Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore MOPA-SD-GF-01_R1

MOPA-SD-GF-01_R1

Published by Architectnoelcalma, 2020-10-18 17:02:03

Description: MOPA-SD-GF-01_R1

Search

Read the Text Version

UPS GARB. ELEC. ROOM. ROOM. ELEVATOR'S LOBBY TELE. A.C ROOM ROOM. LIFT LIFT W.C W.C W.C W.C DISABLED STORE DISABLED TOILET VOID TOILET PANTRY GENTS LADIES TOILET TOILET DISABLED GENTS LADIES W.C TOILET TOILET TOILET W.C W.C W.C G. LIFT G. LIFT L. LIFT A.C ROOM PANTRY ELEC. ROOM. GARB. ROOM. FOR DETAILED DRAWING REFER, AREA REVISED AS PER 27-09-15 FOR APPROVAL 00 CME-1627-15-SD-GF-02_R0 MASRI ENGINEERING LAYOUT 20-10-15 01 REVISED AS PER COMMENT FOR DETAILED DRAWING REFER, AND ISSUED FOR APPROVAL CME-1627-15-SD-GF-03_R0 MINISTRY OF PRESIDENTIAL AFFAIRS FOR DETAILED DRAWING REFER, ABU DHABI CME-1627-15-SD-GF-04_R0 MARBLE SHOP DRAWING P.O. BOX 3565 DUBAI U.A.E. TEL: 28 58 277 FAX: 28 59 774 I-50 THE NATIONAL CENTER OF METEOROLOGY & SEIESMOLOGY & THE SCHOLARSHIP COORDINATION OFFFICE. (GROUND + 5 FLRS.) GROUND FLOOR TOILET ( GR-002,GR-005 & GR-030) WAITING AREA (GR-046) FLOORING LAYOUT AND DETAILS FOR APPROVAL MYA - SBV HM 1627-15 AS SHOWN A1 CME-1627-15-SD-GF-01 01


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook