Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALMURO EN SUPERBOARD UNA CARA M2 1.000 $25,200.00 $37,653.17 Canal galvanizada para Drywall 60mm Und 0.360 $3,800.00 $1,368.00Super board 6 mm 1.20x2.40 Und 0.370 $4,800.00 $9,324.00 Cinta tapajuntas fibra de vidrio USG Rollo 0.033 $8,900.00 $302.51Paral galvanizado para Drywall 59mm Und 0.860 $3,800.00 $4,128.00 Tornillo extrapalno Und 6.000 $428.40Canal galvanizada para Drywall 60mm Und 0.360 $8,900.00 $1,368.00 Tornillo 1\" Und 30.000 $70.00Cinta tapajuntas fibra de vidrio USG Rollo 0.017 Esquinero plástico USG $50.00 $1,530.00Tornillo extrapalno Und 3.000 $70.00 $155.84 Masilla acrilica para interiores Drywall 5gal Ml 2.440 $2,700.00 $6,719.76Tornillo 1\" Und 15.000 $50.00 $214.20 Vinilo Viniltex Und 0.060 $28,900.00 $1,786.02Esquinero plástico USG Ml 1.340 $2,700.00 $765.00 Lija de agua Abracol 150 Gal 0.095 $49,900.00 $4,882.72Masilla acrilica para interiores Drywall 5gal Und 0.020 $28,900.00 $3,690.36 Cuadrilla Especializada Und 2.000 $900.00 $1,854.00Vinilo Viniltex Gal 0.040 $49,900.00 $595.34 Andamio tubular 1.50x1.50 hC 2.400 $13,084.05 $31,401.73Lija de agua Abracol 150 Und 1.000 $900.00 $2,055.88 Tablon para andamio dU 0.100 $800.00Cuadrilla Especializada hC 0.963 $13,084.05 $927.00 Herramienta Menor dU 0.100 $638.00 $80.00Andamio tubular 1.50x1.50 dU 0.100 $800.00 $12,599.94 %(MO) 0.050 $33,716.11 $63.80Tablon para andamio dU 0.100 $638.00 $80.00 $1,685.81Herramienta Menor %(MO) 0.050 $33,716.11 $63.80 PANEL DE CIERRE LISO M2 1.000 $6,900.00 $1,685.81 (PREF.0.5X0.6X1.5) kg 0.100 $273,932.20 $94,269.87MURO EN SUPERBOARD M2 1.000 $25,200.00 Soldadura 3/32 M3 0.005 $51,176.00 $710.70DOS CARAS e=0.2m Und 0.740 $4,800.00 $87,369.14 Mortero 1:4 Und 1.170 $13,084.05Super board 6 mm 1.20x2.40 Und 1.720 $3,800.00 $18,648.00 Prefabricado liso 0.07x0.60x1.50 hC 0.160 $10,724.63 $1,410.75Paral galvanizado para Drywall 59mm Und 0.720 $8,900.00 $8,256.00 Cuadrilla Especializada hC 2.289 $80,300.00 $59,875.92Canal galvanizada para Drywall 60mm Rollo 0.033 $2,736.00 Cuadrilla de Albañilería 1*1 dM 0.020 $55,680.00 $2,093.45Cinta tapajuntas fibra de vidrio USG Und 6.000 $70.00 Soldador Eléctrico dM 0.042 $24,548.69Tornillo extrapalno Und 30.000 $50.00 $302.51 Pluma Eléctrica %(MO) 0.050 $33,716.11 $1,606.00Tornillo 1\" Ml 4.880 $2,700.00 $428.40 Herramienta Menor $2,338.56Esquinero plástico USG Und 0.060 $28,900.00 $1,530.00 $6,900.00 $1,685.81Masilla acrilica para interiores Drywall 5gal Gal 0.095 $49,900.00 $13,439.52 PANEL DE CIERRE LISO M2 1.000 $273,932.20Vinilo Viniltex Und 2.000 $900.00 $1,786.02 (PREF.0.5X0.6X2.8) kg 0.100 $74,964.00 $83,292.70Lija de agua Abracol 150 hC 2.410 $13,084.05 $4,882.72 Soldadura 3/32 M3 0.005 $13,084.05 $710.70Cuadrilla Especializada dU 0.200 $800.00 $1,854.00 Mortero 1:4 Und 0.630 $10,724.63Andamio tubular 1.50x1.50 dU 0.200 $638.00 $31,532.57 Prefabricado liso 0.05x0.60x2.80 hC 0.160 $80,300.00 $1,410.75Tablon para andamio %(MO) 0.050 $33,716.11 $160.00 Cuadrilla Especializada hC 2.476 $55,680.00 $47,227.32Herramienta Menor $127.60 Cuadrilla de Albañilería 1*1 dM 0.020 $2,093.45 $17,700.00 $1,685.81 MURO Ladrillo DE OBRA dM 0.036 $33,716.11 $26,554.19MURO EN Drywall DOS CARAS e=0.1m M2 1.000 $4,800.00 Pluma Eléctrica %(MO) 0.050 $1,606.00Lamina Drywall 1/2\" 1.22x2.44 Und 0.740 $3,800.00 $58,992.34 Herramienta Menor $6,900.00 $2,004.48Paral galvanizado para Drywall 59mm Und 0.860 $8,900.00 $13,098.00 $273,932.20 $1,685.81Canal galvanizada para Drywall 60mm Und 0.360 $4,128.00 PANEL DE CIERRE LISO M2 1.000 $51,176.00Cinta tapajuntas fibra de vidrio USG Rollo 0.033 $70.00 $1,368.00 (PREF.0.7X0.6X1.5) kg 0.100 $13,084.05 $94,849.00Tornillo extrapalno Und 6.000 $50.00 Soldadura 3/32 M3 0.005 $10,724.63 $710.70Tornillo 1\" Und 30.000 $2,700.00 $302.51 Mortero 1:4 Und 1.170 $80,300.00Esquinero plástico USG Ml 2.440 $28,900.00 $428.40 Prefabricado liso 0.07x0.60x1.50 hC 0.160 $55,680.00 $1,410.75Masilla acrilica para interiores Drywall 5gal Und 0.060 $49,900.00 $1,530.00 Cuadrilla Especializada hC 2.343 $59,875.92Vinilo Viniltex Gal 0.095 $900.00 $6,719.76 Cuadrilla de Albañilería 1*1 dM 0.020 $33,716.11 $2,093.45Lija de agua Abracol 150 Und 2.000 $13,084.05 $1,786.02 Soldador Eléctrico dM 0.042 $25,127.82Cuadrilla Especializada hC 1.610 $800.00 $4,882.72 Pluma Eléctrica %(MO) 0.050 $6,900.00 $1,606.00Andamio tubular 1.50x1.50 dU 0.100 $638.00 $1,854.00 Herramienta Menor $273,932.20 $2,338.56Tablon para andamio dU 0.100 $33,716.11 $21,065.33 $90,413.00 $1,685.81Herramienta Menor %(MO) 0.050 $80.00 PANEL DE CIERRE LISO M2 1.000 $13,084.05 $25,200.00 $63.80 (PREF.0.7X0.6X2.8) kg 0.100 $10,724.63 $93,025.57MURO EN DOS CARAS M2 1.000 $17,700.00 $1,685.81 Soldadura 3/32 M3 0.005 $80,300.00 $710.70COMBINADAS e=0.07-0.08cm Und 0.370 $4,800.00 Mortero 1:4 Und 0.630Super board 6 mm 1.20x2.40 Und 0.370 $72,103.74 Prefabricado liso 0.07x0.60x2.80 hC 0.160 $1,410.75Lamina Drywall 1/2\" 1.22x2.44 Und 0.860 $9,324.00 Cuadrilla Especializada hC 2.476 $56,960.19Paral galvanizado para Drywall 59mm $6,549.00 Cuadrilla de Albañilería 1*1 dM 0.020 $2,093.45 $4,128.00 Soldador Eléctrico $26,554.19 $1,606.00 Apu de la Construcción / 2017 101

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Pluma Eléctrica dM 0.036 $55,680.00 $2,004.48 Cuadrilla de Albañilería 1*1 hC 1.992 $10,724.63 $21,363.47 Herramienta Menor %(MO) 0.050 $33,716.11 $1,685.81 Herramienta Menor %(MO) 0.050 $33,716.11 $1,685.81 PANEL DE CIERRE PRE-ENCHAPADO M2 1.000 $6,900.00 $120,651.01 REMATE DE MUROS b=0.25 ML 1.000 $19,201.00 $31,719.61 0.5X0.6X1.5 kg 0.100 $273,932.20 $710.70 Prefabricado remate sobre muro b=0.25 M3 1.000 $273,932.20 $19,201.00 Soldadura 3/32 M3 0.005 $73,229.00 Mortero 1:4 M3 0.010 $10,724.63 $2,821.50 Mortero 1:4 Und 1.170 $13,084.05 $1,410.75 Cuadrilla de Albañilería 1*1 hC 0.747 Prefabricado liso 0.055x0.60x1.50 hC 0.160 $10,724.63 $85,677.93 Herramienta Menor %(MO) 0.050 $33,716.11 $8,011.30 Cuadrilla Especializada hC 2.343 $80,300.00 $2,093.45 $1,685.81 Cuadrilla de Albañilería 1*1 dM 0.020 $55,680.00 $25,127.82 REMATE DE MUROS b=0.35 Soldador Eléctrico dM 0.042 $1,606.00 Prefabricado remate sobre muro b=0.35 ML 1.000 $22,935.00 $36,558.25 Pluma Eléctrica %(MO) 0.050 $33,716.11 $2,338.56 Mortero 1:4 M3 1.000 $273,932.20 $22,935.00 Herramienta Menor $1,685.81 Cuadrilla de Albañilería 1*1 M3 0.010 $10,724.63 $2,821.50 Herramienta Menor hC 0.850 PANEL DE CIERRE PRE-ENCHAPADO %(MO) 0.050 $33,716.11 $9,115.94 0.5X0.6X2.8 $1,685.81 Soldadura 3/32 Mortero 1:4 M2 1.000 $118,917.94 CUBIERTAS E IMPERMEABILIZACIÓN Prefabricado liso 0.055x0.60x2.80 kg 0.100 $710.70 Cuadrilla Especializada M3 0.005 $6,900.00 CABALLETE FIJO ETERNIT ML 1.000 $26,500.00 $66,491.36 Cuadrilla de Albañilería 1*1 Und 0.630 $273,932.20 $1,410.75 Caballete fijo 15 / G15 Und 1.100 $7,532.00 $29,150.00 Soldador Eléctrico hC 0.160 $131,512.00 $82,852.56 Gancho para teja eternit 55 mm Und 4.200 $31,634.40 Pluma Eléctrica hC 2.476 $13,084.05 $2,093.45 Amarre alambre teja Ac Und 2.000 $300.00 Herramienta Menor dM 0.020 $10,724.63 $26,554.19 Cuadrilla de Albañileria 1*1 hC 0.319 $10,724.63 $600.00 dM 0.036 $80,300.00 $1,606.00 Herramienta Menor %(MO) 0.050 $33,716.11 $3,421.16 PANEL DE CIERRE CON MARCO %(MO) 0.050 $55,680.00 $2,004.48 $1,685.81 Soldadura 3/32 $1,685.81 Mortero 1:4 M2 1.000 $33,716.11 CUBIERTA EN TEJA TERMOACUSTICA ML 1.000 $61,193.00 $69,953.14 Prefabricado con marco 1.00x1.10 kg 0.100 $71,285.42 Teja thermo 82 cm 3mt Und 0.450 $7,532.00 $27,536.85 Cuadrilla Especializada M3 0.012 $6,900.00 $710.70 Gancho para teja eternit 55 mm Und 3.000 $22,596.00 Cuadrilla de Albañilería 1*1 Und 0.950 $273,932.20 Amarre alambre teja Ac Und 3.000 $300.00 Soldador Eléctrico hC 0.160 $42,388.00 $3,385.80 Cuadrilla de Albañileria 1*1 hC 1.607 $10,724.63 $900.00 Herramienta Menor hC 2.008 $13,084.05 $40,268.60 Herramienta Menor %(MO) 0.050 $33,716.11 $17,234.49 dM 0.020 $10,724.63 $2,093.45 $1,685.81 PÉRGOLAS 0.05X0.15 %(MO) 0.050 $80,300.00 $21,535.07 DESNIVELES DE CUBIERTA M2 1.000 $292,745.40 Pergolas 0.06x0.15 $1,606.00 Concreto normal de 21 Mpa M3 0.060 $10,724.63 $30,030.22 Mortero 1:4 ML 1.000 $33,716.11 $1,685.81 Cuadrilla de Albañileria 1*1 hC 0.956 $33,716.11 $18,091.67 Cuadrilla de Albañilería 1*1 Ml 1.000 Herramienta Menor %(MO) 0.050 $10,252.75 Herramienta Menor M3 0.005 $12,047.87 $23,616.89 $1,685.81 hC 0.790 $273,932.20 $12,047.87 IMPERMEABILIZACIÓN MANTO M2 1.000 $2,360.00 PÉRGOLAS 0.05X0.20 %(MO) 0.050 $10,724.63 $1,410.75 ASFÁLTICO 3mm(PINTADO) kg 0.200 $7,000.00 $32,300.93 Pergolas 0.06x0.20 $8,472.46 Asfalto solido Gal 0.150 $18,000.00 $486.16 Mortero 1:4 ML 1.000 $33,716.11 $1,685.81 Kerosen M2 1.170 $63,678.00 Cuadrilla de Albañilería 1*1 Ml 1.000 Manto impermeable 3.0mm fiber glass Gal 0.040 $10,724.63 $1,081.50 Herramienta Menor M3 0.005 $17,566.00 $29,778.50 Pintura de aluminio liquida brillante hC 0.398 $33,716.11 $21,481.20 hC 0.850 $273,932.20 $17,566.00 Cuadrilla de Albañileria 1*1 %(MO) 0.070 $2,623.53 PINTURA ALUMINIO BITUMINOSO %(MO) 0.050 $10,724.63 $1,410.75 Herramienta Menor $4,268.40 Pintura de aluminio Líquida brillante $2,360.13 Cuadrilla de Albañilería 1*1 M2 1.000 $33,716.11 $9,115.94 IMPERMEABILIZACIÓN MANTO M2 1.000 $2,360.00 Herramienta Menor Gal 0.070 $1,685.81 ASFÁLTICO 3 mm kg 0.200 $7,000.00 $27,290.59 hC 0.400 $63,678.00 Asfalto solido Gal 0.150 $16,000.00 $486.16 PAÑETE IMPERMEABILIZADO %(MO) 0.050 $10,724.63 $10,566.84 Kerosen M2 1.170 $10,724.63 DE TANQUES $33,716.11 $4,591.18 Manto impermeable Edil 3.0mm con alumol hC 0.398 $33,716.11 $1,081.50 Mortero 1:4 Impermeabilizado $4,289.85 Cuadrilla de Albañileria 1*1 %(MO) 0.070 $19,094.40 $352,232.20 $1,685.81 Herramienta Menor $4,268.40 $2,360.13 $35,021.65 M2 1.000 $11,972.37 M3 0.033 Apu de la Construcción / 2017102

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALIMPERMEABILIZACIÓN MANTO CIELORASOS LUXALON ACERO 98Z 6mm M2 1.000 $104,790.00 1.050 $99,800.00 $104,790.00ASFÁLTICO 4 mm M2 1.000 $41,611.39 Luxacel acero 84R M2 0.200 $486.16 $150,969.00Asfalto solido kg 0.150 $2,360.00 $143,780.00 $150,969.00 1.170 $7,000.00 $1,081.50Kerosen Gal 0.398 $28,000.00 $33,415.20 CIELORASOS LUXALON ACERO 84R M2 1.000 $151,284.00 0.070 $10,724.63 $4,268.40 Luxacel acero 98Z 12mm M2 1.050 $144,080.00 $151,284.00Manto impermeable Edil 4.0mm con alumol M2 $33,716.11 $2,360.13Cuadrilla de Albañileria 1*1 hC $352,232.20 $8,131.00 $10,724.63 $2,176.79Herramienta Menor %(MO) $33,716.11 $4,268.40 CIELORASOS LUXALON ACERO 98Z 180B M2 1.000 $1,685.81 $352,232.20 $8,131.00 Luxacel acero 98Z 180B M2 1.050 $10,724.63 $2,176.79MEDIA CANA DE TANQUES M2 1.000 $33,716.11 $4,268.40 CIELORASOS LUXALON M2 1.000 $4,900.00 $5,145.00Mortero 1:4 Impermebilizado M3 0.006 $1,685.81 ESTRUCTURA MADERA LAM. ACRILICA Und 1.050 $5,145.00Cuadrilla de Albañileria 1*1 hC 0.398 $352,232.20 Angulo de aluminio 0.66x0.39cm L=3mHerramienta Menor %(MO) 0.050 $10,724.63 $35,021.65MEDIA CANA DE TANQUES M2 1.000 $33,716.11 $11,972.37 CIELORASOS YESO PLANO M2 1.000 $30,450.00Mortero 1:4 Impermebilizado M3 0.006 $21,363.47 Cielo raso yesotex M2 1.050 $29,000.00 $30,450.00Cuadrilla de Albañileria 1*1 hC 0.398 $63,678.00 $1,685.81Herramienta Menor %(MO) 0.050 $10,724.63 $33,716.11 $10,566.84PAÑETE IMPERMEABILIZADO DE TANQUES M2 1.000 $4,591.18 CIELO RASO EN DYWALL 1/2\" M2 1.000 $4,900.00 $38,163.34 0.033 $60,000.00 $4,289.85 Angulo de aluminio 0.66x0.39cm L=3m Und 0.330 $150.00 $1,649.34Mortero 1:4 Impermebilizado M3 1.992 $1,685.81 Tornillos autoperforantes Und 11.000 $1,699.50 0.050 Lamina Drywall 1/2\" 1.22x2.44 Und 0.370 $17,700.00 $6,679.98Cuadrilla de Albañileria 1*1 hC $63,000.00 Paral galvanizado para Drywall 59mm Und 0.620 $4,800.00 $3,035.52 $63,000.00 Omega 63mm Und 0.890 $5,000.00 $4,539.00Herramienta Menor %(MO) Cinta tapajuntas fibra de vidrio USG Rollo 0.010 $8,900.00 Tornillo extrapalno Und 10.000 $91.67PINTURA ALUMINIO BITUMINOSO M2 1.000 Tornillo 1\" Und 13.000 $70.00 $714.00Pintura de aluminio liquida brillante Gal 0.070 Masilla acrilica para interiores Drywall 5gal Und 0.055 $50.00 $663.00Cuadrilla de Albañileria 1*1 hC 0.400 Vinilo Viniltex Gal 0.040 $28,900.00 $1,637.19Herramienta Menor %(MO) 0.050 Lija de agua Abracol 150 Und 1.000 $49,900.00 $2,055.88 Cuadrilla Carpintería (madera y Metálica) hC 1.025 $900.00 $927.00 CIELO RASO Andamio tubular 1.50x1.50 dU 0.100 $12,333.33 $12,641.66 Tablon para andamio dU 0.100 $800.00 $80.00ARCO YESO ENCAJADO2 ML 1.000 Herramienta Menor %(MO) 0.050 $638.00 $63.80COL.LUZ ALOGENA M2 1.050 $33,716.11 $1,685.81Cielo raso estructura madera lamina acrilicaCENEFA EN YESO UNIÓN PLANTILLAS, PISOS Y ZOCALOSPARED-PLACAMoldura cenefa Unión pared-placa ML 1.000 $26,000.00 $27,300.00 ANTEPISO e=0.05 M2 1.000 $261,693.80 $27,424.86 M2 1.050 $45,000.00 $27,300.00 Concreto normal de 17,5 Mpa M3 0.060 $10,724.63 $16,172.68CIELORASOS DURACUSTIC Cuadrilla de Albañilería 1*1 hC 0.892 $33,716.11 $9,566.37Ciielo raso fibra mineral Asmtrong M2 1.000 $47,250.00 Herramienta Menor %(MO) 0.050 $1,685.81 M2 1.050 $47,250.00CIELORASOS LUXACEL ACERO 5X5 M2 1.000 $320,386.50 ANTEPISO e=0.07 M2 1.000 $32,815.75Luxacel acero 5x5 M3 0.080 $21,563.57 M2 1.050 $305,130.00 $320,386.50 Concreto normal de 17,5 Mpa hC 0.892 $261,693.80 $9,566.37CIELORASOS LUXACEL ACERO 10X10 %(MO) 0.050 $10,724.63 $1,685.81Luxacel acero 10x10 Cuadrilla de Albañilería 1*1 $33,716.11CIELORASOS LUXACEL ACERO 20X20 M2 1.000 $195,300.00 Herramienta MenorLuxacel acero 20x20 M2 1.050 $186,000.00 $195,300.00CIELORASOS LUXACEL ACERO 15X15Luxacel acero 15x15 ANTEPISO CON MALLA M2 1.000 $99,045.45 ELECTROSOLDADA e=0.05 M2 1.000 $31,068.11 M3 0.055 $16,584.03 M2 1.050 $94,329.00 $99,045.45 Concreto normal de 21 Mpa M2 1.050 $292,745.40 $3,231.90 hC 0.892 $3,078.00 $9,566.37 Malla electrosoldada 5mm 30x30 %(MO) 0.050 $10,724.63 $1,685.81 $33,716.11 M2 1.000 $137,487.00 Cuadrilla de Albañilería 1*1 M2 1.050 $130,940.00 $137,487.00 Herramienta MenorCIELORASOS LUXALON ACERO 98Z 12mm M2 1.000 $113,463.00 ALISTADO PISO e=0.04 M2 1.000 $29,467.22Luxacel acero 98Z 6mm M2 1.050 $108,060.00 $113,463.00 Mortero 1:4 M3 0.050 $273,932.20 $14,107.51 Apu de la Construcción / 2017 103

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Cuadrilla de Albañilería 1*1 hC 1.275 $10,724.63 $13,673.91 Herramienta Menor %(MO) 0.050 $33,716.11 $1,685.81 Herramienta Menor %(MO) 0.050 $33,716.11 $1,685.81 PLACA SOBRE PISO ALISTADO TERRAZAS e=0.08 M2 1.000 $352,232.20 $40,755.66 Concreto normal de 17,5 Mpa M3 1.000 $261,693.80 $416,176.96 Mortero 1:4 Impermeabilizado M3 0.070 $10,724.63 $25,395.94 Cuadrilla de Albañilería 1*1 M3 1.050 $10,724.63 $283,021.84 Cuadrilla de Albañilería 1*1 hC 1.275 $33,716.11 $13,673.91 Vibrador (Gas/Elec) hC 11.598 $56,680.00 $124,384.31 Herramienta Menor %(MO) 0.050 $1,685.81 Herramienta Menor dM 0.125 $33,716.11 %(MO) 0.050 $7,085.00 $1,685.81 ALISTADO PISO ESMALTADO 5cm M2 1.000 $610.00 $33,833.50 PISO EN TABLÓN DE GRES M2 1.000 $12,728.00 $43,025.70 Cemento Gris Kg 0.800 $5,500.00 $502.64 VITRIFICADO 20X20 M2 1.000 $610.00 $12,982.56 Mineral rojo kg 0.080 $273,932.20 $453.20 Tablon gres vitrif./colonial liso 25x25x4cm Kg 2.000 $1,256.60 Mortero 1:4 M3 0.050 $10,724.63 Cemento Gris M3 0.042 $273,932.20 $11,850.31 Cuadrilla de Albañilería 1*1 hC 1.593 $33,716.11 $14,107.51 Mortero 1:4 hC 1.422 $10,724.63 $15,250.43 Herramienta Menor %(MO) 0.050 $17,084.34 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $33,716.11 $1,685.81 $7,830.00 $1,685.81 Herramienta Menor ALISTADO PISO IMPERMEABLE e=0.04 M2 1.000 $352,232.20 M2 1.000 $13,852.00 $42,595.66 Sika 1 Kg 0.560 $10,724.63 $37,798.46 PISO EN TABLÓN DE GRES M2 1.000 $610.00 $14,129.04 Mortero 1:4 Impermeabilizado M3 0.040 $4,516.34 VITRIFICADO 30X15 Kg 2.000 $1,256.60 Cuadrilla de Albañilería 1*1 hC 1.593 $33,716.11 $14,511.97 Tablon gres vitrif./grafilado 33x33x4cm M3 0.042 $273,932.20 $11,850.31 Herramienta Menor %(MO) 0.050 $17,084.34 Cemento Gris hC 1.275 $10,724.63 $13,673.91 $22,330.00 $1,685.81 Mortero 1:4 %(MO) 0.050 $33,716.11 $1,685.81 CERÁMICA ARKET FRESNO 44x44cm M2 1.000 $10,724.63 Cuadrilla de Albañilería 1*1 Cuadrilla de Albañilería 1*1 hC 1.600 $33,716.11 $22,776.60 Herramienta Menor Herramienta Menor %(MO) 0.025 $17,159.41 $20,123.00 PISO EN TABLÓN DE GRES CERÁMICA MARMOL 44x44cm M2 1.000 $10,724.63 $842.90 VITRIFICADO 33X33 M2 1.000 $12,728.00 $41,449.18 Cuadrilla de Albañilería 1*1 hC 1.593 $33,716.11 Tablon gres vitrif./colonial corcho 25x25 M3 1.000 $610.00 $12,982.56 Herramienta Menor %(MO) 0.050 $20,525.46 Cemento Gris Kg 2.000 $1,256.60 $273,932.20 $17,084.34 Mortero 1:4 M3 0.042 $273,932.20 $11,850.31 GUARDAESCOBA EN TABLETA DE GRES ML 1.000 $2,148.00 $1,685.81 Cuadrilla de Albañilería 1*1 hC 1.275 $10,724.63 $13,673.91 0.004 $10,724.63 Herramienta Menor %(MO) 0.050 $33,716.11 $1,685.81 Mortero 1:4 M3 1.000 $33,716.11 $8,426.52 0.319 $1,128.60 PISO EN TABLÓN DE GRES Guardaescoba vitrif./col 10x25 Ml 0.050 $1,688.00 $2,190.96 VITRIFICADO 7X25 $610.00 $3,421.16 Tablon gres vitrif./colonial liso 25x25x4cm Cuadrilla de Albañilería 1*1 hC $1,685.81 Mortero 1:4 $10,724.63 Cemento Gris Herramienta Menor %(MO) $33,716.11 $16,905.43 Cuadrilla de Albañilería 1*1 M2 1.000 $43,154.40 $1,721.76 Herramienta Menor M2 1.000 $12,982.56 GUARDAESCOBA EN GRES ML 1.000 $583.00 M3 0.042 $12,728.00 $11,850.31 Guardaescoba vitrif.esfumado 10x25 M2 1.000 $44,616.00 $628.30 PISO CERÁMICA ADRIANA 30.3X30.3 Kg 2.000 $273,932.20 $1,256.60 Cemento Gris Kg 1.000 $104,740.00 $12,869.56 Pegacor max gris hC 1.434 $15,379.13 Cuadrilla de Albañilería 1*1 hC 1.200 $10,724.63 $1,685.81 Cerámica P. Adriana blan/bei 30.3x30.3 %(MO) 0.050 $610.00 $1,685.81 Herramienta Menor %(MO) 0.050 Cuadrilla de Albañilería 1*1 $10,724.63 $37,856.00 $72,911.89 Herramienta Menor $33,716.11 $29,500.00 $29,733.00 PISO CERÁMICA PIZARRA 45.5X45.5 PAVIMENTO EN ADOQUIN 10X20X4cm M2 1.000 $2,297.72 Pegacor max gris M2 1.000 $2,060.00 $40,941.07 Adoquin rectangular 4x10x20 Und 50.000 $660.00 $16,182.33 Cerámica P. pizarra 45.5x45.5 kg 1.000 $19,656.00 $2,121.80 Arena de Rio m3 0.050 $54,984.00 $24,698.83 Cuadrilla de Albañilería 1*1 M2 1.000 $10,724.63 $20,049.12 Base especializada compactada M3 0.150 $10,724.63 Herramienta Menor hC 1.593 $33,716.11 $17,084.34 Cuadrilla de Albañilería 1*1 hC 2.303 $67,585.72 %(MO) 0.050 $1,685.81 $467.90 PISO CERÁMICA QUIMBAYA 33.8X33.8 M2 1.000 $2,060.00 $55,792.27 PAVIMENTO ADOQUIN VEHICULAR M2 1.000 Pegacor max gris kg 1.000 $34,216.00 $2,121.80 20x10x8cm M3 0.012 $1,823.10 Cerámica P.quimbaya beige 33.8x33.8cm M2 1.000 $10,724.63 $34,900.32 Extrafina con arena m3 0.060 $34,669.80 hC 1.593 $33,716.11 $17,084.34 Arena Lavada Und 51.500 $10,996.80 %(MO) 0.050 $1,685.81 Adoquin rectangular 8x10x20 dM 0.200 $17,942.31 Rana Compactadora hC 1.673 M2 1.000 $2,060.00 $46,881.55 Cuadrilla de Albañilería 1*1 kg 1.000 $25,480.00 $2,121.80 M2 1.000 $25,989.60 Apu de la Construcción / 2017104

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALCuadrilla de Albañilería 1*1 hC 1.593 $10,724.63 $17,084.34 Mortero 1:4 M3 0.032 $273,932.20 $9,028.81Herramienta Menor %(MO) 0.050 $33,716.11 $1,685.81 Cemento Gris Kg 1.000 $610.00 $628.30 Baldosin de cemento rojo 15x30 M2 1.000PISO CERÁMICA COMERCIAL 30X30 M2 1.000 $2,060.00 $44,123.47 Cuadrilla de Albañilería 1*1 hC 1.270 $16,000.00 $16,320.00Pegacor max gris kg 1.000 $22,776.00 $2,121.80 Herramienta Menor %(MO) 0.050 $10,724.63 $13,620.29Cerámica P.duropiso blanco 33.8x33.8cm M2 1.000 $10,724.63 $23,231.52 $33,716.11 $1,685.81Cuadrilla de Albañilería 1*1 hC 1.593 $33,716.11 $17,084.34 PISO GRANITO PULIDOHerramienta Menor %(MO) 0.050 $1,685.81 Granito blanco M2 1.000 $558.00 $97,362.33 $2,060.00 Marmolina blanca kg 48.000 $246.00 $27,587.52PISO CERÁMICA PULPIS 41.6X41.6 M2 1.000 $25,896.00 $47,305.87 Cemento Gris kg 20.000 $610.00 $5,067.60Pegacor max gris kg 1.000 $10,724.63 $2,121.80 Cemento blanco tipo 3 Kg 18.700 $1,200.00 $11,749.21Cerámica P.Pulpis beige 41.6x41.6cm M2 1.000 $33,716.11 $26,413.92 Dilatacion en bronce kg 21.000 $9,700.00 $25,956.00Cuadrilla de Albañilería 1*1 hC 1.593 $17,084.34 Cuadrilla de Albañilería 1*1 Ml 1.600 $10,724.63 $15,830.40Herramienta Menor %(MO) 0.050 $2,060.00 $1,685.81 Pulidora 8500 Rev hC 0.560 $17,400.00 $6,005.80 $25,105.00 Herramienta Menor dU 0.200 $33,716.11 $3,480.00 $10,724.63 $46,499.05 %(MO) 0.050 $1,685.81 $33,716.11 $2,121.80 PISO EN BALDOSAPISO CERÁMICA VERONA 31.5X31.5 M2 1.000 $25,607.10 DE GRANITO PULIDO DE 0,33 X 0,33 M2 1.000 $27,509.00 $88,454.62Pegacor max gris kg 1.000 $2,060.00 $17,084.34 Baldosin de granito blanco 0,33x0,33 M2 1.000 $2,118.00 $28,059.18Cerámica P.Verona 31.5x31.5cm M2 1.000 $1,685.81 Varilla plástica 5x40 mm M2 1.000 $1,200.00 $2,160.36Cuadrilla de Albañilería 1*1 hC 1.593 $26,079.00 Cemento blanco tipo 3 kg 1.700 $2,101.20Herramienta Menor %(MO) 0.050 $10,724.63 $45,787.31 Mortero 1:4 Impermeabilizado M3 0.040 $352,232.20 $14,511.97 $33,716.11 $2,121.80 Piedra Abrasivas UN 1.000 $450.00PISO CERÁMICA AGHATA 44X44 M2 1.000 Pulidora 8500 Rev dU 0.020 $459.00Pegacor max gris kg 1.000 $2,060.00 $26,600.58 Brilladora de pisos Dia 1.000 $17,400.00 $354.96 $15,379.13 Cortadora de concreto a Diesel EQ0166 0.002 $450.00 $450.00CERÁMICA villa de leyva 44x44cm M2 1.000 $1,685.81 Transporte (f150-1.5 Ton) Viaje 0.400 $92.00Cuadrilla de Albañilería 1*1 hC 1.434 Cuadrilla acabados hC 1.750 $46,000.00 $5,568.00Herramienta Menor %(MO) 0.050 $42,900.72 Cuadrilla Especializada hC 0.910 $13,920.00 $22,521.73 $2,121.80 Herramienta Menor %(MO) 0.008 $12,869.56 $11,906.49PISO CERÁMICA PARKET 31.5X31.5 M2 1.000 $13,084.05 $269.73Pegacor max gris kg 1.000 $33,716.11PISO CERÁMICA MARMOL 44X44 M2 1.000 $41,417.41 ESCALERAPegacor max gris kg 1.000 $2,060.00 $2,121.80PISO CERÁMICA Forli 44X44 M2 1.000 $2,060.00 $47,347.69 GRANITO PULIDO MESONES ML 1.000 $558.00 $67,727.72Pegacor max gris kg 1.000 $25,937.00 $2,121.80 Granito blanco kg 43.200 $246.00 $24,828.77CERÁMICA Forly 44x44cm M2 1.000 $10,724.63 $26,455.74 Marmolina blanca kg 17.200 $610.00 $4,358.14Cuadrilla de Albañilería 1*1 hC 1.593 $33,716.11 $17,084.34 Cemento Gris Kg 14.900 $1,200.00 $9,361.67Herramienta Menor %(MO) 0.050 $1,685.81 Cemento blanco tipo 3 kg 16.300 $10,724.63 $20,146.80 Cuadrilla de Albañilería 1*1 hC 0.502 $17,400.00 $5,383.77PISO PORCELANATO 80X80 M2 1.000 $105,452.02 Pulidora 8500 Rev dU 0.200 $33,716.11 $3,480.00Porcelanato 80x80 M2 1.000 $70,380.00 Herramienta Menor %(MO) 0.005Pegacor blanco exteriores kg 7.000 $11,175.50 $168.58Cuadrilla de Albañilería 1*1 hC 2.071 $22,210.72 PELDAÑO GRANITO PULIDOHerramienta Menor %(MO) 0.050 $69,000.00 $1,685.81 Granito blanco M2 1.000 558.00 € 79,392.68 € $1,550.00 Marmolina blanca kg 48.000 246.00 € 27,587.52 € $10,724.63 Cemento Gris kg 20.000 $610.00 5,067.60 € $33,716.11 Cemento blanco tipo 3 Kg 18.700 $273,932.20 $11,749.21 Cuadrilla de Albañilería 1*1 kg 21.000 $20,453.00PISO PORCELANATO GALICIA M2 1.000 $110,167.00 $300,152.80 Pulidora 8500 Rev hC 0.502 $10,724.63 $2,821.50BLANCO 60X60 M2 1.000 $1,550.00 $112,370.34 Herramienta Menor dU 0.200 $33,716.11 $36,508.61Porcelanato Galicia blanco 80x80 kg 4.000 $10,724.63 %(MO) 0.005 $21,535.07Pegacor blanco exteriores hC 1.195 $33,716.11 $6,386.00 PREFABRICADO DE ENCHAPE-Cuadrilla de Albañilería 1*1 %(MO) 5.000 $12,815.94 ABUZARDADO 0.07X40X150 $168.58Herramienta Menor $168,580.53 Mortero 1:4PISO EN BALDOSIN DE CEMENTO 15X30 M2 1.000 $41,283.20 M2 1.000 $84,656.54 $84,656.54 M3 0.010 $273,932.20 $2,821.50 Apu de la Construcción / 2017 105

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Prefabricado enchape abuzardado 1 Und 1.750 $20,453.00 $36,508.61 CERÁMICA PORCELANIZADA M2 1.000 $2,060.00 $38,267.36 Cuadrilla de Albañilería 1*1 hC 2.008 $10,724.63 $21,535.07 EGEO 30.3X30.3 kg 1.000 $17,850.00 $2,121.80 Herramienta Menor %(MO) 0.005 $33,716.11 Pegacor max gris M2 1.000 $10,724.63 $18,207.00 $168.58 Cerámica Egeo blanco 30.3x30.3cm hC 1.593 $17,084.34 $17,084.34 ZOCALO EN GRANITO PULIDO ML 1.000 $558.00 Cuadrilla de Albañilería 1*1 %(MO) 0.050 Granito blanco kg 19.200 $246.00 $61,933.86 Herramienta Menor $2,060.00 $854.22 Marmolina blanca kg 8.400 $610.00 $11,035.01 $17,250.00 Cemento Gris Kg 7.480 $1,200.00 $2,128.39 CERÁMICA PORCELANIZADA M2 1.000 $10,724.63 $37,655.36 Cemento blanco tipo 3 kg 8.400 $450.00 $4,699.68 EGEO 20.5X20.5 kg 1.000 $17,084.34 $2,121.80 Piedra Abrasivas UN 1.250 $2,118.00 $10,382.40 Pegacor max gris M2 1.000 $17,595.00 Varilla plástica 5x40 mm M2 1.050 $12,869.56 Cerámica Egeo bla/bei 20.5x20.5cm piso-par hC 1.593 $2,060.00 $17,084.34 Cuadrilla acabados hC 1.300 $13,084.05 $573.75 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $30,500.00 Cuadrilla Especializada hC 0.800 $17,400.00 $2,268.38 Herramienta Menor $10,724.63 $854.22 Pulidora 8500 Rev dU 0.200 $33,716.11 $16,730.43 $17,084.34 Herramienta Menor %(MO) 0.005 $10,467.24 CERÁMICA PORCELANIZADA $51,170.36 $27,509.00 $3,480.00 ARTICA 30X45 $2,060.00 $2,121.80 ZOCALO EN BALDOSA ML 1.000 $352,232.20 Pegacor max gris M2 1.000 $22,950.00 $31,110.00 DE GRANITO PULIDO M2 0.280 $46,000.00 $168.58 Cerámica Ártica bla/bei 30x45 kg 1.000 $10,724.63 $17,084.34 Baldosin de granito blanco 0,33x0,33 M3 0.002 $12,869.56 Cuadrilla de Albañilería 1*1 M2 1.000 $17,084.34 Mortero 1:4 Impermeabilizado EQ0166 0.001 $13,921.57 Herramienta Menor hC 1.593 $854.22 Cortadora de concreto a Diesel hC 0.400 $33,716.11 $7,856.57 %(MO) 0.050 $2,060.00 Cuadrilla acabados %(MO) 0.005 $75,500.00 $43,469.36 Herramienta Menor $2,060.00 $725.60 CERÁMICA PORCELANIZADA M2 1.000 $10,724.63 $2,121.80 $24,096.00 $23.00 LUMIK 25X36.5 kg 1.000 $17,084.34 $23,409.00 PAÑETES Y ENCHAPES $10,724.63 $5,147.82 Pegacor max gris M2 1.000 $17,084.34 $33,716.11 $168.58 Pared miraflores blanco 25x35 hC 1.593 $2,060.00 CERÁMICA PORCELANIZADA Cuadrilla de Albañilería 1*1 %(MO) 0.050 $24,068.00 $854.22 AMALFI 20X25 $2,060.00 $45,469.87 Herramienta Menor $10,724.63 Pegacor max gris $25,906.00 $2,121.80 $17,084.34 $97,070.36 Cerámica Sassari 25x35cm M2 1.000 $10,724.63 $24,577.92 CERÁMICA PORCELANIZADA M2 1.000 $2,121.80 Cuadrilla de Albañilería 1*1 kg 1.000 $33,716.11 $17,084.34 LAZIO 30X60 kg 1.000 $2,060.00 $77,010.00 Herramienta Menor M2 1.000 $1,685.81 Pegacor max gris M2 1.000 $26,422.00 $17,084.34 hC 1.593 $2,060.00 Cerámica lazio mate/beige 30x60 hC 1.593 $10,724.63 %(MO) 0.050 $20,723.00 $47,316.07 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $17,084.34 $854.22 $10,724.63 $2,121.80 Herramienta Menor CERÁMICA PORCELANIZADA $33,716.11 $26,424.12 $242,209.00 $44,609.72 IMOLA 20X25 M2 1.000 $17,084.34 CERÁMICA PORCELANIZADA M2 1.000 $10,724.63 $2,121.80 Pegacor max gris kg 1.000 $2,060.00 $1,685.81 FORLI 25X35 kg 1.000 $33,716.11 $24,549.36 Cerámica Verona 25x35cm M2 1.000 Pegacor max gris M2 1.000 $17,084.34 Cuadrilla de Albañilería 1*1 hC 1.593 $21,468.00 $42,029.41 Cerámica Forli blanco 25x35 hC 1.593 Herramienta Menor %(MO) 0.050 $10,724.63 $2,121.80 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $854.22 $33,716.11 $21,137.46 Herramienta Menor CERÁMICA PORCELANIZADA $17,084.34 $47,010.80 VERONA 25X35 M2 1.000 $1,685.81 CERÁMICA PORCELANIZADA M2 1.000 $2,121.80 Pegacor max gris kg 1.000 AMPEZZO 20.5X30.5 kg 1.000 $26,950.44 CERÁMICA Salotto 25x35cm M2 1.000 $42,789.31 Pegacor max gris M2 1.000 $17,084.34 Cuadrilla de Albañilería 1*1 hC 1.593 $2,121.80 Cerámica Ampezzo 20.5x30.5 hC 1.593 Herramienta Menor %(MO) 0.050 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $854.22 CERÁMICA PORCELANIZADA $21,897.36 Herramienta Menor BALTICO 25X35 M2 1.000 $17,084.34 $18,633.28 Pegacor max gris kg 1.000 $1,685.81 $4,989.51 $11,957.97 CERÁMICA BÁLTICO 31.5x31.5cm M2 1.000 PAÑETE LISO MUROS 1:5 M2 1.000 $1,685.81 Cuadrilla de Albañilería 1*1 hC 1.593 Mortero1:5 M3 0.020 Herramienta Menor %(MO) 0.050 Cuadrilla de Albañilería 1*1 hC 1.115 Herramienta Menor %(MO) 0.050 Apu de la Construcción / 2017106

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALPAÑETE LISO MUROS 1:6 M2 1.000 $211,665.00 $18,004.07 Esmalte sintetico (Pintulux) GAL. 0.032 $59,900.00 $1,974.30Mortero 1:6 M3 0.020 $10,724.63 $4,360.30 Disolvente (Thiner) Gal 0.021 $15,800.00 $341.75Cuadrilla de Albañilería 1*1 hC 1.115 $33,716.11 $11,957.97 Cuadrilla acabados hC 0.753 $12,869.56Herramienta Menor %(MO) 0.050 $1,685.81 Herramienta Menor %(MO) 0.050 $9,690.78 $9,690.78 $484.54PAÑETE LISO PLACAS 1:5 M2 1.000 $242,209.00 $20,349.22 ESMALTE MARCOS PUERTAS (Doméstico) M2 1.000 $1,400.00 $12,483.24Mortero1:5 M3 0.020 $10,724.63 $4,989.51 Lija No 80 Und 0.630 $48,900.00 $908.46Cuadrilla de Albañilería 1*1 hC 1.275 $33,716.11 $13,673.91 Esmalte Doméstico GAL. 0.021 $15,800.00Herramienta Menor %(MO) 0.050 $1,685.81 Disolvente (Thiner) Gal 0.021 $12,869.56 $1,057.71 $211,665.00 Cuadrilla acabados hC 0.753 $9,690.78 $341.75PAÑETE LISO PLACAS 1:6 M2 1.000 $10,724.63 $19,720.01 Herramienta Menor %(MO) 0.050Mortero 1:6 M3 0.020 $33,716.11 $4,360.30 $9,690.78Cuadrilla de Albañilería 1*1 hC 1.275 $13,673.91 $484.54Herramienta Menor %(MO) 0.050 $3,600.00 $1,685.81 $3,950.00 ESMALTE MARCOS PUERTAS (Pintulux) M2 1.000 $1,400.00 $12,721.17PAÑETE MALLA VENADA 1:3 M2 1.000 $425,393.40 $22,449.77 Lija No 80 Und 0.630 $59,900.00 $908.46Puntilla 1 1/2\" 500 gr kg 0.015 $10,724.63 $55.62 Esmalte sintetico (Pintulux) GAL. 0.021 $15,800.00Malla con vena 0.60x2.00 Und 0.500 Disolvente (Thiner) Gal 0.021 $12,869.56 $1,295.64Mortero 1:3 Impermeabilizado M3 0.015 $800.00 $2,034.25 Cuadrilla acabados hC 0.753 $9,690.78 $341.75Cuadrilla de Albañilería 1*1 hC 1.115 $638.00 $6,572.33 Herramienta Menor %(MO) 0.050Andamio tubular 1.50x1.50 dU 0.100 $33,716.11 $11,957.97 $9,690.78Tablon para andamio dU 0.100 $484.54Herramienta Menor %(MO) 0.050 $80.00 $63.80 ESMALTE PUERTAS METÁLICAS (Doméstico) M2 1.000 $1,400.00 $12,277.15 $1,685.81 Lija No 80 Und 1.050 $48,900.00 $1,514.10 Esmalte Doméstico GAL. 0.050 $15,800.00 $2,518.35 PINTURA Y ACABADO Disolvente (Thiner) Gal 0.030 $12,869.56 Cuadrilla acabados hC 0.574 $7,387.13 $488.22 Herramienta Menor %(MO) 0.050 $7,387.13 $369.36APLIQUE YESO PARA LAMPARAS UND 1.000 $157,500.00 ESMALTE PUERTAS METÁLICAS (Pintulux) M2 1.000 $1,400.00 $12,226.68Y ROSETONES Und 5.250 $30,000.00 $157,500.00 Lija No 80 Und 1.050 $59,900.00 $1,514.10Aplique para lamparas y rosetones Esmalte sintetico (Pintulux) GAL. 0.040 $15,800.00 $2,467.88 Disolvente (Thiner) Gal 0.030 $12,869.56APLIQUE YESO PARA LAMPARAS UND 1.000 $63,000.00 Cuadrilla acabados hC 0.574 $7,387.13 $488.22Y ROSETONES Und 1.050 $60,000.00 $63,000.00 Herramienta Menor %(MO) 0.050 $7,387.13Aplique para lamparas y rosetones1 $369.36COLUMNA YESO EN FALSO UND 1.000 $168,000.00 ESTUCO M2 1.000 $1,400.00 $6,710.74Columna en falso Und 1.050 $160,000.00 $168,000.00 Lija No 80 Und 0.100 $880.00 $144.20 Estuka (estuco listo) kg 2.300ESMALTE MALLA CERRAMIENTO M2 1.000 $17,345.03 Cuadrilla de Albañilería 1*1 hC 0.398 $10,724.63 $2,084.72Lija No 80 Und 1.050 $1,514.10 Herramienta Menor %(MO) 0.050 $4,268.40 $4,268.40Esmalte Icolux GAL. 0.040 $1,561.48Disolvente (Thiner) Gal 0.021 $213.42Cuadrilla acabados hC 0.859 $341.75Compresor de Pintura dM 0.100 $1,400.00 $11,054.95 ESTUCO Y PINTURA EN VINILO M2 1.000 $49,900.00 $13,643.77Herramienta Menor %(MO) 0.050 $37,900.00 $2,320.00 Vinilo Viniltex Gal 0.065 $880.00 $3,340.81 $15,800.00 Estuka (estuco listo) kg 2.300 $2,084.72 $12,869.56 $552.75 Lija No 80 Und 0.100 $1,400.00 $23,200.00 Cuadrilla de Albañilería 1*1 hC 0.717 $10,724.63 $144.20 $11,054.95 Herramienta Menor %(MO) 0.050 $7,689.56 $7,689.56 $384.48ESMALTE MARCOS VENTANAS (Doméstico) M2 1.000 $1,400.00 $14,045.85 ESTUCO Y PINTURA EN VINILO M2 1.000 $34,500.00 $12,612.74Lija No 80 Und 1.050 $48,900.00 $1,514.10 Vinilo Intervinilo Gal 0.065 $880.00 $2,309.78Esmalte Doméstico GAL. 0.040 $15,800.00 $2,014.68 Estuka (estuco listo) kg 2.300 $2,084.72Disolvente (Thiner) Gal 0.021 $12,869.56 Lija No 80 Und 0.100 $1,400.00Cuadrilla acabados hC 0.753 $9,690.78 $341.75 Cuadrilla de Albañilería 1*1 hC 0.717 $10,724.63 $144.20Herramienta Menor %(MO) 0.050 $9,690.78 Herramienta Menor %(MO) 0.050 $7,689.56 $7,689.56 $484.54 $384.48ESMALTE MARCOS VENTANAS (Pintulux) M2 1.000 $14,005.48 $1,400.00 $1,514.10Lija No 80 Und 1.050 ESTUCO VENECIANO M2 1.000 $31,500.00 Apu de la Construcción / 2017 107

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Estuco veneciano instalado M2 1.050 $30,000.00 $31,500.00 Herramienta Menor %(MO) 0.050 $2,895.65 $144.78 FILOS Y DILATACIONES INTERIOES ML 1.000 $30,165.00 PINTURA POLIURETÁNICA M2 1.000 $27,257.70 Mortero 1:3 M3 0.003 $1,024.13 Colmasolvente Uretano Cuadrilla de Albañilería 1*1 Dia 0.320 $331,433.40 $27,455.06 (disolvente liquido incoloro) KG 0.340 $10,400.00 $3,642.08 Herramienta Menor %(MO) 0.050 $85,797.07 $1,685.81 Sika Uretano $33,716.11 (Recubrimiento protector en poliuretano) LACA PUERTAS EN MADERA (Mate) M2 1.000 $16,919.47 Cuadrilla acabados KG 0.340 $52,000.00 $18,210.40 Pintulaca mate GAL. 0.042 $46,400.00 $2,007.26 Herramienta Menor hC 0.400 $12,869.56 $5,147.82 Disolvente (Thiner) Gal 0.021 $15,800.00 %(MO) 0.050 $5,147.82 Sellador lijable GAL. 0.015 $52,000.00 $341.75 $257.39 Tapaporos incoloro pintulaca GAL. 0.015 $51,362.00 $803.40 Lija No 80 Und 1.050 $1,400.00 $770.43 ENCHAPES ACABADOS EXTERNOS Cuadrilla acabados hC 0.853 $12,869.56 $1,470.00 Herramienta Menor %(MO) 0.050 $10,977.74 $10,977.74 ENCHAPE TABLETA VITRIFICADO M2 1.000 $2,060.00 $37,836.10 $548.89 /COL.25X25 kg 2.000 $15,347.00 $4,243.60 LACA PUERTAS EN MADERA (Brillante) M2 1.000 $40,147.00 Pegacor max gris M2 1.000 $10,724.63 $15,653.94 Pintulaca transparente-brillante GAL. 0.042 $15,800.00 $16,581.40 Tableta vitrificada/col 25x25 hC 1.593 $17,084.34 $17,084.34 Disolvente (Thiner) Gal 0.021 $52,000.00 $1,736.76 Cuadrilla de Albañilería 1*1 %(MO) 0.050 Sellador lijable GAL. 0.015 $51,362.00 Herramienta Menor $854.22 Tapaporos incoloro pintulaca GAL. 0.015 $1,400.00 $341.75 Lija No 80 Und 1.050 $12,869.56 $803.40 ENCHAPE TABLETA SEMIBRILLANTE M2 1.000 $2,060.00 $34,171.24 Cuadrilla acabados hC 0.848 $10,913.39 $770.43 25X25 kg 2.000 $11,754.00 $4,243.60 Herramienta Menor %(MO) 0.050 $1,470.00 Pegacor max gris M2 1.000 $10,724.63 $11,989.08 $49,900.00 $10,913.39 Tableta semibrillante 25x25/30x30 hC 1.593 $17,084.34 $17,084.34 PINTURA VINILO SOBRE ESTUCO $10,724.63 $545.67 Cuadrilla de Albañilería 1*1 %(MO) 0.050 Vinilo Viniltex $3,410.43 Herramienta Menor $854.22 Cuadrilla de Albañilería 1*1 $6,921.76 Herramienta Menor M2 1.000 $34,500.00 $3,340.81 ENCHAPE TABLETA VERSALLES 25X7 M2 1.000 $2,060.00 $40,881.82 Gal 0.065 $10,724.63 $3,410.43 Pegacor max gris kg 2.000 $18,333.00 $4,243.60 PINTURA VINILO SOBRE ESTUCO hC 0.318 $3,410.43 Tableta gres fachada versalles 25x7 cm M2 1.000 $10,724.63 $18,699.66 Vinilo Intervinilo %(MO) 0.050 $170.52 Cuadrilla de Albañilería 1*1 hC 1.593 $17,084.34 $17,084.34 Cuadrilla de Albañilería 1*1 $16,950.00 Herramienta Menor %(MO) 0.050 Herramienta Menor M2 1.000 $10,724.63 $5,890.73 $854.22 Gal 0.065 $3,410.43 $2,309.78 PINTURA VINILO SOBRE ESTUCO hC 0.318 $3,410.43 ENCHAPE SPACATO DE MARMOL M2 1.000 $112,997.48 Vinilo Pinturama %(MO) 0.050 BEIGS HUILA Kg 2.000 $1,256.60 Cuadrilla de Albañilería 1*1 $170.52 Cemento Gris M2 1.000 $91,800.00 Herramienta Menor M2 1.000 Spacato de marmol beigs huila kg 2.000 $610.00 $2,002.32 Gal 0.065 $4,715.76 Pegacor blanco interiores hC 1.593 $90,000.00 $17,084.34 hC 0.318 $1,134.80 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $854.22 %(MO) 0.050 $3,410.43 Herramienta Menor $972.00 $10,724.63 $170.52 $17,084.34 PINTURA EN CASEINA M2 1.000 $32,600.00 $5,763.53 ENCHAPE SPACATO DE MARMOL GRIS M2 1.000 $610.00 $109,631.48 Caseina Gal 0.065 $10,724.63 $2,182.57 Cemento Gris Kg 2.000 $86,700.00 $1,256.60 Cuadrilla de Albañilería 1*1 hC 0.318 $3,410.43 $3,410.43 Spacato de marmol gris M2 1.000 $88,434.00 Herramienta Menor %(MO) 0.050 Pegacor blanco interiores kg 2.000 $972.00 $2,002.32 $61,536.00 $170.52 Cuadrilla de Albañilería 1*1 hC 1.593 $10,724.63 $17,084.34 PINTURA GRIS BASALTO M2 1.000 $10,724.63 Herramienta Menor %(MO) 0.050 $17,084.34 $854.22 Pintura gris basalto Gal 0.070 $4,289.85 $8,726.60 Cuadrilla de Albañilería 1*1 hC 0.400 $4,436.75 ENCHAPE SPACATO DE MARMOL M2 1.000 $81,540.68 Herramienta Menor %(MO) 0.050 $61,536.00 $4,289.85 NEGRO Kg 2.000 $1,256.60 $10,724.63 Cemento Gris M2 1.000 $60,343.20 PINTURA GRIS BASALTO COLUMNAS ML 1.000 $214.49 Spacato de marmol negro kg 2.000 $610.00 $2,002.32 Y VIGAS Gal 0.040 Pegacor blanco interiores hC 1.593 $59,160.00 $17,084.34 Pintura gris basalto hC 0.270 $5,575.72 Cuadrilla de Albañilería 1*1 %(MO) 0.050 Cuadrilla de Albañilería 1*1 $2,535.28 Herramienta Menor $972.00 $854.22 $2,895.65 $10,724.63 $17,084.34 Apu de la Construcción / 2017108

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALFACHADA LOCAL ALUMINIO M2 1.000 $168,000.00 PREFABRICADO DE ENCHAPE-Fachada local anoloc cristal 6mm M2 1.050 $160,000.00 $168,000.00 ACANALADO 0.07X55X0.70 M2 1.000 $84,760.95FACHADA LOCAL ALUMINIO Und 2.730 $57,818.67CUADRICULA PESADA Prefabricado enchape acanalado 1 M3 0.010 $21,179.00 $2,821.50Fachada casa anoloc cuadricula pesada hC 2.142 $273,932.20 $22,972.17 Mortero 1:4 %(MO) 0.050 $10,724.63 $1,148.61 $22,972.17 M2 1.000 $577,500.00 Cuadrilla de Albañilería 1*1 M2 1.050 $550,000.00 $577,500.00 Herramienta MenorFILOS Y DILATACIONES EXTERIORES ML 1.000 $331,433.40 $29,851.95 PREFABRICADO DE ENCHAPE- M2 1.000 $1,008,382.45Mortero 1:3 M3 0.003 $85,797.07 $1,024.13 ACANALADO 0.07X55X0.55 0 0.010 $346,642.80 $3,466.43Cuadrilla de Albañilería 1*1 Dia 0.320 $27,455.06 $27,455.06 Mortero 17.5 Mpa 1:4 M3 3.470 $273,932.20 $979,061.08Herramienta Menor %(MO) 0.050 $1,372.75 Mortero 1:4 hC 2.296 $10,724.63 $24,623.76 $7,000.00 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $24,623.76 $1,231.19GRANIPLAST M2 1.000 $7,350.00 Herramienta MenorGraniplast tono claro instalado M2 1.050 $45,062.00 $7,350.00 $610.00MARANON M2 1.000 $11,556.02 SICOPLAST M2 1.000 $6,000.00 $6,300.00Arena lavada tamaño 0-5mm M3 0.015 $10,724.63 $696.21 Sicoplast instalado M2 1.050 $6,300.00Cemento Gris Kg 3.000 $8,547.53Cuadrilla de Albañilería 1*1 hC 0.797 $1,884.90 CARPINTERÍAHerramienta Menor %(MO) 0.050 $8,000.00 $8,547.53 BARANDA METÁLICA TUBO HG 3\" ML 1.000 $360,679.89MARMOPLAST M2 1.000 $273,932.20 $427.38 Codo galvanizado D 3\" Und 4.000 $21,742.00 $86,968.00Marmoplast instalado M2 1.050 $10,724.63 Tubo galvanizado D=3\" Und 4.000 $62,150.00 $248,600.00 $19,616.50 $8,400.00 Cuadrilla carpinteria (madera y metálica) hC 1.851 $12,333.33 $22,828.99PAÑETE RÚSTICO MURO 1:5 $8,400.00 Herramienta Menor %(MO) 0.100 $22,828.99 $2,282.90Mortero 1:4 $654.50Cuadrilla de Albañilería 1*1 M2 1.000 $10,724.63 $0.00 BARANDA METÁLICA TUBO HG 2\" ML 1.000 $8,132.00 $245,162.78Herramienta Menor M3 0.020 $25,643.61 $5,643.00 Codo galvanizado D 2\" Und 4.000 $47,850.00 $32,528.00 hC 1.275 $13,673.91 Tubo galvanizado D=2\" Und 4.000 $10,724.63 $191,400.00PAÑETE FACHADA 1:4 %(MO) 0.050 Cuadrilla de Albañilería 1*1 hC 1.800 $19,304.34 $19,304.34Mortero 1:4 $654.50 Herramienta Menor %(MO) 0.100 $1,930.43Cuadrilla de Albañilería 1*1 M2 1.000Herramienta Menor M3 0.020 $19,616.50 CORTINA MET. ENROLLABLE CAL 23 M2 1.000 $260,000.00 hC 1.275 $5,871.97 Cortina Met. Enrollablle Cal. 23 M2 1.000 $260,000.00 $260,000.00 %(MO) 0.050 $13,673.91 $1,282.18PAÑETE FACHADA 1:5 M2 1.000 $20,000.61 CLOSET CORRIENTE DE 2.10X2.00 UND 1.000 $1,406,059.20Mortero 1:4 M3 0.020 $5,643.00 4.200 $334,776.00 $1,406,059.20Cuadrilla de Albañilería 1*1 hC 1.275 $273,932.20 $13,673.91 Closet entamborado-puertas entamboradas M2Herramienta Menor %(MO) 0.050 $10,724.63 1.000 $1,205,193.60 $13,673.91 $683.70 CLOSET CORRIENTE DE 1.90X.200 UND 3.600 $334,776.00 $1,205,193.60PANETE MURO IMPERMEABLE 1:2Sika 1 $7,830.00 $30,683.26 Closet entamborado-puertas entamboradas M2 1.000 $1,138,238.40Mortero 1:3 Impermeabilizado $425,393.40 $4,838.94 3.400 $334,776.00 $1,138,238.40Cuadrilla de Albañilería 1*1 M2 1.000 $10,724.63 $13,144.66 CLOSET CORRIENTE DE 1.70X2.00 UNDAndamio tubular 1.50x1.50 Kg 0.600 $11,957.97 1.000 $1,004,328.00Tablon para andamio M3 0.030 $800.00 Closet entamborado-puertas entamboradas M2 3.000 $334,776.00 $1,004,328.00Herramienta Menor hC 1.115 $638.00 $80.00 dU 0.100 $11,957.97 $63.80 CLOSET CORRIENTE DE 1.50X2.00 M2 1.000 $364,000.00PREFABRICADO DE ENCHAPE- dU 0.100 $597.90 1.000 $364,000.00 $364,000.00ACANALADO 0.07X55X0.110 %(MO) 0.050 $32,287.00 Closet entamborado-puertas entamboradas M2Prefabricado enchape acanalado 3 $273,932.20 $81,612.70 1.000 $318,900.00Mortero 1:4 $10,724.63 $56,179.38 CONTRAREJA DE SEGURIDAD 2X1 UND 1.000 $318,900.00 $318,900.00Cuadrilla de Albañilería 1*1 $21,535.07 $2,821.50 Contrareja de seguridad 2x1 UndHerramienta Menor $21,535.07 M2 1.000 $1,076.75 DIVISION MET. ENTAMBORADA M2 Und 1.740 1 1/2 CAL. 18 M2 M3 0.010 Division entamborada 1 1/2 Cal. 18 hC 2.008 %(MO) 0.050 Apu de la Construcción / 2017 109

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL HOJA PUERTA OKUME 0.65X2M Herramienta Menor %(MO) 0.050 $16,859.66 $842.98 ENTAMBORADA Puerta paso Okume 0.65x2mx35mm UND 1.000 $47,900.00 $68,352.15 HOJA PUERTA HIGHTOP 0.80-0.85X2.2M Bisagra Induma cobrizada D=4\" Und 1.000 $5,200.00 $47,900.00 Cuadrilla carpinteria (madera y metálica) Und 1.500 $12,333.33 $7,800.00 ENTAMBORADA UND 1.000 $414,745.04 Herramienta Menor hC 0.977 $12,049.66 $12,049.66 1.000 $390,900.00 %(MO) 0.050 Puerta paso Hightop 0.80-0.85x2.2-2.4mx40mm Und 1.500 $390,900.00 $602.48 1.239 $5,200.00 $7,800.00 Bisagra Induma cobrizada D=4\" Und 0.050 $12,333.33 $15,281.00 $15,281.00 Cuadrilla carpinteria (madera y metálica) hC $764.05 HOJA PUERTA OKUME 0.7-0.75X2M Herramienta Menor %(MO) ENTAMBORADA UND 1.000 $72,310.45 1.000 $50,900.00 Puerta paso Okume (0.70=0.75)x2mx35mm Und 1.500 $50,900.00 $7,800.00 HOJA PUERTA HIGHTOP 0.90X2.2M 1.051 $5,200.00 $12,962.33 ENTAMBORADA Bisagra Induma cobrizada D=4\" Und 0.050 $12,333.33 Puerta paso Hightop 0.90x2.2-2.4mx40mm UND 1.000 $453,628.49 $12,962.33 $648.12 Bisagra Induma cobrizada D=4\" Und 1.000 $429,900.00 Cuadrilla carpinteria (madera y metálica) hC Cuadrilla carpinteria (madera y metálica) Und 1.500 $429,900.00 Herramienta Menor hC 1.230 $5,200.00 $7,800.00 Herramienta Menor %(MO) %(MO) 0.050 $12,333.33 $15,170.00 $15,170.00 HOJA PUERTA OKUME 0.80-0.85X2M $758.50 ENTAMBORADA UND 1.000 $79,553.95 1.000 $55,900.00 Puerta paso Okume (0.80=0.85)x2mx35mm Und 1.500 $55,900.00 $7,800.00 HOJA PUERTA MILANO 0.60-0.65X2M 1.154 $5,200.00 $15,099.00 ENTAMBORADA Bisagra Induma cobrizada D=4\" Und 0.050 $13,084.05 Puerta paso Milano (0.60-0.65)x2m UND 1.000 $210,745.04 $15,099.00 $754.95 Bisagra Induma cobrizada D=4\" Und 1.000 $186,900.00 Cuadrilla Especializada hC Cuadrilla carpinteria (madera y metálica) Und 1.500 $186,900.00 Herramienta Menor hC 1.239 $5,200.00 $7,800.00 Herramienta Menor %(MO) %(MO) 0.050 $12,333.33 $15,281.00 $15,281.00 HOJA PUERTA OKUME 0.90X2M $764.05 ENTAMBORADA Puerta paso Okume 0.90x2mx35mm UND 1.000 $49,900.00 $75,402.64 HOJA PUERTA MILANO 0.70-0.75X2.2M UND 1.000 $198,900.00 $224,402.64 Bisagra Induma cobrizada D=4\" Und 1.000 $5,200.00 $49,900.00 ENTAMBORADA Und 1.000 $5,200.00 $198,900.00 Cuadrilla carpinteria (madera y metálica) Und 1.500 $12,333.33 $7,800.00 Puerta paso Milano (0.70-0.75)x2m Und 1.500 $12,333.33 Herramienta Menor hC 1.367 $16,859.66 $16,859.66 Bisagra Induma cobrizada D=4\" hC 1.367 $16,859.66 $7,800.00 %(MO) 0.050 Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $16,859.66 $842.98 Herramienta Menor $842.98 HOJA PUERTA ANDES 0.60-0.75X2M ENTAMBORADA UND 1.000 $79,900.00 $100,429.85 HOJA PUERTA MILANO 0.90X2M UND 1.000 $221,900.00 $242,378.05 Puerta paso Durolac (0.50-0.55)x2m Und 1.000 $5,200.00 $79,900.00 ENTAMBORADA Und 1.000 $5,200.00 $221,900.00 Bisagra Induma cobrizada D=4\" Und 1.500 $12,333.33 $7,800.00 Puerta paso Milano (0.90-1.00)x2m Und 1.500 $12,333.33 Cuadrilla carpinteria (madera y metálica) hC 0.983 $12,123.66 $12,123.66 Bisagra Induma cobrizada D=4\" hC 0.979 $12,074.33 $7,800.00 Herramienta Menor %(MO) 0.050 Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $12,074.33 $606.18 Herramienta Menor $603.72 HOJA PUERTA ANDES 0.80X2M ENTAMBORADA UND 1.000 $82,900.00 $104,310.45 HOJA PUERTA MADECLASI 0.65-0.75X2M Puerta paso Durolac 0.70x2m Und 1.000 $5,200.00 $82,900.00 Bisagra Induma cobrizada D=4\" Und 1.500 $12,333.33 $7,800.00 ENTAMBORADA UND 1.000 $100,310.45 Cuadrilla carpinteria (madera y metálica) hC 1.051 $12,962.33 $12,962.33 1.000 $78,900.00 Herramienta Menor %(MO) 0.050 Puerta Madeclasic (0.65-0.75)x2.03mx35mm Und 1.500 $78,900.00 $7,800.00 $648.12 1.051 $5,200.00 $12,962.33 Bisagra Induma cobrizada D=4\" Und 0.050 $12,333.33 $12,962.33 $648.12 Cuadrilla carpinteria (madera y metálica) hC HOJA PUERTA ANDES 0.85-0.90X2M Herramienta Menor %(MO) ENTAMBORADA Puerta paso Durolac (0.80-0.85)x2m UND 1.000 $89,900.00 $113,848.64 HOJA PUERTA MADECLASI 0.80-0.85X2M Bisagra Induma cobrizada D=4\" Und 1.000 $5,200.00 $89,900.00 Cuadrilla carpinteria (madera y metálica) Und 1.500 $12,333.33 $7,800.00 ENTAMBORADA UND 1.000 $108,745.04 Herramienta Menor hC 1.247 $15,379.66 $15,379.66 1.000 $84,900.00 %(MO) 0.050 Puerta Madeclasic (0.80-0.85)x2.03mx35mm Und 1.500 $84,900.00 $7,800.00 $768.98 1.239 $5,200.00 $15,281.00 Bisagra Induma cobrizada D=4\" Und 0.050 $12,333.33 $15,281.00 $764.05 Cuadrilla carpinteria (madera y metálica) hC HOJA PUERTA HIGHTOP Herramienta Menor %(MO) 0.70-0.75X2.2M ENTAMBORADA Puerta paso Hightop 0.70-0.75x2.2-2.4mx40mm UND 1.000 $358,900.00 $384,402.64 HOJA PUERTA MADECLASIC UND 1.000 $123,102.64 Bisagra Induma cobrizada D=4\" Und 1.000 $5,200.00 $358,900.00 0.90X2.03mX.035mm ENTAMB Und 1.000 $89,500.00 $89,500.00 Cuadrilla carpinteria (madera y metálica) Und 1.500 $12,333.33 Puerta Portico 0.90x 2.03mx35mm hC 1.367 $7,800.00 $16,859.66 Apu de la Construcción / 2017110

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALBisagra gato omega 3\" par 1.500 $10,600.00 $15,900.00 Herramienta Menor %(MO) 0.050 $16,871.99 $843.60Cuadrilla carpinteria (madera y metálica) hC 1.367 $12,333.33 $16,859.66Herramienta Menor %(MO) 0.050 $16,859.66 MARCO ALTO PUERTA EN UND 1.000 $842.98 MADERA e=0.14 Und 1.000 Marco pino caribe largo 2.4 e=0.14 cm Und 6.000HOJA PUERTA PÓRTICO 0.66X2m ENTABL UND 1.000 $219,900.00 $248,413.30 Chazo madera Und 12.000 $59,900.00 $123,006.94Puerta Portico 0.66x 2mx35mm Und 1.000 $10,600.00 $219,900.00 Tornillo para mader 2x8 hC 3.417 $3,000.00 $59,900.00Bisagra gato omega 3\" par 1.500 $12,333.33 $15,900.00 Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $18,000.00Cuadrilla carpinteria (madera y metálica) hC 0.974 $12,012.66 $12,012.66 Herramienta Menor $70.00Herramienta Menor %(MO) 0.050 $12,333.33 $856.80 $600.63 $42,142.99 $42,142.99 $2,107.15HOJA PUERTA PÓRTICO 0.75X2m ENTABL UND 1.000 $219,900.00 $259,368.99 MARCO ALTO PUERTA EN MADERA e=0.12 UND 1.000 $51,900.00 $115,019.89Puerta Portico 0.75x 2mx35mm Und 1.000 $10,600.00 $219,900.00 Marco pino caribe largo 2.4 e=0.12 cm Und 1.000 $3,000.00 $51,900.00Bisagra gato omega 3\" par 1.500 $12,333.33 $15,900.00 Chazo madera Und 6.000 $18,000.00Cuadrilla carpinteria (madera y metálica) hC 1.820 $22,446.66 $22,446.66 Tornillo para mader 2x8 Und 12.000 $70.00Herramienta Menor %(MO) 0.050 Cuadrilla carpinteria (madera y metálica) hC 3.418 $12,333.33 $856.80 $1,122.33 Herramienta Menor %(MO) 0.050 $42,155.32 $42,155.32 $2,107.77HOJA PUERTA PÓRTICO 0.9X2m ENTABL UND 1.000 $251,624.89 1.000 $219,900.00Puerta Portico 0.90x 2mx35mm Und 1.500 $219,900.00 $15,900.00 MARCO ALTO PUERTA EN MADERA e=0.10 UND 1.000 $108,019.89 1.222 $10,600.00 $15,071.33 Marco pino caribe largo 2.4 e=0.10 cm Und 1.000 $44,900.00Bisagra gato omega 3\" par 0.050 $12,333.33 Chazo madera Und 6.000 $44,900.00 $18,000.00 $15,071.33 $753.57 Tornillo para mader 2x8 Und 12.000 $3,000.00Cuadrilla carpinteria (madera y metálica) hC Cuadrilla carpinteria (madera y metálica) hC 3.418 $856.80 Herramienta Menor %(MO) 0.050 $70.00 $42,155.32Herramienta Menor %(MO) $12,333.33 $2,107.77 $42,155.32HOJAPUERTAPINO 9 VIDRIOS 0.9X2m ENTABL UND 1.000 $261,079.69 1.000 $224,900.00Puerta Pino 9 Vidrios 0.91x 2.03mx35mm Und 1.500 $224,900.00 $15,900.00 1.566 $10,600.00 $19,313.99Bisagra gato omega 3\" par 0.050 $12,333.33 MARCO PUERTA EN MADERA e=0.14 UND 1.000 $118,019.89 $19,313.99 $965.70 Marco pino caribe e=0.12 cm Und 1.000 $54,900.00Cuadrilla carpinteria (madera y metálica) hC Chazo madera Und 6.000 $54,900.00 $18,000.00 Tornillo para mader 2x8 Und 12.000 $3,000.00Herramienta Menor %(MO) Cuadrilla carpinteria (madera y metálica) hC 3.418 $856.80 Herramienta Menor %(MO) 0.050 $70.00 $42,155.32HOJA PUERTA PINO 5PANELES UND 1.000 $109,607.55 $12,333.33 $2,107.770.61X2m ENTABL Und 1.000 $80,900.00 $42,155.32Puerta Prepintada 0.60x2.03mx35mm par 1.500 $15,900.00Bisagra gato omega 3\" hC 0.989 $80,900.00 $12,197.66 MARCO PUERTA EN MADERA e=0.12 UND 1.000 $46,900.00 $110,019.89Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $10,600.00 Marco pino caribe e=0.10 cm Und 1.000 $3,000.00 $46,900.00Herramienta Menor $12,333.33 $609.88 Chazo madera Und 6.000 $18,000.00 $12,197.66 Tornillo para mader 2x8 Und 12.000 $70.00 Cuadrilla carpinteria (madera y metálica) hC 3.418 $12,333.33 $856.80HOJA PUERTA PINO 5PANELES UND 1.000 $110,889.60 Herramienta Menor %(MO) 0.050 $42,155.32 $42,155.320.71X2m ENTABL Und 1.000 $80,900.00 $2,107.77Puerta Prepintada 0.70x2.03mx35mm par 1.500 $15,900.00Bisagra gato omega 3\" hC 1.088 $80,900.00 $13,418.66 MARCO PUERTA EN MADERA e=0.08 UND 1.000 $36,900.00 $100,019.89Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $10,600.00 Marco pino caribe e=0.08 cm Und 1.000 $3,000.00 $36,900.00Herramienta Menor $12,333.33 $670.93 Chazo madera Und 6.000 $18,000.00 $13,418.66 Tornillo para mader 2x8 Und 12.000 $70.00 Cuadrilla carpinteria (madera y metálica) hC 3.418 $12,333.33 $856.80HOJA PUERTA PINO 5PANELES UND 1.000 $112,624.89 Herramienta Menor %(MO) 0.050 $42,155.32 $42,155.320.81X2m ENTABL Und 1.000 $80,900.00 $2,107.77Puerta Prepintada 0.80x2.03mx35mm par 1.500 $15,900.00Bisagra gato omega 3\" hC 1.222 $80,900.00 $15,071.33 MARCO MET. DE PUERTA CALB. 23 e=0.15 UND 1.000 $42,000.00 $86,646.98Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $10,600.00 Marco Met. Cal 23 e=0.15 Und 1.000 $273,932.20 $42,000.00Herramienta Menor $12,333.33 $753.57 Mortero 1:4 M3 0.025 $12,333.33 $7,053.75 $15,071.33 Cuadrilla carpinteria (madera y metálica) hC 2.771 $34,175.66 $34,175.66 Herramienta Menor %(MO) 0.100 $3,417.57HOJA PUERTA PINO 5PANELES0.91X2m ENTABL UND 1.000 $80,900.00 $114,515.59 MARCO MET. DE PUERTA CALB. 23 e=0.12 UND 1.000 $80,539.76Puerta Prepintada 0.90x2.03mx35mm Und 1.000 $10,600.00 $80,900.00 $42,000.00Bisagra gato omega 3\" par 1.500 $12,333.33 $15,900.00 Marco Met. Cal 23 e=0.12 Und 1.000 $42,000.00 $7,335.90Cuadrilla carpinteria (madera y metálica) hC 1.368 $16,871.99 $273,932.20 Mortero 1:4 M3 0.026 Apu de la Construcción / 2017 111

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Cuadrilla de Albañilería 1*1 hC 2.771 $10,724.63 $29,717.96 Puerta lamina doblada Cal 23 2x1 e=0.10 Und 1.000 $210,500.00 $210,500.00 Herramienta Menor %(MO) 0.050 $29,717.96 $1,485.90 Mortero 1:4 M3 0.017 $273,932.20 $4,796.55 Cuadrilla carpinteria (madera y metálica) hC 2.771 $12,333.33 $34,175.66 MARCO MET. DE PUERTA CALB. 23 e=0.08 UND 1.000 $273,932.20 $79,834.54 Herramienta Menor %(MO) 0.050 $34,175.66 $1,708.78 Mortero 1:4 M3 0.014 $40,000.00 $3,950.10 Marco Met. Cal 23 e=0.08 Und 1.000 $12,333.33 $40,000.00 PORTON LAMINA DOBLADA M2 1.000 $175,300.00 Cuadrilla carpinteria (madera y metálica) hC 2.771 $34,175.66 $34,175.66 CAL 20 e=0.10 M2 1.000 $175,300.00 $175,300.00 Herramienta Menor %(MO) 0.050 $1,708.78 Porton lam.Doblada Cal. 20 carter 10 cm MARCO MET. DE PUERTA CALB. 20 e=0.15 UND 1.000 $65,000.00 $103,539.76 PORTON LAMINA DOBLADA M2 1.000 $379,000.00 $398,786.00 Marco Met. Cal 20 e=0.15 Und 1.000 $273,932.20 $65,000.00 CAL. 18 e=0.12 M2 1.000 $273,932.20 $379,000.00 Mortero 1:4 M3 0.026 $10,724.63 $7,335.90 Porton lamina doblada Cal. 18 e=0.15 M3 0.010 $12,333.33 Cuadrilla de Albañilería 1*1 hC 2.771 $29,717.96 $29,717.96 Mortero 1:4 hC 1.310 $16,156.66 $2,821.50 Herramienta Menor %(MO) 0.050 $1,485.90 Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $16,156.66 Herramienta Menor $807.83 REJA TUBO CUADRADO 1” MARCO MET. DE PUERTA CALB. 20 e=0.12 UND 1.000 $55,000.00 $96,809.59 VERTICAL C. 0.12 UND 1.000 $139,600.00 Marco Met. Cal 20 e=0.12 Und 1.000 $273,932.20 $55,000.00 Reja tubo cuadrado 1\" vertical c. 0.12 Und 1.000 $139,600.00 $139,600.00 Mortero 1:4 M3 0.021 $12,333.33 $5,925.15 Cuadrilla carpinteria (madera y metálica) hC 2.771 $34,175.66 $34,175.66 VENTANA EN VIDRIO FIJO e=0.08 Herramienta Menor %(MO) 0.050 $1,708.78 Ventana vidriio fijo e=0.08 Mortero 1:4 MARCO MET. DE PUERTA CALB. 20 e=0.08 UND 1.000 $51,700.00 $91,534.54 Cuadrilla carpinteria (madera y metálica) M2 1.000 $110,000.00 $130,945.20 Marco Met. Cal 20 e=0.08 Und 1.000 $273,932.20 $51,700.00 Herramienta Menor m2 1.000 $273,932.20 $110,000.00 Mortero 1:4 M3 0.014 $12,333.33 $3,950.10 M3 0.017 $12,333.33 Cuadrilla carpinteria (madera y metálica) hC 2.771 $34,175.66 $34,175.66 VENTANA METÁLICA HOJA hC 1.247 $15,379.66 $4,796.55 Herramienta Menor %(MO) 0.050 $1,708.78 DE CORRER e=0.10 %(MO) 0.050 $15,379.66 Ventana hoja de corredera e=0.10 Mortero 1:4 $768.98 Cuadrilla carpinteria (madera y metálica) PUERTA DUCTO DE BASURAS ML 1.000 $12,333.33 $23,957.49 Herramienta Menor M2 1.000 $175,000.00 $195,945.20 Cuadrilla carpinteria (madera y metálica) hC 1.850 $22,816.66 $22,816.66 m2 1.000 $273,932.20 $175,000.00 Herramienta Menor %(MO) 0.050 $1,140.83 VENTANA MET. BASCULANTE M3 0.017 $12,333.33 HORIZONTAL e=0.10 hC 1.247 $15,379.66 $4,796.55 PUERTA VAIVEN 0.80-0.85X2.0 Mortero 1:4 %(MO) 0.050 $15,379.66 ENTAMBORADA Ventana basculante horizontal e=0.10 Bisagra para puerta vaiven Cuadrilla carpinteria (madera y metálica) $768.98 Puerta Madeclasic (0.80-0.85)x2.03mx35mm Herramienta Menor Cuadrilla carpinteria (madera y metálica) UND 1.000 $39,463.00 $159,768.29 M2 1.000 $273,932.20 $158,445.20 Herramienta Menor Und 1.000 $84,900.00 $39,463.00 VENTANA MET.BASCULANTE M3 0.017 $137,500.00 $4,796.55 Und 1.000 $12,333.33 $84,900.00 VERTICAL e=0.08 m2 1.000 $12,333.33 hC 2.734 $33,719.32 $33,719.32 Mortero 1:4 hC 1.247 $15,379.66 $137,500.00 %(MO) 0.050 $1,685.97 Ventana basculante vertical e=0.08 %(MO) 0.050 $15,379.66 Cuadrilla carpinteria (madera y metálica) PUERTA LAMINA DOBLADA Herramienta Menor $768.98 CAL. 23.7X1.9 e=0.09 Puerta lamina doblada Cal 23 .7x1.9 e=.09 UND 1.000 $164,800.00 $204,916.69 VENTANA AL. NAT. PROYECTANTE M2 1.000 $273,932.20 $130,898.75 Mortero 1:4 Und 1.000 $273,932.20 $164,800.00 3831 V.4MM M3 0.014 $110,800.00 $3,950.10 Cuadrilla carpinteria (madera y metálica) M3 0.015 $12,333.33 Ventana proyectante natural brazos 8\" m2 1.000 $12,333.33 Herramienta Menor hC 2.771 $34,175.66 $4,232.25 hC 1.247 $15,379.66 $110,800.00 %(MO) 0.050 $34,175.66 VENTANA AL. NAT. PROYECTANTE %(MO) 0.050 $15,379.66 $1,708.78 FIJA V.4MM Ventana proyectante fija natural $768.98 PUERTA LAMINA DOBLADA CAL. 20 2X1 e=0.10 UND 1.000 $256,000.00 $294,705.94 M2 1.000 $250,000.00 Puerta lamina doblada Cal 20 2x1 e=0.10 Und 1.000 $273,932.20 $256,000.00 Und 1.000 $250,000.00 $250,000.00 Mortero 1:4 M3 0.010 $12,333.33 Cuadrilla carpinteria (madera y metálica) hC 2.771 $34,175.66 $2,821.50 Herramienta Menor %(MO) 0.050 $34,175.66 $1,708.78 PUERTA LAMINA DOBLADA UND 1.000 $251,180.99 M2 1.000 $165,000.00 CAL. 23 2X1 e=0.10 Und 1.000 $165,000.00 $165,000.00 Apu de la Construcción / 2017112

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALVENTANA AL. NAT. CORREDIZA M2 1.000 $170,000.00 CERRADURA ALUM/SAT/DOR. ALCOBA UND 1.000 $61,450.00 $75,772.705020 V.4MM Und 1.000 $170,000.00 $170,000.00 Cerradura Schlage Orbit Alcoba Und 1.000 $12,333.33 $61,450.00Ventana corredera aluminio natural 5020 Cuadrilla carpinteria (madera y metálica) hC 1.106 $13,640.66 $13,640.66 Herramienta Menor %(MO) 0.050 $682.03VENTANERÍA EN LAMINA CALIBRE M2 1.000 $149,100.00 $176,267.49 CERRADURA ALUM/SAT/DOR. BANO UND 1.000 $51,600.00 $65,922.7018 e=0.15 M2 1.000 $273,932.20 $149,100.00 Cerradura Schlage Orbit Bano Und 1.000 $12,333.33 $51,600.00Ventana en lamina cal.18 e=0.15 M3 0.010 $12,333.33 Cuadrilla carpinteria (madera y metálica) hC 1.106 $13,640.66 $13,640.66Mortero 1:4 hC 1.880 $23,186.66 $2,821.50 Herramienta Menor %(MO) 0.050Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $23,186.66 $682.03Herramienta Menor $1,159.33 ESPEJOS Y VIDRIOS CERRADURASCERRADURA ENTREADA PRINCIPAL UND 1.000 $182,800.00 $194,860.39 ESPEJO DE 4 MM M2 1.000 $48,300.00 $63,245.42Conjunto Cerradura Schlage Century Und 1.000 $10,724.63 $182,800.00 Espejo 4 mm Und 1.000 $12,869.56 $48,300.00Cuadrilla de Albañilería 1*1 hC 1.071 $11,486.08 Cuadrilla acabados hC 1.106 $14,233.73 $14,233.73Herramienta Menor %(MO) 0.050 $11,486.08 Herramienta Menor %(MO) 0.050 $30,500.00 $574.30 $711.69CERRADURA MADERA ENTRADA UND 1.000 $12,333.33 VIDRIO DE 6 MM M2 1.000 $40,800.00Cerradura Safe Madera Dorado Entrada Und 1.000 $13,640.66 $44,822.70 Vidrio 6 mm Und 1.000 $12,869.56 $43,801.18Cuadrilla carpinteria (madera y metálica) hC 1.106 $30,500.00 Cuadrilla acabados hC 0.220 $2,831.30 $40,800.00Herramienta Menor %(MO) 0.050 $21,900.00 $13,640.66 Herramienta Menor %(MO) 0.060 $2,831.30 $12,333.33CERRADURA MADERA ALCOBA UND 1.000 $13,640.66 $682.03 VIDRIO DE 5 MM M2 1.000 $35,200.00 $169.88Cerradura Safe Madera Dorado Alcoba Und 1.000 Vidrio 5 mm Und 1.000 $12,869.56Cuadrilla carpinteria (madera y metálica) hC 1.106 $21,500.00 $36,222.70 Cuadrilla acabados hC 0.212 $2,728.35 $38,092.05Herramienta Menor %(MO) 0.050 $12,333.33 $21,900.00 Herramienta Menor %(MO) 0.060 $35,200.00 $13,640.66 $13,640.66 $2,728.35CERRADURA MADERA BAÑO UND 1.000 VIDRIO DE 4 MM M2 1.000 $28,000.00Cerradura Safe Madera Dorado Baño Und 1.000 $682.03 Vidrio 4 mm Und 1.000 $12,869.56 $163.70Cuadrilla carpinteria (madera y metálica) hC 1.106 Cuadrilla acabados hC 0.220 $2,831.30Herramienta Menor %(MO) 0.050 $35,822.70 Herramienta Menor %(MO) 0.060 $31,001.18 $21,500.00 $28,000.00 $13,640.66 $2,831.30 $682.03 $169.88 INSTALACIONES ALCANTARILLADO Y AGUACERRADURA ALUM/SAT/DOR. UND 1.000 $73,400.00 $87,722.70 TUBERÍA DE CONCRETO D=40\" ML 1.000 $232,297.00 $546,451.83OFICINA INTERIOR Und 1.000 $12,333.33 $73,400.00 Concreto normal de 14 Mpa M3 0.420 $352,232.20 $100,491.68Cerradura Schlage Orbit Entrada hC 1.106 $13,640.66 $13,640.66 Mortero 1:4 Impermeabilizado M3 0.063 $303,993.00 $22,856.35Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 Tubo de concreto D 40\"-100cm ML 1.000 $310,072.86Herramienta Menor $73,400.00 $682.03 Cuadrilla instaladores (eléctricos y sanitarios) hC 9.125 $11,797.10 $107,648.52 $12,333.33 Herramienta Menor %(MO) 0.050 $107,648.52CERRADURA ALUM/SAT/DOR. UND 1.000 $13,640.66 $87,722.70 TUBERÍA DE CONCRETO D=36\" ML 1.000 $5,382.43ENTRADA OFICINA Und 1.000 $73,400.00 Tubo de concreto D 36\"-100cm ML 1.000 $250,400.00 $440,878.49Cerradura Schlage Orbit Entrada hC 1.106 $45,900.00 $13,640.66 Mortero 1:4 Impermeabilizado M3 0.018 $352,232.20 $255,408.00Cuadrilla carpinteria (madera y metálica) %(MO) 0.050 $12,333.33 Concreto normal de 14 Mpa M3 0.373 $232,297.00Herramienta Menor $13,640.66 $682.03 Cuadrilla instaladores (eléctricos y sanitarios) hC 7.241 $6,530.38CERRADURA ALUM/SAT/DOR. UND 1.000 Herramienta Menor %(MO) 0.050 $11,797.10 $89,246.18ENTRADA APARTAMENTO Und 1.000 $61,500.00 $59,881.68 $85,422.78 $85,422.78Cerradura Geo aluminio hC 1.106 $12,333.33 $45,900.00 $4,271.14Cuadrilla carpinteria (madera y metálica) %(MO) 0.025 $13,640.66 $13,640.66Herramienta Menor TUBERÍA DE CONCRETO D=32\" ML 1.000 $200,804.00 $355,253.02 $341.02 Tubo de concreto D 32\" ML 1.000 $352,232.20 $204,820.08CERRADURA ALUM/SAT/DOR. CLOSET UND 1.000 Mortero 1:4 Impermebilizado M3 0.014 $232,297.00Cerradura Schlage aluminio A71WS Und 1.000 $75,822.70 Concreto normal de 14 Mpa M3 0.321 $5,079.19Cuadrilla carpinteria (madera y metálica) hC 1.106 $61,500.00 Cuadrilla instaladores (eléctricos y sanitarios) hC 5.534 $11,797.10 $76,804.36Herramienta Menor %(MO) 0.050 $13,640.66 Herramienta Menor %(MO) 0.050 $65,285.14 $65,285.14 $3,264.26 $682.03 Apu de la Construcción / 2017 113

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL TUBERÍA DE CONCRETO D=30\" ML 1.000 $210,629.00 $376,093.30 TUBERÍA PVC NOVALCOC D=42\" ML 1.000 $1,050,512.90 Tubo de concreto D 32\"-80cm ML 1.000 $352,232.20 $214,841.58 Tubo pvc alcant. Novalcoc D=42\" ML 1.000 $908,547.00 $926,717.94 Mortero 1:4 Impermebilizado M3 0.013 $292,745.40 Union pvc Novalcoc D=42\" ML 0.200 $155,894.00 $31,802.38 Concreto normal de 21 Mpa M3 0.300 $4,670.60 Cuadrilla instaladores (eléctricos y sanitarios) hC 7.089 Cuadrilla instaladores (eléctricos y sanitarios) hC 5.409 $11,797.10 $89,580.09 Herramienta Menor %(MO) 0.100 $11,797.10 $83,629.63 Herramienta Menor %(MO) 0.050 $63,810.50 $63,810.50 $83,629.63 $8,362.96 $3,190.53 TUBERÍA DE CONCRETO D=28\" ML 1.000 $172,033.00 $304,455.04 TUBERÍA PVC NOVALCOC D=39\" ML 1.000 $851,043.00 $972,580.10 Tubo de concreto D 28\" ML 1.000 $352,232.20 $175,473.66 Tubo pvc alacant.Novalcoc D=39\" ML 1.000 $141,923.00 $868,063.86 Mortero 1:4 Impermebilizado M3 0.012 $232,297.00 Union pvc Novalcoc D=39\" ML 0.200 $28,952.29 Concreto normal de 14 Mpa M3 0.272 $10,724.63 $4,353.59 Cuadrilla instaladores (eléctricos y sanitarios) hC 5.823 $11,797.10 $68,694.50 Cuadrilla de Albañilería 1*1 hC 5.288 $65,080.33 Herramienta Menor %(MO) 0.100 $68,694.50 Herramienta Menor %(MO) 0.050 $56,711.87 $56,711.87 $6,869.45 $2,835.59 TUBERÍA PVC NOVALCOC D=36\" ML 1.000 $695,047.64 TUBERÍA DE CONCRETO D=24\" ML 1.000 $147,141.36 $253,018.46 Tubo pvc alcant Novalcoc D=36\" ML 1.000 $598,631.00 $610,603.62 Tubo de concreto D 24\" ML 1.000 $352,232.20 $150,084.19 Union pvc Novalcoc D=36\" ML 0.200 $126,734.00 $25,853.74 Mortero 1:4 Impermebilizado M3 0.011 $292,745.40 Cuadrilla instaladores (eléctricos y sanitarios) hC 4.515 $53,263.90 Concreto normal de 21 Mpa M3 0.227 $3,990.79 Herramienta Menor %(MO) 0.100 $11,797.10 Cuadrilla instaladores (eléctricos y sanitarios) hC 2.462 $11,797.10 $68,446.80 $53,263.90 $5,326.39 Herramienta Menor %(MO) 0.050 $29,044.45 $29,044.45 $1,452.22 TUBERÍA PVC NOVALCOC D=33\" ML 1.000 $417,303.00 $500,293.61 Tubo pvc alcant. Novalcoc D=33\" ML 1.000 $119,727.00 $425,649.06 TUBERÍA DE CONCRETO D=20\" ML 1.000 $99,043.00 $175,709.36 Union pvc Novalcoc D=33\" ML 0.200 $11,797.10 $24,424.31 Tubo de concreto D 20\"-50cm ML 1.000 $352,232.20 $101,023.86 Cuadrilla instaladores (eléctricos y sanitarios) hC 3.870 $45,654.77 $45,654.77 Mortero 1:4 Impermebilizado M3 0.009 $232,297.00 Herramienta Menor %(MO) 0.100 Concreto normal de 14 Mpa M3 0.186 $3,265.19 $4,565.48 Cuadrilla instaladores (eléctricos y sanitarios) hC 2.173 $11,797.10 $44,503.46 Herramienta Menor %(MO) 0.050 $25,635.09 $25,635.09 TUBERÍA PVC NOVALCOC D=30\" ML 1.000 $372,274.00 $444,307.27 $1,281.75 Tubo pvc alcant. Novalcoc D=30\" ML 1.000 $111,586.00 $379,719.48 Union pvc Novalcoc D=30\" ML 0.200 $11,797.10 $22,763.54 TUBERÍA DE CONCRETO D=18\" ML 1.000 $162,547.22 Cuadrilla instaladores (eléctricos y sanitarios) hC 3.223 $38,022.05 $38,022.05 Tubo de concreto D 18\"-45cm ML 1.000 $95,704.56 Herramienta Menor %(MO) 0.100 Mortero 1:4 Impermebilizado M3 0.008 $2,902.39 $3,802.20 Concreto normal de 14 Mpa M3 0.166 $39,718.14 Cuadrilla de Albañilería 1*1 hC 2.151 $93,828.00 $23,068.69 TUBERÍA PVC NOVALCOC D=27\" ML 1.000 $318,289.00 $377,583.22 Herramienta Menor %(MO) 0.050 $352,232.20 $1,153.43 Tubo pvc alcant. Novalcoc D=27\" ML 1.000 $104,622.00 $324,654.78 $232,297.00 Union pvc Novalcoc D=27\" ML 0.200 $21,342.89 $10,724.63 Cuadrilla instaladores (eléctricos y sanitarios) hC 2.434 $11,797.10 $28,714.14 $23,068.69 Herramienta Menor %(MO) 0.100 $28,714.14 $2,871.41 TUBERÍA DE CONCRETO D=14\" ML 1.000 $83,978.00 $109,785.37 TUBERÍA PVC NOVALCOC D=24\" ML 1.000 $250,519.00 $298,525.25 Tubo de concreto D 14\"-35cm ML 1.000 $352,232.20 $85,657.56 Tubo pvc alcant. Novalcoc D=24\" ML 1.000 $96,566.00 $255,529.38 Mortero 1:4 Impermebilizado M3 0.006 $232,297.00 $2,176.79 Union pvc Novalcoc D=24\" ML 0.200 $11,797.10 $19,313.20 Concreto normal de 14 Mpa M3 0.013 Cuadrilla instaladores (eléctricos y sanitarios) hC 1.825 $21,529.70 $21,529.70 Cuadrilla instaladores (eléctricos y sanitarios) hC 1.521 $11,797.10 $3,110.46 Herramienta Menor %(MO) 0.100 Herramienta Menor %(MO) 0.050 $17,943.39 $17,943.39 $2,152.97 TUBERÍA DE GRESS D=12\" ML 1.000 Tubo Gress D 12\" L=1M ML 1.000 $48,213.00 $897.17 TUBERÍA PVC NOVAFORT D=500mm ML 1.000 $283,868.00 $305,980.15 Mortero 1:4 Impermebilizado M3 0.004 $352,232.20 $94,475.19 Silla yee pvcalcant.D=500x160 mm Und 0.200 $169,670.00 $56,773.60 Concreto normal de 14 Mpa M3 0.112 $232,297.00 $49,177.26 Tubo pvc alcant. Novalfort D=500 mm ML 1.000 $284,599.00 $173,063.40 Cuadrilla de Albañilería 1*1 hC 1.514 $10,724.63 $1,451.20 Union pvc alcant. Novalfort D=500 mm Und 0.200 $58,058.20 Herramienta Menor %(MO) 0.050 $16,237.10 $26,797.78 Cuadrilla instaladores (eléctricos y sanitarios) hC 1.460 $11,797.10 $17,223.76 $16,237.10 Herramienta Menor %(MO) 0.050 $17,223.76 $861.19 $811.85 TUBERÍA DE GRESS D=10\" ML 1.000 $37,134.00 $75,163.83 TUBERÍA PVC NOVAFORT D=450mm ML 1.000 $243,393.63 Tubo Gress D 10\" L=1M ML 1.000 $352,232.20 $37,876.68 $37,216.20 Mortero 1:4 Impermebilizado M3 0.003 $232,297.00 $1,088.40 Silla yee pvcalcant.D=450x160 mm Und 0.200 $186,081.00 $139,425.84 Concreto normal de 14 Mpa M3 0.096 $22,746.52 $136,692.00 $51,676.67 Cuadrilla instaladores (eléctricos y sanitarios) hC 1.086 $11,797.10 $12,811.65 Tubo pvc alcant. Novalfort D=450 mm ML 1.000 $253,317.00 $14,357.07 Herramienta Menor %(MO) 0.050 $12,811.65 $640.58 Union pvc alcant. Novalfort D=450 mm Und 0.200 $11,797.10 Cuadrilla instaladores (eléctricos y sanitarios) hC 1.217 Apu de la Construcción / 2017114

