Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore School Infrastructure, Prey Thom

School Infrastructure, Prey Thom

Published by Sales7, 2017-10-06 00:47:23

Description: School Infrastructure, Prey Thom

Keywords: School,Charity,Project,Cambodia,Prey Thom School,Siem Reap,Angkor Wat,Trip

Search

Read the Text Version

PROJECT CONCEPT1. Project IdentificationProject Name Building a school infrastructureLocationSectors Prei Thom Primary School, Siem Reap Province, CambodiaKey Objectives Infrastructure DevelopmentTime Period To improve the school facilities and infrastructure, extending more activities and the students gain better healthRequirement Need ▪ Expected start date: ▪ Expected finish date:Unit Cost ▪ Duration (weeks): ▪ The flag concrete base need to be innovatedOverall Budget ▪ Repaint school wallsPartnerships ▪ School Vegetable Gardening USD380-Innovate the flag concrete base USD640-Re-paint school walls USD445-Building a hand washing basin USD249-School Vegetable Gardening 1714 USD Apsara Tours2. Project ScopeBackground on Project SiteCambodia is one of the countries amongst 10 countries in South East Asia’s recent past that has been in aserious internal war situation in the Pol Pot Regime between 1975 till 1979. A fundamental and directresult of this with the genocidal onslaught and mass killings of Teachers, Doctors and anyone ofacademia.The Pol Pot destroyed almost the country’s entire infrastructure, economy, public and private properties,and the education system. The regime killed almost two million people through execution, starvation,forced labor, overwork, torture, malnutrition, and poor medical treatment. The regime viewed educationthrough schools and universities as useless for the revolution and the development of the country. As aresult, the Pol Pot regime closed all educational institutions from primary school to higher education.Teacher receives poor training. In addition to the poor teaching qualifications, the country faces theproblem of a lack of teaching materials, educational infrastructure, teacher resources and textbook.At the cessation of this regime Cambodia was and still is to a much lesser extent, at a lower education andless development stage compared to other countries within the region. Therefore Cambodia needs and isasking for more support from other countries around the world, to strengthen specifically its ruraldevelopment structure and build self-help programs.Generally, the development of education in Cambodia currently is a slow process.

Having said that Prei Thom Primary School located in Prei Thom commune in Siem Reap province. Onewooden building was blown up by the strong wind in 2016. Classroom gets stain as it is very old becausethe school cannot afford to repaint it.Water and Sanitation is one of the many problems for the students in this school; they have very lowawareness of proper sanitation and good hygiene practice. Getting worst when the pump well only worksin the rainy season, but in the dry season it doesn’t provide enough water. Whereas most of the studentsdo not have breakfast and they said they don’t have rice, their mother doesn’t cook rice early in themorning. This is the result that student doesn’t have energy which cause their learning speed very slow.We need to help Prei Thom Primary School all together!Currently and running in tandem with these projects, Apsara Foundation intends to help Prei ThomPrimary School to build the national flag concrete base, repaint the school wall, hand washing basin andschool vegetable gardening.Expected Outcome • The most important projected results of this project will be to have the buildings painted also the infrastructure of the school made more inviting, then hope the community appreciates it, as it is mainly for the benefit of the children and to create a better environment for both Teachers and students alike. The main objective of the project is to encourage a sustainable and brighter educational community development. • To have the vegetable garden, so the students can learn how to grow vegetables • Students can gain better health and also will lead to a much healthier life style from hand washing basin. • Enhance the children livelihood; reduce health issue.Sustainable DevelopmentEmergency relief plays a very important role while the development of a long term plan is established.Once the basic need has been sat isfi ed the emergency relief must co nt i nu e to support thiscommunity until it is firmly under way. Having established a stable base this community should be ableto proceed to the next development stage/phase.Tentative Project ScopesBuilding national flag concrete base, repaint the school wall, hand washing basin and school vegetablegardening. Students’ participation: Divided groups of students will participate in the process of building these projects.

School wall need to be paintedPump well need to be repaired One building collapsed in 20163. Project Costing Breakdown ➢ Built a Flag concrete base (Length:2.00 m, Width:2.00 m, Height:0.50 m)No. Material Required Quantity Unit Price Total01 Bricks 1500 pcs $ 0.06 $ 90.0002 Cements 20 bag $ 5.00 $ 100.0003 Sand $ 10.00 $ 30.0004 Tool & Material 3 m3 $ 30.00 $ 30.0005 Cements Dipper 1 Set $ 1.50 $ 7.5006 Cements Plaster 5 pcs $ 0.75 $ 2.2507 Shovels 3 pcs $ 8.00 $ 8.0008 Marks & Gloves 1 pcs $ 12.25 $ 12.2509 Labor 1 box $ 100.00 $ 100.00 1 $ 380.00 Total

➢ Re-paint School Walls: Total wall area 10m x 25m=250m2No. Material Required Quantity Unit Price Total01 Wet Paint 8 bucket $ 45.00 $ 360.0002 Tool & Material 1 set $ 40.00 $ 40.0003 Rolling Sticks made from bamboo 6 pcs $ 2.00 $ 12.0004 Rollers 6 pcs $ 4.00 $ 24.0005 Polishers 10 pcs $ 0.75 $ 7.5006 Staircase 1 pcs $ 40.00 $ 40.0007 Paint brushes 10 pcs $ 1.00 $ 10.0008 Paint mixers 3 pcs $ 5.00 $ 15.0009 Petrol for washing equipment 1 pcs $ 1.50 $ 1.5010 Gloves & Masks 10 box $ 3.00 $ 30.0011 Labor 1 $ 100.00 $ 100.00 $ 640.00 Total➢ Build a hand washing basin: Length:1.50m, Height:0.6m, Width:0.40mNo. Material Required Quantity Unit Price Total01 Bricks 500 pcs $ 0.06 $ 30.0002 Cements 15 bag $ 5.00 $ 75.0003 Water Taps 5 pcs $ 2.00 $ 10.0004 Rubber Pie 5 pcs $ 2.00 $ 10.0005 Water Tank 1 pcs $ 250.00 $ 250.0006 Labor 1 $ 70.00 $ 70.00 $ 445.00 ➢ Build Vegetable Gardening: TotalNo. Material Required Quantity Unit Price Total01 Bricks 500 pcs $ 0.06 $ 30.0002 Cements 10 bag $ 5.00 $ 50.0003 Wet Buckets 5 pcs $ 9.00 $ 45.0004 Spades 4 pcs $ 6.00 $ 24.0005 Hoe 4 pcs $ 10.00 $ 40.0006 Vegetable Seeds 1 box $ 20.00 $ 20.0007 Labor 1 $ 40.00 $ 40.00 $ 249.00 Total


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook