ORANJEMUND     MARINA                                                          BY JACK MUTUA                      FOR MARINA DEVELOPAMRCEHNITTEGCTRSOINUCP.
CLIENT’S NEED                           PROJECT BRIEF &                                                      CONTEXT                   - RESIDENTIAL DEVELOPMENT                     DIRECTLY ACESSING MARINA                   - A YACHT CLUB WITH MOORING                    FACILITIES                   - UPGRADING OF LAGOON                 - ECO TOURISM ACCOMMODATION                      ESTABLISHMENTS                 - ECO-FRIENDLY SUSTAINABLE                      DEVELOPMENTS
NAMIBIA’S NEED  PROJECT BRIEF &                             CONTEXT
A vision for             Oranjemund    “… a unique town that thrives on new possibilities.” – TONY BESSINGER                                       (NAMDEB)
URBANIZATION IS INEVITABLE
URBANISATION IN NAMIBIA  FAILING TO PLAN IS PLANNING                                 TO FAIL: WINDHOEK
URBANISATION IN NAMIBIA  FAILING TO PLAN IS PLANNING                                   TO FAIL: LUDERITZ
MODERN  SUCCESS STORIES
URBANIATION: CASE STUDY  THE CASE OF LAS VEGAS, NEVADA – U.S.A                           LAS VEGAS 1933
URBANIATION: CASE STUDY  THE CASE OF LAS VEGAS, NEVADA – U.S.A                           LAS VEGAS 2017
URBANIATION: CASE STUDY  THE CASE OF DUBAI, UAE                             DUBAI 1991                             SHEIKH ZAYED ROAD
URBANIATION: CASE STUDY  THE CASE OF DUBAI, UAE                             DUBAI 2013                             SHEIKH ZAYED ROAD
URBANIATION: CASE STUDY  THE CASE OF DUBAI, UAE                            DUBAI 2005
URBANIATION: CASE STUDY  THE CASE OF DUBAI, UAE                           DUBAI TODAY
THE CASE OF ORANJEMUND                            ORANJEMUND TODAY
ORANJEMUND    2038?
SUPPLY BASE
CASE STUDY: THE GORGONLOCATION:           BARROW ISLAND – WESTERN AUSTRALIA     PROJECT            SITE CONDITIONS:    CLASS “A” ENVIRONMENTALLY PROTECTED SITE                        ECONOMIC USE:       LOADING WARF FOR L.N.G MINING PROJECT                        JOB OPPORTUNITIES:  8,000 JOBS DURING CONSTRUCTION
SUPPLY BASE BRIEF                                 PROJECT BRIEF &                                                               CONTEXT                       SUPPLY BASE BRIEF                       THE PROBLEM                     - Oranjemund currently has no Rail transport                     - Bulk Transportation of materials for Marina                          developments shall be very costly.                       THE SOLUTION                     - Supply Base to be built to as part of the                          Oranjemund Marina Development to facilitate                        the flow of bulk Goods to produce Water and                        Energy.                     - Incorporates the following:                     - Specialized Oceanic Supply Port                     - Solar Power generation Plant                     - Waste-to-Fuel Energy Plant                     - Desalination Plant                       THE LONG TERM PLAN                     - The Supply Port grows into a Specialized                          Industrial Harbor                     - Power Generation Plant stores and supplies                          energy to National Grid                     - Water Desalination Plant Grows to Supply water                          to the whole Southern Africa Region.
ORANJEMUND                        TOWN    PROJECT CONTEXT                                  NAMIBIA                                                     SOUTH                                                   AFRICA                     ATLANTIC                               ORANGE                    OCEAN                                   RIVER                               ORANJEMUND MARINA     ORANJEMUND MARINA                             SUPPLY BASE LOCATION         LOCATION
THE SMART SUPPLY BASE    MASTER PLAN
THE SMART SUPPLY BASE                           PROPOSED OFFSHORE SUPPLY BASE OFF-LOADING WARF
THE SMART SUPPLY BASE                           PROPOSED OFFSHORE SUPPLY BASE ACCESS ROAD
SUPPLY BASE: WASTE TO ENERGY MODULE        ADAPTABLE TO NUMEROUS FUEL      OPTIONS :             - REFUSE DERIVED FUEL (RDF)           - SOLID RECOVERED FUEL (SRF)
SUPPLY BASE: WASTE TO ENERGY MODULE           G.E. ENERGY HAS SPECIFICALLY ENGINEERED THE FLEX-EFFICIENCY         50 PLANT TO GIVE CUSTOMERS A TOTAL PLANT DESIGN THAT IS         SIMPLE AND COST EFFECTIVE TO INSTALL, CONTROL, AND         MAINTAIN         • 10% INCREASE IN POWER DENSITY OVER COMPETITIVE             SYSTEMS         • STEAM SIDE AT 60% BASE LOAD EFFICIENCY
SUPPLY BASE: SOLAR ENERGY MODULE         SOLAR TO STEAM … DRIVES DAYTIME POWER AND BUILDS STEAM       BATTERY FOR NIGHT TIME POWER VIA STEAM TURBINE GENERATOR
SUPPLY BASE: STRATEGIC ADVANTAGE                - COMPARISON WITH CURRENT                NAMIBIA HARBOURS:                1. WALVIS BAY HARBOUR                       - 16 m DEEP                       - 35M TONNES/a                CAPACITY    WALVIS BAY         - LAND AVAILABILITY    HARBOUR ISSUES                       - LIMITED FRESH                WATER                                     2. LUDERITZ HARBOUR                                        - 8 m DEEP                                        - 10M TONNES/a                               CAPACITY                                        - LAND AVAILABILITY    LUDERITZ HARBOUR ISSUES
SUPPLY BASE: METHODOLOGY         Old Jetty                 10 m            - UTILISE EXISTING MINED                         1000 m                    OUT AREA                                       Sea Wall                                                 - STRATEGIC                                                   REHABILITATION OF THE                                                   MINES    LDV                                            - CHEAP TO CONSTRUCT A                                                   SUPPLY PORT –       2000 m                                      EXCAVATION IS DONE                                                                       - UP TO 27 m DEEP – CAN  27 m HANDLE LARGER SHIPS                                                                          THAN LUDERITZ OR                                                                        WALVIS BAY                                                   - BUILT TO BE A SPECIALIZED                                                   INDUSTRIAL SUPPLY BASE
SUPPLY BASE: OFF-SHORE SUPPLY    SUPPLY BASE TO BE USED TO SERVICE AND SUPPLY OFF-SHORE MINING  & DRILLING ACTIVITIES WITHIN THE ATLANTIC OCEAN
SUPPLY BASE  EXPANSION    SPECIALISED INDUSTRIAL HARBOUR  INFRASTRUCTURE:    1. FOUR (4) BULK SPECIAL CARGO      BERTH    2. TEN (10) PANAMAX SHIPS OF      4200 TEU CAPACITY    EXPANDED INFRASTRUCTURE:    - EXPANSION OF ALL EXISTING     UTILITIES    - OIL REFINERY FACILITY  - COAL & MANGANESE STORAGE       & LOADING FACILITIES  - OFFSHORE OIL RIGS SUPPLY BASE  - KUDU GAS DEGASIFICATION       FACILITY    PUBLIC INFRASTURCTURE (C.S.R):
SUPPLY BASE: RESEARCH IS ALREADY DONE !!    2012 RESEARCH TEAM                               2012 MEETING WITH MINISTER    INVESTOR STILL INTERESTED  2012 MEETING WITH NAMDEB
ORANJEMUND      MARINA
CASE STUDY: ROYAL ALFRED MARINA – EASTERN
CASE STUDY: V&A WATERFRONT – CAPE TOWN,
MARINA BRIEF                                 PROJECT BRIEF &                                                          CONTEXT                  MAIN MARINA BRIEF                  - Client’s Needs                - Namibia’s Vision 2030                - International Case Studies                - Ambitions of Oranjemund Town Council:                      “Because a better place to live, work and visit”                          • Open and Roofed Mooring                        • Launching Bays                        • Boat Repair                        • High End Residential                        • Middle Income Residential                        • Day Care                        • Health Facilities                        • Mixed-use Commercial Buildings                        • Shopping Facilities                        • Eco Resort                        • Beachfront Hotel                        • Camping and Braaing Facilities                        • Water Sport                        • Pedestrian Boulevards & Parks                        • Public Transport                        • Fire Station                        • Police Station                        • Filling Station
ORANJEMUND                        TOWN    PROJECT CONTEXT                                  NAMIBIA                                                     SOUTH                                                   AFRICA                     ATLANTIC                               ORANGE                    OCEAN                                   RIVER                               ORANJEMUND MARINA     ORANJEMUND MARINA                             SUPPLY BASE LOCATION         LOCATION
SITE LOCATION        CONCEPT                 DEVELOPMENT
PROPOSED MATER PLAN  CONCEPT MASTER                                         PLAN
PLANNING     CONCEPTS                 PUBLIC SPACE & PUBLIC PARKS
WASTE WATER                      CONCEPT MASTER             TREATMENT                                          PLAN    PLANNING   ▪ Flush toilets can be used in     CONCEPTS                unsewered district             ▪ Various types of domestic                  wastewater can be treated             ▪ On-site topographic                  conditions present less                  influence on Johkasou             ▪ Treats wastewater             ▪ Properly disinfects effluents             ▪ No bad smells                 THE JOHKASOU SYSTEM
BIOSWALE  CONCEPT MASTER             DRAINAGE                    PLAN    PLANNING   STORM     CONCEPTSWATER
BIORETENTIO         CONCEPT MASTER  N                                     PLAN  WBATSEIRNRETENTION    PLANNING     CONCEPTS
PLANNINGOCEANIC PUBLIC TRANSPORT: CATAMARANS     CONCEPTS                                                                                      - 3 TIER FAST PASSENGER FERRY                                                                                            1. FIRST CLASS                                                                                            2. BUSINESS CLASS                                                                                            3. ECONOMY CLASS                                                                                        - TAKES UP TO 620 PASSENGERS                                                                                         WITH MAX 25KG LUGGAGE PER                                                                                         PASSENGER                                                                                        - CAN TRAVEL UP TO 58 KNOTS                                                                                        - ALLOWS CHEAP PUBLIC                                                                                         TRANSPORT BETWEEN WALVIS                                                                                         BAY & ORANJEMUND IN                                                                                         UNDER 8 HOURS                                                                                        - DRIVING DISTANE VIA                                                                                         WINDHOEK IS 1,372 KM                                                                                         DRIVING DISTANCE (12 HRS                                                                                         NON-STOP DRIVING)                                                                                        - CONNECTS SWAKOPMUND,
OCEANIC PUBLIC TRANSPORT: CATAMARANS    PLANNING     CONCEPTS
Oranjemund Marina
PROJECT STATUS    FEASIBILITY STUDY      ON-GOING
THE END
                                
                                
                                Search
                            
                            Read the Text Version
- 1 - 47
Pages:
                                             
                    