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALHerramienta Menor %(MO) 0.050 $14,357.07 $717.85 TUBERÍA PVC UM RIDE 26 D=8\" ML 1.000 $102,329.21 Tubo pvc UP RDE 26 D=8\" ML 1.000 $77,275.20TUBERÍA PVC NOVAFORT D=400mm ML 1.000 $173,967.00 $201,234.99 Codo GR 90 pvc UP RDE 21 D=8\" Und 0.015 $75,760.00 $7,875.84Silla yee pvcalcant.D=400x160 mm Und 0.200 $103,929.00 $34,793.40 Concreto normal de 14 Mpa M3 0.020 $525,056.00 $4,785.32Tubo pvc alcant. Novalfort D=400 mm ML 1.000 $240,824.00 $106,007.58 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.955 $232,297.00 $11,266.23Union pvc alcant. Novalfort D=400 mm Und 0.200 $10,724.63 $49,128.10 Herramienta Menor %(MO) 0.100 $1,126.62Cuadrilla de Albañilería 1*1 hC 1.004 $10,767.53 $10,767.53 $11,797.10Herramienta Menor %(MO) 0.050 $11,266.23 $538.38 TUBERÍA PVC UM RIDE 26 D=6\" ML 1.000 $63,015.47TUBERÍA PVC NOVAFORT D=315mm ML 1.000 $105,385.00 $130,783.07 Tubo pvc UP RDE 26 D=6\" ML 1.000 $44,533.00 $45,423.66Silla yee pvcalcant.D=315x160 mm Und 0.200 $67,099.00 $21,077.00 Tee pvc UP D=4\"x4\"x4\" Und 0.060 $98,090.00 $5,885.40Tubo pvc alcant. Novalfort D=315 mm ML 1.000 $157,954.00 $68,440.98 Codo GR 90 pvc UP RDE 21 D=6\" Und 0.007 $220,796.00 $1,545.57Union pvc alcant. Novalfort D=315 mm Und 0.200 $11,797.10 $32,222.62 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.783 $11,797.10 $9,237.13Cuadrilla instaladores (eléctricos y sanitarios) hC 0.730 Herramienta Menor %(MO) 0.100 $9,237.13Herramienta Menor %(MO) 0.050 $8,611.88 $8,611.88 $923.71 $430.59 TUBERÍA PVC UM RIDE 26 D=5\" ML 1.000 $73,291.54TUBERÍA PVC NOVAFORT D=250mm ML 1.000 $67,978.00 $86,199.63 Codo GR 90 pvc UP RDE 21 D=6\" Und 0.007 $220,796.00 $1,545.57Silla yee pvcalcant.D=250x160 mm Und 0.200 $45,382.00 $13,595.60 Tubo pvc UP RDE 26 D=5\" ML 1.000 $54,373.00 $55,460.46Tubo pvc alcant. Novalfort D=250 mm ML 1.000 $92,317.00 $46,289.64 Tee pvc UP D=4\"x4\"x4\" Und 0.060 $98,090.00 $5,885.40Union pvc alcant. Novalfort D=250 mm Und 0.200 $11,797.10 $18,832.67 Concreto normal de 14 Mpa M3 0.001 $232,297.00Cuadrilla instaladores (eléctricos y sanitarios) hC 0.604 $7,125.45 $7,125.45 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.783 $11,797.10 $239.27Herramienta Menor %(MO) 0.050 Herramienta Menor %(MO) 0.100 $9,237.13 $9,237.13 $356.27 $923.71TUBERÍA PVC NOVAFORT D=200mm ML 1.000 $58,618.00 $57,677.68 TUBERÍA PVC UM RIDE 26 D=4\" ML 1.000 $82,690.00 $38,289.72Silla yee pvcalcant.D=200x160 mm Und 0.200 $31,218.00 $11,723.60 Codo GR 90 pvc UP RDE 21 D=4\" Und 0.007 $20,789.00 $578.83Tubo pvc alcant. Novalfort D=200 mm ML 1.000 $32,500.00 $31,842.36 Tubo pvc UP RDE 26 D=4\" ML 1.000 $98,090.00Union pvc alcant. Novalfort D=200 mm Und 0.200 $11,797.10 $6,630.00 Tee pvc UP D=4\"x4\"x4\" Und 0.060 $232,297.00 $21,204.78Cuadrilla instaladores (eléctricos y sanitarios) hC 0.604 $7,125.45 $7,125.45 Concreto normal de 14 Mpa M3 0.001 $11,797.10 $5,885.40Herramienta Menor %(MO) 0.050 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.800 $9,437.68 $356.27 Herramienta Menor %(MO) 0.100 $239.27 $9,437.68 $943.77TUBERÍA PVC NOVAFORT D=160mm ML 1.000 $20,560.00 $31,802.62 TUBERÍA PVC UM RIDE 26 D=3\" ML 1.000 $43,067.00 $26,990.50Tubo pvc alcant. Novalfort D=160 mm ML 1.000 $21,355.00 $20,971.20 Codo GR 90 pvc UP RDE 21 D=3\" Und 0.007 $12,587.00 $301.47Union pvc alcant. Novalfort D=160 mm Und 0.200 $10,724.63 $4,356.42 Tubo pvc UP RDE 26 D=3\" ML 1.000 $57,503.00Cuadrilla de Albañilería 1*1 hC 0.575 $6,166.66 $6,166.66 Tee pvc UP D=3\"x3\"x3\" Und 0.060 $232,297.00 $12,838.74Herramienta Menor %(MO) 0.050 Concreto normal de 14 Mpa M3 0.001 $11,797.10 $3,450.18 $308.33 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.783 $9,237.13 Herramienta Menor %(MO) 0.100 $239.27TUBERÍA PVC NOVAFORT D=110mm ML 1.000 $19,272.59 $8,448.00 $9,237.13Tubo pvc alcant. Novalfort D=110 mm ML 1.000 $11,759.00 $11,994.18 TUBERÍA PVC UM RIDE 26 D=2 1/2\" ML 1.000 $23,772.00Union pvc alcant. Novalfort D=110 mm Und 0.200 $7,990.00 $1,629.96 Codo GR 90 pvc UP RDE 21 D=2 1/2\" Und 1.050 $36,574.00 $923.71Cuadrilla instaladores (eléctricos y sanitarios) hC 0.456 $11,797.10 $5,379.48 Tubo pvc UP RDE 26 D=2 1/2\" ML 0.007 $232,297.00Herramienta Menor %(MO) 0.050 $5,379.48 Tee pvc UP D=2 1/2\"x2\"x2 1/2\" Und 0.060 $11,797.10 $21,632.36 $268.97 Concreto normal de 14 Mpa M3 0.001 $9,237.13 $8,870.40 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.783TUBERÍA PVC UM RIDE 32.5 D=6\" ML 1.000 $220,796.00 $54,147.63 Herramienta Menor %(MO) 0.100 $18,497.00 $169.73Codo GR 90 pvc UP RDE 21 D=6\" Und 0.007 $36,333.00 $1,545.57 $5,723.00 $2,194.44Tubo pvc UP RDE 32.5 D=6 ML 1.000 $98,090.00 $37,059.66 TUBERÍA PVC UM RIDE 26 D=2 \" ML 1.000 $25,609.00Tee pvc UP D=4\"x4\"x4\" Und 0.060 $10,724.63 $5,885.40 Codo GR 90 pvc UP RDE 21 D=2 \" Und 0.007 $232,297.00 $236.94Cuadrilla de Albañilería 1*1 hC 0.783 $8,397.39 $8,397.39 Tubo pvc UP RDE 26 D=2 \" ML 1.000 $11,797.10 $9,237.13Herramienta Menor %(MO) 0.150 $1,259.61 Tee pvc UP D=2\"x2\"x2 \" Und 0.060 $9,237.13 Concreto normal de 14 Mpa M3 0.001 $923.71TUBERÍA PVC UM RIDE 26 D=10\" ML 1.000 $117,923.00 $137,491.39 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.783Tubo pvc UP RDE 26 D=10\" ML 1.000 $232,297.00 $120,281.46 Herramienta Menor %(MO) 0.100 $17,903.59Concreto normal de 14 Mpa M3 0.004 $129.48Cuadrilla instaladores (eléctricos y sanitarios) hC 1.198 $11,797.10 $957.06Herramienta Menor %(MO) 0.150 $14,132.92 $14,132.92 $5,837.46 $1,536.54 $2,119.94 $239.27 $9,237.13 $923.71 Apu de la Construcción / 2017 115

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL TUBERÍA PVC UM RIDE 21 D=10\" ML 1.000 $232,297.00 $164,386.96 Concreto normal de 14 Mpa M3 0.001 $232,297.00 $239.27 Concreto normal de 14 Mpa M3 0.004 $144,984.00 $957.06 Tubo pvc UP RDE 21 D=2\" ML 1.000 $6,896.00 $7,033.92 Tubo pvc UP RDE 21 D=10\" ML 1.000 Codo GR 90 pvc UP RDE 21 D=2 1/2 \" Und 0.007 $18,497.00 Cuadrilla instaladores (eléctricos y sanitarios) hC 1.198 $11,797.10 $147,883.68 Tee pvc UP D=2\"x2\"x2\" Und 0.060 $25,609.00 $129.48 Herramienta Menor %(MO) 0.100 $14,132.92 $14,132.92 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.714 $11,797.10 $1,536.54 $1,413.29 Herramienta Menor %(MO) 0.100 $8,423.13 $8,423.13 $842.31 TUBERÍA PVC UM RIDE 21 D=8\" ML 1.000 $232,297.00 $119,334.00 REGISTRO DE ALCANTARILLADO Concreto normal de 14 Mpa M3 0.020 $525,056.00 $4,785.32 Codo GR 90 pvc UP RDE 21 D=8 \" Und 0.015 $92,100.00 $7,875.84 ALCANTARILLA CON CABEZOTE Tubo pvc UP RDE 21 D=8\" ML 1.000 $93,942.00 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.955 $11,797.10 $11,266.23 RECT.L=6 D=30 UND 1.000 $2,962,075.44 Herramienta Menor %(MO) 0.130 $11,266.23 $1,464.61 $926,743.44 $926,743.44 Cabezotes Rectos para Alcantarillas D=30\" Und 1.000 $303,600.00 $1,858,032.00 $177,300.00 $177,300.00 Tubería de Concreto D=30\" ML 6.000 TUBERÍA PVC UM RIDE 21 D=6\" ML 1.000 $72,370.18 Pocetas de Entrada a Alcantarillas D=30\" Und 1.000 Concreto normal de 14 Mpa M3 0.001 $239.27 Tubo pvc UP RDE 21 D=6\" ML 1.000 $232,297.00 ALCANTARILLA CON CABEZOTE Tee pvc UP D=4\"x4\"x4\" Und 0.060 $54,373.00 $55,460.46 Codo GR 90 pvc UP RDE 21 D=6 \" Und 0.007 $98,090.00 $5,885.40 RECT.L=6 D=24 UND 1.000 $2,255,089.01 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.712 $220,796.00 $1,545.57 Herramienta Menor %(MO) 0.100 $11,797.10 $8,399.53 Cabezotes Rectos para Alcantarillas D=24\" Und 1.000 $1,860,529.01 $1,860,529.01 $8,399.53 $839.95 Tubería de Concreto D=24\" ML 6.000 $35,500.00 $217,260.00 Pocetas de Entrada a Alcantarillas D=26\" Und 1.000 $177,300.00 $177,300.00 TUBERÍA PVC UM RIDE 21 D=5\" ML 1.000 $232,297.00 $50,641.30 ACERO DE TRANSFERENCIA D=1/2\" KG 1.000 $2,444.00 $3,345.80 Concreto normal de 14 Mpa M3 0.001 $158,456.00 $239.27 Varilla corrugada 1/2\" Kg 1.050 $10,724.63 $2,617.52 Codo GR 90 pvc UP RDE 21 D=5 \" Und 0.007 $98,090.00 Cuadrilla de Albañilería 1*1 hC 0.060 $10,600.00 Tee pvc UP D=4\"x4\"x4\" Und 0.060 $33,498.00 $1,109.19 Cizalla Manual dU 0.004 $10,600.00 $643.48 Tubo pvc UP RDE 21 D=5\" ML 1.000 $5,885.40 Dobladora manual dU 0.004 $42.40 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.712 $11,797.10 $34,167.96 $3,305.00 $42.40 Herramienta Menor %(MO) 0.100 $8,399.53 $8,399.53 AFIRMADO EN MATERIALES DE LA ZONA M3 1.000 $10,724.63 Material de afirmado (CBR.=10%) M3 1.000 $280,000.00 $11,274.70 TUBERÍA PVC UM RIDE 21 D=4\" ML 1.000 $24,901.00 $839.95 Cuadrilla de Albañilería 1*1 hC 0.067 $92,800.00 $3,404.15 Tubo pvc UP RDE 21 D=4\" ML 1.000 $82,690.00 Carrotanque de Agua dM 0.004 $116,000.00 Codo GR 90 pvc UP RDE 21 D=4 \" Und 0.007 $232,297.00 $41,342.00 Compactador de llantas hM 0.025 $718.55 Concreto normal de 14 Mpa M3 0.001 $98,090.00 $25,399.02 Motoniveladora hM 0.032 $261,693.80 $1,120.00 Tee pvc UP D=4\"x4\"x4\" Und 0.060 $11,797.10 $3,515.00 $2,320.00 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.712 $8,399.53 $578.83 ALFAGIAS b=0.60 ML 1.000 $3,386.00 $3,712.00 Herramienta Menor %(MO) 0.100 $239.27 Concreto normal de 17,5 Mpa M3 0.035 $10,724.63 $232,297.00 $5,885.40 Varilla grafil 6mm Und 1.800 $390.00 $35,035.36 TUBERÍA PVC UM RIDE 21 D=3\" ML 1.000 $15,092.00 $8,399.53 Alambre negro # 18 Kg 0.180 $17,266.66 $9,434.06 Concreto normal de 14 Mpa M3 0.001 $43,067.00 $839.95 Cuadrilla de Albañilería 1*1 hC 1.610 $6,453.54 Tubo pvc UP RDE 21 D=3\" ML 1.000 $57,503.00 Formaleta metálica p/alfagias b=60 dU 1.000 $261,693.80 Codo GR 90 pvc UP RDE 21 D=3 \" Und 0.007 $11,797.10 $28,624.24 Herramienta Menor %(MO) 0.050 $3,515.00 $627.76 Tee pvc UP D=3\"x3\"x3\" Und 0.060 $8,399.53 $239.27 $3,386.00 $17,266.66 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.712 ALFAGIAS b=0.30 ML 1.000 $10,724.63 Herramienta Menor %(MO) 0.100 $23,772.00 $15,393.84 Concreto normal de 17,5 Mpa M3 0.018 $360.00 $390.00 $232,297.00 $301.47 Varilla grafil 6mm Und 1.300 $12,333.33 $863.33 TUBERÍA PVC UM RIDE 21 D=2 1/2\" ML 1.000 Alambre negro # 18 Kg 0.150 Codo GR 90 pvc UP RDE 21 D=2 1/2 \" Und 0.007 $10,116.00 $3,450.18 Cuadrilla de Albañilería 1*1 hC 1.150 $261,693.80 $23,345.83 Concreto normal de 14 Mpa M3 0.001 $36,574.00 $8,399.53 Formaleta metálica p/alfagias b=30 dML 1.000 $3,515.00 $4,851.80 Tubo pvc UP RDE 21 D=2 1/2\" ML 1.000 $11,797.10 Herramienta Menor %(MO) 0.050 $3,386.00 $4,660.89 Tee pvc UP D=2 1/2\"x2\"x2 1/2\" Und 0.060 $8,423.13 $839.95 Cuadrilla instaladores (eléctricos y sanitarios) hC 0.714 ALFAGIAS b=0.20 ML 1.000 $523.14 Herramienta Menor %(MO) 0.100 $22,183.87 Concreto normal de 17,5 Mpa M3 0.013 $12,333.33 $166.40 Varilla grafil 6mm Und 1.000 TUBERÍA PVC UM RIDE 21 D=2\" ML 1.000 $239.27 Alambre negro # 18 Kg 0.150 $360.00 $616.67 $10,318.32 $2,194.44 $19,398.60 $8,423.13 $3,504.08 $3,585.30 $842.31 $523.14 $18,204.65 Apu de la Construcción / 2017116

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALCuadrilla de Albañilería 1*1 hC 1.020 $10,724.63 $10,939.13 Compactador de llantas hM 0.034 $92,800.00 $3,155.20Formaleta metálica p/alfagias b=20 dML 1.000 $300.00 $300.00 Motoniveladora hM 0.044 $116,000.00 $5,104.00Herramienta Menor %(MO) 0.050 $546.96 Volqueta 5M3 Viaje 0.150 $77,300.00 $11,595.00 $10,939.13ANDÉN EN COMPOSICIÓN(BORDE LADRILLO) M2 1.000 $350.00 $51,025.03 BARANDA METÁLICA ML 1.000 $45,000.00 $619,328.71Ladrillo Colonial 7x12x25 Und 14.000 $331,433.40 $4,998.00 Perfil H 4.76ml 20x15 ML 1.450 $20,000.00 $65,250.00Mortero 1:3 M3 0.005 $261,693.80 $1,706.88 Tubo circular 4\" e=2.2mm ML 3.000 $6,400.00 $60,000.00Concreto normal de 17,5 Mpa M3 0.098 $10,724.63 $26,415.37 Soldadura 1/8\" Kg 0.600 $77,678.00 $3,955.20Cuadrilla de Albañilería 1*1 hC 1.590 $17,052.17 $17,052.17 Pintura Acrilica Pura para Trafico Gal 0.300 $15,800.00 $24,002.50Herramienta Menor %(MO) 0.050 Disolvente (Thiner) Gal 0.100 $10,724.63 $1,627.40 $350.00 $852.61 Cuadrilla de Albañilería 1*1 hC 5.350 $12,869.56 $57,376.79ANDÉN EN COMPOSICIÓN M2 1.000 $331,433.40 Cuadrilla acabados hC 27.400 $36,500.00 $352,625.97(BORDE LADRILLO) Und 11.000 $261,693.80 $45,159.80 Anticorrosivo gris económico Gal 0.320 $80,300.00 $12,030.40Ladrillo Colonial 7x12x25 M3 0.004 $10,724.63 $3,927.00 Soldador Eléctrico dM 0.125 $9,800.00 $10,037.50Mortero 1:3 M3 0.089 $15,121.73 $1,365.51 Equipo de oxicorte (acetileno) hM 1.000 $17,400.00 $9,800.00Concreto normal de 17,5 Mpa hC 1.410 $23,989.47 Pulidora 8500 Rev dU 0.042 $23,200.00Cuadrilla de Albañilería 1*1 %(MO) 0.050 $350.00 $15,121.73 Compresor de Pintura dM 0.060 $410,002.77 $730.80Herramienta Menor $331,433.40 Herramienta Menor %(MO) 0.050 $1,392.00 $261,693.80 $756.09 $20,500.14ANDÉN EN COMPOSICIÓN $10,724.63(BORDE LADRILLO) M2 1.000 $13,727.53 $42,560.02 CAMARA DE CAIDA h=4.90-2.00 Mts UND 1.000 $3,327,374.67Ladrillo Colonial 7x12x25 Und 13.000 $4,641.00 Ladrillo de obra Und 1835.000 $422.00 $789,857.40Mortero 1:3 M3 0.005 $5,510.00 $1,706.88 Mortero 1:3 M3 2.050 $331,433.40 $699,821.62Concreto normal de 17,5 Mpa M3 0.077 $20,000.00 $20,754.94 Mortero 1:2 M3 0.100 $441,232.60 $45,446.96Cuadrilla de Albañilería 1*1 hC 1.280 $10,724.63 $13,727.53 Varilla corrugada 1/2\" Kg 51.500 $2,444.00 $128,383.32Herramienta Menor %(MO) 0.126 $37,125.00 $1,729.67 Concreto normal de 21 Mpa M3 0.110 $292,745.40 $33,168.05 $15,872.46 Concreto normal de 17,5 Mpa M3 2.500 $261,693.80 $673,861.54ARBORIZACIÓN $15,344.05 Cuadrilla de Albañilería 1*1 hC 84.970 $10,724.63 $911,272.17Arbol 1.2 Mts. $10,724.63 $5,675.30 Herramienta Menor %(MO) 0.050 $911,272.17 $45,563.61Tierra Abonada $1,694.49Cuadrilla de Albañilería 1*1 UND 1.000 $824.00 CAPA DE RODADURA ASFÁLTICA e=0.075 M2 1.000 $40,785.55Camióneta D300 Und 1.000 $15,080.00 $7,292.75 0.100 $36,441.40Herramienta Menor m3 0.040 $10,724.63 Mezcla densa en caliente mdc-3 m3 0.014 $353,800.00 hC 0.680 $56,680.00 $742.50 0.020 $10,724.63 $150.14ASEO GENERAL VIVIENDAS hM 0.020 $26,811.59 $809.50 Cuadrilla de Albañilería 1*1 hC 0.020 $105,000.00 $2,100.00Cuadrilla de Albañilería 1*1 %(MO) 0.051 0.040 $104,400.00 $2,088.00Herramienta Menor $1,914.78 Finisher SB-111 hMBACHEO CARRETERAS $1,694.49 $150.14 $6.01EN AFIRMADO-CON RECEBO Vibrocompactador hMRacebo para relleno hasta6\" $220.28Cuadrilla de Albañilería 1*1 Herramienta Menor %(MO)Vibrocompactador (Rana) 8 h.p. $53,159.24Herramienta Menor M2 1.000 $19,415.50 CAPA DE RODADURA e=0.05 M2 1.000 $29,315.46 hC 0.158 $26,811.59 SOBRE CONCRETO m3 0.065 $23,686.91BASE PARA CUNETAS e=0.10 %(MO) 0.130 $4,251.00 Mezcla densa en caliente mdc-3 Kg 1.200 $2,595.60Base granular tamaño max. 1 1/2\" $2,681.16 Asfalto Liquido (Liga) hC 0.009Cuadrilla de Albañilería 1*1 M3 1.000 Cuadrilla de Albañilería 1*1 hM 0.014 $353,800.00 $96.52Herramienta Menor m3 1.250 Finisher SB-111 hM 0.014 $2,100.00 $1,470.00 hC 2.500 Vibrocompactador %(MO) 0.050 $10,724.63 $1,461.60BASE GRANULAR dM 0.075 Herramienta MenorBase granular tamaño max. 1 1/2\" %(MO) 0.100 $105,000.00 $4.83Cuadrilla de Albañilería 1*1 $104,400.00Carrotanque de Agua $96.52 ML 1.000 $23,800.00 $19,985.43 CAPA DE RODADURA ASFÁLTICA e=0.05 M2 1.000 $353,800.00 $26,719.86 M3 0.140 $10,724.63 $3,431.96 Mezcla densa en caliente mdc-3 m3 0.065 $10,724.63 $23,686.91 hC 1.470 $15,765.21 $15,765.21 Cuadrilla de Albañilería 1*1 hC 0.009 $105,000.00 %(MO) 0.050 Finisher SB-111 hM 0.014 $104,400.00 $96.52 $23,800.00 $788.26 Vibrocompactador hM 0.014 $1,470.00 M3 1.000 $10,724.63 Herramienta Menor %(MO) 0.050 $96.52 $1,461.60 M3 1.000 $280,000.00 $46,733.42 hC 0.090 $24,514.00 CAPTAFARO UND 1.000 $9,379.00 $4.83 dM 0.005 Captafaro en grado diamante Und 1.000 $965.22 $10,665.96 $1,400.00 $9,379.00 Apu de la Construcción / 2017 117

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Cuadrilla de Albañilería 1*1 hC 0.120 $10,724.63 $1,286.96 Formaleta metálica para caja dU 0.500 $360.00 $180.00 CILINDRO PARA POZO DE INSPECCIÓN ML 1.000 $422.00 $514,802.36 CAMARETA METÁLICA UND 1.000 $37,132.00 $830,718.38 Ladrillo de obra Und 380.000 $441,232.60 $163,567.20 PARA SUB-ESTACIÓN Und 4.000 $9,350.00 $148,528.00 Mortero 1:2 M3 0.420 $190,877.22 Diagonal recta 2x2x1/4\" de 1.44 M Und 4.000 $17,876.00 $37,400.00 Varilla corrugada 1/2\" Kg 6.750 $2,444.00 $16,826.94 Esparrago 18x5/8\" Und 2.000 $1,302.00 $35,752.00 Cuadrilla de Albañilería 1*1 hC 12.746 $10,724.63 $136,696.19 Abrazadera de 9 a 10\" dos salidas Und 8.000 $121,231.00 $10,416.00 Herramienta Menor %(MO) 0.050 $136,696.19 Perno de 1/2\" x 1 1/2\" Und 2.000 $10,724.63 $242,462.00 $6,834.81 Cruceta metálica 2.4Mx2.1/2x2.1/2x1/4\" hH 6.700 $11,797.10 $71,855.05 Técnico hC 21.140 $249,390.64 $249,390.64 CABEZOTE CON ALETAS- UND 1.000 $4,293,070.62 Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.140 $34,914.69 ALCANTARILLAS D=36\" Herramienta Menor Concreto normal de 14 Mpa M3 7.780 $232,297.00 $1,861,488.78 Cuadrilla de Albañilería 1*1 Formaleta metálica de 1*0.50 M-Und hC 210.000 $10,724.63 $2,252,173.19 Herramienta Menor dU 334.000 $200.00 $66,800.00 CASETÓN MADERA 29x75x85 UND 1.000 $48,486.57 Tabla cativo 1\" x 12\" x 15' Und 1.000 $11,064.96 %(MO) 0.050 $2,252,173.19 $112,608.66 Puntilla 1\" x 500grs Kg 0.600 $10,848.00 $1,421.40 Tabla cativo 3/4\" x 12\" x 15' Und 1.000 $2,300.00 $9,220.80 CABEZOTE CON ALETAS- UND 1.000 $3,730,642.05 Cuadrilla de Albañilería 1*1 hC 2.270 $9,040.00 $24,344.92 ALCANTARILLAS D=30\" Herramienta Menor %(MO) 0.100 $10,724.63 $2,434.49 Concreto normal de 14 Mpa M3 5.900 $232,297.00 $1,411,668.87 $24,344.92 Cuadrilla de Albañilería 1*1 Formaleta metálica de 1*0.50 M-Und hC 200.000 $10,724.63 $2,144,926.84 Herramienta Menor dU 334.000 $200.00 $66,800.00 CASETÓN MADERA 29x60x290 UND 1.000 $127,478.33 Tabla cativo 3/4\" x 10\" x 15' Und 3.600 $26,555.90 %(MO) 0.050 $2,144,926.84 $107,246.34 Puntilla 1\" x 500grs Kg 1.000 $7,232.00 $2,369.00 Tabla cativo 3/4\" x 12\" x 15' Und 2.500 $2,300.00 $23,052.00 CABEZOTE CON ALETAS- UND 1.000 $2,310,075.32 Cuadrilla de Albañilería 1*1 hC 6.400 $9,040.00 $68,637.66 ALCANTARILLAS D=24\" Herramienta Menor %(MO) 0.100 $10,724.63 $6,863.77 Concreto normal de 14 Mpa M3 4.410 $232,297.00 $1,055,162.66 $68,637.66 Cuadrilla de Albañilería 1*1 Formaleta metálica de 1*0.50 M-Und hC 107.000 $10,724.63 $1,147,535.86 Herramienta Menor dU 250.000 $200.00 $50,000.00 CASETÓN MADERA 44x75x85 UND 1.000 $54,263.12 Tabla cativo 3/4\" x 10\" x 15' Und 1.000 $7,376.64 %(MO) 0.050 $1,147,535.86 $57,376.79 Puntilla 1\" x 500grs Kg 1.000 $7,232.00 $2,369.00 Tabla cativo 3/4\" x 12\" x 15' Und 2.000 $2,300.00 $18,441.60 CABEZOTES RECTOS UND 1.000 $1,445,427.53 Cuadrilla de Albañilería 1*1 hC 2.220 $9,040.00 $23,808.69 DE ALCANTARILLAS D=36\" M3 2.580 $232,297.00 $617,306.05 Herramienta Menor %(MO) 0.070 $10,724.63 $2,267.19 Concreto normal de 14 Mpa hC 71.000 $10,724.63 $761,449.03 $32,388.40 Cuadrilla de Albañilería 1*1 dU 143.000 Formaleta metálica de 1*0.50 M-Und %(MO) 0.050 $200.00 $28,600.00 CERCA EN VIVO CON LIMONCILLO ML 1.000 $300.00 $23,308.71 Herramienta Menor $761,449.03 $38,072.45 Abono para plantas Kg 6.000 $2,500.00 $1,854.00 Limoncillo 20 cm Und 5.000 $10,724.63 $12,875.00 CABEZOTES RECTOS Cuadrilla de Albañilería 1*1 hC 0.800 $8,579.71 DE ALCANTARILLAS D=30\" Concreto normal de 14 Mpa UND 1.000 $1,342,126.13 CONCRETO REFORZADO M3 1.000 $1,684,481.04 Cuadrilla de Albañilería 1*1 M3 1.960 $232,297.00 $468,961.18 TABLERO PONTONES M3 1.000 $292,745.40 $301,527.76 Formaleta metálica de 1*0.50 M-Und hC 75.000 $10,724.63 $804,347.57 Concreto normal de 21 Mpa hC 80.320 $10,724.63 $861,402.62 Herramienta Menor dU 143.000 Cuadrilla de Albañilería 1*1 Kg 130.000 %(MO) 0.050 $200.00 $28,600.00 Varilla corrugada 1/2\" dM 0.200 $2,444.00 $324,074.40 $804,347.57 $40,217.38 Vibrador (Gas/Elec) dU 500.000 $56,680.00 $11,336.00 Formaleta metálica de 1*0.50 M-Und %(MO) 0.100 CABEZOTES RECTOS UND 1.000 $232,297.00 $956,653.28 Herramienta Menor $200.00 $100,000.00 DE ALCANTARILLAS D=24\" M3 1.550 $10,724.63 $370,862.16 $861,402.62 $86,140.26 Concreto normal de 14 Mpa hC 49.800 $534,086.78 CONCRETO PARA TABLERO PONTONES M3 1.000 Cuadrilla de Albañilería 1*1 dU 125.000 $200.00 $25,000.00 $1,130,827.29 Formaleta metálica de 1*0.50 M-Und %(MO) 0.050 $534,086.78 $26,704.34 Concreto normal de 21 Mpa M3 1.000 $292,745.40 $301,527.76 Herramienta Menor $10,724.63 $689,057.75 $56,680.00 $11,336.00 Cuadrilla de Albañilería 1*1 hC 64.250 $120.00 $60,000.00 CAJA PARA MEDIDOR DE AGUA UND 1.000 $19,373.51 Vibrador (Gas/Elec) dM 0.200 $689,057.75 $68,905.77 Mortero 1:3 Impermeabilizado M3 0.023 $10,077.57 Cuadrilla de Albañilería 1*1 hC 0.850 $425,393.40 Formaleta metálica de 1*0.25 dU 500.000 $10,724.63 $9,115.94 Herramienta Menor %(MO) 0.100 Apu de la Construcción / 2017118

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALCONCRETO REFORZADO BOX-CULBER UND 1.000 $2,444.00 $911,334.91 CONTROL FOTOELÉCTRICO UND 1.000 $581,641.00 $772,833.57Varilla corrugada 1/2\" Kg 80.000 $292,745.40 $199,430.40 ALUMBRADO PÚBLICO Und 1.000 $26,265.00 $581,641.00Concreto normal de 21 Mpa M3 1.000 $10,724.63 $301,527.76 Contactor trifásico Amp. AC3 telem Und 1.000 $30,900.00 $26,265.00Cuadrilla de Albañilería 1*1 hC 32.130 $344,582.50 Fotocelda con base 1000 W INADISA Und 1.000 $26,500.00 $30,900.00Formaleta metálica de 1*0.50 M-Und dU 100.000 $200.00 $20,000.00 Interr. Termomagnetico Bipolar 2x6 Und 1.000 $1,391.00 $26,500.00Vibrador (Gas/Elec) dM 0.200 $56,680.00 Caja para intemperie 25x25 CM ML 3.000 $10,724.63Herramienta Menor %(MO) 0.100 $344,582.50 $11,336.00 Cable No 12 AWG THHN hH 2.000 $11,797.10 $4,256.46 $34,458.25 Técnico hC 6.084 $71,773.54 $21,449.27 Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.140 $71,773.54CONCRETO PARA BOX CULBERT M3 1.000 $292,745.40 $616,959.90 Herramienta Menor $10,048.30Concreto normal de 21 Mpa M3 1.000 $10,724.63 $301,527.76Cuadrilla de Albañilería 1*1 hC 24.760 $56,680.00 $265,541.94 CONFORMACIÓN DE CALZADA EXISTENTE M2 1.000 $11.00 $1,617.34Vibrador (Gas/Elec) dM 0.200 Agua Lt 2.400 $10,724.63 $27.19Formaleta metálica de 1*0.25 dU 100.000 $120.00 $11,336.00 Cuadrilla de Albañilería 1*1 hC 0.014 $116,000.00 $150.14Herramienta Menor %(MO) 0.100 $265,541.94 $12,000.00 Motoniveladora hM 0.006 $280,000.00 $696.00 $26,554.19 Carrotanque de Agua dM 0.001 $92,800.00 $280.00 Compactador de llantas hM 0.005 $464.00CONCRETO REFORZADO ALETAS M3 1.000 $2,444.00 $828,173.67Varilla corrugada 1/2\" Kg 70.000 $292,745.40 $174,501.60 CONCRETO ANDÉNES 0.10 M2 1.000 $261,693.80 $41,535.48Concreto normal de 21 Mpa M3 1.000 $10,724.63 $301,527.76 Concreto normal de 17,5 Mpa M3 0.110 $10,724.63 $29,649.91Cuadrilla de Albañilería 1*1 hC 26.770 $287,098.46 Cuadrilla de Albañilería 1*1 hC 1.050 $24,988.40 $11,260.87Formaleta metálica de 1*0.50 M-Und dU 125.000 $200.00 $25,000.00 Herramienta Menor %(MO) 0.025Vibrador (Gas/Elec) dM 0.200 $56,680.00 $624.71Herramienta Menor %(MO) 0.100 $287,098.46 $11,336.00 $28,709.85CONCRETO PARA POZETAS/ M3 1.000 $292,745.40 $580,934.12 COSTERO EN ARCO UND 1.000 $10,848.00 $50,676.83CABEZOTES/ALETAS M3 1.000 $10,724.63 $301,527.76 Tabla cativo 1\" x 12\" x 15' Und 1.000 $2,300.00 $11,064.96Concreto normal de 21 Mpa hC 21.240 $227,791.23 Puntilla 1\" x 500grs Kg 0.250 $10,724.63Cuadrilla de Albañilería 1*1 dU 125.000 $140.00 $17,500.00 Cuadrilla de Albañilería 1*1 hC 2.000 $20,218.00 $592.25Tablero Madera 1.40*0.70 mts-und dM 0.200 $56,680.00 Liston 4x9x300 Sapan Und 0.800 $21,449.27 $21,449.27Vibrador (Gas/Elec) %(MO) 0.100 $227,791.23 $11,336.00 Herramienta Menor %(MO) 0.050 $16,497.89Herramienta Menor $22,779.12 $1,072.46CONCRETO CICLOPEO M3 1.000 $40,560.00 $383,962.96 COSTERO PARA PLACAS M2 1.000 $13,360.00 $58,815.15PARA ELEVACIONES m3 0.450 $261,693.80 $18,799.56 Liston 4x6x300 Sapan Und 1.050 $17,479.00 $14,308.56Piedra rajoneada M3 0.620 $10,724.63 $167,117.66 Machimbre techo perillo M2 1.050 $2,300.00 $18,903.54Concreto normal de 17,5 Mpa hC 15.940 $170,950.67 Puntilla 1\" x 500grs Kg 0.350 $10,724.63Cuadrilla de Albañilería 1*1 dU 50.000 $200.00 $10,000.00 Cuadrilla de Albañilería 1*1 hC 2.100 $22,521.73 $829.15Formaleta metálica de 1*0.50 M-Und %(MO) 0.100 $170,950.67 $17,095.07 Herramienta Menor %(MO) 0.100 $22,521.73Herramienta Menor $2,252.17CONCRETO CICLOPEO PARA BASES M3 1.000 $40,560.00 $334,678.62 CUBIERTA VERDE EN PRAO M2 1.000 $5,060.00 $134,077.61Piedra rajoneada m3 0.450 $261,693.80 $18,799.56 Geotextil Sika PP 2500 (no tejido) M2 1.000 $32,960.00 $5,211.80Concreto normal de 17,5 Mpa M3 0.620 $10,724.63 $167,117.66 Sikaplan 12R M2 1.000 $25,350.00Cuadrilla de Albañilería 1*1 hC 12.610 $135,237.64 $135,237.64 Capa Vegetal M2 1.000 $52,850.00 $33,948.80Herramienta Menor %(MO) 0.100 $13,523.76 Lamina Drenaje 32 T M2 1.000 $10,724.63 $26,110.50 Cuadrilla de Albañilería 1*1 hC 1.340 $54,435.50CONCRETO CICLOPEO DISIPADOR $14,371.01DE ENERGÍAPiedra rajoneada M3 1.000 $40,560.00 $336,858.33 CRUCETA METÁLICA DE PROTECCIÓN UND 1.000 $1,573,241.40Concreto normal de 17,5 Mpa m3 0.450 $261,693.80 $18,799.56 Cortacircuitos 15KV-100AMP. Und 3.000 $189,520.00 $568,560.00Cuadrilla de Albañilería 1*1 M3 0.620 $10,724.63 $167,117.66 Fusible para M.T.Tipo K 2-10 Amp. Und 3.000Formaleta metálica de 1*0.50 M-Und hC 12.710 $136,310.10 Pararayos 12 KV-10KA Und 3.000 $4,120.00 $12,360.00Herramienta Menor dU 5.000 $200.00 $1,000.00 Cuadrantes acero galvanizado DADOS Und 3.000 $161,710.00 $485,130.00 %(MO) 0.100 $136,310.10 $13,631.01 Cruceta metálica 2M 2.1/2x2.1/2x1/4\" Und 1.000 Perno de 1/2\"x6\" Und 2.000 $9,270.00 $27,810.00 Técnico hH 6.700 $89,198.00 $89,198.00 Cuadrilla instaladores (eléctricos y sanitarios) hC 23.420 $1,680.00 $3,360.00 Herramienta Menor %(MO) 0.140 $10,724.63 $71,855.05 $11,797.10 $276,288.03 $276,288.03 $38,680.32 Apu de la Construcción / 2017 119

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL CUNETA E=0.10 h=0.30 M3 1.000 $472,984.95 Percha de acero galvanizado de 5 puestos Und 1.000 $42,642.00 $42,642.00 1.000 $362,171.69 Aislador tipo carreto de 3x3 Und 5.000 $9,077.00 $45,385.00 Concreto Clase D (3000 PSI o 210KG/CM2 M3 0.800 $351,623.00 Técnico hH 0.500 $10,724.63 $5,362.32 7.970 $3,305.00 $2,723.32 Cuadrilla Especializada hC 1.371 $13,084.05 $17,938.24 Material de afirmado (CBR.=10%) M3 3.000 $10,724.63 $85,475.33 Herramienta Menor %(MO) 0.140 $17,938.24 0.313 $200.00 $2,511.35 Cuadrilla de Albañilería 1*1 hC 0.050 $56,680.00 $600.00 $85,475.33 $17,740.84 Formaleta metálica de 1*0.50 M-Und dU $4,273.77 Vibrocompactador (Rana) 8 h.p. dM Herramienta Menor %(MO) ESTRUCTURA DE PASO 511M UND 1.000 $459,239.73 Arandela plana redonda para perno 5/8\" Und 2.000 $1,434.00 DEFENSA METÁLICA ML 1.000 $257,984.00 $123,428.26 Perno de 5/8\"x12\" Und 1.000 $717.00 $3,322.00 Defensa Metálica ML 0.262 $26,796.00 $67,591.81 Arandela prresion para perno de 1/2\" Und 6.000 $3,322.00 $1,872.00 Amortiguadores Und 0.262 $129,200.00 $7,020.55 Aislador tipo espigoansi 55-5 Und 3.000 $79,104.00 Poste para defensa metálica Und 0.262 $10,724.63 $33,850.40 Perno de 1/2\" x 1 1/2\" Und 6.000 $312.00 $7,812.00 Cuadrilla de Albañilería 1*1 hC 0.800 $31,500.00 $8,579.71 Cruceta metálica 2M 2.1/2x2.1/2x1/4\" Und 2.000 $26,368.00 Camión 350 hM 0.200 $8,579.71 $6,300.00 Diagonal recta 1.1/2x1 1/2\"x3/16\" 0.68 M Und 4.000 $1,302.00 $178,396.00 Herramienta Menor %(MO) 0.010 Espigo acero galvanizado/cruceta 3/4\" Und 3.000 $89,198.00 $67,876.00 $85.80 Esparrago 10x5/8\" Und 3.000 $16,969.00 $43,260.00 Perno 5/8\"x8\" Und 3.000 $14,420.00 $16,377.00 DINTEL PREFABRICADO 0.12X1.20 UND 1.000 $261,693.80 $16,825.07 Técnico hH 1.000 $5,459.00 $8,148.00 Concreto normal de 17,5 Mpa M3 0.016 $2,444.00 $4,312.71 Cuadrilla Especializada hC 2.743 $2,716.00 $10,724.63 Varilla corrugada 1/4 a 3/8 Kg 1.500 $10,724.63 $3,739.32 Herramienta Menor %(MO) 0.140 $10,724.63 $35,889.56 Cuadrilla de Albañilería 1*1 hC 0.740 $220.00 $7,936.23 $13,084.05 $5,024.54 Formaleta metálica para vigueta h=0.20 dML 2.000 $7,936.23 $35,889.56 Herramienta Menor %(MO) 0.050 $440.00 $396.81 ESTRUCTURA DE RETENCIÓN DOBLE-560M Grapa terminal de acero galvanizado UND 1.000 $1,011,279.98 Arandela presion para perno de 5/8\" Und 6.000 DINTEL PREFABRICADO 0.12X0.10 ML 1.000 $15,228.18 Perno de 1/2\" x 1 1/2\" Und 2.000 $18,540.00 $111,240.00 Concreto normal de 17,5 Mpa M3 0.013 $3,504.08 Aislador tipo suspension ansi52-1 Und 4.000 Varilla corrugada 1/4 a 3/8 Kg 1.500 $261,693.80 $3,739.32 Cruceta metálica 2M 2.1/2x2.1/2x1/4\" Und 18.000 $355.00 $710.00 Cuadrilla de Albañilería 1*1 hC 0.670 $2,444.00 $7,185.50 Diagonal recta 1.1/2x1 1/2\"x3/16\" 0.68 M Und 2.000 Formaleta metálica para vigueta h=0.20 dML 2.000 $10,724.63 Aislador tipo espigoansi 55-5 Und 4.000 $1,302.00 $5,208.00 Herramienta Menor %(MO) 0.050 $220.00 $440.00 Espigo acero galvanizado/cruceta 3/4\" Und 1.000 $7,185.50 $359.28 Perno 5/8\"x8\" Und 1.000 $28,222.00 $507,996.00 Esparrago 12 x 5/8\" Und 1.000 Perno de 5/8\"x12\" Und 3.000 $89,198.00 $178,396.00 Arandela plana redonda para perno 5/8\" Und 1.000 Técnico Und 4.000 $16,969.00 $67,876.00 Cuadrilla Especializada hH 1.340 Herramienta Menor hC 3.664 $26,368.00 $26,368.00 %(MO) 0.100 DEMOLICÓN MURO DE CONCRETO M3 1.000 $145,966.52 $14,420.00 $14,420.00 Volqueta 5M3 Viaje 0.450 $35,480.70 Cuadrilla de Albañilería 1*1 hC 9.340 $77,300.00 $100,168.08 $2,716.00 $2,716.00 Transporte interno M3 0.780 $10,724.63 $5,109.00 Herramienta Menor %(MO) 0.052 $6,550.00 $5,208.74 $7,685.00 $23,055.00 $100,168.08 $3,322.00 $3,322.00 $717.00 $2,868.00 $10,724.63 $14,371.01 EMPRADIZACIÓN CON TIERRA ORG. $13,084.05 $47,939.97 Y DEMILLAS Semilla para Empradizar M2 1.000 $8,659.31 $47,939.97 $4,794.00 Liston de Guadua Kg 0.050 $1,024.85 Tierra Abonada ML 3.000 $19,900.00 $3,399.00 ESTRUCTURA DE RETENCIÓN UND 1.000 $3,322.00 $668,833.37 Agua m3 0.100 $1,100.00 $2,060.00 SENCILLA-560M Und 1.000 $717.00 $3,322.00 Cuadrilla de Albañilería 1*1 Lt 15.000 $20,000.00 Perno de 5/8\"x12\" Und 2.000 $355.00 $1,434.00 Herramienta Menor hC 0.170 $169.95 Arandela plana redonda para perno 5/8\" Und 1.000 $355.00 Excavación de 0 a 2 m en material %(MO) 0.100 $11.00 $1,823.19 Arandela presion para perno de 5/8\" Und 9.000 $28,222.00 heterogéneo bajo cualquier grado $10,724.63 Aislador tipo suspension ansi52-1 Und 3.000 $18,540.00 $253,998.00 de humedad. medido en sitio. $1,823.19 $182.32 Grapa terminal de acero galvanizado Und 4.000 $1,302.00 $55,620.00 Cuadrilla de Albañilería 1*1 Perno de 1/2\" x 1 1/2\" Und 2.000 $89,198.00 $5,208.00 Transporte interno M3 1.000 $10,724.63 $19,113.17 Cruceta metálica 2M 2.1/2x2.1/2x1/4\" Und 3.000 $7,685.00 $178,396.00 Herramienta Menor hC 0.980 $6,550.00 $10,510.14 Esparrago 12 x 5/8\" Und 4.000 $16,969.00 $23,055.00 M3 1.230 $10,510.14 $8,056.50 Diagonal recta 1.1/2x1 1/2\"x3/16\" 0.68 M hH 1.340 $10,724.63 $67,876.00 %(MO) 0.052 Técnico hC 3.664 $13,084.05 $14,371.01 $546.53 Cuadrilla Especializada %(MO) 0.360 $47,939.97 $47,939.97 Herramienta Menor $17,258.39 ESTRUCTURA DE BAJA TENSIÓN UND 1.000 $117,744.91 CON PERCHA Und 3.000 $1,302.00 $3,906.00 Perno de 1/2\" x 1 1/2\" Apu de la Construcción / 2017120

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALFILTROS CON GEOTEXTIL M3 1.000 $3,193.00 $81,235.89 LIMPIEZA DE MURO EN LADRILLO M2 1.000 $7,475.00 $13,053.53Geotextil NT 1600 (3.50x1.60x6.08) M2 4.250 $49,497.00 $13,977.36 A LA VISTA Lt 0.143 $7,475.00 $1,100.99Triturado Tamaza maximo 1.1/4\" M3 1.050 $10,724.63 $53,531.01 Hidrosolve limpiador ladrillo rojo Lt 0.143 $13,084.05 $1,100.99Cuadrilla de Albañilería 1*1 hC 1.280 $13,727.53 Concre Bright Limpiador de concreto hC 0.540 $7,065.39 Cuadrilla Especializada dU 1.200 $800.00GÁRGOLAS 0.20X0.15X0.30 UND 1.000 $261,693.80 $21,399.76 Andamio tubular 1.50x1.50 %(MO) 0.400 $7,065.39 $960.00Concreto normal de 17,5 Mpa M3 0.015 $3,386.00 $4,043.17 Herramienta Menor $2,826.16Alambre negro # 18 Kg 0.050 $3,515.00Varilla grafil 6mm Und 0.500 $10,724.63 $174.38 LUMINARIA DE 70 VATIOS-SODIO 220V UND 1.000 $153,000.30 $231,212.79Cuadrilla de Albañilería 1*1 hC 1.340 $300.00 $1,792.65 Luminaria de 70W sodio 220V Und 1.000 $50,985.00 $153,000.30Formaleta metálica para gargolas dU 1.000 $14,371.01 $14,371.01 Brazo/duct.galvanizado de Und 1.000 $50,985.00Herramienta Menor %(MO) 0.050 Alambre # 12 AWG THHN ML 6.000 $748.00 $300.00 Técnico hH 0.400 $10,724.63 $4,622.64GAVIONES e=1.0 h=1.0 $718.55 Cuadrilla instaladores (eléctricos y sanitarios) hC 1.350 $11,797.10 $4,289.85Piedra rajoneada Herramienta Menor %(MO) 0.150 $15,926.08 $15,926.08Alambre negro # 18 M3 1.000 $40,560.00 $128,049.62 $2,388.91Malla Gaviones Cal. 12 TT (2x1x1M) m3 1.200 $3,386.00 $50,132.16Cuadrilla de Albañilería 1*1 Kg 0.500 $56,100.00 $1,743.79 IMPRIMACIÓN- LECHADA (EMULSIÓN) M2 1.000 $858.00 $1,027.52Tablero Madera 1.40*0.70 mts-und Und 0.530 $10,724.63 $30,624.99 Emulsion Asfaltica CRL-0 Lt 0.750 $10,724.63 $662.81Herramienta Menor hC 4.020 $43,113.03 Cuadrilla de Albañilería 1*1 hC 0.008 $63,000.00 $85.80 dU 2.000 $140.00 Carrotanque irrigador de asfalto hM 0.002 $75,600.00 $126.00GEOTEXTIL ANTIRAICES PARQUEADERO %(MO) 0.050 $43,113.03 $280.00 Compresor de aire hM 0.002 $151.20Cuadrilla de Albañilería 1*1 $2,155.65 Herramienta Menor %(MO) 0.020 $85.80 $1.72Geotextil Sika 2500 (Tejido) M2 1.000 $10,724.63 $2,058.81 MARCA VIAL M2 1.000 $23,174.76GEOTEXTIEL PARA FILTROS hC 0.090 $965.22 $965.22 Esferas Reflectivas Kg 0.470 $1,561.81Geotextil NT 1600 (3.50x1.60x6.08) M2 1.100 Pintura Acrilica Pura para Trafico Gal 0.050 $4,000.42Cuadrilla de Albañilería 1*1 $1,093.59 Cuadrilla de Albañilería 1*1 hC 0.980 $10,510.14 Camióneta D300 hM 0.163 $6,051.38JARDINERA CONCRETO 40X40 M2 1.000 $3,193.00 $4,146.76 Herramienta Menor %(MO) 0.100 $3,323.00 $1,051.01Concreto normal de 17,5 Mpa M2 1.000 $10,724.63 $3,288.79 $77,678.00Abono para plantas hC 0.080 $10,724.63Ixora enana 5 colores $857.97 $37,125.00Cuadrilla de Albañilería 1*1 $10,510.14Formaleta metálica de 1*0.25LAVADO DE MUROS M3 1.000 $261,693.80 $66,029.88 MATERIAL GRANULAR FILTRANTE M3 1.000 $40,560.00 $56,753.75Cuadrilla de Albañilería 1*1 M3 0.080 $300.00 $21,563.57 Triturado de segunda 1 1/4' M3 1.000 $10,724.63 $41,776.80Herramienta Menor Kg 6.000 $1,854.00 Cuadrilla de Albañilería 1*1 hC 1.330 $14,263.76 $14,263.76 Und 5.000 $3,000.00 $15,450.00 Herramienta Menor %(MO) 0.050 hC 1.190 $10,724.63 $12,762.31 $713.19 dU 120.000 $14,400.00 M2 1.000 $120.00 $27,669.56 MATERIAL FILTRANTE COLOCADO M3 1.000 $49,497.00 $67,044.04 hC 2.500 $26,811.59 Triturado Tamaza maximo 1.1/4\" M3 1.050 $10,724.63 $53,531.01 %(MO) 0.032 $10,724.63 Cuadrilla de Albañilería 1*1 hC 1.260 $13,513.04 $26,811.59 $857.97LIMPIEZA DE MUROS EN CONCRETO M2 1.000 $7,475.00 $10,988.82 MEZCLA DENSA EN CALIENTE M3 1.000 $342,200.00 $484,886.67Concre Bright Limpiador de concreto Lt 0.180 $10,724.63 $1,385.87 PARA CARPETA m3 1.300 $10,724.63 $458,205.80Cuadrilla de Albañilería 1*1 hC 0.720 $7,721.74 Mezcla densa en caliente mdc-2 hC 0.870 $92,800.00Andamio tubular 1.50x1.50 dU 0.035 $800.00 Cuadrilla de Albañilería 1*1 hM 0.083 $105,000.00 $9,330.43Herramienta Menor %(MO) 0.240 $7,721.74 $28.00 Compactador de llantas hM 0.083 $9,330.43 $7,702.40 $1,853.22 Finisher SB-111 %(MO) 0.100 $8,715.00LINEA DE DEMARCACIÓN ML 1.000 $3,323.00 Herramienta MenorEsferas Reflectivas Kg 0.047 $77,678.00 $1,532.37 $933.04Pintura Acrilica Pura para Trafico Gal 0.015 $15,800.00 $156.18 MEZCLA DENSA EN CALIENTEDisolvente (Thiner) Gal 0.001 $10,724.63 PARA BACHEO M3 1.000 $478,344.71Cuadrilla de Albañilería 1*1 hC 0.002 $37,125.00 $1,200.13 Mezcla densa en caliente mdc-2Camióneta D300 hM 0.001 $106,575.00 $16.27 Cuadrilla de Albañilería 1*1 m3 1.250 $342,200.00 $440,582.50Vehiculo Delineador hM 0.001 $16.09 Terminador de Asfalto $37.13 Vibrocompactador hC 0.340 $10,724.63 $3,646.38 $106.58 Compactador de llantas hM 0.067 $180,000.00 $12,060.00 hM 0.057 $104,400.00 $5,950.80 hM 0.053 $92,800.00 $4,918.40 Apu de la Construcción / 2017 121

Análisis de Precios Detallados DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Volqueta 5M3 Viaje 0.140 $77,300.00 $10,822.00 Cuadrilla de Albañilería 1*1 hC 24.000 $10,724.63 $257,391.22 Herramienta Menor %(MO) 0.100 Motoniveladora hM 12.500 $116,000.00 $1,450,000.00 $3,646.38 $364.64 Compactador de llantas hM 12.500 $92,800.00 $1,160,000.00 SUB-BASE GRANULAR DE CBR>=40% Carrotanque de Agua dM 1.500 $280,000.00 $420,000.00 Base granular tamaño max. 3\" M3 1.000 $29,495.00 $52,834.27 Herramienta Menor %(MO) 0.070 $257,391.22 $18,017.39 Cuadrilla de Albañilería 1*1 M3 1.000 $10,724.63 $30,379.85 Carrotanque de Agua hC 0.090 $280,000.00 PÉRGOLA 0.06X0.30 ML 1.000 $3,386.00 $27,883.40 Compactador de llantas dM 0.005 $92,800.00 $965.22 Alambre negro # 18 Kg 0.075 $3,515.00 $261.57 Motoniveladora hM 0.034 $116,000.00 $1,400.00 Varilla grafil 6mm Und 1.150 $261,693.80 Volqueta 5M3 hM 0.044 $3,155.20 Concreto normal de 17,5 Mpa M3 0.019 $10,724.63 $4,123.10 M3/Km 13.000 $910.00 $5,104.00 Cuadrilla de Albañilería 1*1 hC 1.600 $5,121.35 PASOS PARA ESCALERA b=0.68 $11,830.00 Formaleta metálica p/alfagias b=30 dML 1.000 $360.00 $17,159.41 Concreto normal de 17,5 Mpa Herramienta Menor %(MO) 0.050 $17,159.41 Varilla corrugada 1/4 a 3/8 M3 1.000 $261,693.80 $27,961.42 $360.00 Cuadrilla de Albañilería 1*1 M3 0.040 $2,444.00 $10,781.78 $857.97 Formaleta metálica p/alfagias b=60 Kg 1.700 $10,724.63 $4,237.90 Herramienta Menor hC 1.080 $390.00 $11,582.60 PÉRGOLA .06X0.25 ML 1.000 $261,693.80 $23,788.41 dU 2.000 $11,582.60 Concreto normal de 17,5 Mpa M3 0.016 $3,515.00 $4,312.71 PAVIMENTO EN CONCRETO e=0.18 %(MO) 0.050 $780.00 Varilla grafil 6mm Und 1.050 $3,386.00 $3,764.57 Pavimento Rigido 35.0 Mpa MR 45 $579.13 Alambre negro # 18 Kg 0.075 $10,724.63 Cuadrilla de Albañilería 1*1 Cuadrilla de Albañilería 1*1 hC 1.340 $360.00 $261.57 Formaleta metálica sardineles M2 1.000 $394,748.00 $102,198.49 Formaleta metálica p/alfagias b=30 dML 1.000 $14,371.01 $14,371.01 Vibrador (Gas/Elec) m3 0.189 $10,724.63 $76,845.59 Herramienta Menor %(MO) 0.050 Herramienta Menor hC 2.150 $23,057.96 $360.00 dU 0.175 $696.00 $718.55 PAVIMENTO EN CONCRETO e=0.17 dM 0.018 $56,680.00 $121.80 Pavimento Rigido 35.0 Mpa MR 45 %(MO) 0.050 $23,057.96 $1,020.24 PÉRGOLA 0.60X0.15 ML 1.000 $261,693.80 $18,276.46 Cuadrilla de Albañilería 1*1 $1,152.90 Concreto normal de 17,5 Mpa M3 0.010 $3,515.00 $2,695.45 Formaleta metálica sardineles Varilla grafil 6mm Und 0.860 $3,386.00 $3,083.36 Vibrador (Gas/Elec) M2 1.000 $394,748.00 $96,165.04 Alambre negro # 18 Kg 0.075 $10,724.63 Herramienta Menor m3 0.179 $10,724.63 $72,779.69 Cuadrilla de Albañilería 1*1 hC 1.020 $300.00 $261.57 hC 1.980 $21,234.78 Formaleta metálica p/alfagias b=20 dML 2.500 $10,939.13 $10,939.13 PAVIMENTO EN CONCRETO e=0.16 dU 0.180 $696.00 Herramienta Menor %(MO) 0.050 Pavimento Rigido 35.0 Mpa MR 45 dM 0.017 $56,680.00 $125.28 $750.00 Cuadrilla de Albañilería 1*1 %(MO) 0.050 $21,234.78 $963.56 $546.96 Formaleta metálica sardineles $1,061.74 Vibrador (Gas/Elec) PINTURA EPÓXICA GAL 1.000 $20,818.63 Herramienta Menor M2 1.000 $394,748.00 $90,735.00 Pintura epoxica blanca tipo1 Poliamida Gal 0.100 $90,000.00 $9,270.00 m3 0.168 $10,724.63 $68,307.19 Lija # 80 Und 0.100 $1,400.00 PAVIMENTO EN CONCRETO e=0.15 hC 1.900 $20,376.81 Estuka (Estuco listo) Kg 2.300 $144.20 Pavimento Rigido 35.0 Mpa MR 45 dU 0.180 $696.00 Cuadrilla de Albañilería 1*1 hC 0.790 $880.00 $2,084.72 Cuadrilla de Albañilería 1*1 dM 0.016 $56,680.00 $125.28 Herramienta Menor %(MO) 0.100 $10,724.63 $8,472.46 Formaleta metálica sardineles %(MO) 0.050 $20,376.81 $906.88 PLAQUETA PARA GRANADERA b=0.68 ML 1.000 $8,472.46 Vibrador (Gas/Elec) $1,018.84 Concreto normal de 21 Mpa M3 0.037 $847.25 Herramienta Menor Varilla corrugada 1/4 a 3/8 Kg 2.100 $292,745.40 $24,296.36 M2 1.000 $394,748.00 $85,261.11 Cuadrilla de Albañilería 1*1 hC 0.670 $2,444.00 $11,156.53 PERFILADO-RECONFORMACIÓN- m3 0.158 $10,724.63 $64,241.29 Formaleta metálica plaquetas 0.5*.5*.68 dM2 1.000 $10,724.63 $5,235.05 CUNETEO hC 1.780 $19,089.85 Herramienta Menor %(MO) 0.050 $360.00 $7,185.50 Cuadrilla de Albañilería 1*1 dU 0.180 $696.00 $7,185.50 Motoniveladora dM 0.015 $56,680.00 $125.28 $360.00 Herramienta Menor %(MO) 0.050 $19,089.85 $850.20 $359.28 $954.49 PERFILADO-RECONFORMACIÓN PLAQUETAS DE 0.60X0.50 ML 1.000 $261,693.80 $16,119.38 DE BANCA KM 1.000 $1,667,408.61 Concreto normal de 17,5 Mpa M3 0.017 $2,444.00 $4,582.26 hC 24.000 $10,724.63 $257,391.22 Varilla corrugada 1/4 a 3/8 Kg 1.100 $10,724.63 $2,742.17 hM 12.000 $116,000.00 $1,392,000.00 Cuadrilla de Albañilería 1*1 hC 0.540 $360.00 $5,791.30 %(MO) 0.070 $257,391.22 $18,017.39 Formaleta metálica plaquetas 0.5*.5*.68 dM2 0.300 $5,791.30 Herramienta Menor %(MO) 0.500 $108.00 $2,895.65 POSTE DE CONCRETO 12mts DE 750KG UND 1.000 $881,022.58 $812,000.00 Poste concreto 12M 750KG Und 1.000 $812,000.00 $14,371.01 $10,724.63 $47,939.97 Técnico hH 1.340 $13,084.05 KM 1.000 $3,305,408.61 Cuadrilla Especializada hC 3.664 Apu de la Construcción / 2017122

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALHerramienta Menor %(MO) 0.140 $47,939.97 $6,711.60 Concreto normal de 21 Mpa M3 0.110 $292,745.40 $33,168.05 Ladrillo de obra Und 1265.000 $422.00 $544,506.60POSTE DE CONCRETO 8mts DE 510KG UND 1.000 $324,800.00 $393,822.58 Concreto normal de 17,5 Mpa M3 0.470 $126,685.97Poste concreto 8M 510KG Und 1.000 $10,724.63 $324,800.00 Cuadrilla de Albañilería 1*1 hC 49.998 $261,693.80 $536,210.26Técnico hH 1.340 $13,084.05 $14,371.01 Herramienta Menor %(MO) 0.050 $10,724.63 $26,810.51Cuadrilla Especializada hC 3.664 $47,939.97 $47,939.97 $536,210.26Herramienta Menor %(MO) 0.140 POZO DE INSPECCIÓN h=2.90 Mts $6,711.60 Mortero 1:2 UND 1.000 $1,737,842.49 Mortero 1:3 M3 0.100 $441,232.60 $45,446.96POSTE DE CONCRETO 8mts DE 510KG UND 1.000 $348,000.00 $399,638.73 Ladrillo de obra M3 1.210 $331,433.40 $413,065.45Poste concreto 8M 750KG Und 1.000 $10,724.63 $348,000.00 Varilla corrugada 1/2\" Und 1075.000Técnico hH 1.000 $13,084.05 $10,724.63 Concreto normal de 17,5 Mpa Kg 37.600 $422.00 $462,723.00Cuadrilla Especializada hC 2.743 $35,889.56 $35,889.56 Concreto normal de 21 Mpa M3 0.470 $2,444.00 $93,732.29Herramienta Menor %(MO) 0.140 Cuadrilla de Albañilería 1*1 M3 0.110 $261,693.80 $126,685.97 $5,024.54 Herramienta Menor hC 49.998 $292,745.40 $33,168.05 %(MO) 0.050 $10,724.63 $536,210.26POSTE CONCRETO POZO DE INSPECCIÓN h=2.40 Mts $536,210.26 $26,810.51PARA CAMARETA DE SUB-EST Concreto normal de 21 MpaCable desnudo No 6 UND 1.000 $3,327.00 $72,858.77 Mortero 1:2 UND 1.000 $1,491,672.49Técnico ML 1.000 $10,724.63 $3,393.54 Ladrillo de obra M3 0.110 $292,745.40 $33,168.05Cuadrilla instaladores (eléctricos y sanitarios) hH 1.340 $11,797.10 $14,371.01 Concreto normal de 17,5 Mpa M3 0.100 $441,232.60 $45,446.96Herramienta Menor hC 4.061 $47,908.01 $47,908.01 Mortero 1:3 Und 885.000 %(MO) 0.150 $7,186.20 Varilla corrugada 1/2\" M3 0.470 $422.00 $380,939.40 Cuadrilla de Albañilería 1*1 M3 1.000 $261,693.80 $126,685.97POSTE PARA CERCA 0.1X0.1X2.5 UND 1.000 $321,526.40 $45,154.79 Herramienta Menor Kg 34.100 $331,433.40 $341,376.40Concreto en obra de 24,5 Mpa m3 0.027 $2,444.00 $8,941.65 hC 42.541Varilla corrugada 1/4 a 3/8 Kg 3.500 $10,724.63 $8,725.08 POZO DE INSPECCIÓN h=1.80 Mts %(MO) 0.050 $2,444.00 $85,007.21Cuadrilla de Albañilería 1*1 hC 2.150 $2,600.00 $23,057.96 Mortero 1:2 $10,724.63 $456,236.66Formaleta metálica postes 0.1*0.1*2.5 dU 1.000 $3,386.00 $2,600.00 Mortero 1:3 $456,236.66 $22,811.83Alambre negro # 18 Kg 0.200 $23,057.96 Concreto normal de 21 MpaHerramienta Menor %(MO) 0.050 $677.20 Ladrillo de obra UND 1.000 $1,254,912.15 $1,152.90 Concreto normal de 17,5 Mpa M3 0.100 $441,232.60 $45,446.96 Varilla corrugada 1/2\" M3 0.750 $331,433.40 $256,032.30POZETAS DE ENTRADAS UND 1.000 $1,769,857.58 Cuadrilla de Albañilería 1*1 M3 0.110 $292,745.40 $33,168.05A ALCANTARILLAS D=36\" M3 3.100 $261,693.80 $835,588.30 Herramienta Menor Und 665.000Concreto normal de 17,5 Mpa hC 80.000 $10,724.63 $857,970.74 M3 0.470 $422.00 $286,242.60Cuadrilla de Albañilería 1*1 dU 167.000 Kg 34.200 $261,693.80 $126,685.97Formaleta metálica de 1*0.50 M-Und %(MO) 0.050 $200.00 $33,400.00 hC 37.482Herramienta Menor $857,970.74 $42,898.54 %(MO) 0.050 $2,444.00 $85,256.50 $10,724.63 $401,980.74 $401,980.74 $20,099.04POZETAS DE ENTRADAS UND 1.000 $1,498,231.74 POZO DE INSPECCIÓN h=1.40 Mts UND 1.000 $1,390,492.00A ALCANTARILLAS D=30\" Mortero 1:2 M3 0.080 $441,232.60 $36,357.57Concreto normal de 17,5 Mpa M3 2.640 $261,693.80 $711,597.78 Concreto normal de 21 Mpa M3 0.310 $292,745.40 $93,473.61Cuadrilla de Albañilería 1*1 Concreto normal de 17,5 Mpa M3 0.470 $261,693.80 $126,685.97Formaleta metálica de 1*0.50 M-Und hC 67.000 $10,724.63 $718,550.49 Varilla corrugada 1/2\" Kg 79.200Herramienta Menor Ladrillo de obra Und 532.000 $2,444.00 $197,436.10 dU 167.000 $200.00 $33,400.00 Mortero 1:3 M3 0.600 $422.00 $228,994.08POZETAS DE ENTRADAS Cuadrilla de Albañilería 1*1 hC 44.643A ALCANTARILLAS D=24\" %(MO) 0.022 $1,576,521.23 $34,683.47 Herramienta Menor %(MO) 0.050 $331,433.40 $204,825.84Concreto normal de 17,5 Mpa $10,724.63 $478,779.85Cuadrilla de Albañilería 1*1 UND 1.000 $1,321,083.65 PREFABRICADOS SOBRE CUNETAS $478,779.85 $23,938.99Formaleta metálica de 1*0.50 M-Und M3 2.260 $261,693.80 $609,170.83 Concreto normal de 21 MpaHerramienta Menor hC 61.000 $10,724.63 $654,202.69 Varilla corrugada 1/4 a 3/8 UND 1.000 $292,745.40 $309,121.96 dU 125.000 Cuadrilla de Albañilería 1*1 M3 0.220 $2,444.00 $66,336.11POZO DE INSPECCIÓN h=3.40 Mts %(MO) 0.050 $200.00 $25,000.00 Formaleta metálica de 1.5*0.50 M-Und Kg 25.000 $10,724.63 $62,322.00Varilla corrugada 1/2\" $654,202.69 $32,710.13 Herramienta Menor hC 16.000 $290.00Mortero 1:3 dU 1.000 $171,594.15Mortero 1:2 UND 1.000 $1,924,719.73 %(MO) 0.050 $171,594.15 $290.00 Kg 51.000 $2,444.00 $127,136.88 M3 1.420 $331,433.40 $484,754.49 $8,579.71 M3 0.100 $441,232.60 $45,446.96 Apu de la Construcción / 2017 123

DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL PREFABRICADO ENCHAPE UND 1.000 $20,450.37 Formaleta metálica panel macizo dm2 4.000 $540.00 $2,160.00 ABUZARDADO 1 M3 0.014 $3,773.62 Herramienta Menor %(MO) 0.050 $34,211.58 $1,710.58 Concreto normal de 17,5 Mpa m2 0.650 $3,795.01 Malla Electrosoldada cal.9 15x15 hC 1.080 $261,693.80 $11,582.60 PREFABRICADO PREENCHAPADO UND 1.000 $1,125.00 $71,856.28 Cuadrilla de Albañilería 1*1 dM2 2.000 $5,724.00 0.055X0.60X1.5 Kg 1.800 $261,693.80 $2,085.75 Formaleta metálica prefab. Abuzardado %(MO) 0.050 $10,724.63 $720.00 Cemento blanco tipo 1 M3 0.050 $13,477.23 Herramienta Menor $360.00 $579.13 Concreto normal de 17,5 Mpa m2 0.900 $5,724.00 $5,254.63 $11,582.60 Malla Electrosoldada cal.9 15x15 Kg 1.000 $2,444.00 $2,492.88 PREFABRICADO ENCHAPE ANCLADO 3 UND 1.000 $31,314.31 Varilla corrugada 1/2\" hC 1.830 $10,724.63 $19,626.08 Concreto normal de 17,5 Mpa M3 0.034 $261,693.80 $9,164.52 Cuadrilla de Albañilería 1*1 M2 0.950 $28,272.00 $26,858.40 Malla Electrosoldada cal.9 15x15 m2 0.650 $5,724.00 $3,795.01 Ceramica Frli blanco 25x35 dm2 2.000 $1,080.00 Cuadrilla de Albañilería 1*1 hC 1.590 $10,724.63 $17,052.17 Formaleta metálica panel macizo %(MO) 0.050 $540.00 Formaleta metálica prefab. Abuzardado dM2 1.250 $360.00 Herramienta Menor $19,626.08 $981.30 Herramienta Menor %(MO) 0.050 $17,052.17 $450.00 $852.61 PREFABRICADO LISO 0.05X0.60X1.50 PREFABRICADO ENCHAPE ANCLADO 2 UND 1.000 $261,693.80 Concreto normal de 17,5 Mpa UND 1.000 $261,693.80 $41,078.41 Concreto normal de 17,5 Mpa M3 0.022 $5,724.00 $20,704.31 Malla Electrosoldada cal.9 15x15 M3 0.049 $5,724.00 $13,207.69 Malla Electrosoldada cal.9 15x15 m2 0.400 $10,724.63 $5,929.98 Varilla corrugada 1/2\" m2 0.900 $2,444.00 $5,254.63 Cuadrilla de Albañilería 1*1 hC 1.080 $360.00 $2,335.39 Cuadrilla de Albañilería 1*1 Kg 1.500 $10,724.63 $3,739.32 Formaleta metálica prefab. Abuzardado dM2 0.770 $11,582.60 $11,582.60 Formaleta metálica panel con marco hC 1.590 $540.00 $17,052.17 Herramienta Menor %(MO) 0.050 Herramienta Menor dM2 1.800 $17,052.17 $277.20 %(MO) 0.050 $972.00 $579.13 $852.61 PREFABRICADO ENCHAPE ANCLADO 1 M2 1.000 $261,693.80 $16,097.36 PREFABRICADO LISO 0.05X0.60X2.80 UND 1.000 $261,693.80 $71,420.11 Concreto normal de 17,5 Mpa M3 0.018 $5,724.00 $4,851.80 Concreto normal de 17,5 Mpa M3 0.091 $5,724.00 $24,528.56 Malla Electrosoldada cal.9 15x15 m2 0.350 $10,724.63 $2,043.47 Malla Electrosoldada cal.9 15x15 m2 1.700 $2,444.00 $9,925.42 Cuadrilla de Albañilería 1*1 hC 0.790 $360.00 $8,472.46 Varilla corrugada 1/2\" Kg 1.500 $10,724.63 $3,739.32 Formaleta metálica prefab. Abuzardado dM2 0.850 $8,472.46 Cuadrilla de Albañilería 1*1 hC 2.790 $540.00 $29,921.73 Herramienta Menor %(MO) 0.050 $306.00 Formaleta metálica panel macizo dm2 3.350 $29,921.73 $1,809.00 $423.62 Herramienta Menor %(MO) 0.050 $1,496.09 PREFABRICADO REMATE ML 1.000 $261,693.80 $22,576.26 PREFABRICADO LISO 0.05X0.60X1.50 UND 1.000 $261,693.80 $48,944.78 SOBRE MURO b=0.35 M3 0.021 $2,444.00 $5,660.44 Concreto normal de 17,5 Mpa M3 0.068 $5,724.00 $18,329.03 Concreto normal de 17,5 Mpa Kg 0.900 $3,386.00 $2,243.59 Malla Electrosoldada cal.9 15x15 m2 0.900 $2,444.00 $5,254.63 Varilla corrugada 1/4 a 3/8 Kg 0.100 $10,724.63 Varilla corrugada 1/2\" Kg 1.500 $10,724.63 $3,739.32 Alambre negro # 18 hC 1.240 $360.00 $348.76 Cuadrilla de Albañilería 1*1 hC 1.840 $540.00 $19,733.33 Cuadrilla de Albañilería 1*1 dML 1.000 $13,298.55 $13,298.55 Formaleta metálica panel macizo dm2 1.670 $19,733.33 Formaleta metálica p/alfagias b=30 %(MO) 0.050 Herramienta Menor %(MO) 0.050 $901.80 Herramienta Menor $360.00 PREFABRICADO LISO 0.07X0.60X2.80 UND 1.000 $261,693.80 $986.67 PREFABRICADO REMATE $664.93 Concreto normal de 17,5 Mpa M3 0.127 $5,724.00 $85,515.46 SOBRE MURO b=0.25 Malla Electrosoldada cal.9 15x15 m2 1.700 $2,444.00 $34,232.17 Concreto normal de 17,5 Mpa ML 1.000 $261,693.80 $19,044.65 Varilla corrugada 1/2\" Kg 1.500 $10,724.63 $9,925.42 Varilla corrugada 1/4 a 3/8 M3 0.015 $2,444.00 $4,043.17 Cuadrilla de Albañilería 1*1 hC 3.180 $540.00 $3,739.32 Alambre negro # 18 Kg 0.900 $3,386.00 $2,243.59 Formaleta metálica panel macizo dm2 3.350 $34,104.34 $34,104.34 Cuadrilla de Albañilería 1*1 Kg 0.100 $10,724.63 Herramienta Menor %(MO) 0.050 $1,809.00 Formaleta metálica p/alfagias b=30 hC 1.070 $360.00 $348.76 $1,705.22 Herramienta Menor dML 1.000 $11,475.36 $11,475.36 %(MO) 0.050 $360.00 $573.77 PREFABRICADO CON MARCO 1.00X1.10 UND 1.000 $40,425.21 0.056 $15,094.50 PREFABRICADO PRE-ENCHAPADO Concreto normal de 17,5 Mpa M3 1.100 $261,693.80 $6,422.33 0.055X0.60X2.8 1.600 $5,724.00 $17,159.41 Cemento blanco tipo 1 UND 1.000 $128,663.03 Malla Electrosoldada cal.9 15x15 m2 1.650 $10,724.63 Concreto normal de 17,5 Mpa Kg 3.500 $4,055.63 0.050 $540.00 $891.00 Malla Electrosoldada cal.9 15x15 M3 0.092 $1,125.00 $24,798.10 Cuadrilla de Albañilería 1*1 hC $17,159.41 $857.97 Varilla corrugada 1/2\" m2 1.700 $261,693.80 $9,925.42 Cuadrilla de Albañilería 1*1 Kg 1.500 $3,739.32 Formaleta metálica panel macizo dm2 Ceramica Frli blanco 25x35 hC 3.190 $5,724.00 $34,211.58 M2 1.700 $2,444.00 $48,062.40 Herramienta Menor %(MO) $10,724.63 $28,272.00 PREFABRICADO PLACA DUCTO ML 1.000 $46,123.31 Malla Electrosoldada 5mm 20x20 M2 1.400 $4,860.00 $6,940.08 Apu de la Construcción / 2017124

Análisis de Precios DetalladosDESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALConcreto normal de 21 Mpa M3 0.070 $292,745.40 $21,106.94 Hidrosil concreto Lt 0.250 $10,350.00 $2,665.13Varilla grafil 6mm Und 0.400 $3,515.00 $1,434.12 Cuadrilla Especializada hC 0.640 $13,084.05 $8,373.79Cuadrilla de Albañilería 1*1 hC 1.350 $10,724.63 $14,478.26 Compresor de Pintura dM 0.040 $23,200.00Formaleta metálica plaquetas 0.5*.5*.68 dM2 4.000 $360.00 $1,440.00 Herramienta Menor %(MO) 0.215 $8,373.79 $928.00Herramienta Menor %(MO) 0.050 $14,478.26 $1,800.37 $723.91PREFABRICADO PLACA CANALETA ML 1.000 $2,444.00 PROTECCIÓN DE PISOS M2 1.000 $9,200.00 $10,450.69Varilla corrugada 1/2\" Kg 1.090 $1,560.00 $24,067.38 EN TABLETA GRES Lt 0.250 $13,084.05 $2,369.00Varilla Grafil 4mm Und 2.500 $292,745.40 $2,717.24 Hidrosil 5 hC 0.440 $23,200.00 $5,756.98Concreto normal de 21 Mpa M3 0.031 $10,724.63 $3,978.00 Cuadrilla Especializada dM 0.027 $5,756.98Cuadrilla de Albañilería 1*1 hC 0.670 $9,347.36 Compresor de Pintura %(MO) 0.295 $626.40Formaleta metálica prefab. Canaleta dML 2.000 $240.00 $7,185.50 Herramienta Menor $1,698.31Herramienta Menor %(MO) 0.050 $7,185.50 $480.00 PROTECCIÓN DE MUROSPREFABRICADO VIGUETA 0.10X0.35 ML 1.000 $292,745.40 $359.28 EN CONCRETO M2 1.000 $10,350.00 $17,053.85Concreto normal de 21 Mpa M3 0.037 $2,444.00 Hidrosil concreto Lt 0.250 $13,084.05 $2,665.13Varilla corrugada 1/2\" Kg 1.150 $1,560.00 $27,428.89 Cuadrilla Especializada hC 0.800 $10,467.24Varilla Grafil 4mm Und 0.900 $10,724.63 $11,156.53 Andamio tubular 1.50x1.50 dU 0.050 $800.00Cuadrilla de Albañilería 1*1 hC 1.010 $300.00 $2,866.81 Compresor de Pintura dM 0.050 $23,200.00 $40.00Formaleta metálica para vigueta h=0.35 dML 2.000 $10,831.88 $1,432.08 Herramienta Menor %(MO) 0.260 $10,467.24 $1,160.00Herramienta Menor %(MO) 0.050 $10,831.88 $2,721.48 $292,745.40PREFABRICADO VIGUETA 0.10X0.30 ML 1.000 $2,444.00 $600.00 PROTECCIÓN MUROS EN LADRILLO M2 1.000 $11,500.00 $15,709.83Concreto normal de 21 Mpa M3 0.032 $3,515.00 $541.59 A LA VISTA Lt 0.250 $13,084.05 $2,961.25Varilla corrugada 1/2\" Kg 1.150 $10,724.63 Hidrosil Ladrillo hC 0.650 $8,504.63Varilla grafil 6mm Und 0.850 $270.00 $26,688.42 Cuadrilla Especializada dU 0.028 $800.00Cuadrilla de Albañilería 1*1 hC 0.940 $10,081.16 $9,648.89 Andamio tubular 1.50x1.50 dM 0.028 $23,200.00 $22.40Formaleta metálica para vigueta h=0.30 dML 2.000 $2,866.81 Compresor de Pintura %(MO) 0.420 $8,504.63 $649.60Herramienta Menor %(MO) 0.050 $292,745.40 $3,047.51 Herramienta Menor $3,571.95 $2,444.00 $10,081.16PREFABRICADO VIGUETA 0.10X0.25 ML 1.000 $1,560.00 RESTAURACIÓN DE PISOS M2 1.000 $9,000.00 $15,155.51Concreto normal de 21 Mpa M3 0.027 $10,724.63 $540.00 EN TABLETA GRES Lt 0.167 $13,084.05 $1,548.09Varilla corrugada 1/2\" Kg 1.000 $240.00 $504.06 Ladri Bright (Limpiador Universal de Ladrillo) hC 0.800 $10,467.24 $10,467.24Varilla Grafil 4mm Und 0.750 $9,866.66 Cuadrilla Especializada %(MO) 0.300 $3,140.17Cuadrilla de Albañilería 1*1 hC 0.920 $22,667.53 Herramienta MenorFormaleta metálica para vigueta h=0.25 dML 2.000 $292,745.40 $8,141.25Herramienta Menor %(MO) 0.050 $2,444.00 $2,492.88 RED AREA 4No.2/0+1No4ACSR ML 1.000 $1,710.00 $9,768.06 $1,560.00 $1,193.40 BAJA TENSIÓN ML 4.000 $1,143.00 $7,045.20PREFABRICADO VIGUETA 0.10X0.20 ML 1.000 $10,724.63 $9,866.66 Cable No 2 AWG - ACSR ML 1.000 $10,724.63 $1,177.29Concreto normal de 21 Mpa M3 0.022 $220.00 Cable No 4 AWG - ACSR hH 0.030 $11,797.10Varilla corrugada 1/2\" Kg 1.000 $9,759.42 $480.00 Técnico hC 0.091 $1,073.54 $321.74Varilla Grafil 4mm Und 0.750 $493.33 Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.140 $1,073.54Cuadrilla de Albañilería 1*1 hC 0.910 $292,745.40 Herramienta MenorFormaleta metálica para vigueta h=0.20 dML 2.000 $5,724.00 $21,007.28 $150.30Herramienta Menor %(MO) 0.050 $10,724.63 $6,633.61 $540.00 $2,492.88 RED AREA 4No.1/0+1No4CSR ML 1.000 $1,143.00 $9,832.34PREFABRICADO CON MARCO 1.00X2.40 UND 1.000 $34,318.83 $1,193.40 BAJA TENSIÓN ML 4.000 $1,143.00 $4,709.16Concreto normal de 21 Mpa M3 0.127 $9,759.42 Cable No 1 AWG - ACSR ML 1.000 $10,724.63 $1,177.29Malla Electrosoldada cal.9 15x15 m2 2.400 Cable No 4 AWG - ACSR hH 0.077 $11,797.10Cuadrilla de Albañilería 1*1 hC 3.200 $440.00 Técnico hC 0.232 $2,736.93 $825.80Formaleta metálica panel macizo dm2 4.000 $487.97 Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.140 $2,736.93Herramienta Menor %(MO) 0.050 Herramienta Menor $90,501.15 $383.17 $38,294.03PROTECCIÓN DE PISOS EN CONCRETO M2 1.000 $14,012.35 RED AREA 4No.2/0+1No4ACSR ML 1.000 $3,327.00 $16,954.26 $34,318.83 BAJA TENSIÓN ML 4.000 $1,143.00 $13,707.24 $2,160.00 Cable No 2/0 AWG - ACSR ML 1.000 $1,177.29 $1,715.94 Cable No 4 AWG - ACSR $13,767.29 Apu de la Construcción / 2017 125

DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Técnico hH 0.040 $10,724.63 $428.99 SEÑAL DE TRÁNSITO GRUPO IV Cuadrilla instaladores (eléctricos y sanitarios) hC 0.122 $11,797.10 $1,439.25 Herramienta Menor %(MO) 0.140 $1,439.25 (60CMX75CM) UND 1.000 $238,779.57 $201.49 0.045 $9,860.31 $5,360.00 Concreto Clase F (2000 PSI o 140KG/CM2) M3 1.000 $212,736.00 $10,724.63 $24,663.63 1.000 $139,266.00 $139,266.00 $11,797.10 $22,083.20 Tablero lamina galv. Cal.16 reflectivo tipo 1 (60x75) Und 0.710 $69,600.00 $69,600.00 $1,793.16 0.333 $10,724.63 $7,614.49 RED AREA 4No.4/0+1No4ACSR $536.23 Poste en angulo2x2x1/4 Und 0.010 $37,125.00 $12,362.63 BAJA TENSIÓN $20,000.00 $1,793.16 Cable No 4/0 AWG - ACSR ML 1.000 $2,203.00 Cuadrilla de Albañilería 1*1 hC 1.000 $7,614.49 $76.14 Técnico ML 4.000 $1,840.00 $251.04 0.045 Cuadrilla instaladores (eléctricos y sanitarios) hH 0.050 $10,724.63 Camióneta D300 hM 1.000 Herramienta Menor hC 0.152 $98,600.00 $108,152.28 1.000 %(MO) 0.140 $19,518.83 $41,200.00 Herramienta Menor %(MO) 0.700 $9,076.36 0.333 $48,613.00 $1,895.20 SEÑAL DE TRÁNSITO GRUPO I 0.010 $3,160.00 $19,518.83 $5,500.00 $34,510.00 (60CMX60CM) UND 1.000 $223,276.18 $10,724.63 $1,951.88 4.000 $9,860.31 REMOCIÓN DE ESPECIES VEGETALES UND 1.000 Concreto Clase F (2000 PSI o 140KG/CM2) M3 1.000 $212,736.00 Tierra Abonada m3 2.000 $30,325.85 0.570 $123,250.00 $123,250.00 Costales de Fique o de Fibra M2 4.000 $6,076.63 Tablero lamina galv. Cal.16 reflectivo tipo 1 (60x60) Und 1.880 $69,600.00 $69,600.00 Nutrientes Kg 1.000 $2,030.62 0.150 $10,724.63 $7,507.24 Cuadrilla de Albañilería 1*1 hC 1.820 $13,596.00 Poste en angulo2x2x1/4 Und $37,125.00 $12,362.63 Retrocargador hM 0.350 $8,622.61 $69,600.00 Herramienta Menor %(MO) 0.100 Cuadrilla de Albañilería 1*1 hC $696.00 Camióneta D300 hM Herramienta Menor %(MO) REMOVIBLE DE MADERA 44x75x85 U/Uso 1.000 SEPARADOR DE LINEA 5 PUESTOS UND $9,785.00 $79,835.37 Casetón Madera 44x75x85 Und 0.125 Separador de linea en acero galvanizado Und $9,077.00 $39,140.00 Lamina de Icopor e=12mm Und 0.630 Aislador tipo carreto de 3x3 Und $10,724.63 $9,077.00 Polietileno Cal.6 m 2.400 Técnico hH $11,797.10 Cuadrilla de Albañilería 1*1 hC 0.804 Cuadrilla instaladores (eléctricos y sanitarios) hC $22,178.54 $6,113.04 Herramienta Menor %(MO) $22,178.54 $3,326.78 REMOVIBLE DE MADERA 29x75x85 U/Uso 1.000 $43,498.00 $29,697.20 SISTEMA DE TIERRA UND 1.000 $3,327.00 $538,855.76 Casetón Madera 29x75x85 Und 0.125 $3,160.00 $5,437.25 PARA SUB-ESTACIÓN ML 17.000 $5,510.00 $57,690.18 Lamina de Icopor e=12mm Und 0.630 $5,500.00 $2,030.62 Cable desnudo No 6 Kg 45.000 $96,600.00 $247,950.00 Polietileno Cal.6 m 2.400 $10,724.63 $13,596.00 Hidrosolta tratamiento de suelo artif. Und 1.000 $49,440.00 $96,600.00 Cuadrilla de Albañilería 1*1 hC 0.805 $8,633.33 Varilla de cobre 5/8\"x1.8M con conec 60-70-707582 Jgo 1.000 $3,505.00 $49,440.00 $43,498.00 Kit de soldadura tecno-weld cable 6-2 Awg ML 2.000 $7,010.00 REMOVIBLE DE MADERA 29x60x290 UND 1.000 $3,160.00 $129,305.75 Cinta Bandit de 5/8\" Und 2.000 $773.00 $1,546.00 Casetón Madera 29x75x85 Und 2.400 $5,500.00 $104,395.20 Hebilla o grapa par cinta de 5/8\" ML 1.000 $9,080.00 $9,261.60 Lamina de Icopor e=12mm Und 1.200 $10,724.63 Tubería galvanizada 1/2\" hH 1.330 $10,724.63 $14,263.76 Polietileno Cal.6 m 2.200 $3,867.84 Técnico hC 4.061 $11,797.10 $47,908.01 Cuadrilla de Albañilería 1*1 hC 0.800 $7,475.00 $12,463.00 Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.150 $47,908.01 $7,186.20 $13,084.05 $8,579.71 Herramienta Menor $10,467.24 RESTAURACIÓN DE PISOS EN CONCRETO M2 1.000 $15,950.38 SISTEMA REM-MAD 2D H=0,40 M2/U 1.000 $206,558.80 $109,353.35 Concre Bright Limpiador de concreto Lt 0.167 $212,736.00 $1,285.77 Concreto 10.5 Mpa M3 0.440 $10,724.63 $93,612.45 Cuadrilla Especializada hC 0.800 $10,724.63 $10,467.24 Cuadrilla de Albañilería 1*1 hC 0.320 $3,431.88 Herramienta Menor %(MO) 0.401 $56,680.00 $4,197.36 Cercha Metálica dU 15.000 $139.00 $2,085.00 Paral metalico 3m dU 28.000 $116.00 $3,248.00 SARDINEL EN CONCRETO h=0.40 M M3 1.000 $696.00 $40,653.68 Formaleta metálica de 1*0.50 M-Und dU 17.000 $200.00 $3,400.00 0.120 $11,260.87 $26,294.17 Herramienta Menor %(MO) 1.042 $3,431.88 $3,576.02 Concreto Clase F (2000 PSI o 140KG/CM2) M3 1.050 $11,260.87 0.030 $29,000.00 $1,700.40 Cuadrilla de Albañilería 1*1 hC 1.200 $10,724.63 0.050 $1,362.03 $835.20 Vibrador (Gas/Elec) dM $563.04 Formaleta metálica sardineles dU $30,430.13 SISTEMA REM-MAD 2D H=0,25 M2/U 1.000 $12,336.48 $29,000.00 Cuadrilla de Albañilería 1*1 hC 0.320 $3,431.88 Herramienta Menor %(MO) $1,362.03 Cercha Metálica dU 15.000 $10,724.63 $2,085.00 Paral metalico 3m dU 28.000 $139.00 $3,248.00 SELLOS PARA JUNTAS DE PUENTE ML 1.000 $68.10 Formaleta metálica de 1*0.50 M-Und dU 17.000 $116.00 $3,400.00 Cinta Sika PVC O-22 ML 1.000 Herramienta Menor % 0.050 $200.00 Cuadrilla de Albañilería 1*1 hC 0.127 $171.59 Herramienta Menor %(MO) 0.050 $3,431.88 SISTEMA REM-MAD 1D H=0,25 M2/U 2.000 $13,871.19 Apu de la Construcción / 2017126

DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTALCuadrilla de Albañilería 1*1 hC 0.225 $10,724.63 $2,413.04 Formaleta metálica de 1*0.50 M-Und dU 500.000 $200.00 $100,000.00Cercha Metálica dU 62.500 $139.00 $8,687.50 Herramienta Menor %(MO) 0.100 $685,304.13 $68,530.41Paral metalico 3m dU 12.500 $116.00 $1,450.00 TACHA REFLECTIVA UND 1.000 $7,544.18Formaleta metálica de 1*0.25 dU 10.000 $120.00 $1,200.00 Tacha reflectiva $6,960.00 $6,960.00Herramienta Menor %(MO) 0.050 Resina Termoplastica ( Pegante Epoxico) Und 1.000 $3,308.00 $2,413.04 $120.65 Cuadrilla de Albañilería 1*1 Kg 0.010 $10,724.63 $34.07 Camióneta D300 hC 0.025 $37,125.00 $268.12SUBESTACIÓN AÉREA DE 75 KVA UND 1.000 $11,038,952.67 Maquina termica (pegatachas) hM 0.004 $26,670.00 $148.50TRIFÁSICO Und 1.000 $9,874,000.00 $9,874,000.00 Herramienta Menor hM 0.004 $106.68Transformador 75 KV-13.2 kv/220/127 Vol. hH 18.600 %(MO) 0.100 $268.12 $26.81Técnico hC 74.400 $10,724.63 $199,478.20Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.100 $11,797.10 $877,704.06 TEMPLETE DIRECTO A TIERRA UND 1.000 $3,838.00 $134,710.15Herramienta Menor $877,704.06 $87,770.41 BAJA TENSIÓN Kg 1.000 $33,600.00 $3,953.14 Alambre galvanizado para enlice No 10 Und 1.000 $1,480.00 $33,600.00SUBESTACIÓN AÉREA DE 45 UND 1.000 $8,622,431.88 Varilla de anclaje de 3/4\"x1.80M Und 1.000 $2,936.00 $1,480.00KVA TRIFÁSICO Und 1.000 $7,953,000.00 $7,953,000.00 Guardacabo acero galvanizado para 3/8\" Und 1.000 $4,785.00 $2,936.00Transformador 45 KV-13.2 kv/120/127 Vol. hH 13.340 Arandela cuadrada plana 4x4x5/8\" ML 12.000 $11,137.00 $58,568.40Técnico hC 40.562 $10,724.63 $143,066.62 Cable acero galvaniado 1/4\" Und 1.000 $10,724.63 $11,137.00Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.100 $11,797.10 $478,513.87 Aislador tipo tensor ansi 54-1 de 3 1/2\" hH 0.450 $11,797.10 $4,826.09Herramienta Menor $478,513.87 $47,851.39 Técnico hC 1.354 $15,973.27 $15,973.27 Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.140 $2,236.26Suministro, transporte e instalación Herramienta Menor $3,838.00de geotextil no tejido tipo NT2000 $33,600.00 $178,299.52de pavco o similar. M2 1.000 $3,193.00 $23,428.44 TEMPLETE DIRECTO A TIERRA UND 1.000 $1,480.00 $3,953.14Geotextil NT 1600 (3.50x1.60x6.08) M2 5.340 $10,724.63 $17,391.63 MEDIA TENSIÓN Kg 1.000 $2,936.00 $33,600.00Cuadrilla de Albañilería 1*1 hC 0.350 $13,920.00 $3,753.62 Alambre galvanizado para enlice No 10 Und 1.000 $4,785.00 $1,480.00Transporte (f150-1.5 Ton) Viaje 0.150 $3,753.62 $2,088.00 Varilla de anclaje de 3/4\"x1.80M Und 1.000 $22,660.00 $2,936.00Herramienta Menor %(MO) 0.052 Guardacabo acero galvaniado para 3/8\" Und 1.000 $10,724.63 $87,852.60 $195.19 Arandela cuadrada plana 4x4x5/8\" ML 18.000 $11,797.10 $22,660.00 Cable acero galvaniado 1/4\" Und 1.000 $17,943.39 $5,362.32Suministro, transporte e instalación M3 1.000 $39,100.00 $126,100.83 Aislador tipo tensor ansi 54-4 de 7\" hH 0.500 $17,943.39de triturado de 1” a 3” medido en sitio. m3 2.560 $10,724.63 $102,097.92 Técnico hC 1.521 $10,724.63 $2,512.07Incluye acarreo interno, mano hC 1.230 $6,550.00 $13,191.30 Cuadrilla instaladores (eléctricos y sanitarios) %(MO) 0.140 $35,000.00Triturado de 1\" M3 1.560 $13,191.30 $10,218.00 Herramienta Menor $116,000.00 $24,040.03Cuadrilla de Albañilería 1*1 %(MO) 0.045 $116,000.00 $536.23Transporte interno $593.61 TERRAPLÉN ( PRÉSTAMO ENTRE 7 Y 11 KM) M3 1.000 $104,400.00 $700.00Herramienta Menor $910.00 $5,800.00 Cuadrilla de Albañilería 1*1 hC 0.050 $4,060.00 $10,724.63 $2,296.80TABLERO PARA COLUMNAS M2 1.000 $64,582.70 Carrotanque de Agua hM 0.020 $35,000.00 $10,647.00Puntilla 1\" x 500grs Kg 0.350 $829.15 $116,000.00Liston 4x9x300 Sapan Und 1.000 $2,300.00 Bulldozer D5G hM 0.050 $116,000.00 $19,308.03Machimbre techo perillo M2 1.000 $20,218.00 $20,622.36 $104,400.00 $536.23Cuadrilla de Albañilería 1*1 hC 2.130 $17,479.00 $18,003.37 Motoniveladora hM 0.035 $700.00Herramienta Menor %(MO) 0.100 $10,724.63 $22,843.47 $910.00 $22,843.47 $2,284.35 Vibrocompactador hM 0.022 $5,800.00 $4,060.00 Volqueta 5M3 M3/Km 11.700 $2,296.80 $5,915.00 TERRAPLÉN ( PRÉSTAMO ENTRE 3 Y 7 KM) M3 1.000 0.050TABLERO PARA PLACA 0.70X1.40 M3 1.000 $72,110.31 Cuadrilla de Albañilería 1*1 hC 0.020Puntilla 1\" x 500grs Kg 0.350 $829.15 0.050Liston 4x9x300 Sapan Und 1.500 $2,300.00 Carrotanque de Agua hM 0.035Machimbre techo pavito M2 1.050 $20,218.00 $30,933.54 0.022Cuadrilla de Albañilería 1*1 hC 1.990 $15,600.00 $16,871.40 Bulldozer D5G hM 6.500Herramienta Menor %(MO) 0.100 $10,724.63 $21,342.02 $21,342.02 $2,134.20 Motoniveladora hM Vibrocompactador hM Volqueta 5M3 M3/KmTABLERO PONTONES M3 1.000 $1,166,698.30 TERRAPLÉN ( PRÉSTAMO ENTRE 0 Y 3 KM) M3 1.000 $15,712.03Concreto normal de 21 Mpa 0.050 $536.23Cuadrilla de Albañilería 1*1 M3 1.000 $292,745.40 $301,527.76 Cuadrilla de Albañilería 1*1 hC 0.020 $10,724.63 $700.00Vibrador (Gas/Elec) 0.050 $35,000.00 hC 63.900 $10,724.63 $685,304.13 Carrotanque de Agua hM $116,000.00 $5,800.00 dM 0.200 $56,680.00 $11,336.00 Bulldozer D5G hM Apu de la Construcción / 2017 127

DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL DESCRIPCIÓN UNIDAD REND/CANT V. UNITARIO V. TOTAL Motoniveladora hM 0.035 $116,000.00 $4,060.00 Concreto normal de 17,5 Mpa M3 0.010 $261,693.80 $2,695.45 Vibrocompactador hM 0.022 $104,400.00 $2,296.80 Cuadrilla de Albañilería 1*1 hC 0.100 $10,724.63 $1,072.46 Volqueta 5M3 Viaje 0.030 $77,300.00 $2,319.00 VIGUETA PARA GRADERÍA ML 1.000 $3,515.00 $38,064.65 TERRAPLÉN ( PRÉSTAMO LATERAL) M3 1.000 $10,724.63 $13,393.03 Varilla grafil 6mm Und 1.300 $2,444.00 $4,660.89 Cuadrilla de Albañilería 1*1 hC 0.050 $35,000.00 $536.23 Varilla corrugada 1/2\" Kg 1.150 $292,745.40 $2,866.81 Carrotanque de Agua hM 0.020 $116,000.00 $700.00 Concreto normal de 21 Mpa M3 0.046 $10,724.63 $13,870.28 Bulldozer D5G hM 0.050 $116,000.00 Cuadrilla de Albañilería 1*1 hC 1.140 $12,226.08 Motoniveladora hM 0.035 $104,400.00 $5,800.00 Formaleta metálica sardineles dU 1.430 $696.00 Vibrocompactador hM 0.022 $4,060.00 Vibrador (Gas/Elec) dM 0.050 $56,680.00 $995.28 $12,650.00 $2,296.80 Herramienta Menor %(MO) 0.050 $12,226.08 $2,834.00 TOPELLANTAS EN PARQUEADERO UND 1.000 Topellantas 50x15x20 Und 1.000 $16,417.91 $611.30 $12,650.00 Ahora el ingeniero, el arquitecto o el constructor ya no tiene que lla-DE LA mar a consultar precios y tarifas. Ahora todo lo encuentra aquí !! CONSTRUCCIÓN GSueímaestral Apu de la Construcción / 2017128

Tablas de Cantidades 07 07Sección TABLAS DE[ ]CANTIDADES

CONVERSIÓN DE MATERIALES DE HIERRO Y ACERO ACERO EN VARILLAS Kg/Ml ALAMBRES PUNTILLAS DE HIERRO Teórico Cnt/lb Pulgadas No. Teórico Kg/Ml Real Kg/Ml No. 2 Kg/Ml Log. 930 Real Cnt/lb 1/4” 1” 325 1050 3/8” 2 0,25 0,3 4 0,225 1 1/2” 185 495 1/2” 2” 111 432 5/8” 3 0,56 0,61 6 0,163 2 1/2” 73 127 3/4” 3” 52 75 7/8” 4 1 1,1 8 0,117 3 1/2” 33 50 1” 4” 25 49 5 1,55 1,6 10 0,071 4 1/2” 19 29 5” 20 6 2,24 2,32 12 0,047 7 3,04 3,15 14 0,027 8 3,97 4,1 16 0,017 18 0,009 pua 0,125 DE LA CONSTRUCCIÓN GSueímaestral CONVERSIÓN DE MATERIALES DE HIERRO Y ACERO ACERO EN VARILLAS Kg/Ml ALAMBRES PUNTILLAS DE HIERRO Teórico Cnt/lb Pulgadas No. Teórico Kg/Ml Real Kg/Ml No. 2 Kg/Ml Log. 930 Real Cnt/lb 1/4” 1” 325 1050 3/8” 2 0,25 0,3 4 0,225 1 1/2” 185 495 1/2” 2” 111 432 5/8” 3 0,56 0,61 6 0,163 2 1/2” 73 127 3/4” 3” 52 75 7/8” 41 1,1 8 0,117 3 1/2” 33 50 1” 4” 25 49 5 1,55 1,6 10 0,071 4 1/2” 19 29 5” 20 6 2,24 2,32 12 0,047 7 3,04 3,15 14 0,027 8 3,97 4,1 16 0,017 18 0,009 pua 0,125 Fuente: Hugo Cardozo Curso de Presupuesto DOSIFICACIÓN CONCRETOS Y MORTEROS CONCRETOS/m3 RESISTENCIA MORTEROS/m3 Proporción Cemento/ Kg Arena /m3 Gravilla/m3 Agua/Galón Agua/L P.S.I Kg/cm3 Proporción Cemento/Kg Arena/m3 Agua/Galón Agua/L 1:2:2 420 281 1:2:2.5 380 0,670 0,670 45 230 3000 210 1:2 610 0,97 10,4 109 1:2:3 350 255 1:2:3.5 320 0,600 0,760 43 1:3 454 1,09 4,03 249 1:2:4 300 245 1:2.5:4 280 0,555 0,835 42 210 2500 175 1:4 364 1,16 9,44 240 260 238 1:2.5:4.5 300 0,515 0,900 41 1:5 302 1,2 9,22 231 1:3:3 260 230 1:3:4 230 0,475 0,950 40 204 2000 140 1:6 261 1,2 9,07 1:3:5 210 Columna4 1:3:6 0,555 0,890 39 1:7 228 1,25 8,88 1:4:7 183,75 0,520 0,940 38 1:8 203 1,25 8,81 0,715 0,715 36 1:10 166 1,25 8,55 0,825 0,835 34 1:12 141 1,25 8,51 0,555 0,920 32 MORTEROS CUC CARIBE/OCHOA/m3 0,500 1,000 30 192 1500 105 Columna1 Kg Kg2 Kg3 0,59 1,07 28 194 1:3.65 393,53 1436,4 301,64 1:4.87 304,97 1485,23 311,89 RENDIMIENTO DE SOLDADURA (NÚMERO DE ACOPLES POR CADA 1/4 DE GALÓN) DIÁMETRO EN PULGADAS 1/2” 3/4” 1” 1 1/4” 1 1/2” 2” 2 1/2” 3” 4” 6” TUBERIA DE PRESIÓN 760 430 320 230 170 90 80 65 45 TUBERIA SANITARIA Y VENTILACIÓN 330 180 90 60 30 TUBERIA CPVC 1300 750 12 0,047 3” 73 75 Apu de la Construcción / 2017130

MAMPOSTERIADESCRIPCIÓN UN Tolete Común Tolete Prensado Hucco Mortero Pega Desp. Mano / ObraLad. Tolete Común e= 25cm UN UN UN Lts % h/HLad. Tolete Común e= 15cmLad. Tolete Común e= 10cm M2 96.00 70.00 5 2.93Lad.Prens. V.1.C e=25cmLad.Prens. V.2.C e=25cm M2 48.00 35.00 5 1.73Lad.Prens. V.1.C e=15cmLad.Prens. V.2.C e=15cm M2 30.00 17.00 5 1.43Lad. Hueco N° 6 e=20cmLad. Hueco N° 5 e=20cm M2 110.00 60.00 10 3.52Lad. Hueco N° 5 e=15cmLad. Hueco N° 4 e=10cm M2 110.00 60.00 15 4.25Alfajia lad. Tolete e=10cmAlfajia lad. Prens. e=11.5cm M2 57.00 30.00 10 2.08Dintel lad. Hueco e=20cm M2 57.00 30.00 20 3.68 M2 12.50 30.01 5 1.80 M2 16.70 30.02 5 1.95 M2 12.50 30.03 5 1.50 M2 12.50 30.04 5 1.14 ML 8.50 30.05 5 1.60 ML 15.550 30.06 10 2.10 ML 4.00 30.07 5 1.80 ESTRUCTURA DE CONCRETODESCRIPCIÓN(*) UN Concreto Hierro 60.000 Hierro 37.000 Formal Mat. Aligerad. Equipo Herram. Mano / ObraZapatas M3 Kg Kg M2 ML D.D h/HViga CimentaciónColumnas M3 1.05 67.20 X X 20.00Vigas AéreasEntrepiso Macizo M3 1.05 X XX X 22.00Entrepiso AligeradoDinteles M3 1.05 X XX X 38.00Vigas Amarre CubiertaViga Canal M3 1.05 X XX X 25.00Alfajias - MarcosEscalera M2 X X X X X 7.50 M2 X X X X X X 6.80 ML X X X X 1.85 M3 1.05 X XX X 28.00 M3 1.05 X XX X 65.00 ML X X X X X 1.85 M3 1.05 X XX X 55.00 CUBIERTAColumna1 Columna2 Teja Ondulada Teja de Barro Caballete Ganchos Amarres Correas Taquetes Varios Mano de obraDescripción UN M2 UN GL h/HEn asbesto - cemen- ML UN UN ML ML 1.00 3.32to De composición M2 M2 1.00 5.07(Asb - Cem + barro) 1.05 1.05 11.00 X 2.10 X 1.10 0.75En teja de barro Guadua M2 X 2.10 X 1.10 0.75 1.00 4.55(con estructura) 1.00 2.20En teja de barro Mortero Lts 1.00 0.82Impermealización terraza M2 1.05 22.00 30.00 2.62 0.75 M2 1.05 22.00 3.00 Emulsión Asfaltica Perma - Play ASFALTO 90° Manto Edil Pintura Bitumin. Tela Asfática ML Kg M2 Gln M2 Gln X X XXX X X DE LA CONSTRUCCIÓN GSueímaestral Apu de la Construcción / 2017 131

APARATOS Y ACCESORIOS DESCRIPCIÓN Elemento Grifería Mortero Pega Cemento Blanco Mueble Chazos Desperd. Mano de Obra UN UN UN UN % h/H Sanitario Tanque Bajo 1.00 1.00 Lts Kg 1.00 2 2.50 Lavamanos de Colgar 1.00 1.00 2.00 2 2.00 Ducha Mezclador 1.00 1.00 3.00 1.00 2 1.80 2 Juego de Incrustar 1.00 4.50 0.50 2 3.50 Papelera 1.00 0.70 0.60 1.50 Cemento Gris 4.00 0.60 PISO DESCRIPCÓN UN Desp. Recebo Polietil Concreto Ref Equipo Herram Mano / Obra Base Recebo Suelto % M3 M2 M3 Kg % h/H Imperm. Polietileno Placa de Piso (Simple) M3 40 1.00 X 5.90 Placa Piso (Reforzada) M2 20 1.00 X 0.20 M3 5 1.00 X 0.79 M3 5 1.00 X X 0.95 ACABADO DE PISOS Descripción UN Acabado Mortero de Pega Cemento Gris Cemento + mineral Cemento Blanco Varios Desperrd. Mano de Obra M2 Kg Gl % h/H Mortero de nivelación M2 Lts Kg Kg 0.60 5 1.50 Baldosa Porcelana M2 1.00 1.00 5 2.20 Tableta Cerámica M2 1.00 0.04 1.10 1.00 5 2.15 Ladrillo Tablón M2 1.00 1.20 1.00 5 2.50 Mosaico o Cristanac M2 1.00 10.00 1.00 5 2.25 Baldosín de Cemento M2 1.00 Puntilla 1.00 5 2.30 Guarda escoba Cerámica 1.00 10.00 0.70 Lb 1.00 5 0.45 0.10 Valdosa en Vinilo o Caucho 1.00 25.00 0.50 0.10 1.00 Guarda escoba Vinilo 1.00 0.02 1.00 Listón 2.90 Alistado M2 Bto 1.00 15.00 0.10 1.00 0.15 Chazos UN 2.00 0.15 1.00 Pegante Gln 0.10 3 0.80 3 0.35 0.02 Desperd. Mano / Obra % h/H Durm. 4x4 Malla Mortero 5 3.65 5 2.00 ML M2 Lts Listón M.H.S/ Durmiente 2.50 0.25 4.00 Listón M.H.S/ Entresuelo Guard. ML 5 0.60 Guarda escoba en Madera 2.50 SI DESEA CUMPLIR Y ENTREGAR OBRAS A TIEMPO AGILICE SUS PRESUPUESTOS CON CONSTRUCCIÓNDE LA Guía de precios y tarifas del gremio constructor Apu de la Construcción / 2017132

Tablas de Cantidades CONVERSIÓN DE MATERIALES DE HIERRO Y ACERO ACERO EN VARILLAS Kg/Ml ALAMBRES PUNTILLAS DE HIERRO Teórico Cnt/lbPulgadas No. Teórico Kg/Ml Real Kg/Ml No. 2 Kg/Ml Log. 930 Real Cnt/lb 1/4” 1” 325 1050 3/8” 2 0,25 0,3 4 0,225 1 1/2” 185 495 1/2” 2” 111 432 5/8” 3 0,56 0,61 6 0,163 2 1/2” 73 127 3/4” 3” 52 75 7/8” 4 1 1,1 8 0,117 3 1/2” 33 50 1” 4” 25 49 5 1,55 1,6 10 0,071 4 1/2” 19 29 5” 20 6 2,24 2,32 12 0,047 7 3,04 3,15 14 0,027 8 3,97 4,1 16 0,017 18 0,009 pua 0,125 Fuente: Hugo Cardozo Curso de Presupuesto DOSIFICACIÓN CONCRETOS Y MORTEROS CONCRETOS/m3 RESISTENCIA MORTEROS/m3Proporción Cemento/ Kg Arena /m3 Gravilla/m3 Agua/Galón Agua/L P.S.I Kg/cm3 Proporción Cemento/Kg Arena/m3 Agua/Galón Agua/L 1:2:2 420 281 1:2:2.5 380 0,670 0,670 45 230 3000 210 1:2 610 0,97 10,4 109 1:2:3 350 255 1:2:3.5 320 0,600 0,760 43 1:3 454 1,09 4,03 249 1:2:4 300 245 1:2.5:4 280 0,555 0,835 42 210 2500 175 1:4 364 1,16 9,44 240 260 238 1:2.5:4.5 300 0,515 0,900 41 1:5 302 1,2 9,22 231 1:3:3 260 230 1:3:4 230 0,475 0,950 40 204 2000 140 1:6 261 1,2 9,07 1:3:5 210 Columna4 1:3:6 0,555 0,890 39 1:7 228 1,25 8,88 1:4:7 183,75 0,520 0,940 38 1:8 203 1,25 8,81 0,715 0,715 36 1:10 166 1,25 8,55 0,825 0,835 34 1:12 141 1,25 8,51 0,555 0,920 32 MORTEROS CUC CARIBE/OCHOA/m3 0,500 1,000 30 192 1500 105 Columna1 Kg Kg2 Kg3 0,59 1,07 28 194 1:3.65 393,53 1436,4 301,64 1:4.87 304,97 1485,23 311,89 RENDIMIENTO DE SOLDADURA (NÚMERO DE ACOPLES POR CADA 1/4 DE GALÓN)DIÁMETRO EN PULGADAS 1/2” 3/4” 1” 1 1/4” 1 1/2” 2” 2 1/2” 3” 4” 6”TUBERIA DE PRESIÓN 760 430 320 230 170 90 80 65 45TUBERIA SANITARIA Y VENTILACIÓN 330 180 90 60 30TUBERIA CPVC 1300 750 12 0,047 3” 73 75 MAMPOSTERIADESCRIPCIÓN UN Tolete Común Tolete Prensado Hucco Mortero Pega Desp. Mano / ObraLad. Tolete Común e= 25cm UN UN UN Lts % h/HLad. Tolete Común e= 15cmLad. Tolete Común e= 10cm M2 96.00 70.00 5 2.93Lad.Prens. V.1.C e=25cmLad.Prens. V.2.C e=25cm M2 48.00 35.00 5 1.73Lad.Prens. V.1.C e=15cmLad.Prens. V.2.C e=15cm M2 30.00 17.00 5 1.43Lad. Hueco N° 6 e=20cmLad. Hueco N° 5 e=20cm M2 110.00 60.00 10 3.52Lad. Hueco N° 5 e=15cmLad. Hueco N° 4 e=10cm M2 110.00 60.00 15 4.25Alfajia lad. Tolete e=10cmAlfajia lad. Prens. e=11.5cm M2 57.00 30.00 10 2.08Dintel lad. Hueco e=20cm M2 57.00 30.00 20 3.68 M2 12.50 30.01 5 1.80 M2 16.70 30.02 5 1.95 M2 12.50 30.03 5 1.50 M2 12.50 30.04 5 1.14 ML 8.50 30.05 5 1.60 ML 15.550 30.06 10 2.10 ML 4.00 30.07 5 1.80 Apu de la Construcción / 2017 133

Tablas de Cantidades Columna1 Columna2 Columna3 Columna4 DESAGÜES SUBTERRÁNEOS Columna10 Columna11 Columna12 Columna13 Columna14 DESCRIPCIÓN UN Recebo Concreto Comp Columna5 Columna6 Columna7 Columna8 Columna9 Tubería Gres 3” ML Pobre Tubería Gres 4” ML M3 Tuberia Gres Accesorio Gres Yute Mortero Mano Tubería Gres 6” ML 0.06 M3 estopa imperm. de Obra Salida Sanitaria UN 0.06 0.03 0.06 0.03 3” 4” 6” 3” 4” 6” Excav. Sent. Rell 0.21 0.04 UN KG LTS h/H h/H 0.11 ML ML ML UN UN 0.08 1.80 0.35 1.41 1.05 0.20 0.10 2.00 0.35 1.41 0.15 0.12 2.20 0.35 1.95 1.05 0.20 0.50 0.35 7.00 1.23 4.94 1.05 0.80 2.50 0.60 1.00 2.00 Columna1 Columna2 Columna3 INSTALACIONES ELÉCTRICAS Columna9 Columna10 Columna11 Columna12 DESCRIPCIÓN Roseta Tuberia P.V.C Columna4 Columna5 Columna6 Columna7 Columna8 o Toma Salida Luminaria - roseta Salida Tomo Monofásica 3/4” 1/2” ALAMBRE Juegos UN Interrup. Varios Mano / Obra Toma 3x50A (Trifásica) ML ML 1.00 Salidad Teléfono xx N° 12 N° 14 Cajas 3/4” 1/2” 1.00 1.00 xx ML ML UN UN UN 1.00 UN GL h/H x 1 1/4” xx x x xx x 1.00 1.00 x x x xx 1.00 x N° 8 N° 10 x x 1 1/4” 1.00 x 2X22 x x 1.00 x INSTALACIONES HIDRÁULICAS Agua Fria Columna2 Columna3 Columna4 Columna5 Columna6 Columna7 Columna8 Columna9 Columna10 Columna11 Columna1 Tuberia P.V.C Accesorio P.V.C Mano / Obra Descripción (**) 3/8” 1/2” 3/8” Soldad. Limp. Desp. 3/4” 1/2” ML 3/4” UN UN Gln Gln % h/H Salida Hidráhulica ML ML UN x Lavamanos x Punto Hidráhulica xx xx x x5 M/O Sanitario x Agua Caliente x xx x x x x x5 x Salida Hidráhulica Tuberia P.V.C Accesorio P.V.C Soldad. Limp. Desp. Lavamanos Salida Hidráhulica xx xx x x5 Ducha xx xx x x5 ACABADOS MUROS Y CIELORASO Descripción Mortero 1:15 Mortero 1:16 Alistado Guadua Alambre puntilla Varios Desperd. Mano / Obra Lts Lts Gl Gl % h/H Pañete Bajo Placa Bto M2 1.00 Pañete Bajo Falso 5.00 15.00 1.00 1.00 20 1.70 Pañete Muros Interiores 10.00 15.00 0.05 1.00 1.00 1.00 25 2.80 Pañete Muros Exteriores 20.00 1.00 15 1.24 20.00 20 1.65 Enchape en Porcelana Acabado 5 Enchape en Cristanac Mortero de Pega Cemento Gris Boceles Molduras Cemento Blanco 1.00 2.35 M2 Lts Kg ML Kg 5 2.45 1.00 2.20 0.20 0.50 1.00 1.01 2.90 1.20 Apu de la Construcción / 2017134

Expensas de Curadur ía 08 08Sección EXPENSAS DE[ ]CURADURÍA

Expensas de Curaduría $ 683.000 EXPENSAS DEL CURADOR URBANO DECRETO 1469 de 2010 LICENCIAS URBANISTICAS ( RESOLUCION DSH No 004 de diciembre del 2013) salario minimo legal mensual vigente año 2016 E =expensas m = factor de municipio en funcion del tamaño del mercado y la categorizacion presupuestal Cf = cargo fijo la tarifa unica nacional para licencias de parcelacion, urbanizacion y construccion y sus modalidades, sera igual al 40% de un SMLMV Cv = cargo variable la tarifa unica nacional para licencias de parcelacion, urbanizacion y construccion y sus modalidades, sera igual al 80% de un SMLMV i = por estrato de vivienda y categoria de usos 1 VIVIENDA 3 4 56 ESTRATO 0,5 1,0 1,5 2,0 2,5 2 0,5 OTROS USOS “Q” expresa el numero de M2 INSTITUCIONAL COMERCIO INDUSTRIAL 1 A 300 2,9 2,9 2,9 301 A 1000 3,2 3,2 3,2 MAS DE 1001 4 4 4 j = factor que regula la relacion entre el valor de la expensas y la cantidad de M2 area M2 j de conformidad con articulo 11 de la ley 810 de 2003 las expensas seran liquidadas al 50% cuando se trate de Vivienda de Interes Social. Para todas las modalidades y actos de reconocimiento de < = 100 0,45 dotaciones publico destinados a salud, educacion y bienestar social en el caso de proyectos del nivel central o desentralizados de la rama ejecutiva del orden nacional, departamental, municipal y distrital > 100 e < 11,000 3,8/0,12+(800/Q) las expensas seran liquidadas al 50% de los valores del presente decreto. > 11,000 2,2/0,018+(800/Q) urbanismo y parcelacion 4/0,025+(200/Q) USO RESIDENCIAL MUNICIPIO/ DISTRITO VALOR DEL FACTOR “ m “ ESTRATO Unifamiliar - Multifamiliar Multifamiliar barranquilla 0,85 bifamiliar (precio por M2) mas de 6 pisos cartagena 0,9 1 hasta 6 pisos (precio por M2) monteria 0,574 2 (precio po M2) santa marta 0,638 3 $ 296.147,00 sincelejo 0,638 4 $ 366.685,00 $ 279.215,00 soledad 0,765 5 $ 346.788,00 valledupar 0,608 6 $ 382.079,00 $ 329.856,00 $ 466.570,00 $ 471.486,00 $ 488.418,00 $ 561.159,00 $ 547.506,00 $ 564.437,00 $ 714.019,00 $ 695.817,00 $ 712.749,00 $ 832.551,00 $ 770.516,00 $ 787.447,00 precios minimos del 2014 de presupuestos de obra o construccion po M2 que se deben tener en cuenta para los contribuyentes del impuesto de delineacion urbana para declarar y pagar el anticipo del impuesto de delineacion urbana EXPENSAS DE EXPEDICIÓN DE LICENCIAS DE CONSTRUCCIÓN INDIVI- OTROS USOS precio por M2 DUAL uso de la construccion $ 563.163,00 DE VIVIENDA DE INTERES SOCIAL $ 461.368,00 comercial $ 604.974,00 Solicitudes de viviendas de interes social unifamiliar o bifamiliar en los estratos industrial $ 146.334,00 1,2 y 3, generaran una expensa unica a diez salarios legales vigentes al momen- institucional $ 199.345,00 espacio publico y recreativo $ 88.497,00 to de la radicacion por cada unidad estacionamiento publico y se liquidaran al 50%, según lo dispuesto en el articulo 11 de la ley 810 de 2003 cerramiento $ 9.020,00 demolicion Apu de la Construcción / 2017136

Expensas de CuraduríaAJUSTES DE COTAS DE AREAS POR PROYECTO EXPENSAS POR OTRAS ACTUACIONES AUTORIZACION PARA EL MOVIMENTO DE TIERRAS Y CONSTRUCCION DE PISCINA (M3 de excavación) APROBACIÓN DE PLANOS DE PROPIEDAD HORIZONTAL (M2 de construcción)estratos 1 y 2 4 SMLDiarioV hasta 250 M2 0,25 SMLMV hasta 100 M3 2 SMLMV de 251 a 50 M2 0,50 SMLMV de 101 a 500 M3 4 SMLMVestratos 3 y 4 8 SMLDiarioV de 501 a 1000 M2 1,0 SMLMV de 501 a 1000 M3 1 SMLMV de 1001 a 5000 M2 2,0 SMLMV de 1001 a 5000 M3 2 SMLMVestraos 5 y 6 12 SMLDiarioV de 5001 a 10000 M2 3,0 SMLMV de 5001 a 10000 M3 3 SMLMV de 10001 a 20000 M2 4,0 SMLMV de 10001 a 20000 M3 4 SMLMVla copia certificada de planos causara de 1 SMLMV por mas de 20000 M2 mas de 20000 M3 5 SMLMVcada plano 5 SMLMV liquidacion de expensas para las licencias de urbanizacion y parcelacion liquidacion de expensas para las licencias de construccionel factor “ j “ de que trata el articulo 118 se aplicara sobre el area bruta del predio el factor “ Q “ se aplicara sobre el numero de M2 del area de cubierta a construir, ampliar o adecuar de cadao predios objeto de la solicitud unidad estructurantes independiente, siempre y cuando estas unidades conformen edificaciones separadas. E= (Cf*i*m) +(Cv*i*j*m) AREA (Q) J i (estrato y categoria) $ 314.160,00 85 1,5 Cf (40% SMLMV) $ 246.400,00 Cv (80% SMLMV) $ 492.800,00 m (ciudad) 0,85 < = 100 0,45 12,54 > 100 e < 11,000 131,63 > 11,000 162,35urbanismo y parcelacion 1 estrato Apu de la Construcción / 2017 137

09 Convenciones Sección09 [ ]HONORARIOS PROFESIONALES

Honorarios Profesionales TABLA No. 9: HONORARIOS S.C.A. Para una cabal comprensión del contenido y alcance de estas tablas, debe consultarse el DECRETO 2090 del 13 de septiembre de 1989, mediante el cual se promulgó el Reglamento de Honorarios de la Sociedad Colombiana de Arquitectos DISEÑO Y DIRECCIÓN ARQUITECTÓNICA Determine el valor de su proyecto, de acuerdo con la Tabla 1. Calcule el honorario básico según la tabla 2 y aplique el porcentaje que le corresponda, según su categoría (ver tabla 3). Si pertenece a una serie, aplique finalmente la tabla 4. Al valor final agregue 16% de IVA (Art. 25 de la Ley 06 de 1992), a menos que un proyecto sea de vivienda hasta de 2300 UPAC (equivalente a 340, 537 UVR en noviembre de 2000). 1. COSTO DE OBRAEl presupuesto de obra que servirá de base para el cálculo de honorarios comprende los siguientes costos: 1 Mano de obra, materiales, equipos y transportes, así como también costos de nacionalización, aduanas y fletes 2 Gastos generales y administración de la obra, excepto costos reembolsables de residentes y auxiliares 3 Licencia de construcción y derechos de servicios públicos 2. HONORARIO BÁSICO HONORARIO De acuerdo con el costo obtenido por metro cuadrado y el área del proyecto, calcular el honorario básico así: 50% 7,0% Del costo de los primeros 1000 m2 de obra 70% 5,0% Del costo de los siguientes 4000 m2 de obra 85% 4,0% Del costo de los primeros 5000 m2 de obra 100% 3,0% Del costo del área faltante 130% Ver tabla 4 3. CATEGORÍASDefinir la categoría de la obra y aplicar al honorario básico la tarifa que corresponda para obtener el honorario definitivo 20%TIPO DESCRIPCIÓN 10% A Construcciones simples con instalaciones mínimas B Construcciones sencillas C Construcciones complejas D Construcciones de gran complejidad E Vivienda (hasta trifamiliar) F Construcciones en serie G Edificios mixtos. Calcular individualmente para cada área, según su categoría H Restauraciones. Calcular según su categoría y agregar I Reparaciones, reformas, ampliaciones. Calcular según su categoría y agregar AHORRESE LAS PREGUNTAS POR TELÉFONOAGILICE SUS PRESUPUESTOS CONDE LACONSTRUCCIÓNGuía de precios y tarifas del gremio constructor Apu de la Construcción / 2017 139

Honorarios Profesionales 4. CATEGORÍAS Honorarios de diseño y dirección arquitectónica para unidades repetitivas, expresadas como porcentaje de la primera unidad UNIDADES DE LA SERIE HONORARIO POR UNIDAD UNIDADES DE LA SERIE HONORARIO POR UNIDAD Primera Unidad 100% Siguientes 30 unidades 10,0% Siguientes 4 unidades 40% Siguientes 50 unidades 7,5% Siguientes 5 unidades 30% Siguientes 200 unidades 5,0% Siguientes 10 unidades 20% En adelante 4,0% EJEMPLO Para un edificio de oficinas de 10.000 m2 y valor de $300,000 por m2, calcule los honorarios así: 1. Honorario Básico (1000 m2 x $300,000 x 7%) + (4000 m2 x $300,000 x 5%) + (5000 m2 x $300,000 X 4%) = $195,000,000 2. Honorario Final (categoría C) $195,000,000 x 85% = $165,750,000 TABLA No. 10: DISEÑO URBANÍSTICO Calcule el valor de las obras de urbanismo para todo el lote y la Primeras UNIDADES DE LA SERIE UNIDADES DE LA SERIE cantidad de viviendas a construir. Defina el honorario preliminar por Siguientes 10 Unidades 100% unidad de vivienda así: Siguientes 40 Unidades 75% Siguientes 50 Unidades 50% 8% (vr. Obras urbanismo/Cantidad viviendas) Siguientes 100 Unidades 25% Cada unidad de vivienda del proyecto devenga un honorario basado En adelante 300 Unidades 15% en el honorario preliminar que se calcula así: 10% PARA OTRAS URBANIZACIONES 10% Según el valor de las obras de urbanismo 15% 20% PARA URBANIZACIONES COMBINADAS 30% Divida el terreno según el tipo de urbanización y calcule separadamente cada honorario PARA URBANIZACIONES CON PENDIENTE Calcule los honorarios de acuerdo con las tablas e increméntelos de acuerdo con la siguiente tabla Pendientes entre 2% y 10% Pendientes entre 10% y 20% Pendientes mayores de 20% TABLA No. 11: OTROS HONORARIOS S.C.A. CONCEPTO COSTO BASE HONORARIO CONCEPTO COSTO BASE HONORARIO PRESUPUESTO Costo de obra 0,80% PRESUPUESTO PRELIMINAR Planos 10,00% CONTROL DE PROGRAMACIÓN Planos 15,00% CANTIDADES DE OBRA TÉCNICAS Costo de obra 2,50% CONTROL DE COSTOS Obras por administración delegada Planos 2,50% INTERVENTORÍA DE PROYECTOS Costo de obra 4,00% CONTROL DE COSTOS Obras por precios unitarios Costo de obra 10,00% PROGRAMACIÓN DE OBRA Costo del capítulo 5,00% INTERVENTORÍA DE CONSTRUCCIÓN Excepto categorías E, H, I Costo de obra 17,00% PROGRAMACIÓN ACTIVIDADES PREVIAS Y PROYECTOS Costo de obra 14,00% Costo de la obra 0,90% INTERVENTORÍA DE CONSTRUCCIÓN Categorías E, H, I Costo de la obra 0,45% CONSTRUCCIÓN Categorías A hasta H Planos 10,00% CONSTRUCCIÓN Categoría H Planos 2,00% CONSTRUCCIÓN Categoría I NOTAS Notas: De acuerdo con el artículo 25 de la Ley 06 de 1992, los servicios de Arquitectura e ingenie- ría deben facturar IVA del 16%, excepto los que estén vinculados con vivienda hasta de 2.300 UPAC. Apu de la Construcción / 2017140

Honorarios Profesionales EL HONORARIO BÁSICO Para calcular los honorarios del diseño estructural se calcula inicialmente el honorario básico, que equivale a 8% del valor de la estructura, y luego se afecta por el grado de comple- jidad de la misma y por el grado de repetitividad así: H = CE x 0.08 x GC x GR donde: H = honorario CE = Costo Estructura GC = Grado de complejidad GR = Grado de repetitividad EL COSTO DE LA ESTRUCTURA El costo de la estructura que servirá de base para calcular el honorario incluye los costos de materiales, mano de obra, prestaciones , formaletas y equipo, los impuestos, el trans- porte y todos los demás costos de construcción. No se incluyen los costos administrativos, los imprevistos ni la utilidad del constructor.GRUPO CLASIFICACIÓN DE LAS ESTRUCTURAS SEGÚN SU GRADO DE COMPLEJIDAD % DE HONORARIO Grupo A EJEMPLOS 100% Puentes de carretera, intercambios viales urbanos, Muelles, Cascarones y placas ple- Grupo B gadas. Bases y fundaciones de maquinaria, Silos, Edificaciones con tres o más sótanos 90% Grupo C y más de quince pisos de altura, Rehabilitación de estructuras existentes, incluyendo 80% Grupo D análisis de vulnerabilidad. 70% Grupo E Coliseos, Estadios, Iglesias , Teatros, Aeropuertos y Helipuertos, Puentes peatonales, Estructuras 60% Industriales, Edificaciones indispensables, según las normas sismorresistentes, Edificaciones con tres o más sótanos o más de quince pisos de altura. Tanques, Piscinas, Plantas de tratamiento, Muros y estructuras de contención, Estructu- ras de madera, Edificaciones con dos sótanos y más de ocho pisos de altura. Estructuras metálicas de cubierta, Edificaciones con dos sótanos o más de ocho pisos de altura. Edificaciones con un sótano o sin sótano y menos de ocho pisos de altura. Casas.Cuando se trate de edificaciones de uso mixto, se hará un promedio ponderado de la dificul- Planos 10,00%tad, según el área para obtener el porcentaje del honorario básico que se debe aplicar para Planos 2,00%obtener el honorario efectivo.PROGRAMACIÓN ACTIVIDADES PREVIAS Y PROYECTOS REPETITIVIDAD DE LAS ESTRUCTURASAfectan el valor de las estructuras de la siguiente forma: Estructura No. 1 1.0 Por ejemplo para un grupo de 16 estructuras el Estructura No. 2 0.5 valor del factor por repetitividad corresponde a:De la estructura en su totalidad: Cuando los planos de la estruc- Estructura No. 3tura se utilizan más de una vez el valor de los honorarios se ve Cada una de las siguientes 0.3 1.0 + 0.5 + 0.3 + (0.1 x (16-3)) = 3.1afectado por el siguiente factor acumulativo: 0.1De partes de la misma estructura: En el caso de edificios, Nep: Número de plantas estructurales para las cuales el diseño estructural es exactamente igual,cuando algunas losas de entrepiso tienen exactamente el mis- incluyendo vigas, viguetas, losas , etc. y exceptuando las columnas y muros estructurales.mo diseño estructural es posible aplicar el siguientes factor alhonorario efectivo: Ntp: Número total de losas aéreas del edificio.0.5 + (0.5 x (Nep/Ntp)) Apu de la Construcción / 2017 141

Honorarios Profesionales OTROS TRABAJOS ESPECIALIZADOS Los honorarios se cobran como un porcentaje del honorario efectivo de cálculos estructurales, excepto donde se indique lo contrario. Para trabajos no incluidos en esta tabla se aplican las tarifas de la S.C.A. y la S.C.I. TIPO DE TRABAJO HONORARIO Revisión de diseños 30% Elaboración de cantidades de obra 10% Presupuesto 15% Programación de obra 10% Factibilidad 15%, cuando no hace parte del diseño estructural Pruebas de carga Contratación de honorario fijo Coordinación de estudios preliminares Contratación de costo más multiplicador Coordinación de diseños técnicos Contratación de costo más multiplicador HONORARIOS INGENIERÍA ELÉCTRICA Para una cabal comprensión del contenido y alcance de estas tablas debe consultarse el Manual de Referencia de Tarifas y Contratación de Ingeniería, publicado por ACIEM en Mayo de 1998. CATEGORÍA 1 Definición: Obras o proyectos, o parte de ellos, que no requieren de estudios y cálculos especiales, y deben estar a cargo de un ingeniero electricista matriculado y con menos de tres años de experiencia (escalafón 6) en esta actividad. Ejemplos: Pequeños almacenes de depósitos, multifamiliares con pisos típicos en estratos 1 y 2, unifamiliares, parqueaderos pequeños. INGENIERÍA ELÉCTRICA - TARIFAS - CATEGORÍA 1 VALOR OBRA EN SMLMV 0-100 101-500 501-1.000 1.001-2.000 >2.000 Proyecto 10 5 4 Presupuesto 1 86 1 1 Administración 14 11 10 Interventoría 5 11 3 3 Ingeniería 4 2 2 14 12 54 43 CATEGORÍA 2 Definición: Obras o proyectos o partes de ellos, cuyos cálculos y diseños pueden efectuarse por métodos convencionales y deben estar a cargo de un ingenierp electricista matriculado y con experiencia correspondiente al escalafón 5 en esta actividad. Ejemplos: Auditorios, centros deportivos y parques pequeños, edificios varios en estratos 3 y 4, tableros varios con potencias menores de 150 kVA. INGENIERÍA ELÉCTRICA - TARIFAS - CATEGORÍA 2 VALOR OBRA EN SMLMV 0-100 101-500 501-1.000 1.001-2.000 >2.000 Proyecto 10.0 5.0 4.0 Presupuesto 1.5 8.0 6.0 1.5 1.5 Administración 15.0 13.0 12.0 Interventoría 6.0 1.5 1.5 4.0 3.0 Ingeniería 5.0 3.0 2.0 15.0 14.0 5.0 5.0 4.0 3.0 Apu de la Construcción / 2017142

Honorarios ProfesionalesCATEGORÍA 3Definición: Obras o proyectos o partes de ellos cuyos estudios y/o ejecución requieren conocimientos especializados y amplia experiencia en la elaboración de diseños y cálculos demediana complejidad. Estos trabajos deben estar a cargo de un ingeniero electricista matriculado y con experiencia correspondiente al escalafón 4 en esta actividad.Ejemplos: Bibliotecas, cárceles, cuarteles, clubes, coliseos, edificios varios en estratos 5 y 6, grupos de generación de energía menores de 500 kV. Industrias metalmecánicas, litográ-ficas, químicas, petroleras, textiles y plásticas con potencias menores de 1.5 MVA, subestaciones hasta de 1.400 kVA INGENIERÍA ELÉCTRICA - TARIFAS - CATEGORÍA 3VALOR OBRA EN SMLMV 0-100 101-500 501-1.000 1.001-2.000 >2.000Proyecto 11 6 5Presupuesto 2 97 2 2Administración 16 13 12Interventoría 6 22 5 4Ingeniería 5 4 3 15 14 66 54CATEGORÍA 4Definición: Obras o proyectos o partes de ellos cuyos estudios y/o ejecución requieren conocimientos especializados y amplia experiencia en la elaboración de diseños y cálculosde alto grado de complejidad. Estos trabajos deben estar a cargo de un ingeniero electricista matriculado y con experiencia correspondiente al escalafón 2 en esta actividad.Ejemplos: Museos, bancos, clínicas, hospitales, hoteles, depósitos de combustibles. Grupos de generación de energía mayores a 1.400 kVA y menores de 2.500 kVA. Industriasmetalmecánicas, litográficas, químicas, petroleras, textiles y plásticas con potencias de 1.5 MVA. Subestaciones con más de 1.5 kVA. TARIFAS CATEGORÍA 4 INGENIERÍA ELÉCTRICA - TARIFAS - CATEGORÍA 4VALOR OBRA EN SMLMV 0-100 101-500 501-1.000 1.001-2.000 >2.000Proyecto 7.0 6.0Presupuesto 12.0 10.0 8.0 2.5 2.5Administración 15.0 13.0Interventoría 2.5 2.5 2.5 4.0 4.0Ingeniería 3.0 3.0 18.0 17.0 16.0 6.0 6.0 5.0 5.0 4.0 4.0CATEGORÍA 5 CATEGORÍA 6Definición: Obras o proyectos o partes de ellos cuyos estudios y/o ejecución requieren conocimien- Definición: Obras o proyectos o partes de ellos cuyas características y/otos especializados y amplia experiencia en la elaboración de diseños y cálculos de gran compleji- ejecución requieren conocimientos muy especializados y no están con-dad. Estos trabajos deben estar a cargo de un ingeniero electricista matriculado y con experiencia templados en las categorías anteriores. Estos trabajos no tiene tarifascorrespondiente al escalafón 1 en esta actividad. predeterminadas y deben estar a cargo de un ingeniero electricista matri- culado y con experiencia correspondiente al escalafón 1 en esta actividadEjemplos: Instalaciones industriales complejas, redes de fibra óptica, aeropuertos, terminales ma-rítimos, centrales hidroeléctricas, grupos de generación de energía mayores de 2.500 kVA. Auto-pistas de alto tráfico. INGENIERÍA ELÉCTRICA - TARIFAS - CATEGORÍA 5VALOR OBRA EN SMLMV 0-100 101-500 501-1.000 1.001-2.000 >2.000Proyecto 12.0 7.0 6.0Presupuesto 2.5 10.0 8.0 2.5 2.5Administración 18.0 15.0 13.0Interventoría 7.0 2.5 2.5 4.0 4.0Ingeniería 5.0 3.0 3.0 17.0 16.0 6.0 5.0 4.0 4.0 Apu de la Construcción / 2017 143

Honorarios Profesionales HONORARIOS INGENIERÍA MECÁNICA Para una cabal comprensión del contenido y alcance de estas tablas debe consultarse el Manual de Referencia de Tarifas y Contratación de Ingeniería, publicado por ACIEM en Mayo de 1998. CATEGORÍA 1 Trabajos de ingeniería simple que no presenten un carácter especial de novedad, consistentes en la adaptación de elementos conocidos a condiciones dadas que exijan relativamente corto tiempo y que requieran un ingeniero mecánico matriculado con menos de tres años de experiencia (escalafón 6 en esta actividad). Ejemplos: Instalaciones simples de bombeos y de distribución de aguas, fluidos comunes bajo presión, calefacción simple, aire comprimido, ventilación, aislamiento acústico, transporte y mantenimiento de pequeñas plantas, talleres mecánicos simples. Valor obra en SMLMV 70 140 INGENIERÍA MECÁNICA - TARIFAS - CATEGORÍA 1 2.110 3.520 7.040 10.550 >10.550 Anteproyecto – Ing. Conceptual 1.5 1.2 210 350 700 1.060 0.6 0.5 0.4 0.4 0.3 Estudio factibilidad – Ing. Básica 2.2 1.8 1.1 1.0 0.8 0.7 0.9 0.8 0.7 0.6 0.5 Proyeto – Ing. De Detalle 7.0 6.0 1.6 1.5 1.2 1.0 3.0 2.5 2.0 2.0 1.5 Dir. Técnica – Admón. 4.5 3.5 5.0 4.5 4.0 3.5 2.0 1.5 1.5 1.5 1.2 Interventoría 3.0 2.5 3.0 3.0 2.5 2.0 1.2 1.0 1.0 1.0 1.0 Presupuesto 1.2 1.1 2.0 2.0 1.5 1.5 0.4 0.3 0.2 0.2 0.2 1.0 0.9 0.7 0.5 CATEGORÍA 2 Definición: Trabajos de ingeniería que presenten ciertas dificultades, en razón del empleo de elementos particulares y nuevos que deban ser adaptados al fin previsto, que demanden más tiempo que los de la categoría 1 y que exijan ingeniero mecánico matriculado con menos de cuatro años de experiencia (escalafón 4). Ejemplos: Conducciones con válvulas, turbinas y bombas, instalaciones complejas de bombeo y distribución de agua, generadores de calor, ventilación a compresión, aire acondicionado para pequeñas edificaciones, escaleras rodantes, talleres metal-mecánicos con máquinas automáticas, instalaciones simples para industria química. INGENIERÍA MECÁNICA - TARIFAS - CATEGORÍA 2 Valor obra en SMLMV 70 140 210 350 700 1.060 2.110 3.520 7.040 10.550 >10.550 Anteproyecto – Ing. Conceptual Estudio factibilidad – Ing. Básica 1.7 1.4 1.3 1.1 0.9 0.8 0.7 0.7 0.6 0.6 0.5 Proyeto – Ing. De Detalle Dir. Técnica – Admón. 2.5 2.0 1.9 1.7 1.5 1.3 1.2 1.0 0.9 0.8 0.7 Interventoría Presupuesto 8.0 7.0 6.0 5.5 5.0 4.5 4.0 3.5 3.0 2.5 2.0 5.0 4.5 4.0 3.5 3.0 2.5 2.5 2.0 2.0 2.0 1.5 3.4 2.9 2.5 2.5 1.9 1.9 1.5 1.4 1.4 1.4 1.4 1.3 1.2 1.1 1.0 0.8 0.6 0.5 0.4 0.3 0.3 0.3 CATEGORÍA 3 Definición: Trabajos de ingeniería que, además de las exigencias previstas para la categoría 2, requieren estudios y cálculos especiales, así como también una particular experiencia y especialización por parte del ingeniero mecánico matriculado (más de cinco años – escalafón 3). Ejemplos: Conducciones forzadas para centrales de gran potencia, instalación de calderas de gran potencia y alta presión, grandes instalaciones de producción de gas, instalaciones de ventilación de grandes cocinas, instalaciones complejas de ascensores, fábricas medianas metalmecánicas. INGENIERÍA MECÁNICA - TARIFAS - CATEGORÍA 3 Valor obra en SMLMV 70 140 210 350 700 1.060 2.110 3.520 7.040 10.550 >10.550 Anteproyecto – Ing. Conceptual Estudio factibilidad – Ing. Básica 1.9 1.6 1.4 1.3 1.1 1.0 0.9 0.8 0.7 0.7 0.6 Proyeto – Ing. De Detalle Dir. Técnica – Admón. 2.8 2.4 2.2 2.0 1.7 1.6 1.4 1.3 1.2 1.1 1.0 Interventoría Presupuesto 9.0 8.0 7.0 6.5 6.0 5.5 5.0 4.5 4.0 3.5 3.0 5.5 5.0 4.5 4.0 3.5 3.0 3.0 2.5 2.5 2.5 2.0 3.7 3.2 2.8 2.8 2.2 2.2 1.8 1.7 1.7 1.7 1.7 1.4 1.3 1.2 1.1 0.9 0.7 0.6 0.5 0.4 0.4 0.4 Apu de la Construcción / 2017144

Honorarios ProfesionalesCATEGORÍA 4Definición: Ejecución de labores e instalaciones de dificultad poco frecuente, y que requieran claramente de ingenieros mecánicos matriculados y especializados, con más de siete añosde experiencia en la actividad o con la especialización, maestría o doctorado universitarios (escalafón 2).Ejemplos: Instalaciones hidráulicas que requieran gran experiencia y conocimientos especializados, modificaciones en centrales térmicas, en instalaciones de producción y distribuciónde gas y en instalaciones de ventilación y aire acondicionado, instalaciones para grandes fábricas metalmecánicas y para instrumentación industrial. INGENIERÍA MECÁNICA - TARIFAS - CATEGORÍA 4Valor obra en SMLMV 70 140 210 350 700 1.060 2.110 3.520 7.040 10.550 >10.550Anteproyecto – Ing. ConceptualEstudio factibilidad – Ing. Básica 2.0 1.7 1.6 1.5 1.3 1.2 1.1 1.0 0.9 0.8 0.8Proyeto – Ing. De DetalleDir. Técnica – Admón. 3.0 2.5 2.4 2.2 1.9 1.8 1.6 1.5 1.4 1.3 1.3InterventoríaPresupuesto 10.0 9.0 8.0 7.5 7.0 6.5 6.0 5.5 5.0 4.5 4.0 6.0 5.5 5.0 4.5 4.0 3.5 3.5 3.0 3.0 3.0 2.5 4.0 3.5 3.2 3.2 2.6 2.6 2.2 2.0 2.0 2.0 2.0 1.5 1.4 1.3 1.2 1.0 0.8 0.7 0.6 0.5 0.5 0.5Haga su presupuesto rápido con DE LA CONSTRUCCIÓN GSueímaestral Apu de la Construcción / 2017 145

10 Tablas de Rendimientos 10Sección TABLADE[ ]RENDIMIENTOS

Tabla de Rendimientos TABLA DE RENDIMIENTOS DE MANO DE OBRA (UNIDAD DE MEDIDA POR HORA HOMBRE)ITEM DESCRIPCIÓN UNIDAD Tiempo en H/H Oficial Ayudante TRABAJOS PRELIMINARES M² 0.05 0.051.0 Levantamiento de terrenos áreas menores a 300 m2 M² 0.201.1 Limpieza y descapote a mano M3 3.251.2 Desalojo material en volqueta hasta 5 km M3 1.501.3 Limpieza y descapote a maquina M²1.4 Localizacion, trazado y replanteo M² 0.06 0.121.5 Localizacion y replanteo mas de 1000 m2 0.06 0.10 Gl CAMPAMENTOS Gl 13.00 26.001.0 Campamento de 9 m2 Gl 25.00 50.001.1 Campamento de 18 m2 40.00 75.001.2 Campamento de 30 m2 M2 M² 0.06 0.12 CERRAMIENTOS 0.25 0.501.0 Alambre de pua M21.1 Cerca en madera M² 0.30 0.30 ML 0.20 0.40 PISOS E INSTALACIONES PROVISIONALES ML 0.05 0.051.0 Madera ML 0.10 0.101.1 Concreto E=0,04 Un 0.05 0.051.2 Red electrica M2 5.00 5.001.3 Agua potable 1.00 2.001.4 Telefono M31.5 Sanitarios M3 - 2.701.6 Talleres M3 - 3.20 M3 - 3.60 EXCAVACIONES M3 - 4.00 En tierra suelta a mano M3 - 6.001.0 Hasta 1 m de profundidad M3 - 8.001.1 Hasta 1,50 m de profundidad - 11.301.2 A mano hasta 2,0 m de profundidad M31.3 A mano entre 2 y 3 m de profundidad M3 4.001.4 A mano entre 3 y 4 m de profundidad M3 6.001.5 A mano entre 4 y 5 m de profundidad M3 8.001.6 A mano entre 5 y 6 m de profundidad M3 11.30 En conglomerado a mano M3 15.001.7 Hasta 2 m de profundidad M31.8 Entre 2 y 3 m de profundidad M3 7.001.9 Entre 3 y 4 m de profundidad M3 8.002.0 Entre 4 y 5 m de profundidad 11.302.1 Entre 5 y 6 m de profundidad M3 En piedra a mano M3 23.002.2 Hasta 2 m de profundidad M3 25.000.1 Entre 2 y 3 m de profundidad M3 30.002.3 Entre 3 y 4 m de profundidad 40.00 En roca a mano M32.4 Hasta 2 m de profundidad 5.00 Entre 2 y 3 m de profundidad Entre 3 y 4 m de profundidad Entre 4 y 5 m de profundidad En tierra a mano bajo agua incluyendo bombeo Hasta 2 m de profundidad Apu de la Construcción / 2017 147

Tabla de Rendimientos TABLA DE RENDIMIENTOS DE MANO DE OBRA (UNIDAD DE MEDIDA POR HORA HOMBRE) ITEM DESCRIPCIÓN UNIDAD Tiempo en H/H Entre 2 y 3 m de profundidad M3 Oficial Ayudante Entre 3 y 4 m de profundidad M3 7.00 Entre 4 y 5 m de profundidad M3 9.00 En conglomerado a mano bajo agua incluyendo bombeo 12.00 Hasta 2 m de profundidad M3 Entre 2 y 3 m de profundidad M3 7.00 Entre 3 y 4 m de profundidad M3 9.00 Entre 4 y 5 m de profundidad M3 12.00 En piedra a mano bajo agua incluyendo bombeo 15.00 Hasta 2 m de profundidad M3 Entre 2 y 3 m de profundidad M3 7.00 Entre 3 y 4 m de profundidad M3 9.00 Entre 4 y 5 m de profundidad M3 14.30 En roca a mano bajo agua incluyendo bombeo 15.30 Hasta 2 m de profundidad M3 Entre 2 y 3 m de profundidad M3 29.00 Entre 3 y 4 m de profundidad M3 34.00 En tierra a mano bajo agua incluyendo Entibado 40.00 Entre 2 y 3 m de profundidad M3 Entre 3 y 4 m de profundidad M3 6.00 8.00 Entre 4 y 5 m de profundidad M3 8.00 10.00 En tierra a mano bajo agua incluyendo Bombeo y Entibado 10.00 14.00 Entre 2 y 3 m de profundidad M3 Entre 3 y 4 m de profundidad M3 6.00 10.00 8.00 12.00 DERRUMBES M3 3.00 Sacada de derrumbes M3 4.00 Hasta 2 m de profundidad M3 5.30 Entre 2 y 3 m de profundidad M3 8.00 Entre 3 y 4 m de profundidad M3 11.30 Entre 4 y 5 m de profundidad Entre 5 y 6 m de profundidad 8.00 2.00 PREPARACION DE MEZCLAS M3 1.00 Mezcla de concreto a mano M3 0.50 11.00 Mezcla de concreto a maquina 15.00 2.00 7.30 CIMENTACIONES (Concreto a Mano) M3 2.00 8.3 Cimiento concreto ciclopeo hasta 1,00 m de profundidad M3 1.30 3.00 M3 1.30 Cimiento concreto ciclopeo hasta 1,50 m de profundidad 2.00 Cimiento concreto ciclopeo hasta 1,00 m de profundidad (Concreto preparado a Maquina) 1.30 0.75 1.00 SOBRECIMIENTOS M2 0.75 12.00 8.7 En concreto M2 1.00 1.00 8.8 En ladrillo recocido 12.00 4.00 1.00 5.00 ESTRUCTURAS EN MADERA (Formaleteria) M2 4.00 9.1 Formaleta para zapatas M2 5.00 M3 Formaleta para bases M2 Formaleta para pedestales M2 Formaleta para placa aligerada M2 Formaleta para escaleras rampa Formaleta para escaleras acordeon Apu de la Construcción / 2017148

Tabla de Rendimientos TABLA DE RENDIMIENTOS DE MANO DE OBRA (UNIDAD DE MEDIDA POR HORA HOMBRE)ITEM DESCRIPCIÓN UNIDAD Tiempo en H/H Formaleta para escalera en abanico M2 Oficial Ayudante Formaleta para escalera en espina de pescado M2 Formaleta para escalera en caracol M2 6.00 6.00 Formaleta para columna (Seccion menor 0,30 x 0,30 m) M3 5.00 5.00 Formaleta para columna (Seccion 0,30 x 0,30 m) M3 8.00 8.00 Formaleta para vigas de carga M3 21.00 18.50 Formaleta para vigas corridas en T M3 15.00 13.00 Formaleta para vigas corridas M3 20.00 20.00 Formaleta para vigas de amarre sobre muros de soga Ml 16.00 16.00 Formaleta para muros de contencion M2 15.00 15.00 Formaleta para viga canal M3 0.54 0.54 Formaleta para dinteles Ml 1.00 1.00 20.00 20.00 0.60 0.60 CONCRETOS (Incluye preparacion a maquina) M3 2.30 10.00 Concreto para zapatas M3 3.00 12.00 Concreto para bases y pedestales M3 1.40 7.00 Concreto para placa aligerada 1o. y 2o. nivel M3 4.00 20.00 Concreto para placa aligerada 1o. y 2o. Nivel con vigas de carga M3 4.00 16.00 Concreto para escaleras rampa M3 4.00 16.00 Concreto para escaleras acordeon M3 4.30 18.00 Concreto para escaleras en abanico M3 6.00 20.00 Concreto para escaleras en espina de pesacdo M3 5.00 20.00 Concreto para escaleras en caracol M3 3.30 15.00 Concreto para escaleras en vena central M3 4.00 8.00 Concreto para columnas seccion menor de 0,30 x 0,30 M3 3.50 7.00 Concreto para columnas seccion mayor de 0,30 x 0,30 M3 5.00 14.00 Concreto para vigas de carga M3 4.00 12.00 Concreto para vigas corridas en T M3 3.30 12.00 Concreto para vigas corridas Ml 0.20 1.10 Concreto para vigas de amarre sobre muros a soga Ml 0.25 1.20 Concreto para dinteles M3 3.00 10.00 Concreto para muros M3 6.00 16.00 Concreto para vigas canales M3 3.00 16.70 Concreto para placa maciza CONCRETOS PARA PLACAS ALIGERADAS SEGÚN ESPESORES M2 2.25 4.20 (Incluye hechura y colocacion de casetones sin incluir concretadora) M2 2.40 4.80 Concreto para placa aligerada e= 0,25 M2 2.60 5.20 Concreto para placa aligerada e= 0,30 M2 2.80 5.80 Concreto para placa aligerada e= 0,35 Concreto para placa aligerada e= 0,40 1.10 1.10 1.30 1.30 ALFAGIAS EN CONCRETO (Incluye formaletas) Ml 1.00 1.00 Alfagia en concreto tipo A Ml 1.30 1.30 Alfagia en concreto tipo B Ml 1.20 1.20 Alfagia en concreto de remate tipo E Ml Alfagia en concreto de remate tipo C Ml 1.50 0.15 Alfagia en concreto de remate tipo D 1.50 1.50 CONCRETOS Ml Concreto en mesas de cocina (incluye formaleta y colocacion de hierro sin muros) Ml Concreto en descolgados e=0.05 m (incluye formaleta) Apu de la Construcción / 2017 149

Tabla de Rendimientos TABLA DE RENDIMIENTOS DE MANO DE OBRA (UNIDAD DE MEDIDA POR HORA HOMBRE) ITEM DESCRIPCIÓN UNIDAD Tiempo en H/H Descolgados en ladrillo y viga Ml Oficial Ayudante Concreto en cunetas Ml Gargolas en concreto (incluye formaleta y hierro) Un 1.50 1.50 Sardineles en concreto (incluye excavacion, formaleta, armado y fundida) Ml 0.25 1.30 Refuerzo figurado y colocado Ton 2.00 0.25 Colocacion losas prefabricadas e=0.20 con recubrimiento M2 0.80 0.80 Colocacion losas prefabricadas e=0.25 con recubrimiento M2 50.00 50.00 Colocacion losas prefabricadas e=0.30 con recubrimiento M2 1.80 6.00 Colocacion losas prefabricadas e=0.35 con recubrimiento M2 1.90 6.20 2.00 6.30 2.10 6.40 MUROS M2 1.60 1.60 Muro en ladrillo prensado 0,23 (Tizón) 2 - C M2 1.40 1.40 Muro en ladrillo prensado 0,23 (Tizón) 1 - C M2 1.30 1.30 Muro en ladrillo prensado 0,11 (Soga) 2 - C M2 1.15 1.15 Muro en ladrillo prensado 0,11 (Soga) 1 - C M2 0.90 0.90 Muro en ladrillo comun 0,24 Tizon M2 0.62 0.62 Muro en ladrillo comun 0,11 Soga M2 0.70 0.70 Muro en ladrillo comun 0,07 Papelillo M2 1.40 1.40 Muro en ladrillo comun 0,34 Tizon y Soga M2 0.50 0.50 Muro bloque hueco No. 3 de canto M2 0.60 0.60 Muro bloque hueco No. 4 de canto M2 0.70 0.70 Muro bloque hueco No. 5 de canto M2 0.90 0.90 Muro bloque hueco No. 6 de canto M2 0.70 0.70 Muro en bloque de concreto M2 0.25 0.25 Muro en bloque de concreto estructural M2 0.90 0.90 Muro en bloque Cinva-Ram 0,10; 0,14; 0;29; soga estriado por una cara M2 1.30 1.30 Muro en bloque Cinva-Ram Tizon estriado por una cara Ml 1.00 1.00 Descolgados en ladrillo y viga Ml Sobrecimiento en tizon (ladrillo recocido con impermeabilizante en tres hiladas) Ml 0.60 0.60 Remate canto soga en ladrillo prensado Ml 0.50 0.50 Remate canto tizon en ladrillo prensado M2 1.01 1.01 Sobrecimiento en ladrillo comun a Tizon E=0,23 ARCOS Ml 1.50 1.50 Arcos de medio punto en ladrillo comun Ml 2.50 2.50 Arcos de medio punto en ladrillo prensado Ml 1.50 1.50 Arcos ojival en ladrillo comun Ml 3.00 3.00 Arcos ojival en ladrillo prensado PISOS M2 0.05 0.20 Piso en triturado E=0,10 estando base lista M2 0.05 0.50 Piso en triturado E=0,10 alistando base M2 0.03 0.30 Piso en recebo E=0,10 estando base lista M2 0.03 0.60 Piso en recebo E=0,10 alistando base M2 0.15 1.00 Piso en concreto E=0,05 M2 0.20 1.50 Piso en concreto E=0,10 M2 0.25 2.20 Piso en concreto E=0,15 Pavimento M2 0.35 1.50 Piso en concreto E=0,05 afinado y coloreado con mineral M2 0.35 2.00 Piso en concreto E=0,10 afinado y coloreado con mineral M2 1.60 1.60 Piso en ladrillo prensado de canto M2 1.60 1.60 Piso en tableta moore M2 1.30 1.30 Piso en tablon Apu de la Construcción / 2017150