Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore PU FUHUANG

PU FUHUANG

Published by haiiianhhh96, 2023-08-15 01:12:11

Description: PU HÓA (2)

Search

Read the Text Version

["","","","","","","","","","","","","","","","","","","","","","","","","","","","Construction manual Construction manual Fuhuang PU professional glue Professional construction tools Non-toxic, tasteless, no radiation, green and environmentally friendly, clean and bright appearance, easy to clean like porcelain, 100% waterproof, 100% mildew-proof, long-term non-humidity, 1. Measuring angle ruler 2. Hand saw 3. Money board cutting tool 4. Large line board cutting tool non-oxidation, oil and corrosion resistance, anti-aging, no bursting, small shrinkage, super strong Adhesiveness, wide application range, simple operation and direct contact with the skin without irritation. 5. Glue gun (1) 6. Glue gun (2) 7. Electric lock 8. Small spray gun Construction method: Decorative flower series construction method 1. All bonding surfaces must be clean, dry from water, etc., free from dirt, oil film and dust. 2. All surfaces must be flat and easy to bond, and the rough part must be sanded first. 1. Apply Panshi 100 glue on the 2. Squeeze the product with a 3. Use a tool or cloth to wipe off the 4. After the glue is completely dry, the 3. Apply the professional back primer on the rough surface of the PU product (3-5 mm thick), and fix it on the surface of the PU product after the glue is applied. Squeeze the product firmly, the back of the product, calendar, then remove the product, wet glue on the decoration, construction is completed. remove the product and apply the professional anti-cracking interface glue on the wall contact surface and line interface, apply the range of three to five places, then put the product back to its original wait for 30-60 minutes, then put the product back to its original position Fuhuang PU professional back primer and hold it for 2-3 minutes with your hands. Applications: For wood plaster, PU foam, lighting and other materials, it can position, super stick, and waterproof Product Features: Strong adhesive force, easy construction Physical properties: Same content \u226570% Appearance: white paste Curing time: 24-36H\/25\u00b0C Fuhuang PU professional anti-cracking interface glue Applications: For the connection of stone, wood plaster, ceramics, metal, plastic, PU foam, lighting and other materials, it can be filled to achieve a high connection effect, prevent cracking, and have waterproof and other functions. Product Features: Super strong bonding, anti-cracking interface, no corrosion, weather resistance. Physical properties: Solid content\u226595%, Appearance:white paste, Consumption: 40m\/piece, Curing time: 24-36H\/25\u00b0C","Construction manual Construction manual Money board series construction method Construction method of lamp holder series Outer diameter 1.Arc lamp holder series Outer layer 1. Before installing the arc-shaped lamp holder, measure the arc-shaped diameter on the back of the product, and dig holes on the ceiling that are larger than the actual one by Inner thickness 5mm. outer layer Inner thickness Side width Inner diameter Side width 2. Apply glue on the contact surface between the back of the arc-shaped lamp holder and the ceiling, put it into the dug hole, fix it with wood screws, fill the nail hole with filling soil and putty, and paint the nail hole to complete the construction. 1. Place the measuring tool at the 2. The line board to be installed is 3. Place the line board on 4. Place the coin board on the 5. Use the cutting tool to follow corner marked with a pencil in the corner the right wall Corner, ceiling left wall corner , ceiling and the oblique hair drawn on the positioning mark and wall The surface is 90 wall Formed at 90 degrees, money board degrees, use a pencil to use a pencil to draw a mark war cut, draw a mark on the hammer on the money board Diagonal 2. Flat lamp holder series plate Diagonal mark mark between two dots between two dots money, (Money, the angle becomes the angle becomes 45 45 degrees. degrees 6. Apply Panshi 100 adhesive on 7. Fix the glued shallow board in 8. Squeeze the product hard. 9. Then remove the product, 10. Then use Panshi 200 1. Apply on the contact surface 2. Squeeze the product with a 3. Use a tool or cloth to wipe off the rough surface of PU the arranged position: interface agent to apply to the between the back of the product calendar, then remove the the wet glue on the lamp holder, products wall in contact with the warp and the ceiling product, wait for 30-60 minutes, wait until the water is completely (3-5mm thick). protection interface, and the then put the product back in dry, and the construction is scope of application is three to 3. Square convex bottom lamp holder series place and fix it for 2-3 minutes. completed. five places. 1. Before installing the inner square lamp holder, first make a square wooden frame with an inner size of 61X61cm, 2. Pick up the inner lamp holder and put it into the square box from the opposite corner, as shown in the figure below 11. Put the product back in 12. Connect to the Panshi 200 13. Fill the gap between the 14. Use a tool or cloth to wipe 15. After the glue is completely place, fix it, and press it with interface at the interface of the wire and board with filling soil off the undried glue on the fried, the painting construction is your hands for 2-3 minutes. line board, and Then install the and atomic ash coin board, completed, Longyi money board,","Construction manual CConosntsrutrcutciotinonmmanaunaulal Wall decoration, beam head column series construction method Roman column series construction method 1. Apply Panshi 100 adhesive on 2. Squeeze the product with a 3. Use a tool or cloth to wipe off the the back of the product, 2-3 calendar, then remove the product, unhatched water on the lamp minutes. wait for 30-30 minutes, then put the holder, and wait for the glue to be product back to its original position completely finished before the Door decoration series construction method and hold it down for 2-3 minutes. construction is completed Door decoration series construction method 1. Measure the required size and 2. Use the cutting tool to cut 3. Apply Panshi 100 bonding 4. Put the Roman column in the mark it. according to the mark, agent to the butt joint of column installation position, head and column bottom, and fix it. 1. According to the size of the 2. Apply 100-stop glue on the back 3. After the product is installed, 5. Use a nail gun to fix the top of 6. Fix the bottom of the Roman 7. After the Roman column is 8. Wipe off the undried glue with a door trim, cut the product into of the product, then fix it at the wipe off the dry glue on the product the Roman column, column with a nail cabinet. installed, fill the gaps and nail hole tool or cloth, and after the push-up the appropriate length installation position, use a calendar with a tool or cloth. After the glue is walls with filling soil and putty are completely dry, smooth to dismantle the product, then take completely dry, the construction is and putty. the repaired part with Construction method of flat column series it off, wait for 30-60 minutes, completed. sandpaper, and paint the seams and then put the product back to its nail holes to complete the original position and fix it by hand Hold for 2-3 minutes. 1. When installing the flat column, 2. According to the drawn 3. After the product is installed, adjust the length of the column positioning points, install the wipe off the dry glue on the product body according to the required product from top to bottom (column with a tool or cloth. After the glue is size, define the positioning point, head, column body, column completely dry, the construction is and then apply Panshi 100 union bottom), and squeeze the product completed. agent on the product, to the wall, so that the glue sticks more smoothly.","Construction manual Cozy Harmonious Inside Foreign The company provides a stable and peaceful working environment for employees, cares about the lives of employees, The company will always maintain a caring heart for the society and continuously and cultivates their skills. The painters have full confidence and loyalty to the company, and the employees maintain improve the trust of customers and the society in the company. solidarity with each other."]


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook