Project: Community Centre and           Supporting FacilitiesLocation: Madina.Club House, Mosque, FM Hub, GateArea, Parking, Path WayClient: Knowledge Economic CityValue : 25 MillionScope of Work CIVIL, STRUCTURAL& ELECTRO MECHANICAL
Available Resources
Available Resources
Available Resources             Manpower List          No. of                                                     Employees                     No. Manpower Category                                                          25                      1 Project Managers                  12                      2 Senior Structural Engineers       14                      3 Senior Architects                 14                      4 Senior Electrical Engineers       14                      5 Senior Mechanical Engineer         6                      6 Senior Planning Engineers          8                      7 Senior Quantity Surveyors         20                      8 Civil Engineers                   25                      9 Electrical Engineers              25                     10 Mechanical Engineer               16                     11 Structural Engineers              10                     12 Cost Engineers                    35                     13 CAD Operators                     15                     14 Land Surveyor                    658                     15 Skilled Labors                   780                     16 General Labors                    20                     17 Safety Officers                   15                     18 Q.A/Q.C                         1712                                             Total
Equipment
Equipment  Equipment              25                                  10           Tower Crane            30           Mobile Crane           20           Generator              15           Bobcat                 25           Air compressor         30           Bar Bending Machine    8           Bar Cutting Machine    8           Big Shovel             20           Forklift               34           Welding Machine        100           Trowel                 30           Port Cabinet           10           Plate Compactor        2           Roller Compactor       2           Jumping Compactor      12           Sand Blasting Machine  15           Man lift               5           GMC Bus                8           JCB                    4           Trailer           Flat bed Mercedes
Policy Statement
HSE Statement                SCC HSE Policy Statement               SCC recognizes that our long-term business success depends on our ability and commitment to continually               implement and improve our standers of health, safety and Environmental ( HSE ) management. Therefore               emphasis must be clearly placed by everyone on ensuring that we take into consideration human health, safety,               environmental protection and community goodwill at all times.               SCC is fully committed to:               • Providing employees at all levels within the organization, the necessary information, instruction,                 training and supervision they require to work safely at all times.               • Preventing HSE non-conformances and HSE incidents.               • Setting HSE performance objectives, measuring results, assessing and continually improving processes                 through the use of an effective management system.               • Planning for, responding to and recovering from any emergency, crisis and business disruption.               • Minimizing our impact on the environment through pollution prevention, reduction of natural resources                 consumption and skills to all aspects in performing our services.               • Sharing our knowledge of successful HSE programe and initiatives within the industry.                 This policy shall be reviewed periodically to ensure ongoing suitability. The commitments listed above                 are in addition to our basic obligation to comply with SCC standard, as well as applicable HSE laws and                 regulations where we operate.                This commitment is in the best interest of our employees, clients, stakeholders and the communities in                 which we live and work. I fully support and expect everyone to comply with our HSE policy and standards and                 make SCC a world leader in HSE
Quality Statement                 SCC Quality Statement                   SCC believes that this commitment will contribute to achieving its vision of being amongst the leaders                   Constructions.                   SCC is fully committed to :                   • Implementing a Quality Management System in accordance with recognized international best practices.                   • Developing, communicating , implementing and improving our strategies, objective, policies and procedures                     that allow our project to be delivered to the best standards.                   • Complying with national and international laws, codes, statutory and regulatory requirements .                   • Maintaining stakeholder confidence by consistently meeting requirements and exceeding expectations.                   • Employing and retaining talented professionals by providing excellent working condition and professional                    development.                   • Influencing service providers and supply chains to ensure their compliance with the QPM Quality Management                     System.                   • Conducting regular performance reviews and audits, and acting diligently on the findings to improve the                     effectiveness of the system across all projects and services.                    It is a requirement on all SCC employee to comply with the content of the SCC Quality Management System and                    all associated documents, which are issued with the managements full approval and commitment.
Company Certificates
Classification Certificate
                                
                                
                                Search
                            
                            Read the Text Version
- 1
 - 2
 - 3
 - 4
 - 5
 - 6
 - 7
 - 8
 - 9
 - 10
 - 11
 - 12
 - 13
 - 14
 - 15
 - 16
 - 17
 - 18
 - 19
 - 20
 - 21
 - 22
 - 23
 - 24
 - 25
 - 26
 - 27
 - 28
 - 29
 - 30
 - 31
 - 32
 - 33
 - 34
 - 35
 - 36
 - 37
 - 38
 - 39
 - 40
 - 41
 - 42
 - 43
 - 44
 - 45
 - 46
 - 47
 - 48
 - 49
 - 50
 - 51
 - 52
 - 53
 - 54
 - 55
 - 56
 - 57
 - 58
 - 59
 - 60
 - 61
 - 62
 - 63
 - 64
 - 65
 - 66
 - 67
 - 68
 - 69
 - 70
 - 71
 - 72
 - 73
 - 74
 - 75
 - 76
 - 77
 - 78
 - 79
 - 80
 - 81
 - 82
 - 83
 - 84
 - 85
 - 86
 - 87
 - 88
 - 89
 - 90
 - 91
 - 92
 - 93
 - 94
 - 95
 - 96
 - 97
 - 98
 - 99
 - 100
 - 101
 - 102
 - 103
 - 104
 - 105
 - 106
 - 107
 - 108
 - 109
 - 110
 - 111
 - 112
 - 113
 - 114
 - 115
 - 116
 - 117
 - 118
 - 119
 - 120
 - 121
 - 122
 - 123
 - 124
 - 125
 - 126
 - 127