Foreword The operation of the Delhi Metro is into its 18th year now. Almost two decades after the operationalisation of the first Metro in India, i.e, Kolkata Metro, the Delhi Metro started its journey on the 25th of December, 2002 when the first ever section (Shahdara - Tis Hazari) was inaugurated. Since then, the Delhi Metro has emerged as one of the fastest growing Metro networks in the world. Today, over 350 train sets operate more than 5,000 trips a day for more than 18 hours covering a network of 389 kilometres (including the NOIDA – Greater NOIDA corridor) and 285 stations. While management of such a massive scale of operation requires meticulous planning and precision, the maintenance of the assets is also another important dimension of the entire exercise. Based on commuter feedback and the shortcomings observed, a host of initiatives have been taken in recent times to ensure the timely refurbishment of our infrastructure. For example, though the rolling stock available with us generally has a life of 30 years, they have to undergo midlife refurbishment at about 15 years or so. This exercise has been taken up in DMRC and all aspects of the train sets are being minutely looked into. Similarly, DMRC has taken up renovation of its oldest corridor, i.e, the Red Line. DMRC has also controlled other system failures by finding low cost solutions. Other operational Metros like Bengaluru, Hyderabad, Chennai, Kochi etc have also been running Metro services for many years. These Metros have also solved maintenance issues through innovation. It is very important to periodically document these initiatives so that these compilations remain as manuals for the future Metro systems to follow. In this book, we have put together the initiatives taken by the Metros all over the country. I am sure this e-publication would be of great benefit to the Operations and Maintenance wing of Metro systems in the days to come. I would like to thank our respected Secretary, MoHUA, Sh. D S Mishra for coming up with this great idea of compiling this publication. A word of gratitude must also go to our Managing Director, Dr. Mangu Singh for guiding us in taking these initiatives forward. I would like to thank the other operational Metros who have provided inputs for this publication in very short time. A K Garg Director, Operations DMRC 4
Compendium on various initiatives by Indian Metros CONTENTS 11-19 Bangalore Metro Rail Corporation Limited (BMRCL) 12 12 Department : Rolling Stock 13 Title of Initiative : 13 • Passenger Information Board Repair 13 • Providing stationery 750VStinger supply in 2 Bays of Repair Bay • PA-PIS test bench with simulator software 14 • HVAC test bench 15 • Shifting of existing wiring of ATO push button 15 Department : Traction 16 Title of Initiative : 17 • Modification to DC circuit by providing Disconnector Switch in feeder High Speed Circuit Breaker 17 • Setting Up of Relay Testing Division 18 • Rehabilitation of Cad Weld Joints 19 Department : Signalling 19 Title of Initiative : • Improvements in S&T UPS System 21-23 • UPS modules in house service 22 Department : Telecom & AFC Title of Initiative : 22 • In-house telecom & AFC Repair Lab 23 • Tool for PIDS-ATS messages interpretation (Quick analysis of interface issues) 25-71 Department : Civil Engineering 26 Title of Initiative : 27 • Provision of Safety life lines in Inspection Bay Lines • Track Extension in RBL Chennai Metro Rail Limited Department : Rolling Stock Title of Initiative : • Chemical-Free Aqueous sanitization by CMRL in Rolling Stock Department : Mechanical, Electrical and Plumbing Title of Initiative : • Foot Operated Lift Mechanism • Foot Operated Buttons for Restroom Taps Delhi Metro Rail Corporation Ltd. Department : Rolling Stock Title of initiative : • RS1 Stock Train Refurbishment & Upgradation Work (2020) • Refurbishment of AIT Saloon HVACs of RS1 Stock (Work started from August, 2020)
Department : Rolling Stock& IT Department 28 Title of initiative : • Wi-Fi system installation In Airport express Line metro trains (January, 2020) 28 29 Department : Rolling Stock 30 Title of initiative : • Retro Fitment of CCTV System (October, 2020) 30 • In house repairing of electronics cards & modules in the train maintenance depot 31 • Coil Cleaning of HVAC using chemical named “Dechoker” (2020) 31 31 Department : Operation 32 Title of Initiative : 32 • Outsourcing of Train Operations 33 • Operating and Troubleshooting Manual [OTM] 33 • Crew Scheduling / Roster Automation and Crew Management Services • Planning of Monthly Mega Block 34 • Digitization of Operations Registers 34 • Special cleaning drives at metro stations. 35 • To reduce passengers queues at entry / exit of the stations. 35 • Standardization of Signage 35 36 Department : Telecom 37 Title of Initiative : 37 • In-house software patch developed to address AFC Gate Hanging or Gate Non-Responsiveness 38 • Replacement of M/s Thales AFC Gate door switch with Magnetic Switch 38 • In-house Software modification in AFC Gates to address issue of not sensing Cards/Tokens • Relearning of Currency / Notes in BNA of TVMs to address rejection of currency notes in TVMs 39 • Mobile app based QR Ticketing 39 • Implementation of National Common Mobility Card (NCMC) on Airport Line 40 • AFC Gate memory disk replacement to reduce failures • Power/Data Cable replaced in Phase-I&II Thales AFC Gates 41 • Upgradation of telephone system of Line-1 42 • Radio Coverage Improvement in the Phase-I&II network 42 43 Department : Electrical & Mechanical (E&M) 43 Title of Initiative : 44 • Replacement of Old Conventional lights with LED lights 44 • Provision of Lights at Viaduct Level • Replacement of Split ACs with Air Cooled Chiller in UG stations and Variable Refrigerant 45 Volume (VRVs) in elevated stations 45 • Replacement of copper coils of Air Handling Units installed in underground stations 46 • Shifting of E&M UPS load to S&T UPS of PH-I & II at Non-interlocking elevated Stations 47 • Use of Roof top Solar Energy • Improvement in Phase-II Lifts • Foot Operated Switch for Lift Operation • Escalator Handrail Sanitization device based on Ultraviolet (UVC) Technology. • Lifts and Escalators Installedfor Passenger Amenities in the Operational stations. Department : Signalling Title of initiative : • Rectification of DMI/On-board ATC failures • Resolving Track Circuit Issues • Resolving On-Board ATP Issues • Mh,evkjlh }kjk vxz.kh dk;Z ds rgr f}Hkk\"kh dk;Z funsZ'k ¼fgUnh ,oa v¡xzsth½ dk çdk'kuA Pioneer work of publication of Bilingual Work Instructions in Metro Railways.
Compendium on various initiatives by Indian Metros • Development of Broken Rail Detection Solution for CBTC System 48 • Centralized Track Circuit Monitoring of 80 Track Circuits on 6.675 Kms from 49 Noida Sec-34 to Noida Electronic City 49 • In-house activities by DMRC in YBD Signalling Lab 50 • Repair of Platform Screen Doors Rectifier at Airport Express Line 50 • Track Circuit Relay Cleaning 50 Department: Traction 51 Title of Initiative : 52 • Ultrasonic testing of Contact wire to detect brazed joints 53 • Split pin failure in Insulator disc of Return Current circuit 53 • Fire safety for electrical cables bridges crossing open drains 54 • Provision of bypass jumper to avert catenary wire parting • Creation of OHE sectioning to facilitate short loop operation 54 • Special discs with spikes to deter birds from sitting on OHE 56 58 Department : Civil Engineering Department (O&M) 59 Title of Initiative : 60 • Thorough Renovation of Stations 61 • Thorough Attention of Stations 63 • Renovation of Toilet Blocks 64 • Improvement of Parking Areas 65 • Improvement / Rectification of Circulating Area 66 • Maintenance of Bridge Bearings. 67 • Measures for Prevention of Cable Theft 67 • Anti-Carbonation painting 68 • Maintenance of Fire-Fighting system 68 • Environment Friendly Measures 69 • Digitization of Land Records and Drone Survey 70 • Modification of Track Access gates at Stations 71 • Ultrasonic Flaw Detection testing (USFD) • Reconditioning of Switches and Crossings 73-74 • Replacement of rails / Interchange (Reversal) of rails • Attention to track through Track Machines 74 • De-stressing of Track 74 L&T Metro Rail (Hyderabad) Limited [LTMRHL] 75-77 Department: Rolling Stock & Traction Power Supply System 76 Title of Initiative : • Increase in Regenerated Energy 76 • Vendor Development under the Aatma Nirbhar Bharat initiative 77 Jaipur Metro Rail Corporation Department : Project Title of Initiatives : • Conserving and recreating the Heritage discovered during excavation in Jaipur Walled City Department: Rolling Stock Title of initiative : • UVC Token Sanitization Machine • Reduction in train Mounted Battery Charger float voltage setting from 113.6Volt to 110.4 Volt to avoid battery overheating
Kochi Metro Rail Ltd. 79-88 Department : Communications 80 Title of the initiative : 80 • QR Reader Glass replacement in AFC Gates • Development of portal to update the AFC group ticket issued at station to Central Control 81 81 Department : Rolling Stock 82 Title of Initiative : • Staggered Maintenance Approach 82 • Paperless Maintenance Management 83 • Parking Brake release handle Re-location 84 Department : Civil and Track 84 Title of the Initiative : 85 • Rainwater collection at Stations • Debris and other loose particle cleaning in viaduct 85 • Food Waste Management using Clay pots 86 Department : E&M 87 Title of the initiatives : • Exhaust Fan Automation in Electrical Substation 87 • Energy saving mode in escalators 88 89-90 Department: Electrical Title of the initiative : 90 • Escalator Specification Change to Accelerate Make In India Initiative 91-95 • Combined Uninterrupted Power Supply System 92 Department: Telecommunications Title of the initiative : 92 • Combining of Signalling and Telecommunication Room 93 Department: Power & Traction Title of the initiative : • Power Factor Improvements • Permanent Measures for Mitigation of Anticipated Floods Maha Mumbai Metro Operation Corporation Ltd., Mumbai Department: Signal & Telecommunication Title of Initiative : • Introduction of Mobile Attendance Application NOIDA Metro Rail Corporation Department: Automatic Fare Collection System (AFC System) Title of Initiative : • National Common Mobility Card (NCMC) Compliant AFC System Department: Rolling Stock Title of Initiative : • Increased opening of Fresh Air Damper [FAD] • Additional Parking Brake Tread Brake Unit (TBU) provided on the first axle of DT car
Compendium on various initiatives by Indian Metros Department: Electrical 93 Title of Initiative : 94 • 33/25 KV Traction Transformers in Depot 94 • Catenary Monitoring System • Provision of insulated sleeve on Catenary wire Uttar Pradesh Metro Rail Corporation Limited 97-104 Department: Rolling Stock 98 Title of initiative : 99 • Roof camera for continuous monitoring of pantograph and OHE 99 • Automatic Drop Device to lower panto to avoid OHE damage in case of Pantoentanglement • Train to Ground Communication (TGC) for real-time downloading & monitoring of train parameters 100 to Depot, OCC, HQ 100 • Maximo-TGC Integration for Automatic Job Creation 101 • CO2 Sensor based HVAC control to reduce train energy consumption • Smart Passenger Infotainment System to increase advertisement revenue Department: AFC 101 Title of initiative : • Extremely economical UV Sanitization box for passenger Token Department: Telecom 102 Title of initiative : • Lucknow Metro FM Radio Station Department: Civil 102 Title of initiative : • Deep Cleaning of Stations using compressed water jet Department: Traction/Electrical (O&M) 103 Title of initiative : • Outsourcing of manpower of traction (O&M) for OHE, PSI maintenance work Department: Electrical & Mechanical 104 Title of initiative : 104 • Increase in air conditioning temperature of equipment rooms to 30 degree C and public/manned space to 27 degree C • Installation of Scrubber System for DG set at all underground stations
Bangalore Metro Rail Corporation Limited (BMRCL)
Bangalore Metro Rail Corporation Limited (BMRCL) Department Modified: Provision of movable stinger supply in Repair Bay was not feasible due to Overhead Cranes. Hence 4 Rolling stock nos of 750 V DC stationery stingers installed for each bay for energizing of Trains. This increased effective Title of Initiative : Passenger Information Board utilization of Repair Bay in terms of Maintenance and Repair Testing purpose. Testing & Commissioning of 50 Trains completed in RBL to maximum extent. BMRCL is having 50 rakes of 3 cars and same are running since 2011. The Public Announcement and Passenger Benefits/advantages of the initiative: Information System is supplied by M/s TOA, Japan. • 3RS-DM units commissioning improved after Passenger Information Board (PIB) is used to display the video information and 900 Nos are there in 150 Cars. providing stationary stinger units in RBL-1&4. Recently 75 Nos of PIBs failed. On investigation, it is found that power supply module PCB failed, in which a • Optimum utilization of RBL. special DC-DC Converter failed. M/s TOA informed that the PIB is obsolete and spare parts are not available. • Testing and commissioning of 6 Car Train completed at Also, in Indian market same DC-DC converter not faster rate. available readily and it may take 6 to 8 months to procure. The cost of PIB is around 2 Lakhs. • Train Functional check can be carried out at repair Bay. In-house Team came-up with replacement of DC-DC Converter, by a simple SMPS unit. The cost of repair was ` 5,500/-. By using same method 75 Nos of PIBs were repaired. The Cost of repairs is with respect to new spare cost of PIB is 2.75%. Benefits/advantages of the initiative: • Nos of PIBs are claimed back with less cost. • Further method is established for such repairs. Laying of Stinger cable Passenger Information Board SMPS Title of Initiative : Providing stationery 750V Stinger supply in 2 Bays of Repair Bay Existing: Depot is having 3 Inspection Lines & 4 Repair Lines. All the repair Bay lines were not having 750V provision & as such maintenance and testing of Trains were not possible. Hence, no power availability in Repair bay lines and constraints of inspection lines was major constraint for day to day maintenance and Testing commissioning of 50 Nos of 6 Car Trains. Stinger connection 12