable Tray Execution Visual Check for following parameters: i) Cable tray route as per drawing ii) Cable trays free from sharp edges. iii) Physical damages during installation. 2.1 Cable Tray Installation Major iv) Straightness & Alignment v) Coupler Plates securely fastened with ad of Nuts/ Bolts vi) Adequte number of cable tray support us approved drawings. 3 Earthing arrangement of Panel 3.1 Earthing Major Visual check for continuous earth connectio 4 Signage 4.1 Signage for Cable Tray Minor Visual Check for adequate signage. 5 Site Acceptance Test after Installation i) Visual Check for completeness and overa 5.1 Site Acceptance Test Major and accessibility. ii) Measurement of lenght/ position / level 6 Final Documentation Documentation for records: i) Test Certificate for GI coating thickness. 6.1 Final Documentation --- ii) CESC Standard Checklist (QCC/Tech/Co Tray Work) iii) HOTO Checklist iv) Tray layout drawing Note: This QAP shall be read along with PO and Technical Specifications. Any additional Prepared by: DM (Con) Approved by: GM (Con) 1
Y ASSURANCE PLAN NTROL CABLE TRAY AND DISMANTLING ay Work; Rev: 00; Dated: 26.03.2022 Extent of Reference document and Format of Records to be Remark check acceptance norms Record Furnished I E F GH w of Test 100% Tech Specs/ Approved IR/QCC Yes 100% drawings IR/QCC Yes Tech Specs/ Approved drawings/ IS 2629 100% Tech Specs/ Approved -- No dequate number drawings/ IS/ IEC 61537 sed as per on 100% Approved drawing IR/QCC Yes Yes 100% Tech Specs/ Approved IR/QCC drawings/ IS/ IEC 61537 Yes all workmanship 100% Tech Specs/ Approved IR/QCC drawings/ IEC 61537 ontrol Cable 100% CESC guidelines -- Yes l inspection test shall be performed as deemed appropriate. Issued by: SDM (Con) Reviewed by: BVIL 17
STANDARD QUALITY A INSTALLATION, TESTING COMMISSIO QAP no. QAP/Tech/ITC-Cap Ban Sl. No. Item Category Type / Method of Check AB CD 1 Before Work Major i) Visual checks for Cracks / Overall Site C 1.1 Foundation ii) Measurement for Overall dimensions / C / Orientation 1.2 BOM / Packing List Major Visual checks 1.3 Capacitor Unit Major Document review of Test Certificates 1.4 Capacitor bank enclosure Major Measurment dimension 2 Capacitor Bank Installation 2.1 Testing of Capacitor bank Major Measurment unit 2.2 Capacitor Bank Unit Major Visual Check & Measurement 2.3 NCT/ Reactor/ Busbar Major Visual Check & Measurement 2.4 Entry point door trip (as Major Visual Check applicable) 3 Earthing associated with Capacitor bank 3.1 Earthing Major Visual Check for Double Earth connections 4 Signage Major Visual check for adequate signage 4.1 Signage/Identification 5 Site Acceptance Test Major Visual Check and Measurement for tests/p i) IR Value 5.1 Site Acceptance Test ii) Capacitor Bank balancing check 1
ASSURANCE PLAN FOR ONING OF HV/EHV CAPACITOR BANK nk; Rev: 00; Dated: 26.03.2022 k Extent of Reference document and Format Records to Remark of be Furnished check acceptance norms Record E F GH I Cleanliness. Tech Specs/ Approved IR/QCC Yes Coordinate / Level 100% drawings Yes 100% Purchase order/ Tech IR/QCC Yes 100% Specs/ Approved drawings IR/QCC Yes 100% IR/QCC Tech Specs/ Approved drawings Tech Specs/ Approved drawings 100% Tech Specs/ Approved IR/QCC Yes 100% drawing / CESC Guideline Yes 100% Yes 100% Tech Specs/ Approved IR/QCC Yes drawing / CESC Guideline Yes Yes Tech Specs/ Approved IR/QCC Yes drawing / CESC Guideline IR/QCC Approved drawing / CESC Guideline s provided. 100% Tech Specs/ Approved IR/QCC parameters: drawing / CESC Guideline 100% CESC Guideline IR/QCC 100% Tech Specs/ Approved IR/QCC drawing / CESC Guideline 18
STANDARD QUALITY A INSTALLATION, TESTING COMMISSIO QAP no. QAP/Tech/ITC-Cap Ban Sl. No. Item Category Type / Method of Check AB C D 6 Final Documentation Documentation for records: 6.1 Final Documentation Critical i) Stage Inspection Reports, Test Certificat ii) CESC Standard Checklist (QCC/Tech/IT iii) HOTO Checklist Note: This QAP shall be read along with PO and Technical Specifications. Any additional Prepared by: DM (Con) Approved by: GM (Con) 1
ASSURANCE PLAN FOR ONING OF HV/EHV CAPACITOR BANK nk; Rev: 00; Dated: 26.03.2022 k Extent of Reference document and Format Records to Remark of be Furnished check acceptance norms Record E F GH I tes 100% CESC Guideline -- Yes TC-Cap Bank) l inspection test shall be performed as deemed appropriate. Issued by: SDM (Con) Reviewed by: BVIL 19
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- 136
- 137
- 138
- 139
- 140
- 141
- 142
- 143
- 144
- 145
- 146
- 147
- 148
- 149
- 150
- 151
- 152
- 153
- 154
- 155
- 156
- 157
- 158
- 159
- 160
- 161
- 162
- 163
- 164
- 165