Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore Niche Planning Studio

Niche Planning Studio

Published by NS.SHAMSUL, 2015-03-22 07:25:50

Description: Example of Work

Search

Read the Text Version

PROJECT EXAMPLES NICHE PLANNING STUDIO

MILDURA RIVERFRONT REDEVELOPMENTDESCRIPTION OF WORKThe Mildura Riverfront Redevelopment represents a significant open space renewal project, Niche Planning Studio, acting on behalf of Mildura Rural City Council, securedwhich will reinvigorate the 1.2km stretch of parklands and facilities along the banks of the all planning permits associated with the development of the Mildura RiverfrontMurray River in proximity to the Mildura Central Business District. The project involves the in a timely and efficient manner. This process involved collaborating withcooperation of Local, State and Federal Government and includes an $18.3 million multiple co-consultants, including the input of architects, engineers, urbaninvestment in public infrastructure. In order to facilitate timely delivery of various stages, designers and cultural heritage experts. Additionally, the process requiredbalance the demands of various stakeholders and provide a world class response to careful land use planning in order to respond to a complex pattern of landenvironmental, built form, cultural and heritage constraints, the project required the issuance ownership and tenure.of multiple planning permits. In addition to preparing, lodging and managing all planning permit applications CLIENT LOCATION for the various stages of the project, Niche Planning Studio was involved in the Mildura Rural City Council The Mildura Riverfront preparation of risk mitigation reports to guide proposed forward works undertaken by co-cosultants Tract and Lateral Projects. Our input to this process VALUE START/END DATE was integral to delivering these works in a timely, cost-effective and efficient $18.3 mil 17/8/2013 – 11/12/2013 manner. Niche Planning Studio has secured the following planning permits for the Redevelopment: 1. Promenade/ Jogging and Cycling Pathway 4. Nowingi Place Events Area 2. Nowingi Place Early Works 5. Rowing Club Building 3. Water Play Par 6. Langtree Connection 7. Mildura WharfNICHE PLA NNIN GST UD I O Drawing Source: Tract Consultants (landscape architects)

REGIONAL COMMUNITY INFRASTRUCTUREDESCRIPTION OF WORKNiche Planning Studio is committed to assisting in the ongoing improvement of for both Clients and their respective communities.community infrastructure in regional and rural areas. As a consultancy, we arecognisant of the important contribution that community assets make to the social Through the leveraging of our insightful understanding of regional and rural Planningfabric and cohesiveness of rural centres and the need to ensure that these assets Schemes, relevant Regional Growth Plans and our collaborative approach to permitare aligned with public expectations. discussions, Niche Planning Studio has adeptly managed the permit process for both community groups. Both examples required significant negotiations with the relevantAs part of this commitment, Niche Planning Studio has partnered with a number of Responsible Authority with a focus on balancing the net community benefit ofcommunity groups to secure planning permission for upgrades, extensions and improvements to Club infrastructure with potential amenity impacts in the surrounds.improvements to existing centres. Specifically, our recent involvement with TheWarragul Club and the Colac Bowling Club has delivered high quality outcomes Given our strong team of statutory planners, Niche Planning Studio is well placed to assist community groups to achieve their development goals, whilst ensuring thatLOCATION START/END DATE CLIENT Annual Value community impacts and benefits are carefully managed.Colac April 2014 - present Various $3,000,000 CommunityNIC HE Groups PLA NNIN GST UD I O

STRATEGIC ADVICE - GROWTH CORRIDOR PLANNINGDESCRIPTION OF WORKIn 2012, Niche Planning Studio was approached by a number of landowners Specifically, Niche was engaged to provide advice and make formal submissions onlocated along the Western Highway, Rockbank to assist in the provision of strategic the Western Growth Corridor Plan and undertake negotiations with the Metropolitanplanning advice to retain long term development rights for a variety of land parcels Planning Authority (MPA) and Melton Council, ultimately leading to the identificationlocated within the proposed Mt Atkinson Precinct Structure Plan (PSP). of the subject land for development potential in the draft PSP, released in late 2014. Niche continues to provide advice on the ongoing preparation of the Mt Atkinson PSP.Niche Planning Studio has continued to work extensively with the landownerconsortium to resolve multiple statutory and strategic planning issues, assisting the As a result of the subject landholding being significantly impacted by a Publiclandowners in realising the development potential of the sites. Acquisition Overlay (PAO) for the future construction of the Outer Metropolitan Ring Road (OMR), Niche Planning Studio has leveraged our existing relationships withLOCATION START/END DATE CLIENT Annual Value multiple statutory bodies including the Department of Transport, Planning and Local Infrastructure, Municipal Planning Authority, Melton City Council, VicRoads andMt Atkinson PSP August 2012 - February 2013 ISPT $10,000,000 Melbourne Water to commence compensation processes, ensure the appropriate location of important infrastructure and commence permit applications forNICHE development of the landholdings. PLA NNIN GST UD I O

BALLARAT ROAD COMMERCIAL DEVELOPMENTDESCRIPTION OF WORKNiche Planning Studio assisted in the development of the Super A-Mart and Niche Planning Studio provided advice specifically designed and constructed toassociated office, retail and restaurant on Ballarat Road in Braybrook. The site was suit the intricate specification requests of a number of tenants consisting of a largelocated in a very prominent location, selected and developed as per the retail showroom and storage warehouse retailing, restaurants and offices to helprequirements of Super A-Mart. Pelligra Group contracted Niche Planning Studio to expose the expanding retail area of Braybrook.advise and recommend solutions to statutory planning, building design, internal fitout, building compliance with associated permit conditions and landscaping for This job presented challenges around heritage compliance and landscaping, requiringthe proposed development. Niche Planning Studio to negotiate an outcome between Heritage Victoria, the City of Maribyrnong and the Client to obtain the best outcome possible for all stakeholders.LOCATION START/END DATE CLIENT Annual Value Niche Planning Studio had also been engaged to lodge new planning permits, amend existing planning permits and review planning permit conditions to assist in obtainingBraybrook, VIC April 2013 - October 2014 Private $5,000,000 Endorsed Plans and Statement of Compliance. This included working with building Developer surveyors, construction managers and site personnel directly to finalise a plan that was acceptable to all relevant government authorities.NICHE PLA NNIN GST UD I O

CLOW STREET APARTMENTS - DANDENONGDESCRIPTION OF WORKNiche Planning Studio acted on behalf of the landowners of 60 Clow Street A unique aspect of the site was the centralised location of an existing heritageDandenong to submit a permit application for high-density apartments with a building: Thuruna House. Niche Planning Studio utilised our in-house understanding ofvariety of retail uses to the City of Greater Dandenong. built form heritage constraints and urban design capabilities to work together with the applicant and PARP to prepare an ‘Urban Context Report’ and a detailed designAs the development was in a Ministerial Declared Project area and was a response to retain the heritage building within the proposed development.development of four or more storey’s it was referred to Places Victoria forconsideration by the Planning Application Review Panel (PARP) consisting of Niche Planning Studio undertook meetings with PARP to discuss and gain support inrepresentatives from the City of Greater Dandenong, Department of Planning and principal for the proposal. Niche Planning Studio worked closely with the heritageCommunity Development (DPCD) and Places Victoria. consultant, traffic consultant and architect to ensure that each revision of the plan had taken into consideration comments from PARP together with items containedLOCATION START/END DATE CLIENT Annual Value within the Guidelines for Higher Density Residential Development. As a result Niche maintained a good working relationship with the state and local government whichDandenong, VIC April 2012 - October 2012 Private $4,000,000 will ultimately result in the redevelopment of the site and a great outcome for the Developer Greater Dandenong Region.NIC HE PLA NNIN GST UD I O

DISCUSSION PAPER - HIGHER DENSITY HOUSING DESCRIPTION OF WORK In this role, Niche Planning Studio provided an accurate briefing paper that synthesises relevant best practice case studies from a range of international and national examples to inform best practice planning with regard to higher density housing At this stage, Stonnington City Council was responding to recent efforts by inner-Melbourne Local Government Municipalities to develop more comprehensive design, siting and layout guidelines for higher density residential buildings. Specifically, Council was interested in understanding how similar inner city Councils are responding to development and population pressure through housing strategies relating to minimum dwelling size and design standards. Niche Planning Studio undertook a thorough process of research relating to specific international and national case studies and liaised specifically with the City of Melbourne, contacts in NSW on SEPP64 and contacts from the Office of State Government Architect to ensure Stonnington City Council was provided with the most up to date and relevant information. LOCATION ANNUAL VALUE Stonnington $10,000 START/END DATE CLIENT October 2013 - November 2013 Stonnington City CouncilNICHE Image Source: urbanmelbourne.info PLA NNIN GST UD I O

METROPOLITAN REGIONAL SCHEME AND TOWN PLANNING SCHEME AMENDMENT DESCRIPTION OF WORKThrough strong relationships with the WAPC and Local Councils, Niche PlanningStudio was approached by several landowners in the Baldivis area to facilitatethe re-zoning of private land to encourage future development.The sites, located within the City of Rockingham represent the remaining logicalextension of the Urban Zone within Baldivis. The breadth of experience NichePlanning Studio has in understanding and assisting with the strategic developmentof land allowed us to provide timely and essential advice regarding the necessity ofinitiating a Metropolitan Regional Scheme (MRS) amendment and a Town PlanningScheme (TPS) amendment to rezone land parcels within the area from Rural to Urban,providing a statutory rationale for the future development of land.In addition, through our team’s experience in Local Government we advised thatthe support of many landowners would help the justification for re-zoning land asspot re-zonings is an uncommon occurrence. Following a positive outcome, NichePlanning Studio will be able to assist any future development options from thestructure planning stage through to the lodgement of development applicationswith the help of our statutory and design team.LOCATION START/END DATE CLIENT Annual ValueBaldivis November 2014 - present Multiple $5,000,000 landownersNICHE PLA NNIN GST UD I O

RESIDENTIAL SUBDIVISION - JOONDALUP, WADESCRIPTION OF WORKThrough extensive work with private developers and a consistently positive track In addition to the submission of subdivision layout plans for Council, detailed 3Drecord, Urban Designer Matthew Patullock was assigned the task of aiding the renders based on the architects initial design of the development were prepared.approval of an R60 residential subdivision. This project required the expertise of an The application, referred to the State Administrative Tribunal (SAT), was subsequentlyurban designer with an acute understanding of how graphic representation is used approved, with the 3D renders being crucial to visually demonstrate how theas a tool to influence conceptual understanding of space. development was sympathetic and reflective of the local streetscape.The site, situated in a standard residential area was initially only able to support a As Principal Urban Designer, Matt ensured the efficient use of the site by complyinglow density dwelling yield. However, with Matt’s design experience he successfully with best practice grouped development techniques, utilising well-designed privateachieved an approval for three units with an additional studio for the site. open spaces, ensuring maximum exposure to solar access and incorporating CPTED guidelines. The result is an effective and well thought out design that is bothLOCATION START/END DATE aesthetically appealing and responsive to the environment.University Viillage, April 2010 - October 2010 CLIENT Annual ValueJoondalup HE Private $7,000,000NIC Developer PLA NNIN GST UD I O

THE GREATER LAUNCESTON PLANDESCRIPTION OF WORKNiche Planning Studio partnered with project leader Geografia in the preparation of the Greater Launceston Plan (GLP)on behalf of Launceston City Council. Specifically, our role related to undertaking multiple rounds of stakeholder engagementin order to inform and refine the preparation of the Plan. The GLP is a community vision that provides an evidence basedframework for sustainable land use planning and management of development and investment in the Greater Launceston area.The GLP was initiated by the City of Launceston through the Liveable Cities Programadministered through the Commonwealth Department of Infrastructure and Transport.This plan will encompass the City of Launceston along with other municipalities inthe Greater Launceston Region such as George Town, Meander Valley, NorthernMidlands and West Tamar. The City’s role as a key regional centre for infrastructureprovision, population growth and economic activity underscores theimportance of effective long term planning.Niche Planning Studio provided valuable input into the preparation andfacilitation of a detailed stakeholder engagement process and thedistillation of key inputs to the Plan. The GLP was conceived as acommunity driven strategic project and as such meaningful consultationwas a fundamental determinant of its long-term efficacy. This engagementwas conducted over the span of 12 months and consisted of multiplestages. The depth and rigour of the engagement process has ensured thatall relevant stakeholders were consulted and their input incorporated intothe final plan.LOCATION START/END DATE CLIENTLaunceston, Tasmania August 2012 - October 2013 Launceston City CouncilANNUAL VALUE$320,000NICHE Image Source: The Greater Launceston Plan PLA NNIN GST UD I O

STRATEGIC ENVIRONMENT AND INFRASTRUCTURE APPROVALS DESCRIPTION OF WORK Acutely aware of development pressures within the south-east growth corridor, Niche Planning Studio was called upon by the largest landowner within the Devon Meadows Precinct Structure Plan (PSP), Vella Sands, to assist in the facilitation of preliminary planning for land generally bound by South Gippsland Highway, Craig Road and Browns Road. Niche Planning Studio initially provided the landowner with assistance in obtaining Works Authority approvals for the continuing operation of a sand blending facility, and later in obtaining approval for final remediation of the site for sale to a private developer. To progress the ongoing subdivision and development of the site, Niche facilitated discussions with the Metropolitan Planning Authority (MPA) assisting in the development of the PSP and associated Scheme Amendment. This project has also enabled Niche to showcase their in-depth knowledge of the strategic approvals process required under the Federal Environmental Protection and Biodiversity Conservation (EPBC) Act. Prior to the bilateral agreement between the Federal and State Government, Niche Planning Studio was engaged in the provision of advice to clients regarding the Part 9 approval process. Today, as a result of the Devon Meadows project, Niche has increased their expertise in regard to the EPBC Act process and provides clients across Victoria with advice on the Strategic Impact Assessment, Biodiversity Conservation Strategy and Sub-Regional Species Strategies.LOCATION START/END DATE CLIENT Annual ValueDevon Meadows August 2012 - present Vella Sands $7,000,000NICHE PLA NNIN GST UD I O

HAWKSBURN ACTIVITY CENTRE STRUCTURE PLANDESCRIPTION OF WORKNiche Planning Studio was engaged by Stonnington City Council to preparea detailed Project Brief to guide the tendering process and preparation of theHawksburn Activity Centre Structure Plan. The Structure Plan provides a 10-20year strategic framework for the future development of the activity centre,including establishing preferred land use patterns, built form outcomes, transportconnectivity and pedestrian movement networks. The Structure Plan was promptedby Council’s Municipal Strategic Statement , which identified the HawksburnPrecinct as a Neighbourhood (Large) Activity Centre, requiring effective strategicplanning to guide growth and development. This classification reflects the precinct’simportant role as a larger local centre, catering to the everyday needs of localresidents as well as providing speciality retail, office and service land uses.To enable a high quality, well-researched project brief, Niche Planning Studioundertook an initial review of the Stonnington Planning Scheme, relevantreference and strategic documents and other information relating to theHawksburn Activity Centre. In addition, Niche engaged with relevant stakeholdersin order to procure necessary information to further the brief. The final project briefclearly articulated the key development and land use pressures impacting theHawksburn Neighbourhood Activity Centre, as well as the range of strategicplanning outcomes required. As the result of this project brief, Stonnington CityCouncil was better able to understand the transport, economic and urban designissues relevant to the centre.LOCATION START/END DATE CLIENTHawksburn Activity Centre March 2014 - April 2014 Stonnington City Council ANNUAL VALUE $2,000,000NICHE PLA NNIN GST UD I O

BOTANIC RIDGE PRECINCT STRUCTURE PLAN DESCRIPTION OF WORK Niche Planning Studio has had an active role in the preparation of the Botanic Ridge Precinct Structure Plan (PSP) in Melbourne’s south-east growth corridor since the commencement of preliminary landowner discussions in 2010. Initially employed at Peet Limited as a Development Manager, Niche Planning Studio Director Nicola Smith was actively involved in the preparation of draft PSPs, liaising with the Metropolitan Planning Authority, local government authorities and other key stakeholders. In regard to the Botanic Ridge PSP, her role included championing the 96A planning permit process with the City of Casey to ensure concurrent approvals were achieved for the PSP and Subdivision as well as coordinating submissions for a likely PSP panel process. Within Peet she also played a key design review role for a variety of PSP’s and subdivisions across Victoria’s urban growth areas. This expertise has been built upon within Niche where all staff continue to provide assistance to landowners within various growth corridors. Specifically, within the south-east, Niche provides strategic assistance to clients such as ISPT Pty Ltd to ensure successful and timely implementation of PSP requirements.LOCATION START/END DATE CLIENT Annual ValueBotanic Ridge PSP August 2010 - February 2013 ISPT $10,000,000NICHE PLA NNIN GST UD I O

MULTI-UNIT SUBDIVISION - DESIGN AND PLANNINGDESCRIPTION OF WORKNiche Planning Studio has worked closely with the property owner to design a Through a process of detailed site analysis and studio based design refinement,subdivision layout that responds to the unique physical characteristics and planning Niche was able to prepare multiple subdivision solutions for the Client. In response toconstraints of the subject site at 48-52 Kathryn Road, Knoxfield. The property features the Client’s specific product requirements and vision for the site as well as ourextensive areas of native vegetation and is subject to significant statutory constraints expectations of statutory planning constraints, we assisted the client in the selectionon development, tree removal and allotment size. In order to achieve a high quality of a final design solution. This multi-stage subdivision design process ensures that the vision of the client is best realised in balance with the physical and planning constraintsoutcome, Niche has drawn upon our highly developed expertise in subdivison of the site.design, native vegetation management, project management and statutoryplanning. In conjunction with this studio based design methodology, Niche has also providedLOCATION START/END DATE CLIENT Annual Value advice and assistance in relation to ongoing Strategic and Statutory Planning processes. This includes a review and submission of the impact of a proposedKnox City Council November 2014 - present Private $3,000,000 Planning Scheme amendment and the preparation, lodgement and ongoing management of a permit application with the City of Knox. This evidences Niche’sNICHE ability to provide specialised advice and assistance at all stages of the development cycle in order to achieve a high quality outcome for clients PLA NNIN GST UD I O

Drawing Source: Draft Bayside Coastal Management StrategyTHE COASTAL BAYSIDE MANAGEMENT PLANDESCRIPTION OF WORKNiche Planning Studio was engaged by Bayside City Council to prepare a Summary In order to produce a Plan that reflects the concerns and input of land users and theof Issues Paper for Council relating to the Draft Bayside Coastal Management Plan. wider community, Bayside City Council chose to engage in a rigorous process ofThe Draft Plan provides strategic direction, vision and policy for coastal land use community consultation. This included multiple rounds of stakeholder engagement,and development at the local level. The Plan is required in order to satisfy Council including the review and incorporation of feedback relating to the Draft Plan in orderLocal Planning Policy requirements and Section 31 of the Coastal Management to inform the Final Plan. Niche Planning Studio played an important role in this processAct 1995. The plan provides both higher-level strategic discussion of land use and of review, including undertaking preliminary background research and review ofdevelopment issues impacting coastal land and specific implementation actions relevant policies and strategies, summarising and coding submissions and identifyingto achieve Council’s long-term vision and priorities over the next 10 years for the 1 key issues. This process was undertaken whilst also seeking to maintain open and7km of designated foreshore. transparent lines of communication with Council.LOCATION START/END DATE CLIENT Annual Value Niche’s output consisted of a detailed and comprehensive Summary of Issues Paper that is currently being used by Council to inform the preparation of the final BaysideBayside area April 2014 - May 2014 Bayside City Council $600,000 approx. Coastal Management Plan. This project allowed Niche to leverage our particular strength in managing and responding to community and stakeholder engagement,NICHE in order to assist the client to deliver a Plan that will achieve the strategic goals of Council, whilst also delivering on the key issues of relevance to land users. PLA NNIN GST UD I O

PORT HEDLAND DEVELOPMENT PLANSDESCRIPTION OF WORKThis WA project enabled Niche Planning Studio to work together with Blaxland In addition to the preparation of structure plan and subdivision documentation,Property Developers, Macroplan Dimasi, DPS Urban Designers, Port Hedland Niche Planning Studio undertook high level strategic discussions within governmentCouncil and the Western Australian Planning Commission to guide two to ensure that key environmental, social and economic constraints were addressedDevelopment Plans and subsequent Plans of Subdivision from inception through to within a timely manner.approval and implementation. Excellent relationships with planners within the Western Australian Planning Commission,Based on our comprehensive planning and property experience within Western Department of Planning and Town of Port Hedland ensured the facilitation of aAustralia and our network of government and consultant contacts in regional and number of planning approvals and amendments within efficient time periods. As ametropolitan WA, Niche Planning Studio was engaged to facilitate the result, a high level Development Plan ensuring the protection of Telstra infrastructuredevelopment of an infill parcel of land within the Port Hedland townsite. This parcel while maintaining high residential yields and environmental protection was returned.was previously constrained by infrastructure buffers and a complex arrangement Niche Planning Studio looks forward to continuing to prepare and implement Structureof fragmented government land parcels. Plans, Plans of Subdivision and Design Guidelines within regional and metropolitan WA.LOCATION START/END DATE CLIENT Annual ValuePort Hedland August 2012 - July 2014 Blaxland Property Development and $ 27 million Macroplan DimasiNICHE PLA NNIN GST UD I O

GRAHAMS RESEVRE BAY TRAIL CONNECTIONDESCRIPTION OF WORKGrahams Reserve is an important area of riparian vegetation and public open Green Wedge Zone and the presence of an Environmental Significance Overlay andspace at the mouth of the Werribee River. The precinct fulfils a significant habitat, Aboriginal Cultural Heritage Sensitivity, the proposal required the issuance of aenvironmental and recreational function and constitutes a critical buffer between planning permit form Wyndham City Council.residential areas to the north-east and internationally significant wetlands centredon the Werribee River to the south-west. Additionally, the location of the site at the periphery of the Port Phillip Bay (Western Shoreline) RAMSAR Wetlands, required referral of the proposed action to the FederalThe project sought to provide an inclusive, environmentally sensitive mixed trail Environment Minister pursuant to the Environment Protection and Biodiversity Act.across the reserve, consisting of elevated and at-grade sections, viewing and Niche Planning Studio provided specific planning assistance in the preparation of theactivity platforms and associated landscaping and earthworks. Given referral documents and secured agreement from the Department of the Environmentdevelopment sensitivities relating to the location of the bulk of the site within the that the proposed works are not a controlled action and do not require further assessment of impact.LOCATION START/END DATE CLIENT Annual Value Niche Planning Studio’s intimate understanding of referral triggers and the broaderGrahams Resevre Jan 2014 - October 2014 Wyndham City $10,000,000 impact of the EPBC Act assisted the Client in securing timely approval for the works Council and ensured that the environmental and landscape significance of the area wasNICHE protected. PLA NNIN GST UD I O

PRECINCT STRUCTURE PLAN - BOUNDARY REVIEW SUBJECT SITEDESCRIPTION OF WORKThrough Niche Planning Studio’s extensive experience in dealing with Precinct To actively pursue a positive outcome for our Clients, Niche Planning Studio engagedStructure Plans (PSP) we were engaged by multiple landowners to represent in ongoing discussions with the Metropolitan Planning Authority (MPA) and Boral Deertheir interests in providing certainty of land value and confidence with progessing Park Operations group to present a strong argument and negotiate the realignmentfuture development. of PSP boundaries to include our Client’s landholding in an adjacent PSP with stronger development opportunities and a shorter time horizon to facilitate development.Aware that their landholdings were the only private parcels located within theRavenhall PSP, and that the remainder of the land within the PSP boundaries Through a sequence of discussions and review of technical documents such aswere owned by Boral Deer Park quarrying and landfill services, the landowners Servicing Plans, Pre and Post Cultural Heritage Assessments and Land Capabilityapproached Niche Planning Studio to provide strategic advice to enable the sale Reports, Niche Planning Studio was successful in providing a sound justification basedand potential development of the subject site in the short to medium term. on statutory implications and our understanding of the overall machinations of the PSP process to realign the PSP boundaries. This realignment ultimately led to anLOCATION START/END DATE CLIENT Annual Value increase in the viability of the land parcels for futuredevelopment outcomesWestern Growth October 2014 - January 2015 Multiple $5,000,000Corridor landownersNICHE PLA NNIN GST UD I O

LOT YIELD ANALYSIS - ALKIMOS EGLINGTON Source: City of WannerooDESCRIPTION OF WORKNiche Planning Studio worked in partnership with David Lock Associates to provide Our role was to provide a peer review service and assist in the preparation of aspecialist planning advice to Landcorp and Woodsome Management Pty Ltd in the detailed lot yield plan to meet both client and government density expectations. Thispreparation of the Alkimos Eglington District Structure Plan (DSP) and Local Structure plan proposed a variety of lot sizes to cater for the varied market expected toPlan (LSP) located in Perth’s north-west corridor. purchase land in the Alkimos-Eglington corridor. Small lot product aimed at young professionals and singles included rear-loaded cottage lots, four packs with commonSpecifically, Niche Planning Studio provided strategic advice to facilitate the driveways and apartment sites designed around the proposed town centre and areasplanning and design of residential lots within the 2600ha coastal landholding of open space. Medium density sites more appropriate for family living were alsowhich is expected to accommodate a total population of up to 50,000 people. proposed with an average density of R30. The design prepared by David Lock also looked to offer large lots on undulating land and on the periphery of the site.LOCATION START/END DATE CLIENT Annual Value Our work assisted DLA in creating a “master-planned coastal community of globalAlkimos Eglington April 2012- October 2012 Private $4,000,000 significance that is moving towards carbon-neutral living”.District Structure DeveloperPlanNICHE PLA NNIN GST UD I O

MORNINGTON CHILDRENS FARMDESCRIPTION OF WORKThe Green Wedge Zone is an important planning mechanism applied to areas flocated on land formerly used for low level agricultural purposes and included withinaround Melbourne’s urban fringe to protect agricultural land uses and the the Green Wedge Zone. Our Client sought to establish the Children’s Farm, whichenvironmental, landscape and recreational values of scenic areas. Niche Planning would leverage existing farm infrastructure and livestock in order to deliver anStudio has extensive experience achieving high quality planning and development educational and entertaining rural experience.outcomes within this context. This track record is reflective of our establishedrelationships with numerous peri-urban/urban fringe municipalities, our insightful In order to achieve this vision, Niche Planning Studio assisted the client in theunderstanding of Planning Scheme Controls and the permit process and our ability preparation, lodgement and securing of the required Planning Permit. This involved ito accurately capture Client development goals. mprovements to the overall design and layout of the proposed Children’s Farm and extensive negotiations with Mornington Peninsular Shire Council pertaining to theThe Mornington Children’s Farm is designed as a locally significant tourist attraction nature of the proposed use, environmental and landscape impacts and vehicle access and amenity issues.LOCATION START/END DATE CLIENT Annual Value Utilising a collaborative, negotiation based strategy and employing our understandingMornington April 2014 - November 2014 Private Client $2,000,000 of the specific requirements of Green Wedge Zone development; Niche Planning Studio was able to secure issuance of a Planning Permit for Development and Use ofNICHE the site. PLA NNIN GST UD I O




Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook