Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore ANAN ISKAN PROFILE 0821

ANAN ISKAN PROFILE 0821

Published by Mohammed Khrawish, 2016-08-21 07:52:00

Description: ANAN ISKAN PROFILE 0821

Search

Read the Text Version

COMPANY PROFILE

WHOWE ARE?

ANAN ISKANIS THE RESULT OF ASTRATEGIC PARTNERSHIPBETWEEN A GROUP OFINVESTORS WITH BROADRELEVANT EXPERIENCE

VISION STATEMENTTO PLAY A LEADING ROLE INTHE WORKERS ACCOMMODATIONSECTOR THROUGHOUT THE GCCMISSION STATEMENTTO ADVOCATE WORKERS WELLBEINGBY MANAGING AND OPERATING WORKERSACCOMMODATION FACILITIES IN COMPLIANCEWITH WORLD-CLASS STANDARDS

OUR VALUES HUMAN CENTRIC SUSTAINABILITY & ENVIRONMENT FRIENDLY WORLD-CLASS STANDARDS OFFERING GREATER VALUE FOR OUR CLIENT

WHATWE DO?

WHAT WE DO1WORKERS HOUSING DEVELOPMENT Guidelines on design were drawn from studying IMPLEMENTATION OF WORKERS ACCOMMODATION THROUGHOUT THE WORLD (UAE, Malaysia, Singapore) and taking into considerations local needs.

SERVICES DIVERSITYA SELF-SUFFICIENT HOUSING ENVIRONMENT,WITH FULL AMENITIES AND SERVICESPERMANENT & URBAN VILLAGESConventional buildings, fully establishedTEMPORARY AND MOBILE VILLAGESMobile units with high flexibility tobe placed next to working site.

WHAT WE DO2OPERATE AND MAINTAIN FACILITIES OF WORKERS HOUSINGUndertaken by TRAINED and QUALIFIED staffStandard Operating Procedures (SOPs), Service LevelAgreements (SLAs) and Key Performance Indicators (KPIs)Service Level Monitoring by Quality Assurance/QualityControl (QAQC)Accommodation Management System (AMS)

STANDARD RATIOBEDROOM 4.0 - 5.5 M2Typically maximum of 4 people ABLUTION 0.7 M2 One set of utensils (WC, HWB, Shower) per 7 tenants KITCHEN 0.14 M2 No cooking is allowed inside the room

STANDARD RATIO DINING 0.33 M2 On a 6-sitting basis LAUNDRY 0.03 M2 Central laundry service & self-laundry facility FIRST AID/MEDICAL 0.025 M2 One bed per 500 tenants

STANDARD RATIO MASJEED 0.12 M2 To accommodate 10% at one time RECREATION 0.25 M2 To accommodate 25% at one time REFUSE 0.3 M2 Chutes feeding 1 x 2.5m3 container bin per 100 tenants

STANDARDS AND VALUESADOPTING A SAFE, SECURED, APPLYINGINTERNATIONAL COMFORTABLE AND CURRENTSTANDARDS AND HEALTHY ENVIRONMENT EXPERIENCEADAPTINGTHEM TO LOCAL THAT COMPLIES WITHENVIRONMENT INTERNATIONAL STANDARDSSafety & Security Basic Retail Masjeed ClinicMoney Transfer TelecommunicationSport Activities Controlled Access LaundryATM Educational Center Etc.

WHEREWE ARE?

WESTERN REGION OUR LOCATIONISHRAQA VILLAGE 1 – JEDDAHMATTAF PROJECT – MAKKAHZAIDI CAMP - MEKKAHISHRAQA VILLAGE 2 - JEDDAH CENTRAL REGIONISHRAQA VILLAGE 1 – RIYADHISHRAQA VILLAGE 2 – RIYADHFAST COMPOUND– RIYADHISHRAQA VILLAGE 3 - RIYADH EASTERN REGION SENIOR CAMP – RAS AL KHAIR DAR ALHIMMAH - DAMMAM INTERNATIONAL ON SITE VILLAGE (QD – SBG) - QATAR

WESTERNREGION 4CAMPS

WESTERN REGION ISHRAQA 1 JEDDAH INDUSTRIAL CITY 2 BUILDING CAPACITY 2,540 TENANTS

WESTERN REGION MATTAF MAKKAH AL MUKARRAMA CAMP CAPACITY 5,604 TENANTS

WESTERN REGIONZAIDI MAKKAHAL MUKARRAMACAMP CAPACITY875 TENANTS

WESTERN REGIONISHRAQA 2NORTH EAST CAMPBUILDING CAPACITY2,540 TENANTS

CENTRAL 3 CAMPSREGION

CENTRAL REGION ISHRAQA 1 RIYADH INDUSTRIAL CITY 2 CAMP CAPACITY 2,160 TENANTS ISHRAQA 2 RIYADH INDUSTRIAL CITY 2 CAMP CAPACITY 1,962 TENANTS

CENTRAL REGIONFAST PORTA CABINCONSORTIUM (MOBILE PROJECT)RIYADH METRO CAPACITY 9,000 LABORS 2014 - 2018

CENTRAL REGION ISHRAQA 3 (EAST CAMP) RIYADH INDUSTRIAL CITY 2 CAMP CAPACITY 2,160 TENANTS

EASTERN 2 CAMPREGION

EASTERN REGIONRAS ALKHAIRPORTA-CABINSTOTAL CAPACITY OF656 TENANTS (EXCUTIVE)

EASTERN REGIONDAR ALHIMMAHDAMMAMTOTAL CAPACITY OF3,336 TENANTS242 TENANTS (EXCUTIVE)

2 CAMPSINTERNATIONAL

GCC REGIONQATAR QD SBGCAMP 1&2TOTAL CAPACITY OF5,436 TENANTS (EXCUTIVE)

HOWWE DO IT?

DEVELOPMENT OF WORKERS HOUSINGPRE-MOBILIZATION Project Progress Report, Safety and Quality REPORTTECHNICAL SERVICE Project Audit CONSTRUCTPHASE - MASTER PLANNING, Obtain approval from authority for project fitness DESIGNDESIGN DEVELOPMENT Manage timeline, monitoring and quality control Problem solving and coordinationAND CONSTRUCTION STAGE Analyze project requirement, regulations and market Offer advice to integrate operational requirement and benefits

OPERATE AND MAINTAINTRANSITION AND Transition – Handover from Contractor EXECUTE Execute Service PLANNINGMOBILIZATION PERIOD Audit, Report and Improve NEGOTIATEPHASE - TRANSITION Process Mapping Manpower and Material planningAND DURING Procurement planningOPERATIONS & MAINTENANCE Understanding client requirement Mapping input and output Cost analysis and propose



OUR VALUE PROPOSITIONFLEXIBILITYFacilities are designed as per ETHNICPREFERENCE and HARMONIOUS LIVING and tofit within your business requirements TIME SAVING Saving you time and cost by providing AFFORDABLE ACCOMMODATION & COMPETENT SERVICE.

OUR VALUE PROPOSITION RELIABILITY We have dedicated team for managing your staff so that you can FOCUS ON YOUR CORE BUSINESSSTANDARDSWe have low tolerance forQUALITY STANDARDS to ensurethat you will always have a safeand comfort minds.

OUR KEY CLIENTS

ananiskan.com


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook