PSL-01. Project Status Letter GILEAD NB - 324 Rosendin Electric, Inc. Project # 280151 Division 08 001 Work Week 01 - TEST STATUS LETTER March 22, 2017 Wayne Peterein McCarthy Builing Company Coordination and Design: 1. Regular Meeting Attended are: Wednesday Coordination, Thursday Lab Equipment. 2. Current Design Drawing Completion Level : Permit dated 12/16/16, working on changes For Construction drawings 3. Current Design Assist: Circuiting Lighting QA QC will be complete to Lily on 3/22/2017and Power for Office Areas, response for larger panels answered 3/20/2017. Level 4 complete 3/24/2017. levels 2 & 3 revived 3/17/2017 to be complete 3/29/2017. Note Power for all floors are still lacking AV and Office equipment power requirements for dedicated circuits. 4. Lab Lighting and Controls Re-Estimate due to McCarthy/Gilead by 4/5/17. Office Lighting and Controls Re-Estimate due to McCarthy/Gilead by 4/11/17 5. All Up-Dated Drawings and one line drawings need to be date stamped Value Engineering: 1. $<882,430> reduce pending, $507,914 add pending, $<307,480> rejected, and $<1,120,820> of work integrated. 2. Our latest version of the log is 02/24/17 and needs updating, last VA/VE Meetings 01/19/17. 3. There are log suggestions regarding VE's used at other Gilead buildings (NB-357) that need EEOR feedback. 4. Per E-mail from Wane Peterin dated 3-16-2017 lighting and control revised pricing due 4/11/2017 RFI Status: 1. Rosendin RFI 035 Submitted on 3/20/2017, Response needed by 03/24/2017 2. Rosendin RFI 035 Submitted on 3/20/2017, Response needed by 03/24/2017 3. We would like better access to Teamsight for better collaboration with MBC and the project. 4. REI RFI Status - (38) Total, (26) Completed, (3) New, (2) Submitted, (3) Returned, (2) Draft Submittal Status: 1. REI Submittals 26 0500, 26 0519, 26 0533, and 26 0543 have been submitted not yet responded to 2. REI Submittals 26 0554, 26 0553, 26 2726, and 26 2727 are currently being developed for submission 3. We would like to discuss the breakdown requirements for submittal packages. PCO Status: 1. PCO 001 & 002 have been approved and included in Part A contract 2. We are currently on revision #4 of work to be done prior to 05/31/17 - R2 was submitted on 3-16-17. 3. All PCO's will require final design / confirming RFI's for accurate PCO pricing, until then pricing is ROM. 4 . PCO #006 for H fixtures to be revised 5. PCO 007 Has been submitted for Porcurement of equipment with long lead time. Look Ahead Concerns: 1. We need release of funds to immediately place long lead equipment purchase orders. 2. We receive changed drawings and other documents as un-dated bootleg information. We welcome your comments related to this communication and are willing to provide additional details and backup. General Updates Date Reference Item Detail 03/30/2017 first issue real test of first issue - under general updates Issues Log Printed on: 3/30/2017 PSL-01. Project Status Letter Page 1
Number Date Created Subject Description Responsible Due Date 0001 3/30/2017 test where is this McCarthy 3/16/2017 Request for Information - Open Log REI RFI# GC RFI # Date Submitted Subject Responsible Due Date 004 12/14/2016 Load Bank Cam Lock Locations 12/24/2016 005 12/15/2016 Structured Wiring Conduit Requirements 12/20/2016 007 0123 1/18/2017 Request for Revised Cold Room Specifications Flad 1/28/2017 008 0008 1/20/2017 Clarification on Cold Room Distribution Branch Flad 1/30/2017 011 1/6/2017 Using Styrofoam Backfill and fiberglass strut 1/12/2017 021 2/2/2017 Ceiling Panels 2/12/2017 025 2/6/2017 Existing Underground Utility Vaults 2/10/2017 026 0015 2/15/2017 Gilead324 & PG324 are separate Parcels McCarthy 2/22/2017 030 3/3/2017 Underground Fire Alarm and BMS 3/13/2017 032 0210 3/9/2017 Floor Box Specifications 3/16/2017 034 0202 3/3/2017 Level 2-4 Floor Box Location Flad 3/13/2017 Submittal Package - Open Log #-SpecSection-Rev Date Submitted Description Responsible Due Date 0001-26 05 00-0 3/22/2017 Common Work Results for Electrical McCarthy 3/24/2017 0002-26 05 05-0 3/22/2017 Excavation & Backfill McCarthy 3/24/2017 0003-26 05 43-0 3/22/2017 Underground Ducts and Raceways for Electrical McCarthy 3/24/2017 Systems 0004-26 05 19-0 3/22/2017 Product Data for Low-Voltage Power Wire and Cable McCarthy 3/24/2017 0005-26 05 33-0 3/22/2017 Product Data for Raceway and Boxes for Electrical McCarthy 3/24/2017 Systems Procurement Updates Description Release Due Drop Dead Projected Ship Confirmed Date Matl Due Date Matl Date Date Date Ship Date on Jobsite Received Outstanding CORs COR # Date Submitted Description Amount Proceeded 0.001 11/02/2016 Copy of Part B Preconstruction Budget $1,817,201.00 No 000 11/02/2016 Part A Preconstruction Budget $1,817,201.00 No 003 12/30/2016 NB324 - Safety Officer 01-03-17 through 05-31-17 $88,790.00 No 004 12/30/2016 NB324 - Part B per Sched 01-03-17 through $2,316,139.00 No 05-31-17 006 H1 VS S1 fixture ($16,898.00) No 007 03/23/2017 Early Pourcurement of Equipment $8,293,323.00 No Printed on: 3/30/2017 PSL-01. Project Status Letter Page 2
Search
Read the Text Version
- 1 - 2
Pages: