Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore Event_Log May 2018 (Autosaved)

Event_Log May 2018 (Autosaved)

Published by Zetro SPA Subang, 2020-02-17 20:24:33

Description: Event_Log May 2018 (Autosaved)

Search

Read the Text Version

No. Date Time System Facilities Event Crew 1 1/5/2018 0000 Handover  Handover shift duty to shift D 0000 Takeover  SV: Patimah 0057 Daily PM 0144 Round check  Takeover shift duty from shift A Amierul Adam 1200 Handover 1200 Takeover  Daily preventive maintenance at MER 1300 Radio and control room 1400 Atcs  Round check at control room 2/5/2018 0000 Handover  Weather update normal  MLAT alarm still active 0000 Takeover  125.05 have a bit bursting 0123 Radio (135.25)  Handover shift duty to shift C 0135 Radio (125.05)  Takeover shift duty from shift D Amira 0150 Preventive Salman Maintenance  East asked about freq 125.05 SE 0210 Radio (121.25)  Update to east  125.05 still bursting  Weather update  MLAT alarm active  Handover shift duty to shift A  Takeover shift duty from shift A Khaidzir  SV : En.Izad Adli  Controller report 135.25 SE Rx caused pilot to hear background noise and after controller off SE Rx pilot said it was okay, no more background noise.  Monitor for 10 minutes, no problems so far.  Checked on 125.05, no bursting heard for now. Controller will monitor and report if anything occurs.  Daily PM done for MER and control room. All serviceable except for KVM for SWH.  Controller report 121.25 have seldom background noise.  Monitor, for the 1st 10 minutes, occurred twice, an interference from unknown source, unclear.

 Monitor for 20 minutes more, no more problems.  Reported to Afifi and East shift phone. 0214 Direct Line  Direct line to KLIA out of service from 0230 Radio (125.05) 0214 to 0220. 0400 Radio (125.05)  6 minutes out 0615 Others  125.05 check, no bursting. 1200 Handover  Reported radio 125.05 status to ATCS 1200 Take over 1227 ATCS Group, Afifi, and Salbiah.  Afifi said that radio troubleshoot will be 1348 Preventive maintenance done tonight. 1614 Radio 121.25  Informed SV, En Izat on 125.05 monitor 0000 Handover and to close docket if there is no further 3/5/2018 0000 Takeover problems until tonight.  Shift phone bill was paid, informed by KakNahar. But shift phone was still barred.  Restarted phone as instructed but still barred.  Informed KakNahar of situation.  Handover shift phone and shift duty to shift D.  SV: En Rhodizat  Takeover shift duty from shift A Amierul Adam  Roundcheck at control room  Weather update normal  MLAT alarm still active  125.05 no more bursting  Weekly preventive maintenance at control room  ABT at SWH u/s due to KVM problem  Monitor 121.25 se tx about the background noise  Handover shift duty to shift duty to shift B  Takeover shift duty from shift D Zulkifli  CAAM Sv morning/night: Mr Ng Ameer  Evening Sv: Mr Shun

0030 Preventive  Daily preventive maintenance at control maintenance room & MER 0040 Radio 121.25  ABT at SWH u/s due to KVM problem 0050 ATCS KLIA  121.25 Rx Se interference noise (intermittent) 0805 Radio 125.05  Happen when radio not in use 0845 Radio 126.0  Report to KLIA East  Maintenance cannot be done due to 1200 Handover 3/5/2018 1200 Takeover controller got many flight to handle & bad weather, cannot change site 1300 Radio (125.05)  121.25 Rx Se still use by the controller 1410 Radio (119.45)  Under monitor  AAT request to check flight plan data/callsign for MAS 5001 at KLIA  Request KLIA East to check flight plan/callsign and feedback to us (Subang)  125.05 Rx Se background noise, now change to 119.45  119.45 Tx Se cannot transmit  Report to KLIA East & En Afifi  Maintenance done  Test call request, however due to bad weather Sv postpone to the next shift  Background noise 126.0 Rx Se  Happen a few times  Monitor to determine what kind of noise occur  However no more noise  Continue monitor  Handover shift duty to shift A  Takeover shift duty from shift B. Khaidzir  On Duty: Khaidzir and Adli Adli  SV: En Ng  Request SV to testcall frequency 125.05. SV said later because busy right now.  Receive a call from Khairy Zetro East informing that they have troubleshoot the frequency and is requesting testcall to them.

1530 Radio (119.45)  119.45 is not in use and NWH is already 1530 Radio (125.05) using 125.05. 2230 Roundcheck  Performed testcall, all is okay. Next is to 2300 ATCS testcall to airplane. Will perform when 4/5/2018 0000 Handover SV is available and not busy. Currently busyand will be performed after console 0000 Takeover close. 0047 Roundcheck  Testcall to pilot on 119.45. Transmit to 0131 Direct line pilot was good, strength 4/5. 0347 Radio 121.25 0754 Server radio  Reported to Fadly Khairy. 1200 Handover  Inform SV of 125.05 status and is under observation.  Weather update normal  NWH is still on 125.05, no reports on faults so far.  121.25 only SU Rx is selected.  119.45 not in use right now.  CAAM shift change to shift Alpha  WM: Mr. Silva.  SV: Mr. Shun  Handover shift duty and shift phone to Shift D.  Takeover shift duty from shift A  Roundcheck at control room  Weather update normal  MLAT alarm still active  125.05 is monitoring but no serious bursting  Direct line out of service about 4 minute  Monitor radio 121.25 se tx but controller not used due to intermittan interference breaktrough  East request picture of server radio at MER  Explain and verified the list radio on the server and take the picture  Handover shift duty to shift B

1200 Takeover  Takeover shift duty from shift D Zulkifli 1300 Roundcheck  CAAM Sv: Mr Shun Ameer 1430 Radio 125.05  Roundcheck at control room 5/5/2018 0000 Handover  Weather update normal  MLAT alarm still active 0000 Takeover 0300 Atcs  Docket WM 2018/04/017 - 125.05 Rx Se Bursting done closed by Mr Silvaraj 0315 Atcs  Handover shift duty to shift C 1200 Handover 1200 Takeover  Takeover shift duty from shift B Amira 1511 Round check  SV : Hajah Fatimah Salman 1545 Radar KB  Daily maintenance at control room and 0000 Handover MER room 0000 Takeover 0100 Preventive  All equipment serviceable except KVM SWH maintenance 0200 Round check  Round check  Weather update  MLAT alarm active  126.0 permanent squelch  Handover shift duty to shift D  Take over shift duty from shift C Amierul adam  Round check at control room  Weather update normal  MLAT alarm still active  Radar KB withdrawal until 630am  Handover shift duty to shift B  Take over shift duty from shift D Zulkifli Ameer  Daily preventive maintenance at control room & MER  ABT at SWH u/s due to KVM problem  Round check at control room  Weather update normal  MLAT alarm still active

1200 Handover  Handover shift duty to shift C 1200 Takeover 1245 Direct lines  Takeover shift duty from shift B Amira 1400 Atcs Salman  Direct lines out of service, then back to 7/5/2018 0000 Handover normal after 5 minutes 0000 Takeover 0040 Radio  Round check at control room 0100 Daily PM  Weather update normal  MLAT alarm active 1200 Handover  Handover shift duty to shift A 1200 Takeover 1300 Round check  Takeover shift duty from shift C Adli Amira 1335 Radio 125.85  126.0 intermittant sound (kadang2 xdgr 8/5/2018 0000 Handover suara pilot) 0000 Takeover 0400 Atcs  After monitor 5 minutes, back to normal  Round check at control room and MER room  Daily preventive maintenance, all equipment serviceable, except KVM SWH  Handover shift duty to shift B  Takeover shift duty from shift A Zulkifli Ameer  Round check at control room  Weather update normal  MLAT alarm still active  Rx Se breakthrough  Happen only 1 time  Monitor for confirmation on which site is affected  No more breakthrough  Handover shift duty to shift C  Takeover shift duty from shift B Amira Salman  Daily preventive maintenance at control room and MER room

0415 Atcs  All equipment are serviceable except KVM SWH 1200 Handover 1200 Takeover  Round check at control room 1300 ATCS  121.25 no breakthrough 1415 ATCS  Weather update 1700 ATCS  MLAT alarm status 9/5/2018 0000 Handover  Handover sift duty to shift A 0000 Takeover  Takeover shift duty from shift C Khaidzir 0100 Preventive Adli Maintenance  Roundcheck at control room 0400 ATCS  Weather update okay 0955 Radio  Radio no problems and no complains 1200 Handover 1200 Takeover  SV report that the LED table light cannot on at SWH console  Will check after closing  Open SWH console workstation to check on LED light  Connector was disconnected  Reconnect connector  LED light on  Handover shift duty and shift phone to shift D  Takeover shift duty from shift A Amira  On duty: Amira(replace Amierul on Ameer leave) and Ameer(switch shiftwith Adam).  Performed daily PM at control room and MER  All equipment serviceable except KVM SWH  Roundcheck at control room  AAT informed 126.0 permanent squelch  Monitor they back to normal  Handover shift to shift C  Takeover shift duty from shift D Khaidzir  On Duty: Khaidzir (shift change with Adam

Salman) and Adam (shift change with Amira) 1300 ATCS  Roundcheck at control room  Weather update okay  Radio no problems  SWH KVM still u/s 1550 Preventive  Weekly PM done for control room Maintenance  All check passed 2230 ATCS  Roundcheck at control room  Weather update updated on al consoles.  Radio, no complains 2300 Preventive  Weekly PM done for MER room. Maintenance  All check passed 10/5/2018 0000 Handover  Shift duty and shift phone handover to shift A 0000 Takeover  Takeover shift duty and shift phone from Khaidzir shift C Adli 0100 ATCS  Round check control room  No new problem so far. Equipment functioning as normal 0350 Preventive  Performed Daily PM for MER and maintenance control room  All equipment serviceable except for SWH KWM 0420 Radio 126.0  Check on 126.0  No problem detected. Permanent squelch was not seen 0740 Fallback  Controller report NEL/SEL mouse not functioning  Change the USB slot for the mouse back to normal 1100 ATCS  CAAM change shift 1200 Handover  SV: En Rodhizat 1200 Takeover 1400 ATCS  Shift duty and phone handover to shift D  Takeover shift duty from shift A Amierul  Round check at control room Adam

2315 Radio  Weather update normal  MLAT alarm active 11/05/2018 0000 Handover 0000 Takeover  125.85 GT Rx bursting – used SE site 0100 Preventive only maintenance  125.05 SE Rx bursting – under 0300 ATCS monitoring 0500 ATCS  Handover shift duty from shift D to shift Zul 0600 Monthly B Ameer maintenance  Takeover shift duty from shift D 1100 ATCS 1200 Handover  Performed Daily PM for MER and 1200 Takeover control room 1300 ATCS  All equipment serviceable except for 2315 Fallback SWH KWM 2200 Radio 12/5/2018 0000 Handover  Round check control room 0000 Takeover  No new problem so far. Equipment functioning as normal  CAAM change shift  SV: Mr.Shun  Console and VCSS  Done  CAAM change shift  SV: Mr.ng  Handover shift duty from shift B to shift Khaizir A Adli  Takeover shift duty from shift B  Round check at control room  Weather update  MLAT alarm  One aircraft FFM1000 not sync between barco and fallback MSOBM  125.85 GT Rx bursting – under monitoring  Handover shift duty from shift A to shift Amierul D Adam  Takeover shift duty from shift A

0148 Round check  Round check at control room and MER  Weather update normal 0332 Daily PM  Fallback not sync with barco 0454 Monthly PM 1200 Handover shift  Done daily preventive maintenance at 1200 Takeover MER and control room 1300 Roundcheck  Done monthly Preventive maintenance at 1400 Fallback Subang tower 13/05/2018 0000 Handover  Handover shift duty to shift B 0000 Takeover 0200 Atcs  Takeover shift duty from shift D Zulkifli Ameer 0400 Atcs  Round check at control room and MER  Weather update normal 0530 Metnav  MLAT alarm still active  Fallback monitoring 1200 Handover  Still abnormal 1200 Takeover  Handover shift duty to shift C 1347 Round check  Takeover shift duty from shift B Amira Salman  Round check at control room  Weather update  MLAT alarm active  Daily preventive maintenance at control room and MER room  All equipment are serviceable except KVM SWH  Metnav FM1 no display  Check wire connection  Restart metnav monitor  Monitor, then back to normal  Handover shift duty to shift D  Takeover shift duty from shift C  Roundcheck at control room  Weather update normal  MLAT alarm still active

1717 Radio  Monitor frequency 125.85 gt rx 0000 Handover  Nothing abnormal 0000 Takeover 0100 Round check  Handover shift duty to shift B 0200 Preventive  Takeover shift duty from shift D Zulkifli maintenance Ameer  Roundcheck at control room 1200 Handover  Weather update normal 1200 Takeover  MLAT alarm still active 1400 Atcs  Performed Daily PM for MER and 2301 Radio control room 15/5/2018 0000 Handover  All equipment serviceable except for 0000 Takeover SWH KVM 0100 ATCS  Handover shift duty to shift C 0500 ATCS 0800 Preventive  Takeover shift duty from shift B Amira Salman Maintenance  Round check at control room  Weather update Khaidzir  MLAT alarm status Adli  AAT inform at console ACD have problem  ACD console using freq 126.0  Have breakthrough, but still under monitor. Because the transmission TX RX still okay  Handover shift duty to shift A  SV : Mr Ng  Takeover shift duty from shift C  Round check control room.  Weather update, normal.  No new problems detected.  CAAM shift change  SV : Mr Shun  Performed Daily PM for MER and control room.  All equipment serviceable except for SWH KWM

0900 ATCS  Round check control room  Weather update , normal 1100 ATCS  No direct line OOS seen or reported 1200 Handover  No new problem reported of found on 1200 Takeover 1300 ATCS radio and equipment 2230 Ground Display  CAAM shift change 16/5/2018 0000 Handover  SV : Mr. Ng 0000 Takeover 0200 Atcs  Shift duty and shift phone handover to 0215 Atcs shift B 1200 Handover  Takeover shift duty from shift A Zulkifli 1200 Takeover Ameer 1330 ATCS 1600 Preventive  Round check control room  Weather update , normal Maintenance  MLAT alarm still active  No flight display on ground display  MLAT TP1 & TP2 at KLIA East down as KLIA East inform  Back to normal at 2350  Continue monitor  Handover shift duty and shift phone to shift C  Takeover shift duty from shift B Amira  Sv : Mr Shun Salman  Round check at control room  Weather update  MLAT alarm status  Daily preventive maintenance at MER room and control room  All equipment are serviceable except KVM SWH  Handover shift duty to shift A  Sv : Mr Shun  Takeover shift duty from shift C Khaidzir  On duty : Khaidzir and Adli Adli  Round check control room  Weather update, normal  No new problem  Performed Weekly PM for MER and

2200 ATCS control room  All equipment serviceable except for 2300 ATCS 2330 ABT (FM 1) SWH KWM 17/5/2018 0000 Handover  Round check control room 0000 Takeover  Weather update, normal 0147 Atcs  No direct line OOS seen or reported 0227 Daily PM  No new problem reported or found on 0436 Mapping 0912 Direct line radio and equipment 1200 Handover 1200 Takeover  CAAM shift change 1347 Atcs  SV : Mrs Hajjah Fatimah 1440 MLAT  No internet for FM1 ABT  Cant open network setting  Restarted PC. Still not connection  Network setting LAN was disabled. Enable it  Connection on ok , back to normal  Shift duty and shift phone handover to shift D  Takeover shift duty from shift A Amierul Adam  Roundcheck at control room  Weather update normal  MLAT alarm still active  Daily preventive maintenance at MER  Draw map polygon on barco screen  Direct line out of service 5 min  Handover shift duty to shift C  Takeover shift duty from shift D Amira  Caam : hajah Fatimah Salman  Round check at control room  Weather update  MLAT alarm warning  MLAT down for a few minutes before back to normal  Informed by east

18/05/2018 0000 Handover  METNAV back to normal 0000 Takeover  VOR/DME1 under ILS DVOR system 0130 ATCS 0145 ATCS (PUNCAK system)  MLAT data report by AAT 0300 Preventive Maintenance  Handover shift duty to shift A 0500 ATCS  Takeover shift duty and shift phone from Khaidzir 1000 ATCS shift C Adli 1100 ATCS 1200 Handover  On Duty: Khaidzir and Adli 1200 Takeover 1230 ATCS  Roundcheck control room.  Weather update, normal.  No MLAT problem reported.  Received call from Muhaimim requesting for docket from start until now.  Sent docket pictures to Muhaimim.  Performed Daily PM for MER and control room.  All equipment serviceable except for SWH KWM.  CAAM shift change  SV: Mr Ng  Roundcheck control room  Weather update, normal  No Direct Line OOS seen or reported.  MLAT data intermittent problem have no reports from AAT until now.  No new problem reported or found on radio and equipment.  CAAM shift change  SV: Mr Rodhizat  Shift duty and shift phone handover to shift D.  Selamat Berbuka.  Takeover shift duty from shift A Amierul Adam  Round check at control room  Weather update normal  MLAT alarm still active

1508 Direct line  Direct line out of service 4 min 1600 Cleaning 1933 Direct line  Cleaning console at control room 19/05/2018 0000 Handover 0000 Takeover  Direct line out of service 4 min 0100 Preventive  Handover shift duty to shift B Maintenance  Takeover shift duty from shift D Zulkifli 0500 ATCS Ameer 1200 Handover 1200 Takeover  Performed Daily PM for MER and 1234 Direct Line control room. 1330 ATCS  All equipment serviceable except for 2300 ATCS SWH KVM. 2320 ATCS  Round check control room.  Weather update normal. 20/5/2018 0000 Handover  Handover shift duty and shift phone to 0000 Takeover shift A 0151 Roundcheck  Takeover shift duty from shift B Khaidzir  On duty : Khaidzir and Adli Adli  Call from AAT direct line out of service.  Out for 3 minutes.  Roundcheck control room.  Weather update, normal.  All functions normal.  CAAM shift change  SV: Mr Shun  WM: Mr Silva  Roundcheck control room  Weather update, normal  No new problem reported or found on radio and equipment.  Shift duty and shift phone handover to shift D.  SelamatBerpuasa.  Takeover shift duty from shift A Amierul Adam  Round check at control room  Weather update normal

0211 Daily pm  Mlat alarm still active 1200 Handover 1200 Takeover  Daily preventive maintenance at mer and 1300 ATCS control room 1700 ATCS  Handover shift duty to shift B 1700 BARCO &  Takeover shift duty from shift D Zulkifli Fallback Ameer 1800 BARCO &  Roundcheck control room Fallback  Weather update, normal  No new problem reported or found on 0000 Handover 0000 Takeover radio and equipment. 0200 Daily PM  AAT informed TAR radar withdrawal 0230 Atcs start at 1600 until 2200 0550 Abt  Informed to KLIA East  Too many false target detected by MLAT  Informed to KLIA East for action  MLAT withdrawal by AAT  Back to normal after 15 minutes  Continue monitor  Too many false target detected by MLAT  Informed to KLIA East for action  MLAT withdrawal by AAT  At 2130 monitor shown that MLAT already back to normal  Continue monitor  Handover shift duty to shift C  Takeover shift duty from shift B Amira  Camm : Mr. Simon salman  Daily preventive at control room and MER room  All equipment are serviceable except SWH KWM  Round check  Weather update  MLAT alarm status  Weather cant update  No internet connection  Informed to DCA Mr Kucai

0830 Direct lines  Back to normal 1200 Handover 1200 Takeover  Direct lines out of service, then back to 1344 Round check normal after 5 minutes 2400 Handover  Handover shift duty to shift D 0000 Takeover 0100 Daily PM  Take over shift duty from shift C 0500 Round check  Round check at control room  Weather update normal 1200 Handover  MLAT alarm still active 1200 Takeover 1300 Atcs  Handover shift duty to shift B 23/5/2018 0000 Handover  Takeover shift duty from shift D Zulkifli 0000 Takeover Ameer 0200 ATCS  Daily preventive at control room and MER room 0310 Radio (121.25)  All equipment are serviceable except SWH KVM  Round check at control room  Weather update normal  MLAT alarm still active  Handover shift duty to shift C  Takeover shift duty from shift B Amira  Caam : Mr. Thiru Salman  Round check at control room  Weather update  MLAT alarm active  Handover shift duty to shift A  Takeover shift duty from shift C Khaidzir Adl  Round check control room  Weather update, normal.  Radio no problem seen, only KVM for SWH still down.  Other equipment running normally.  Controller reported 121.25 had break trough problem. Controller offer SE site

0415 Preventive on RX. Maintenance  On only SE RX and monitor 121.25 for 0520 Barco 10 minutes. (NWL/SWL)  No problems. Will monitor if receive 0640 Barco report again. (NWL/SWL)  Daily PM done for control room and 0807 Direct Line MER. 0815 Radio (121.25) 1135 Radio (126.0)  All serviceable except SWH KVM. 1145 Barco (NEH)  Controller reported Barco for NWL/SWL console have colour problem. 1200 Handover 1200 Takeover  Tried to find setting for the Barco but only brightness adjust available.  Report to ATCS group Zetro for assistance.  After discussion in group, it was decided to switch with another less used available Barco and wait for replacement.  Tonight switch (NWL/SWL) Barco with (NEL/SEL) Barco  Direct line out of service until 0810.  3 minutes down.  Inquire from controller on 121.25 if there is any problems, controller said there were none.  AAT called informing ACD have frequency problem  Controller said now okay, but the frequency was blocked and cannot transmit.  For now, no problems transmitting or receiving, but have permanent squelch.  Cant transfer and click smoothly  Suspect barco CPU lagging  Rebot barco. Slight improvement but still problem  Changed to spare mouse behind barco smooth performance  Handover shift duty to B  Takeover shift duty from shift A Zulkifli  CAAM Sv: Mr Ng Ameer

