Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore Brosur SAVASA Agustus 2020

Brosur SAVASA Agustus 2020

Published by Bobry Khaerudin, 2020-09-16 06:12:38

Description: Brosur SAVASA Agustus 2020

Keywords: brosur,savasa

Search

Read the Text Version

2





Exit Gate KM.37 (Cikarang Pusat) Cikarang Japanese School Mitra Keluarga Hospital (Under Construction) THE DEVELOPER JAPANESE COMPANY WITH THE LARGEST MOST RESPECTED PROPERTY GLOBAL NET WORK REPUTATION DEVELOPER IN SOUTH EAST ASIA 2

Exit Gate KM.41 Karawang Station (Future Gate) Jakarta - Bandung High Speed Rail (KCIC) (Under Construction) (Future Development) Institut Teknologi Sains Bandung (ITSB) Korea Education Complex (K-Eduplex) This Image is Property of Kota Deltamas SMART LIFESTYLE 3

41

25

N The cluster road design incoroporates features that provide passive cooling effect. 3

To create wind passages, roads are laid out in correspond to Comfortable microclimate is important to create a good quality living dominant local wind flow. environment. To reduce energy consumption, SAVASA is designed by applying passive solar design concept. 47

Main Gate CCTV Security Gate CCTV Security Post ONE GATE SYSTEM Beam Sensor SAVASA’s Smart Security adopt a One-Gate System that centralizes security check in 85 one location, thus minimizing the security personnel manpower cost. Perimeter wall will be protected from intruders by infrared beam sensor.

Home Network System Our Home Network System makes your home a Safer Place. All Houses in SAVASA come equipped with Panasonic Home Network System which consists of 2 indoor & outdoor CCTV cameras, 1 hub, 1 motion sensor, 1 window/door sensor, smart plug and 1 digital cordless phone. 69

Wall Pre-Cast Concrete (WPC) Method Panasonic WPC Construction method can save minimum three months time compared to conventional construction method. Automation of construction process improves product quality and consistency without reliance on skills of workers. Due to higher-spec of concrete, SAVASA house is much stronger, durable, and more resistant to earthquake. Wall Pre-Cast Concrete (WPC) With the rapidly increasing population of Indonesia, the WPC construction method served as an efficient and faster way of building homes. Using pre-casted walls and slabs that are created at the on-site temporary factory (casting yard), the method warrants much consistent quality houses at affordable prices. * Wall Pre-Cast Concrete for type B only 107

Air Filtration & Ventilation System PURETECH system will filter and flow fresh air from outside into the house and ventilate out contaminated air inside the house due to cooking activities and cigarette smoking. This system guarantees the indoor air quality of the house, which heavily affect the healthy life of your family, because 57% of air that we breathe is from indoor air. 47 Full 8 11

Delivery Drop Box Community Coin Laundry 129

SAVASA Resident Activity Center will also served as the hub for all community-building activities, such as weekend bazaar which knit the true sense of belongings among Smart People of SAVASA. Urban Farming Area Mini Market Day Care Center Car Wash Canteen / Coffee Shop 1013

1411

TYPE BUILDING SIZE 51 m2 LAND SIZE 66 m2 A CHIC 3.000 1.175 625 1.200 2.500 2.500 1.900 1.100 3.000 2.000 1.000 1.000 3.000 11.000 4.000 2.500 3.000 2.000 4.000 500 1.900 4.100 6.000 4.000 3.000 3.000 6.000 Features: Home Network System Air Filtration & Ventilation System *This is image illustration only 1215

1613

TYPE BUILDING SIZE 80 m2 LAND SIZE 84 m2 B 2.700 4.300 2.700 4.300 1.750 3.600 3.500 2.400 2.000 1.300 12.000 3.250 2.700 2.600 3.900 750 3.600 2.400 1.000 7.000 4.600 6.000 1.000 7.000 Features: Wall Pre-Cast Concrete (WPC) Home Network System Air Filtration & Ventilation System 1417

1815

DT Y P E (LIMITED STOCK) BUILDING SIZE 137 m2 LAND SIZE 157 m2 2.200 4.900 1.900 1.925 1.015 2.460 2.460 4.000 2.000 3.000 2.940 2.940 2.200 2.200 1.800 1.500 3.300 17.400 2.200 3.800 2.200 3.800 1.500 1.000 1.500 1.000 3.000 4.100 1.900 9.000 5.000 5.000 3.000 4.100 1.900 9.000 Features: Home Network System Air Filtration & Ventilation System *This is image illustration only 1619

Living Room Dining Room 2017

Main Bedroom Secondary Bedroom * All pictures represent unit type B 182151

PHOTO GALLERY Main Gate Security Gate Main Street ASA Cluster Wall Pre-Cast Concrete (WPC) Casting Yard WPCs Installation Pile : Mini Pile Entrance Door : Solid Engineering Wood Structure Other Door : ALC (Airated Lightweight Concrete) Window : Engineering Door (Honey Comb) Roof Structure Wall Pre-Cast Concrete (only type B) Water Roof Covering Electricity : Alumunium Frame Floor Finishing : Light Weight Steel (Truss System) Other Feature : PDAM Standard Ceiling : Concrete Roof Tile Paint : 2200 Watt Sanitary Ware : Homogenous Tile (60 x 60 at Living Room) Ceramic Tile (30 x 30) : Panasonic Home Network System Panasonic Low Energy LED Lighting : Gypsum Board (Indoor), GRC (Outdoor) PURETECH Air Filtration & Ventilation System Landscape in front : Weather Shield Painting Biotech Filter Septic Tank : TOTO 19

FUTURE DEVELOPMENT Karawang Station, High Speed Rail (KCIC) AEON MALL Deltamas Mitra Keluarga Deltamas Hospital EXISTING DEVELOPMENT Exit Toll KM.37 Cikarang Pusat Elevated Highway Cikampek Institut Teknologi Sains Bandung SMK Ananda Mitra Industri Deltamas Cikarang Japanese School Korean Education Complex (TK/SD/SMP/SMA) (TK/SD/SMP/SMA) Sakura Park Hotels Le Premier Hotel & Service Apartment McDonald’s Deltamas 20

ACCESIBILITY Great accesibility is one of the major key advantages of living in SAVASA. The township is strategically located about 5 minutes away from the future Karawang High Speed Rail Station. From this station you can reach Jakarta or Bandung within 20 minutes. KCIC – High Speed Rail | Jakarta – Bandung (Under Construction) HALIM KARAWANG WALINI TEGAL LUAR TRAVEL DISTANCE & DURATION ±37 km ±60 mins JA K A R TA ±110 km ±120 mins (CAWANG - HALIM AIRPORT) ±15 km ±30 mins BANDUNG ±1 km ±5 mins CIKARANG STATION (COMMUTER LINE) KARAWANG STATION (KCIC - JAKARTA BANDUNG HIGH SPEED RAIL) FUTURE DEVELOPMENT KERTAJATI A IRPORT ±130 km ±90 mins 21


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook