A+ Builders Inc., with respect to the design and plans provided by Carivil Construction, shall provide the Architectural & Engineering Design Services for the Project: a) Architectural and Engineering o Architectural Design ▪ Floor Plans; ▪ Elevations; ▪ Lay-outs; ▪ Sections; ▪ Wall, Floor & Ceiling Finishes; ▪ Door and Window Schedules; ▪ Details o Structural Design / Calculation ▪ Building Foundation; ▪ Beams and Girders; ▪ Column, Walls, and Floor slabs; ▪ Other Structural Elements o Electrical System Design ▪ Main Power Distribution System ▪ Power Layout ▪ Lighting Layout o Mechanical System ▪ Air conditioning and ventilation system (if applicable) ▪ Fire protection (if applicable) o Plumbing & Sanitary System ▪ Waterline Layout; ▪ Wastewater/sewer lines layout; ▪ Septic tank design layout; o Civil Works ▪ Covered walkways connecting Matalino Building to Magiting Building ▪ Grading and Drainage Design
o Electronics & Communication ▪ CCTV Layout ▪ LAN & TV Layout o Geotechnical Investigation ▪ Soil Boring Investigation as a requirement for structural design The Design Firm shall submit the following document in addition to the other submittals, which may be requirements during the execution of the services: 1. Three (3) sets of Bases of Design and/or Design Criteria for the A&E Design. 2. Three (3) sets of the Preliminary / Design Drawings/Plans for the client review. 3. Three (3) sets of the Design Development Drawings/Plans for the client review. 4. Five (5) sets of Building Permit plans and specifications signed and sealed and other required documents (i.e. Bill of Materials) for building permit application. 5. Three (3) sets of Final Detailed Construction Drawings/Plans, technical specification signed and sealed, Two (2) for Clients Copy & One (1) for Site Copy. 6. Copy of AutoCAD file (2010 ver.) of Final Detailed Construction Drawings/Plans. 7. The Design firm shall sign and sealed all pertaining requirements for Building Permits and Occupancy
The project covers the following scope of work which shall be done in accordance with the approved plans, specifications, and provisions of the contract, to wit; This item covers the expenses for building permits, insurance, water & electric connections including temporary connections, the provisions of worker barracks, and other related works necessary during the implementation and completion phase of the project. Mobilization consists of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of offices, buildings, and other facilities necessary for the work; for premiums on bonds and insurance for the work; and for other operations performed or costs incurred before the beginning of work. This item covers the supply of labor, materials, and equipment necessary to accomplish the following: 1. Reinforced concrete footing, slab on grade, columns, beams, concrete suspended slab, stair slab, roof slab, concrete canopy, zocalo at corridors, raised flooring for counters, janitor’s closet, electrical riser, concrete molding 2. Fabrication and installation of formworks for structural concrete works This item covers the supply of labor, materials, and equipment necessary to accomplish the laying of the CHB wall as required and indicated in the approved plans. Specifically, 1. For exterior walls, use 125 mm thick for concrete, hollow blocks (non-load bearing, minimum strength - 350 psi), plastered. 2. For interior walls, use 100 mm thick concrete hollow blocks (non- load bearing, minimum strength -350 psi), plastered.
This item covers the supply of labor, materials, and equipment necessary for the fabrication and installation of steel trusses with gusset plates, canopy frame, C-purlins, stainless steel railings including painting of epoxy primer of completed trusses, and all other related works needed for the completion of this item. Specifically, 1. Stainless Steel Handrail with Steel Railing for All Stairs 2. Stainless Steel Railing for Ramp 3. Steel Staircase at Fire Escape Stair 4. Corridor Stair Floor Framing 5. ACU Ledge 6. Window Grills This item covers the supply of labor, materials, and equipment necessary to accomplish the following: Waterproofing at all toilets, roof deck slab and firewall This item covers the supply of labor, materials, and equipment necessary to accomplish the following: 19 mm thick marine plywood for janitor’s cabinet, slop sink door, electrical riser door This item covers the supply of labor, materials, and tools necessary for the installation of doors and windows including all its accessories as indicated in the approved plans.
A. Doors 1. Panel Door with 6mm ordinary clear glass for Classrooms Faculty and Staff Area 2. Laminated HDF Door for All Men's & Women's Toilets, PWD Toilets, Suite Room, Standard Rooms, Fourth Floor Storage 3. Panel Type Door w/ Grooves at Ground Floor Storage 4. Double Action Laminated HDF Door at Lecture Hall Upper Part to Lobby 5. Steel Door with Louvers at Pump Room 6. Aluminum Powder coated Gray Swing Door with clear glass at ICT Room 7. Aluminum Powder Coated Gray Frame Swing Door with Fixed Bronze Glass at Main Entrance, Left Side Entrance, Right Side Entrance, Dean’s Office 1 & 2, Faculty Room and Fourth Floor, Lobby to Corridor 8. Laminated HDF Door at Suite Room Toilet and Standard Room Toilet 9. Aluminum Powder Coated Gray Frame Double Action Door with Fixed, Bronze Glass at Multi-Purpose Hall 10. Steel Door at Control to ACU Ledge B. Windows 1. Casement Window, Aluminum Powder Coated Gray Window with Bronze Glass, 6.0mm with Insect Screen 2. Awning Window, Aluminum Powder Coated Gray Window with Bronze Glass, 6.0mm with Insect Screen C. Builder’s Hardware 1. Door locksets shall be Hafele for the main door & Grade III Lockset faultless or Sentry for other doors or approved equal, Lever type, stainless 2. Door hinges shall be Stanley or approved equal, ball bearing type, stainless 3. Sliding tracks shall be Silent Type or approved equal
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- 136
- 137
- 138
- 139
- 140
- 141
- 142
- 143
- 144
- 145
- 146
- 147
- 148
- 149
- 150
- 151
- 152
- 153
- 154
- 155
- 156
- 157
- 158
- 159
- 160
- 161
- 162
- 163
- 164
- 165
- 166
- 167
- 168
- 169
- 170
- 171
- 172
- 173
- 174
- 175
- 176
- 177
- 178
- 179
- 180
- 181
- 182