1500 Barco (NEH)  Takeout the problem mouse 1515 Radar  Change with 2nd hand mouse 1530 BARCO  No more same issue NWL/SWL  KB radar withdrawal until 2200 24/5/2018 0000 Handover  Informed by AAT 0000 Takeover  Monitor colour problem 0120 Plotting  Reduce monitor brightness 0200 Withdrawal  Confirm by Sv, monitor got no more 0830 Atcs same issue 0845 Radio  Handover shift duty to shift C 1200 Handover 1200 Takeover  Takeover shift duty from shift B Amira 1315 ATCS Salman 2240 ATCS  Re-plotting map at console NWL/SWL  Save as : trolakslimriverkkb.loc  Thompson radar withdrawal 0900 until 1600 LT  Informed by AAT  Already informed to KLIA ATCS  Console NEH USB port problem  Mouse and keyboard problem  Only one port okay  Used splitter to connect both mouse and keyboard to USB port  Mouse and keyboard back to normal  121.25 SE RX breakthrough  Under monitoring  Handover shift duty to shift A  Caam : Mr. Shun  Takeover shift duty and shift phone from Khaidzir shift C. Adli  On Duty: Khaidzir and Adli  Round check control room  Weather update, normal  NEH Barco, normal so far.  Radio frequencies , no reports so far  Round check control room  Weather update, normal  NEH Barco mouse seems fine, no

25/5/2018 0000 Handover problems 0000 Takeover  No reports or sight of direct line out of 0123 Round check service 0703 Direct line  No reports on radio frequency faulty 0800 Handover 0800 Takeover  Handover shift phone and shift duty to 1300 ATCS shift D 2300 ATCS  Takeover shift duty from shift A 26/5/2018 0000 Handover  Round check at control room 0000 Takeover  Weather update normal  MLAT alarm still active 26/5/2018 0000 Takeover  Direct line out of service 0703-0706 0050 ATCS  Handover shift duty to shift C 0255 Preventive Maintenance  Takeover shift duty from shift D Amira  CAAM ; Mr. Simon Salman  Round check at control room  Weather update  MLAT alarm status  Round check at control room  Weather update  MLAT alarm status  Handover shift duty to shift A  Takeover shift duty from shift C Khaidzir Adli  Takeover shift duty and shift phone from Khaidzir shift C Adli  On Duty: Khaidzir and Adli  Round check control room  Weather update, normal.  Radio no problem seen, only KVM for SWH still down.  Mouse okay at Barco for NEH.  Other equipment running normally.  Daily PM done at control room and MER.  All serviceable except for SWH KWM at MER.

0320 Preventive  Monthly PM at Subang tower. Maintenance  All pass.  Only problem is that another equipment 0500 ATCS 0753 Direct Line not under zetro, frequency 125.05 1100 ATCS produced sound when 125.1 radio was 1110 ATCS being tested. 1200 Handover  CAAM shift change 1200 Takeover  SV: En Fauzi 1547 Roundcheck 0000 Handover  Direct Line out of service until 0554 0000 Takeover  1 minute out 0100 Preventive  CAAM Shift change Maintenance  SV: En Rhodizat 0513 Radio 135.75  Round check control room  No reports on faults. 0926 Radio 126.0  Weather update normal. 1200 Handover  Shift duty and shift phone handover to shift D.  Takeover shift duty from shift A Amierul adam  Roundcheck at control room  All normal  Handover shift duty to shift B  Takeover shift duty from shift D Zulkifli  CAAM Sv moning/night: Mr Ng Ameer`  Evening Sv: Mr Shun  Daily PM done at control room and MER.  All serviceable except for SWH KVM at MER.  Informed by AAT the radio was down  Check & found that the radio is not in used by controller  Noise at Rx while not in used  Monitor, however no more same noise  Continue monitor  Handover shift duty to shift A

