["PREMIUM AMERICAN TECHNOLOGY PAINT SUPER GLOSS PAINT FILM OUTSTANDING STAIN CLEANING ANTI-MOLD EFFECTIVE HEAT REDUCTION DURABLE AND BEAUTIFUL COLOR","PREMIUM AMERICAN TECHNOLOGY PAINT PREMIUM AMERICAN TECHNOLOGY PAINT DESCRIPTIONS OF PRODUCT Premium smooth interior paint Levist-Nano is a premium color-coating \ufb01nish interior paint, with a smooth paint \ufb01lm, high coverage; rich and diverse colors, easy to apply. Do not contain harmful ingredients, safe for operators and users. COMPONENTS OF PAINT Ingredients: Titanium Dioxide, resin, water and other mixtures. CONSTRUCTION CONDITIONS Surface preparation: Before applying the premium smooth interior paint Levist-Nano, the wall surface must be painted with 02 layers of primer. The wall surface must be clean, free from dirt, grease, salt, alkali, acid, and free from moss and mold. The wall surface must not be too dry (below 11%) or too wet (over 16%), the wall surface is best after applying the last layer of primer from 4 to 6 hours in normal weather conditions (no humidity, no wet rain). Application process: Before applying a paint roller, the paint bucket must be stirred for 5 minutes to make the paint \ufb02exible and increase the permeability of the paint, and the paint components that are better mixed. Before stirring well, do not divide the paint bucket (can) into two parts, which will lead to two parts of paint with different quality and color. Layers of paint is 02 to 03 depending on each color. The time between layers of paint is from 3 to 5 hours in normal weather conditions (no humidity, no wet rain). Do not add water. Adding water will make the paint be different from the selected color. The paint \ufb01lm is not too thick or too thin. Roll thoroughly so that the paint \ufb01lm is evenly spread, and the color is even. Do not apply paint in wet weather conditions (humidity, rainy weather, etc.), and in a weather temperature that is over 36 degrees Celsius or below 12 degrees Celsius. Used paint bucket should be used up within 05 days. Absolutely do not use the premium smooth interior paint for outdoor, it will be faded and appeared a thin layer of powder on the paint \ufb01lm after a while. Construction tools: Paint roller, paint brush, paint sprayer. SPECIFICATIONS Smooth Under color fan deck Type of paint 4 m2 \u2013 5 m2\/kg Color 3 \u2013 5 hours Coverage 10 days in minimum Surface drying time Bonding stabilization time of paint \ufb01lm RECOMMENDED PAINT SYSTEM Putty 1 - 2 layers Premium interior and exterior putty LEVIST-NANO Primer 2 layers Alkali Resistant Interior Primer LEVIST-NANO Coating 2 -3 layers Premium smooth interior paint LEVIST-NANO INFORMATION OF SAFETY AND STORAGE Close the lid tightly, store in a cool and dry place, combined with good ventilation, away from heat sources and ignition devices, out of reach of children. Wear gloves and facemasks when applying. Do not pour paint into the environment, dispose of paint packaging in the right place. 36 months Safety Health Environment Shelf life","PREMIUM AMERICAN TECHNOLOGY PAINT OUTSTANDING ALKALI RESISTANCE ANTI-MOLD PROTECT PAINT COLOR HIGH COVERAGE ANTI-PEELING","PREMIUM AMERICAN TECHNOLOGY PAINT PREMIUM AMERICAN TECHNOLOGY PAINT DESCRIPTIONS OF PRODUCT Alkaline interior paint Levist-Nano is an interior primer paint with the ability to resist alkalis, with high coverage, helping the color paint layer (coating) to increase its gloss, anti-mold, anti-thin layer of powder on the paint \ufb01lm, anti-color cross stain, colorfast. Eco-Friendly product, safe for operators and users. COMPONENTS OF PAINT Ingredients: Titanium Dioxide, resin, water and other mixtures. CONSTRUCTION CONDITIONS Surface preparation: Before applying the alkaline interior primer paint Levist-Nano, the wall surface can be put putty (putty powder) or not (depending on the construction custom of each region) but must be clean, free from dirt, grease, salt, alkali, acid, and free from moss and mold. The wall surface must not be too dry (below 11%) or too wet (over 16%) equivalent to the wall surface after plastering from 21 to 28 days in normal weather conditions (no humidity, no wet rain). If it is a wall surface with putty (putty powder), it must be sanded and only applied the \ufb01rst primer when the wall surface has been last put at least 12 hours in normal weather conditions (no humidity, no wet rain) Application process: Before applying a paint roller, the paint bucket must be stirred for 5 minutes to make the paint \ufb02exible and increase the permeability of the paint, and the paint components that are better mixed. Before stirring well, do not divide the paint bucket (can) into two parts, which will lead to two parts of paint with different quality and color. Layers of paint in minimum is 02. The time between layers of paint is from 3 to 5 hours in normal weather conditions (no humidity, no wet rain). For the layer of primer 01, add from 5% to 10% clean water; in case the wall is too dry, the air is too dry or hot, the wall is absorbed quickly from water, the ratio of adding clean water can be up to 15%. For the layer of primer 02, it can be added clean water or not. The paint \ufb01lm is not too thick or too thin. Roll thoroughly so that the paint \ufb01lm is evenly spread. Do not apply paint in wet weather conditions (humidity, rainy weather, etc.), and in a weather temperature that is over 36 degrees Celsius or below 12 degrees Celsius. Do not use the alkaline interior primer paint as primer for the paints such as pearl gloss, super gloss interior and other exterior paints. Construction tools: Paint roller, paint brush, paint sprayer. SPECIFICATIONS Interior primer White Type of paint 5 m2 \u20136 m2\/kg Color 3 \u2013 5 hours Coverage 10 days in minimum Surface drying time Bonding stabilization time of paint \ufb01lm RECOMMENDED PAINT SYSTEM Putty 1 - 2 layers Premium interior and exterior putty LEVIST-NANO Primer 2 layers Alkali Resistant Interior Primer LEVIST-NANO Coating 2 -3 layers Smooth interior paint LEVIST-NANO Effective clean paint LEVIST-NANO Super white interior paint LEVIST-NANO INFORMATION OF SAFETY AND STORAGE Close the lid tightly, store in a cool and dry place, combined with good ventilation, away from heat sources and ignition devices, out of reach of children. Wear gloves and facemasks when applying. Do not pour paint into the environment, dispose of paint packaging in the right place. 36 months Safety Health Environment Shelf life","PREMIUM AMERICAN TECHNOLOGY PAINT ULTIMATE CLEANING SMOOTH PAINT FILM HIGH COVERAGE HIGH ADHESION ANTI-EXFOLIATION","PREMIUM AMERICAN TECHNOLOGY PAINT PREMIUM AMERICAN TECHNOLOGY PAINT DESCRIPTIONS OF PRODUCT Premium effective cleaning pain Levist-Nano is a color coating paint for interior \ufb01nish, with smooth paint \ufb01lm, good adhesion, high coverage, diverse colors, easy to apply, easy to clean, high color fastness. It does not contain hazardous substances, is safe for construction workers and users. COMPONENTS OF PAINT Ingredients: Titanium Dioxide, resin, water and other mixtures. CONSTRUCTION CONDITIONS Surface preparation: Before applying Levist-Nano effective cleaning paint, the wall surface must be painted with 02 primers. The wall surface must be cleaned; no dirt; no grease, salt, alkali, acid; no moss, mold. The wall surface must not be too dry (less than 11%) or too wet (more than 16%), the wall surface is in the best condition after applying the \ufb01nal primer from 4h to 6h in normal weather conditions (no humid weather, rain or moisture). Application process: Before rolling the paint, it is necessary to stir the paint bucket for 05 minutes to make the paint \ufb02exible and increase the osmolarity of the paint, the components of the paint are mixed better. Before stirring, do not divide the paint cans into two parts leading to two different paint parts in quality and color. The number of layers when painting is from 02 to 03 layers depending on each color. The intervals between layers of paint is from 3 to 5 hours in normal weather conditions (no humid weather, rain or moisture). Should not add water to the paint. If more water is added to the paint, the paint color will deviate from the selected color. Do not roll the paint \ufb01lm too thick or too thin. Roll the roll thoroughly so that the paint \ufb01lm evenly and the color is even. Do not carry out painting in wet weather (humid weather, rain...), weather temperature above 36 degrees C or below 12 degrees C. Used paint cans should be used up within 05 days. It is absolutely forbidden to use effective cleaning paint to paint outdoors, because after a while it will be discolored and decomposed. Construction tools: Roller, brush, paint sprayer. SPECIFICATIONS Smooth By color fan deck Type of paint 4 m2 \u2013 5 m2\/kg Color 3 \u2013 5 hours Coverage 10 days in minimum Surface drying time Bonding stabilization time of paint \ufb01lm RECOMMENDED PAINT SYSTEM Putty 1 - 2 layers Premium interior and exterior putty LEVIST-NANO Primer 2 layers Alkali Resistant Interior Primer LEVIST-NANO Coating 2 -3 layers Effective clean paint LEVIST-NANO INFORMATION OF SAFETY AND STORAGE Close the lid tightly, store in a cool and dry place, combined with good ventilation, away from heat sources and ignition devices, out of reach of children. Wear gloves and facemasks when applying. Do not pour paint into the environment, dispose of paint packaging in the right place. 36 months Safety Health Environment Shelf life","PREMIUM AMERICAN TECHNOLOGY PAINT SUPER WHITE PAINT FILM ANTI-MOSS AND MILDEW ANTI-EXFOLIATION EFFECTIVE COVERAGE OUTSTANDING ANTIBACTERIAL","PREMIUM AMERICAN TECHNOLOGY PAINT PREMIUM AMERICAN TECHNOLOGY PAINT DESCRIPTIONS OF PRODUCT Premium supper white interior pain Levist-Nano is a color coating paint for the ceiling surfaces, with smooth paint \ufb01lm, good adhesion, very high whiteness, easy to apply. It does not contain hazardous substances, is safe for construction workers and users. COMPONENTS OF PAINT Ingredients: Titanium Dioxide, resin, water and other mixtures. CONSTRUCTION CONDITIONS Surface preparation: : Before applying Levist - Nano super white interior paint, the wall surface must be painted with 02 primers. The wall surface must be cleaned; no dirt; no grease, salt, alkali, acid; no moss, mold. The ceiling surface must not be too dry (less than 11%) or too wet (more than 16%), the ceiling surface is in the best condition after applying the \ufb01nal primer from 4h to 6h in normal weather conditions (no humid weather, rain or moisture). Application process: Before rolling the paint, it is necessary to stir the paint bucket for 05 minutes to make the paint \ufb02exible and increase the osmolarity of the paint, the components of the paint are mixed better. Before stirring, do not divide the paint cans into two parts leading to two different paint parts in quality and color. Minimum number of coats is 2 coats. The intervals between layers of paint is from 3 to 5 hours in normal weather conditions (no humid weather, rain or moisture). Can add clean water to the paint with ratio from 5% to 10%. Do not roll the paint \ufb01lm too thick or too thin. Roll the roll thoroughly so that the paint \ufb01lm evenly and the color is even. Do not carry out painting in wet weather (humid weather, rain...), weather temperature above 36 degrees C or below 12 degrees C. Paint bucket which is mixed with water should be used up within 05 days. It is absolutely forbidden to use super white interior paint to paint outdoors, because after a while it will be yellowed and decomposed. Construction tools: Roller, brush, paint sprayer. SPECIFICATIONS Smooth Super white Type of paint 4 m2 \u2013 5 m2\/kg Color 3 \u2013 5 hours Coverage 10 days in minimum Surface drying time Bonding stabilization time of paint \ufb01lm RECOMMENDED PAINT SYSTEM Putty 1 - 2 layers Premium interior and exterior putty LEVIST-NANO Primer 2 layers Alkali Resistant Interior Primer LEVIST-NANO Coating 2 -3 layers Super white interior paint LEVIST-NANO INFORMATION OF SAFETY AND STORAGE Close the lid tightly, store in a cool and dry place, combined with good ventilation, away from heat sources and ignition devices, out of reach of children. Wear gloves and facemasks when applying. Do not pour paint into the environment, dispose of paint packaging in the right place. 36 months Safety Health Environment Shelf life","Technical INFORMATION NOTES ON CONSTRUCTION TECHNIQUES AND COMMON PROBLEMS SURFACE PREPARATION STAGE - This is a critical stage in the painting process. Later incidents are frequently caused by poor surface preparation that does not meet technical requirements. - The surface must be stable: \ufb02at, free of cracks, peeling marks, blisters, and mosses. - The wall must be dry: The humidity of the wall must not exceed 16%, or the wall must be allowed to dry after plastering\/embossing for 3-4 weeks in normal weather conditions (sunny, no rain). - The surface must be clean and free of dust, as well as free of stains, grease, and chemicals. When painting old surfaces, all old paint layers, mosses, dust, impurities, and so on must be removed. PLASTERING STAGE - This is the stage in which the wall surface is \ufb02attened, increasing the aesthetics, saving paint, ensuring the uniformity of the paint \ufb01nish, limiting uneven coating \ufb01lm, and causing later seepage and color evaporation. - Follow the instructions on the package for using Levist-Nano putty and plaster powder. - Avoid caking when mixing powder with water. Using a stirrer, pour the powder into the water. - After the plaster layer has dried, \ufb02atten the surface with sandpaper. - Notes on Plastering: Do not plaster while the wall is still wet (humidity greater than 16%). Caking powder should not be used or stored in a wet environment. Apply no more than 2 mm of powder. Do not use powder on a wall that has been sanded with cement or that has been overcoated. For local points that require a thicker plaster layer than 2 mm, add 5% exterior primer to the plaster powder. PRIMER STAGE - A primer is a primer that is applied between the wall (plaster layer) and the color primer. The primer has a protective effect, ensuring that the color primer does not peel, alkalize, stain, or discolor and that the color \ufb01nish is uniform. - The primer must be chosen in accordance with the manufacturer's recommended system, which is printed on the bucket. - It is necessary to avoid dust and impurities falling into the bucket when opening (unsealing) the bucket and stirring the paint before use. - Paint in accordance with the manufacturer's technical instructions on the bucket. Ensure that the time between two coats of paint is greater than two hours. COATING STAGE (COLOUR PAINTING) - Coatings (colored paint) for decoration, building block shaping, and wall surface protection. Choose the appropriate paint based on the project's requirements. - It is necessary to avoid dust and impurities falling into the bucket when opening (unsealing) the bucket and stirring the paint before use. - Paint in accordance with the manufacturer's technical instructions on the bucket. Ensure that the time between two coats of paint is greater than two hours. TECHNICAL NOTES WHEN PREPARING PAINT, PUTTY AND PLASTER POWDER - Clean water is required for paint preparation; prepare with \ufb01ltered water. - Prepare at the correct rate as directed by the manufacturer on the bucket and packaging; not too dense, not too dilute, depending on the humidity of the wall and the environment at the time of application. TECHNICAL NOTES WHEN PAINTING - Wet the roller with clean (\ufb01ltered) water and shake off any excess water before dipping it in the paint. Allowing dry paint to adhere to both ends of the roller is not recommended. Begin painting in the corner of the ceiling \ufb01rst, sweeping in pieces from top to bottom. Starting with a rolling line from the bottom to the top to limit paint splashing out, do not lift the rolling line from the wall, and continue to install the spaces of the M with regular parallel rolling lines. - Rolling all liners and coatings in accordance with the manufacturer's recommendations. - The roller coating must not be excessively thick or thin. PREMIUM AMERICAN TECHNOLOGY PAINT","Technical INFORMATION NOTES ON CONSTRUCTION TECHNIQUES AND COMMON PROBLEMS 1. The paint \ufb01lm is wrinkled after painting * Cause: Because the paint is too thick or uneven, it does not dry at the same rate. Because of improper roller use. Because of the rain or high humidity, the paint \ufb01lm has not dried. Painting in bright sunlight causes the outer layer to wrinkle because it dries too quickly while the inner layer is still wet. Furthermore, if the temperature suddenly drops after \ufb01nishing painting, it can affect the paint layer; the inner paint layer dries slowly and takes longer to dry than the outer layer. * Remediation solution: Scrape the wrinkled paint off the surface, \ufb02atten it, and clean it. Repaint the bucket according to the manufacturer's instructions. Paint the surface evenly, not too thickly or thinly. 2. Porous paint \ufb01lm * Cause: During construction, the paint dries on the paint container's wall or due to dirt. After use, construction tools are not washed. The following paint will cause the paint to porous. The surface that needs to be painted should be thoroughly cleaned because it is full of dust and impurities. Many air bubbles are formed when the paint is diluted. Air bubbles appear on the paint \ufb01lm during construction, and when they dry, they break to form holes. * Remediation solution: Scrape off the old paint, clean the surface, and repaint according to the manufacturer's instructions. 3. Non-homogeneous paint color * Cause: The priming surface is uneven. Make no use of primer. Inadequate roller paint layer. Incompatible primers and coatings result from failing to use the correct paint system recommended by the manufacturer. Use the incorrect base. Painters produce uneven results. Before rolling, do not evenly stir the paint bucket. Inadequate painting, uneven application Construction tools differ in that they both use rollers and brushes. The brush impedes paint spread, resulting in a thicker paint \ufb01lm... and a darker color. Because of the disparity in paint dilution ratios between paints. The temperature is signi\ufb01cantly different from when the previous coatings were painted. * Remediation solution: Depending on the severity of the situation, 1-2 thin layers of paint \ufb01nish can be repainted. 4. Decomposition phenomena on painted surfaces * Cause: Because of the dilution of the paint, the cohesion of the paint is reduced. Do not use or use incorrectly the primer, or use it for the wrong purpose, as indoor paint is used for outdoor paint. * Remediation solution: Scrape off the failed paint, let it dry completely, and then repaint according to the technical instructions on the bucket. 5. Peeled paint \ufb01lm * Cause: The surface to be painted is not clean; there is too much dust and impurity, which reduces the adhesion of the paint layer. The wall is wet, and moisture from the inside is ejected. In violation of construction technique, do not use primer or use primer in violation of the manufacturer's instructions. On a smooth surface, the paint is too thick. Old and new coatings are not compatible. * Remediation solution: Scrape off the old paint, clean the surface, and remove all dust. Repaint in accordance with the manufacturer's technical process printed on the bucket: 02 coats + 02 primers. 6. Blistered paint \ufb01lm * Causes: Construction on too wet surface. Insecure construction conditions: low temperature, wet weather. Construction on too damp surface. Insecure construction conditions: low temperature, wet weather. The layers of paint are too short apart. Construction in high temperature and weather conditions then there is a long rain, low temperature when the paint \ufb01lm is not stable. * Remediation solution: It is advised that the wall surface return to normal temperature, that the airbags automatically collapse, and that the paint \ufb01lm return to normal. When an airbag is punctured or the paint \ufb01lm peels, it must be rebuilt. Remove the old paint and roughen the surface. Under normal weather conditions, allow the wall surface to dry for 3-4 weeks (sunny, no rain). Before painting, clean the surface. Handle moisture sources with care. follow the manufacturer's instructions when painting. 7. The paint \ufb01lm after painting is cracked Cause: There are two common causes: the paint \ufb01lm is cracked by the cracked inner wall or the paint is cracked by the paint. Paint cracking occurs when the paint is either too thin or too thick, or when the surface treatment and cleaning are inadequate. Apply two coats of paint with varying elasticity, and paint in extreme heat or cold. * Remediation solution: Remove all cracked paint, clean, and repaint according to the manufacturer's recommended technique and paint system printed on the bucket. 8. Paint \ufb01lm is mossy and moldy * Cause: Because the painting surface is wet. When the new paint is not thoroughly treated, the old paint layer becomes moldy. 1 paint layer or paint layer is too thin due to insuf\ufb01cient anti-mould agent, paint is too dilute To tighten the exterior paint, use interior paint. The wall is cracked and soaked in moisture. Because the painted surface is frequently damp after painting. * Remediation solution: Scrape off the outer paint layer to allow moisture in the wall to evaporate, dry to the required level: humidity no higher than 16% or wait 3-4 weeks in sunny weather (no rain), thoroughly treat the sources of moisture. Mold can be killed by using detergent chemicals. Thoroughly clean the surface. Replace the paint according to the manufacturer's instructions: 2 coats + 2 primers. PREMIUM AMERICAN TECHNOLOGY PAINT","Technical INFORMATION NOTES ON CONSTRUCTION TECHNIQUES AND COMMON PROBLEMS 9. Paint \ufb01lm has poor coverage *Cause: Paint is too washy. Paint application is not enough layers. The surface for painting is not well prepared, hard, and does not stick to the paint. The skills of workers are not good, the painting is uneven. *Solution: Clean the surface to be painted. Repaint according to the manufacturer's instruction 10. Paint loses its color *Cause: Not use prime. Paint \ufb01lm is moldy. Use tones that are sensitive to light, such as blue, lime, bright red, purple. Use interior paint for exterior. Paint is too washy. The environment is too harsh, area for chemical production, winemaking, honeycomb charcoal stove.... *Solution: Remove the old paint layer, clean the surface. Repaint according to the process and paint system according to the manufacturer's instructions. 11. Paint is foamy *Cause: Construction technique is not good. The use of roller is not inappropriate. The wall surface is dirty, the paint layer is too thick. The construction surface is dry, thirsty and in hot weather, the paint is too condensed. *Solution: Repaint according to the manufacturer's recommended process and Levist-Nano paint system (remove foam before repainting). 12. The paint \ufb01lm is alkaline (discolor), salted *Cause: Paint when the wall surface is wet, the humidity is over 16%. Paint immediately on the plaster wall is too new. Not use primer; the number of prime layer is not suf\ufb01cient; or use white paint instead of primer. The coastal area uses brackish water to mix mortar. There is a contamination of salt from water sources, sand, bricks used in construction. Walls have cracks or absorb moisture from the outside. *Solution: In case of mild salt contamination, color change is not unnecessary, just wipe clean. In case of serious salt contamination, it is necessary to completely scrape off the old paint layer, treat the surface, ensure the removal of absorbent elements, repaint according to the technical process and the Levist-Nano paint system as recommended by the manufacturer. 13. Paint \ufb01lm is saggy *Cause: Paint in too humid or too cold weather. Apply with a spray gun at a too close distance to the surface to be painted. Paint is too washy or the paint layer is too thick, causing melting. *Solution: If the paint is still wet, use a brush or roller to evenly distribute the excess paint. If the paint is dry, sand the surface and clean it and then apply a new layer of paint. 14. Roller traces *Cause: The skills of execution are not good, the application of paint is wrong. Use poor quality or incorrect rollers. Apply layers after the \ufb01rst layer is not completely dry, the paint is too condensed. *Solution: Repaint 1-2 layers of \ufb01nishing paint, use the correct roller. 15. The putty layer has cracked with crow's feet traces *Cause: The putty layer is too thick, exceed the allowed level of 2mm. *Solution: Remove all crow's feet traces by scraping. If the surface of that area is too deeply concave, it is recommended to use cement mortar to make it \ufb02at, then put a new putty layer. 16. The putty layer appears as chalk dust *Cause: A low water volume when mixing can lead to this situation, or uneven mixing is also a cause of chalk dust. Because the application surface is too dry, the water in the kneading mixture has been absorbed into the surface. The mature process (consolidation) of the mixture cannot occur, so the putty layer turns into chalk dust. Due to construction immediately after not mixing, the chemical does not have time to take effect. *Solution: Remove this layer of putty. Clean dust with water and broom. If the surface is too dry, it should be moistened. Mix putty with water thoroughly and wait about 7 to 10 minutes for the chemical to take effect, then stir again before starting to apply. PREMIUM AMERICAN TECHNOLOGY PAINT","EXTERIOR WATERPROOFING ENAMEL INTERIOR We are proud to be the leading paint company in Vietnam in terms of paint quality, giving your home a great space with a collection of thousands of colors for you to choose from. LEVIST-NANO paint is a premium product that brings vibrant colors, luxury appearance and optimal antibacterial function to your home. With the feature of covering cracks and imperfections of the wall surface, our paint keeps your walls smooth. LEVIST-NANO paint product lines are environmentally friendly and safe for users' health because we have completely removed hazardous substances, with light paint smell, very low VOC content, effective antibacterial and anti-mildew ability. The true color technology of LEVIST-NANO paint will enhance and protect your home over time. OUR GUIDE TO CHOOSE FENG SHUI COLORS METAL WOOD SOIL WATER FIRE THANH THANG GROUP JOINT STOCK COMPANY Safety Health Environment Headquaters: My Thai Industrial cluster - Lang Giang District - Bac Giang Province Email: [email protected] Telephone: 0971 176 286 - 0393 01 8888"]
Search