St. John’s Heritage ParkwayCorridor (ACE) / Babcock PD&E / Malabar PD&E UPDATE

CONTENTS• BACKGROUND• SJHP Corridor / Alternative Corridor Evaluation (ACE) Study• BABCOCK Project Development & Environment (PD&E)• MALABAR RD Project Development & Environment (PD&E)• NEXT STEPS

BACKGROUND

Adopted 9 / 13 / 18 SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2019 TRANSPORTATION PROJECT PRIORITIES 2019 PRIORITY RANK B. REGIONALLY SIGNIFICANT FACILITIES (NON SIS) 2019 PRIORITY RANK HIGHWAY COMPONENT (STATE HIGHWAY SYSTEM) 1 PROJECT NUMBER PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASE NEEDED PHASES 2019 PRIORITY RANK PROJECT NUMBER PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASES NEEDED PHASES 2a 4336551 US 192 At Hollywood Blvd. / Turn lane additions Design underway ROW FY 21 - 24 CST $4,000,000 2019 PRIORITY RANK Evans intersection $4,339,872 PROJECT NUMBER PROJECT NAME PROJECT DESCRIPTION NEEDED PHASES 2b PROJECT LIMITS PROGRAMMED PHASES 4302025 SR A1A Intersection realignment ROW $2,600,000 2019 PRIORITY RANK South of International Drive and sidewalk Design underway CST PROJECT NUMBER PROJECT NAME to Long Point Road 3 PROJECT DESCRIPTION PROGRAMMED PHASES NEEDED PHASES 4302028 SR A1A PROJECT LIMITS 2019 PRIORITY RANK Install median / curb and gutter Design underway ROW PROJECT NUMBER PROJECT NAME Long Point Road to reconstruction / sidewalk CST 4 George King Blvd. PROGRAMMED PHASES 2376506 BABCOCK ST. (SR 507) PROJECT DESCRIPTION PROGRAMMED PHASES NEEDED PHASES 2019 PRIORITY RANK PROJECT LIMITS PROJECT NUMBER PROJECT NAME Widen to 6 lanes / Design complete ROW FY 19 - 24 CST 5 Malabar Road (SR 514) to intersec improvements $32,000,000 4336051 CLEARLAKE (SR 501) Palm Bay Road NEEDED PHASES 2019 PRIORITY RANK PROJECT DESCRIPTION PROGRAMMED PHASE PROJECT NUMBER PROJECT NAME PROJECT LIMITS ROW $13,000,000 6 Wide to 4 lanes divided Design complete CST $12,900,000 4301361 MALABAR RD. (SR 514) Michigan Avenue to 2019 PRIORITY RANK Industry Road PROJECT DESCRIPTION PROGRAMMED PHASE NEEDED PHASES PROJECT NUMBER PROJECT NAME 7 PROJECT LIMITS Widen to 4 lanes PD&E complete; ROW $27,300,000 4379831 SR 524 Design FY 22 $4,000,000 CST $24,500,000 2019 PRIORITY RANK Babcock (SR 507) to PROJECT DESCRIPTION PROJECT NUMBER PROJECT NAME US 1 PROGRAMMED PHASE NEEDED PHASES 8 Widen to 4 lanes 4336041 US 1 PROJECT LIMITS sidewalk / trail Design FY 19 $1,763,000 DESIGN 2019 PRIORITY RANK PROJECT LIMITS PROJECT NAME South Friday Road to PROJECT DESCRIPTION PROGRAMMED PHASE NEEDED PHASES 9 Industry Road No information listed SR 3 (COURTENAY PKWY.) Widen to 6 lanes No information listed PD&E $1,700,000 2019 PRIORITY RANK PROJECT LIMITS PROJECT NUMBER PROJECT NAME PROJECT DESCRIPTION PROGRAMMED PHASE NEEDED PHASES 10 (NEW) Pineda Causway (SR 404) 4356281 SR 520 to Park Avenue Catalina Isle Drive to Venetian Way Corridor planning study complete DESIGN 2019 PRIORITY RANK sidewalks; bus stops; corridor from Fortenberry to CST PROJECT NUMBER PROJECT NAME PROJECT LIMITS lighting; pedestrian crosswalks Grant / Smith Road 1 NEEDED PHASES 4437341 WICKHAM & EAU GALLIE No information listed PROJECT DESCRIPTION PROGRAMMED PHASE 2019 PRIORITY RANK DESIGN PROJECT LIMITS Short term; bike / ped transit Corridor planning CST 2 improvements - Long term; roadway study complete US 1 to East City Limits NEEDED PHASES (Indian River) reconfiguration / eliminate right PROGRAMMED PHASES turn slip lane at US 1 ROW $8,500,000 PROJECT LIMITS Design complete (COUNTY) CST PROJECT DESCRIPTION No information listed Operational improvements / Dedicated turn lanes HIGHWAY COMPONENT (OFF STATE HIGHWAY SYSTEM) LOCAL INITIATIVE PROJECTS PROJECT NUMBER PROJECT NAME PROJECT NAME PROJECT DESCRIPTION PROGRAMMED PHASES NEEDED PHASES 4372101 MALABAR RD. SJHP TO MINTON WIDEN TO 4 LANES PD&E FY 20 - ($1,000,000 TRIP/SU) DESIGN ROW CST PARTIAL ROW (CITY) PROJECT NUMBER NEEDED PHASES PROJECT NAME PROJECT NAME PROJECT DESCRIPTION PROGRAMMED PHASES 4372041 ROW CST BABCOCK ST. S. OF MICCO / DEER RUN WIDEN TO 4 LANES PD&E UNDERWAY - DESIGN FY 20 TO MALABAR RD. ($1.5M TRIP / $1.5M LF)

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2019 TRANSPORTATION PROJECT PRIORITIES (Adopted 9/13/2018 B. REGIONALLY SIGNIFICANT FACILITIES (NON SIS)2019 PRIORITY RANK PROJECT NUMBER PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASE NEEDED PHASES 2019 PRIORITY RANK PROJECT LIMITS PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASE NEEDED PHASES 3 (NEW) 4437381 WICKHAM ROAD Aurora intersection Intersection and operational Operational analysis DESIGN - $550,000 to Northgate improvements / sidewalk completed ROW - $2,800,000 2019 PRIORITY RANK PROJECT LIMITS PROJECT NAME both sides CST - $3,100,000 PROJECT LIMITS PROGRAMMED PHASE 4 (NEW) 4437351 WICKHAM ROAD PROJECT DESCRIPTION NEEDED PHASES At Lake Washington Operational analysis 2019 PRIORITY RANK PROJECT NUMBER PROJECT NAME intersection NB right turn lane on Wickham; completed DESIGN - $600,000 extend EB right turn lane on Lake ROW - $4,600,000 5 (NEW) 4372031 HOLLYWOOD BLVD. PROJECT LIMITS Washington; extend WB turn lane PROGRAMMED PHASE CST - $3,500,000 2019 PRIORITY RANK PROJECT NUMBER Palm Bay Road on Wickham and second WB Design FY 20 $4,000,000 (CIGP/LF) NEEDED PHASES to US 192 through lane across Wickham; Partial Row (COUNTY) 1 4415841 bike / pedestrian improvements ROW $7,539,776 CST 2019 PRIORITY RANK PROJECT NUMBER PROJECT DESCRIPTION NEEDED PHASES 2 4437681 Widen to 4 lanes CST $7,000,000 2019 PRIORITY RANK PROJECT NUMBER TRANSPORTATION SYSTEM MANAGEMENT AND OPERATIONS (TSM&O) NEEDED PHASES 3 4437311 PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASE DESIGN 2019 PRIORITY RANK PROJECT NUMBER Brevard Traffic Management No information listed Construct regional traffic Design FY 19 $900 CST Center (TMC) - CR 404 Pineda management center (County to Design) 4 4437321 PROJECT LIMITS NEEDED PHASES PROJECT NAME PROJECT DESCRIPTION PROGRAMMED PHASE 2019 PRIORITY RANK PROJECT NUMBER DESIGN SR 3 (COURTENAY) Cone Road to SR 528 ITS expansion project No information listed CST 5 4437331 PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASE NEEDED PHASES 2019 PRIORITY RANK PROJECT NUMBER MALABAR ROAD SJHP to San Filippo Adaptive control system No information listed DESIGN 6 4289301 CST PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASE 2019 PRIORITY RANK PROJECT NUMBER NEEDED PHASES SAN FILIPPO DRIVE Waco to Malabar Road ITS infrastructure No information listed 1 (NEW) No information listed DESIGN PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASE CST 2019 PRIORITY RANK PROJECT NUMBER EMERSON DRIVE ITS SJHP to Minton Road ITS infrastructure No information listed NEEDED PHASES 2 No information listed PROJECT NAME PROJECT LIMITS PROJECT DESCRIPTION PROGRAMMED PHASES DESIGN 2019 PRIORITY RANK PROJECT NUMBER CST ITS operational support No information listed Operational support of the SU funding $225,000 3 (NEW) 4437391 countywide ATMS set-aside each year NEEDED PHASES CORRIDOR / FEASIBILITY PLANNING STUDIES Feasibility study PROJECT NAME PROJECT NAME PROJECT DESCRIPTION PROGRAMMED PHASES NEEDED PHASES SR 520 Humphrey bridge to SR A1A Causeway vulnerability No information listed Alternative corridor evaluation (Indian and Banana River) analysis study - $1,000,000 PROJECT NAME PROGRAMMED PHASES PROJECT NAME PROJECT DESCRIPTION NEEDED PHASES St. John’s Heritage Parkway No information listed Phase 4 Babcock to New road capacity Corridor study Malabar Road PROGRAMMED PHASES PROJECT NAME PROJECT NAME PROJECT DESCRIPTION No information listed DAIRY ROAD US 192 to Hibiscus Widening

PROJECT DEVELOPMENT PROCESS PLANNING PD&E DESIGN CONSTRUCTION• Existing Conditions • Federal or State Process • Detailed Design • Build and Deliver• Needs Assessment • Purpose and Need • Utilities • Env. Reevaluation• Planning Analysis • Alternate Analysis • Construction Plans• Alternative Studies • Environmental Studies • Specifications• Travel Demand • Technical Reports • Cost Estimates• LRTP1, CFP2, TIP3, STIP4 • Env. Doc. Approval • Right of Way• Purpose and Need • Permits• Work Program • Env. Reevaluation PD&E DESIGN ADVERTISE / AWARDSCOPING SCOPING CONTRACT ETDM Screening ACRONYMS• Screening Environmental Issues (1) Long Range Transportation Plan Planning and Environmental Linkage (2) Cost Feasible Plan• Subarea and Corridor Studies• Alternatives Corridor Evaluation (3) Transportation• Interchange Access Study Improvement Program SWAT Process (4) State Transportation Improvement Program• Project Scoping Public Outreach and Interagency Coordination

St. John’sHeritage ParkwayCorridor (ACE)

SITE LOCATION• St. John’s Heritage Parkway 426905-3 (1,495 miles) 426905-1 (2,312 miles) from Malabar to Babcock I-95 Interchange at Ellis Rd. / St. John’s Heritage Parkway Ellis Rd. West of I-95 Interchange to Wickham Rd. (13.6 miles) FDOT Project for New Interchange (D/B/B) Study Complete 10/2015 Study Complete 10/2015 • New capacity alignment DESIGN - Complete 426905-2 (1,691 miles) R/W - Ongoing Ellis Rd. from John Rodes to West of Wickham Rd.• Local Agency Program UTILITY - $7.7M FY19 LAP Project with Brevard County (LAP) - Corridor / ACE Study CONST - Underway R/W on Segment - 4 (FY20 - $1M) CONTRACTOR - JR Davis Construction Co. DESIGN - Ongoing FY 21-25 (FDOT on Seg - 4) Estimated Completion 3/2020 R/W - $4.4M FY 21-24• 12-24 month project to be CONST - Unfunded managed by COPB PW 428346-4 (2,196 miles) St. John’s Heritage Parkway from 426904-3 (1,117 miles)• PD&E to be completed US 192 to I-95 Interchange at Ellis Rd. I-95 Interchange at St. John’s Heritage Pkwy / afterward JPA with Brevard County Palm Bay Pkwy North of Micco Rd. DESIGN & ROW on Segment - 2 DESIGN & ROW by Brevard County FDOT Project for New Interchange (D/B) Construction Underway by Brevard County Study Complete 2/2015 Estimated Completion 7/2020 CONST - Underway CONTRACTOR - Ranger Construction Ind. Inc. 428346-3 (2.63 miles) Estimated Completion 2/2019 St. John’s Heritage Parkway from North Palm Bay City Limits to US 192 JPA with Brevard County Construction Complete 12/2017 428346-1 (5,846 miles) Palm Bay Pkwy. from Malabar Rd. to North of Palm Bay City Limits LAP Project with City of Palm Bay (D/B) Construction Complete 12/2014 No Projects Palm Bay Pkwy. from Babcock St. to Malabar Rd. No PD&E Study has been done 426904-1 (3,931 miles) Babcock St. Micco Rd.

BABCOCK PD&E

SITE LOCATION MISSING FDOT MAP • Babcock Street from south of Micco Rd. to Malabar Rd. (9 miles) • Capacity alignment • PD&E project is managed by FDOT - ongoing • Anticipated completion by Spring 2019Further information can be found by visiting the url: http://www.cflroads.com/project/437204-1/Babcock_Street_PD_E_Study

MALABAR PD&E

SITE LOCATION MISSING MAP • St. John’s Heritage Parkway to Minton Rd. (approx. 4 miles) • Capacity alignment • Local Agency Program (LAP) - PD&E (FY20 - $1M) • 12 - 18 month project to be managed by COPB PW • Future phases include design and constructionFurther information can be found by visiting the url: http://www.cflroads.com/project/437204-1/Babcock_Street_PD_E_Study

FDOT’s Position• Will offer technical assistance throughout the Corridor / ACE study process• Based on findings from the Corridor / ACE study, the Department may further asses their involvement with future phases

Next StepsCollaborate Plan Execute

Feedback