27/5/2018 1200 Takeover  Takeover shift duty and shift phone from Khaidzir 1440 Fallback 1500 Fallback shift B Adli 1550 Radio (135.75)  On Duty: Khaidzir and Adli 2230 ATCS  AAT called informing sector 5 fallback don’t have callsign 2300 ATCS 28/5/2018 0000 Handover  Check and found out that all fallback 0000 Takeover have the same problem. 0133 Daily PM  After informing SV, En Fauzi, of fallback problem, went to server room with AAT staff to reboot fallback.  Started rebooting GWF. After GWF is done rebooting, fallback says it is offline.  Change to RDF to reboot. RDF was already rebooting by itself without inputting command.  After RDF finished rebooting, fallback was back to normal.  Request testcall to SV regarding morning report on 135.75 having problem.  Testcall was done on 135.75, Rx Se Gt, Tx Se.  All okay, pilot informed frequency strength 4.5. 135.75, no problems.  Roundcheck control room  Weather update, okay and updated on all ABT.  No direct line out of service seen.  No radio problem reported.  Fallback no problem.  CAAM shift change  SV: Mr Shun  WM: Mr Silva  Handover shift duty and shift phone to shift D.  Control room aircond very cold, selamat berpuasa.  Takeover shift duty from shift A Amierul adam  Do daily preventive maintenance at MER and control room

0532 Roundcheck  Round check at control room  Weather update normal 1200 Handover  MLAT alarm still active 1200 Takeover 1300 ATCS  Handover shift duty to shift B 1600 ATCS  Takeover shift duty from shift D Zulkifli 29/5/5018 0000 Handover Ameer  Round check control room 0000 Takeover  No reports on faults. 0715 Abt monitor  Weather update normal.  Cleaning at control room 0730 Direct lines 1200 Handover  Handover shift duty to shift C 1200 Takeover 1747 Roundcheck  Takeover shift duty from shift B 0000 Handover  Cannot open browser firefox 0000 Takeover  Computer hang  After restart back to normal 0104 Direct lines  Connection lost internet  Reconnect the internet, then back to normal  Direct lines out of service, then back to normal after 5 minutes  Handover shift duty to shift D  Takeover shift duty from shift C Amierul adam  Round check at control room  Weather update normal  MLAT alarm still active  Handover shift duty to shift B  Takeover shift duty from shift D Zulkifli  Morning & night SV: Mr Izzad Ameer  Evening Sv: Mr Ng  Direct lines out of service, then back to normal after 3 minutes

0130 Preventive  Daily PM done at control room and Maintenance MER. 0417 Fallback  All serviceable except for SWH KVM at MER. 0848 ATCS 1200 Handover  No call sign at fallback display 1200 Takeover  Reboot GWF & RDF 1300 Atcs  Still no call sign  Reboot GWF for 2nd time 1400 MLAT  Fallback display back to normal 31/5/2018 0000 Handover  AAT request to use frequency 119.45 0000 Takeover  Advice AAT to ask permission from 0130 ATCS CAAM Sv 0230 Radar 0330 ABT  Handover shift duty to shift C  Takeover shift duty from shift B Amira Salman  Round check at control room  Caam : En rohizad  Weather update  MLAT alarm status  Aat report false target on MLAT system  Report to east KLIA  No problem occurs to KLIA MLAT  TAR MLAT status offline  Report back to AA Subang  MLAT system back to normal  Handover shift duty to shift A  Takeover shift duty from shift C Khaidzir Adli  Roundcheck control room  Weather update all okay  Barco have funny looking weather.  No radio problem reported for now.  AAT called to inform Genting radar will be withdrawn from 5 to 10.  SV, Mr Ng, told to make NWH and NWL/SWL ABT auto reload the page.  Downloaded new auto reload extensions for both ABT. All done.

0345 Radar  Mr Ng informed that KR radar is 0450 Preventive showing wrong info on weather at barco. Maintenance  Inform group for opinion. KR radar at 0500 ATCS KLIA is under AAT, will inform them of 0645 Radio (125.85) this problem. 0930 Barco  Daily PM done.  All serviceable except for SWH KVM at 1100 ATCS 1200 Takeover MER. 1400 ATCS  Changed new daily PM for June. 1430 Monthly PM  CAAM shift change.  WM: Mr Silva  SV: Mr Shun  Controller informed of 125.85 having problems.  Controller was using backup radio as 125.85 cannot transmit. Receive was okay.  Controller changed to SE site for Tx and Rx, can transmit again.  Controller change to Gt Site to check, it was okay, can transmit.  Now using SE site.  Informed Afifi on this and monitor frequency.  Controller inform on lines not disappearing on barco screen.  2 lines, green and yellow on screen.  Pressing CNL does not work.  Controller off and on the grp from the heart menu, It worked. Back to normal.  CAAM shift change  SV: Mr Ng  WM: En Rosli  Takeover shift duty from shift A Zulkifli Ameer  Roundcheck control room  Weather update all okay  No radio problem reported for now.  Done monthly PM for transceiver at MER  VSWR for frequency 118.65 failed

1/6/2018 0000 Handover  Handover shift duty to shift C 0000 Takeover 0038 Barco  Takeover shift duty from shift B Amira  Caam : Shum Salman 0417 Dpsd  The display blurry and have double 0010 Daily PM vision 1200 Handover  Inform SV to troubleshoot the problem 1200 Takeover tonight 1240 ATCS  One target just stayed at the end of the 1300 Barco runway 1740 Barco  Report to East to ask the status of MLAT, no problem  One aircraft forgot to turn off the responder  Then back to normal  Daily preventive maintenance at control room and MER room  All equipment serviceable except KWM SWH  Handover shift duty to shift A  Takeover shift duty from shift C Khaidzir Adli  Roundcheck control room  Weather update all okay  NWH/SWH barco have color issue again.  Inform En Azlan of barco problem.  Inform SV, Mr Shun, that we will switch the barco with NEL/SEL tonight.  Started switching the barco for NEL/SEL and NWH/SWH.  Because NWH/SWH barco is an old model, the display wire needed to switch too.  After switching and reassembling the barco to CPU. We had to restart the CPU, then the barco monitor have display. Else, the barco only displayed no signal.  Finished switching process at 1845. All working normally.

 The problematic barco(now at NEL/SEL) display still have minor lines, but not as bad as before switching. Will replace when replacement barco arrive. 2300 ATCS  CAAM Shift change. 2310 ATCS  SV: Mr Simon 2/6/2018 0000 Handover  Roundcheck at control room 0000 Takeover  No problems so far at barco 0144 Atcs  No radio problem reported  No direct line out of service seen or 0655 Makenav ATIS reported.  Weather update, okay. 1200 Handover 1200 Takeover  Handover shift duty and shift phone to 1400 Atcs shift D 2200 ABT  Takeover shift duty from shift A 3/6/2018 0000 Handover Amierul adam  Round check at control room  Caam : MR,simon  Weather update  MLAT alarm status  Mr,shun report atis n makenav so dirty  Cleaning all  Handover shift duty and shift phone to shift c  Takeover shift duty from shift D Amira Salman  Round check at control room  Weather update  MLAT alarm active  AAT called, Mr. Simon report on weather update  No problem detected, call meteorology department to ask the status on weather update  Status : updated  Informed to Mr. Simon  Handover shift duty to shift A

0000 Take over  Takeover shift duty from shfit C Adli 0150 ACTS Khaidzir 0315 Barco  Round check control room 0450 Preventive  Weather update all ok Maintenance  No problems 0500 ATCS  Controller ask to wipe the SHE barco 0520 Barco screen a few stains and fingerprints can be seen 0840 Barco  Wiped all the barco screen as all other 0930 Barco barco screen seem to have some stains  Daily maintenance done for MER and control room  All serviceable except for KVM u/s and Barco for NEL/SEL reduce efficiency  CAAM Shift change  SV : Mr Ng  Sv informed that weather for barco, under the TH radar, is showing weather but ABT weather website shows no weather.  Informed AAT  Controller called because of aproblem at DEP barco  Controller did not show or explain problem.  AAT staff came and resolve it immediately.  Probably the controller cannot change height of the target due to the altitude/height select tab was already out  Sv coplain about weather on barco is wrong and ther have been no action taken on this.  Weather is from TH/Thompson radar, which is under Amcrop.  Called Amcrop to ask on radar status. Amcorp staff said that radar have no problem, only that last night there were but now it is ok.  Informed Sv on this, Sv said to take and send pictures of weather display and barco weather and send them to Amcorp

1100 ATCS  Amcorp insist that radar have no 1200 Handover problems. 1200 Takeover 1344 ATCS  CAAM Shift  SV : Mr Rhodizat 0000 Handover  Handover shift duty to shfit D  Takeover shift duty from shift A  Roundcheck at control room  Weather update normal  MLAT alarm still active  Barco normal  Handover shift duty to shift B


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook