15 MW KANDAHAR Construction of a 15 MW Solar Power cporomjepclet ted SOLAR POWER Plant in Kandahar Province, Afghanistan. PLANT, KANDAHAR, Main components inside the Facility AFGHANISTAN are PV arrays, inverters, transformers, electrical building, control room and distribution center. Project Name : 15MW Solar Power Plant Kandahar Afghanistan Project Company : 77 Construction Company Project Location : Kandahar / Afghanistan Project Duration : 10 Months Guarantees : Escrow Account Project Cost : 19,250,000 USD Project Highlights : It is the first BOT (Build Operate Transfer) type Investment project completed in Afghanistan. Investor will operate the plant for 20 years. EPC Contactor : 77 Insaat and Taahhut A.S Manufacturer : Hanhwa Q Cells Qidong Co., Ltd. (“Hanhwa”), ABB, Schletter
www.77insaat.com 77 İnşaat ve 52 Energy Taahhüt A.Ş. IPnrvoejesctmtsent
ponrogjoecintg KAJAKI 100MW Project Name : Kajaki 100MW Hydro Power Plant Investment Project HYDRO POWER PLANT INVESTMENT Project Company : 77 Construction USA Corp PROJECT AFGHANISTAN Project Location : Kajaki/Helmand Province / Afghanistan Project Duration : Phase I (Construction of 100MW Power Plant) 2.5 years, Phase II (Construction of Spillway and Installation of Radial Gates) 1.5 years. Guarantees : Sovereign Guarantee is provided by Ministry of Finance Afghanistan. Sovereign Guarantee is covering the payment obligations of Afghanistan Electricity Utility (DABS) Project Cost : Phase I - 97,466,265 USD, Phase II - 51,194,535 USD, Total Project Cost: 148,660,800 USD Project Highlights : Kajaki HEPP Project was constructed between 1951 and 1953 on the Helmand River. Subsequent to the construction of the dam, the Kajaki Power Station was recommended with an installation of 150-MW capacity in two stages and the first Power Plant had its 2 x 16.5 MW turbines installed by USAID in 1975, later the 18.5 MW capacity third turbine was commissioned and installed by 77 Construction USA Corp between 2014 and 2016 under USAID funded Kajaki Phase I project. The second Phase of the Project (Construction of 100MW capacity second Power House) was not started due to the unstable political situation in Afghanistan. 77 Construction USA Corp proposed Government of Afghanistan to invest and complete the second phase of the Project under a Build Operate and Transfer contract after completing the installation of 18.5 MW capacity third turbine in Kajaki as a contractor. EPC Contactor : 77 Insaat and Taahhut A.S is planned to be the Engineering Procurement and Construction (EPC) Contactor for the Project Turbine Manufacturer : 77 Insaat and Taahhut A.S has entered into a contract with Voith Hydro GmbH & Co. KG for the electro-mechanical equipment procurement of the Project Feasibility Report : The Feasibility Report of the Project was prepared by Hidro Dizayn Engineering and Consultancy Inc., a Group Company of LAHMEYER INTERNATIONAL
www.77insaat.com 77 İnşaat ve 54 Energy Taahhüt A.Ş. IPnrvoejesctmtsent
25MW WIND 77 Construction USA Corp (“77 77 Construction USA Corp’s proposal ponrogjoecintg PROJECT IN HERAT Construction USA Corp” or the “Seller”) was green lighted by USAID for further AFGHANISTAN has proposed to design, build, finance, considerations on December 10, 2018. 77 commission, operate, and maintain a 25 Construction USA Corp shared all the MW MWe / 30,4 MW wind powered technical and financial details of the Herat electric generation facility (the “Project”) WF Project with USAID after this date. On in the Province of Herat, Afghanistan, 14 March, 2019, 77CUSA was informed that and shall sell all generated energy by Government of Afghanistan authorities such the Facility to Da Afghanistan Breshna as DABS, Ministry of Energy and Water Sherkat (“DABS” or the “Purchaser”) for (“MEW’’), Land Authority (“ARAZI’’), 20 years with the proposal submitted to National Environmental Protection Agency United States Agency for (“NEPA’’) and Central Partnership Authority International Development (“USAID”) (“CPA’’) are fully involved in the BAA under Afghanistan Broad Agency Projects and are helping to support and Announcement (‘’BAA’’) for Energy facilitate in completing the co-development Program on September 04, 2018. and finally implementation of the Project. The Power Purchase Agreement (‘’PPA’’) negotiations are on going with DABS, the parties are planning to sign the PPA agreement on October 2019.
www.77insaat.com 77 İnşaat ve 56 Buildings & Facilities Taahhüt A.Ş. Energy Projects Energy Investment Projects Dams & Water Structures Runways & Aprons Pipeline & Steel Storage Tanks Other Projects
04 SDtarumcstu&reWsater
www.77insaat.com 77 İnşaat ve 58 Dams & Taahhüt A.Ş. WStrautcetrures
DAHLA DAM The Dahla Dam Improvement Project pcoromjepclet ted IMPROVEMENT will raise Dahla Dam seven meters to PROJECT PH1, increase reservoir storage for irrigation DAHLA, in the Arghandab Valley and future AFGHANISTAN municipal water supply for Kandahar City. Phase 1 of the project consists of modifications to the inlet, outlet works, and appurtenant structures to accommodate an eight meter dam raise.
www.77insaat.com 77 İnşaat ve 60 Dams & Taahhüt A.Ş. WStrautcetrures
INSTALLATION OF The scope of Kajaki Project is Installation cporomjepclet ted TURBINE GENERATOR of Turbine Generator Unit #2 and re- UNIT #2 AT KAJAKI furbishment of Governor, Excitation and DAM HYDROPOWER Automation Systems of Unit #1 and Unit PLANT, KAJAKI, #3 at Kajaki HPP in Helmand Province / AFGHANISTAN Afghanistan.
www.77insaat.com 77 İnşaat ve 62 Buildings & Facilities Taahhüt A.Ş. Energy Projects Energy Investment Projects Dams & Water Structures Runways & Aprons Pipeline & Steel Storage Tanks Other Projects
05 Runways & Aprons
77 İnşaat ve 64 RAupnrownasys & Taahhüt A.Ş. www.77insaat.com
REPAIR AIRFIELD This project includes demolition, removal, pcoromjepclet ted PAVEMENTS and replacement of deteriorated concrete SATHER AIRBASE, pavement and joint seal material for IRAQ eight separate airfield features. The airfield markings that were removed with the demolished pavement are also be repainted. The runway repair project includes removal of the rubber deposits in the landing/touchdown zones and restriping of the touchdown areas. Totally 27.000 m3 concrete to be removed and replaced in this project.
77 İnşaat ve 66 RAupnrownasys & Taahhüt A.Ş. www.77insaat.com
BALAD AIRFIELD Scope of work includes replacement of pcoromjepclet ted RUNWAY 12/30 damaged or cracked pavement, REPAIR PROJECT, resurfacing of Runway & Taxiway A, B, BALAD D (approximately 200.000 squaremeter of IRAQ Asphalt pavement), replacement of joint sealants and repainting of entire Runway & Taxiway.
77 İnşaat ve 68 RAupnrownasys & Taahhüt A.Ş. www.77insaat.com
CAS APRON CAS Apron Expansion project consists of Project will include access road, pcoromjepclet ted EXANSION PROJECT the design and construction of an apron pavement markings, edge lighting, area BAGRAM AIRFIELD, currently designed for approximately 32 lighting, utilities and other necessary site AFGHANISTAN fighter aircraft by a paved aircraft apron improvements. The Project also includes with shoulders, to provide space for 46 relocating existing revetments, installing fighter aircraft with space for an new revetments, construction of HAMS additional 4 aircraft on the taxiway. pad, Trim pad, Fabric Aircraf Shelter, Armament pad, Expeditionary Fighter Shelters, AOM facility and NDI facility.
77 İnşaat ve 70 RAupnrownasys & Taahhüt A.Ş. www.77insaat.com
CONSTRUCTION OF Construction of 25,500 m2 concrete area pcoromjepclet ted TEMPORARY including a landing zone, two helicopter FERNANDEZ LANDING parking aprons and a taxiway connecting ZONE, the landing zone to aprons and a (GREEN ZONE) helicopter maintenance hangar with a BAGHDAD height of 13.5m and an area of 3,950 m2. IRAQ
77 İnşaat ve 72 RAupnrownasys & Taahhüt A.Ş. www.77insaat.com
RE-EXECUTION The project involves the modernization of on AIRSTRIP, RUNWAYS, the airport through the reconstruction of hold TAXIWAYS, EXIT the taxiways and take-off runways. Scope TAXIWAYS AND of work includes provision and installation LIGHTING IN of subbase, crushed stone base course, AL KUFRA AIRPORT base bitumen course, binder and wearing LIBYA courses, concrete slab for the airport rehabilitation.
77 İnşaat ve 74 RAupnrownasys & Taahhüt A.Ş. www.77insaat.com
BLAHA – ECP & Entry Control Point and pcoromjepclet ted ACCESS ROAD, Access Roads CAMP BASTION AFGHANISTAN The project includes construction of a new ECP and access roads at Camp Bastion, Afghanistan. Primary facilities include the ECP with inspection area, guard towers, fencing, lighting, material transfer point, control building, canine area, asphalt roads, and ATFP barriers. Basic Load Ammo Holding Area The project includes approximately a 22,500 square meters (m2) of aircraft ramp area dedicated for handling hazardous cargo in Camp Bastion, Afghanistan. The primary facilities include a ramp parking area, ladder connecting taxiway, and vehicular access road.
77 İnşaat ve 76 RAupnrownasys & Taahhüt A.Ş. www.77insaat.com
SPEICHER AIRBASE 77 Construction is operating a cporomjepclet ted RUNWAY & ROAD fully functional Asphalt Batch Plant in ASPHALT PAVEMENTS Camp Speicher (Tikrit/Iraq) capable IRAQ of producing Hot Mix Asphalt Airfield Pavements and Hot Mix Asphalt Road Pavements, and having associated Support Equipment for purposes of laying road and runway asphalt to various locations in Camp Speicher.
www.77insaat.com 77 İnşaat ve 78 Buildings & Facilities Taahhüt A.Ş. Energy Projects Energy Investment Projects Dams & Water Structures Runways & Aprons Pipeline & Steel Storage Tanks Other Projects
06 Pipeline &TaSntkesel Storage
www.77insaat.com 77 İnşaat ve 80 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
ENGINEERING, BETWEEN Scope: ponrogjoecintg PROCUREMENT & Expansion of existing well pads by CONSTRUCTION FOR LUKOIL MID-EAST LIMITED hook up of fifty two (52) wells at six WELL PADS AND existing well pads EXPANSION AND # 2, 5, 7, 8, IO and 12 (guaranteed part HOOK-UP OF SICIM S.P.A. AND 77 INSAAT VE of the scope of WORK); HISTORICAL WELLS TAAHHUT A.S. CONSORTIUM AT THE WEST QURNA :: Hook-Up of 2 water injection wells, (PHASE 2) CONTRACT WQ#2 I 5 at WP#8 and WQ# 232 at AREA AT WEST QURNA, WP#7 (guaranteed IRAQ part of the scope of WORK) :: Hook-up of historical well # WQ- 08 to manifold of existing well pad# 2 (provisional part of the scope of WORK); :: Hook-up of historical well# WQ- 148 to manifold of existing well pad #7 (provisional part of the scope of WORK).
www.77insaat.com 77 İnşaat ve 82 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
DAMMAM Engineering, Procurement and pcoromjepclet ted DECENTRALIZED Construction of Dammam Decentralized WATER INJECTION Water Injection Facilities for Water FACILITIES FOR Supply Wells at the West Qurna II Site, WATER SUPPLY Basra, IRAQ for LUKOIL Company.. WELLS AT THE WEST The project includes construction of QURNA (PHASE 2), three new water wells, their connection IRAQ to existing oil production wells, renewal of existing oil production well piping and accessories, chemical injection skid, ICCS, instrumentation, electrical and telecom systems, and security measures.
www.77insaat.com 77 İnşaat ve 84 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
CENTRAL Infrastructure and Construction Works cporomjepclet ted PROCESSING FACILITY at 550,000 BPD CPF and Oil Well Pads. AND OIL WELL PAD T Wall Security Perimeters, Foundations INFRASTRUCTURE and Construction of Substations, Utility WORKS AT WEST Buildings, Underground Pipe Road QURNA-2 OIL FIELD, Crossings, Water Piping Networks, LUKOIL OVERSEAS Grouting Works, Earthworks, Access PROJECT Roads, Cast in Situ Pile Foundations, BASRA Precast Production of Well Cellars, Pipe IRAQ Trenches and Cable Trenches and Other Civil Works for Oil Well Pads; fast track production and installation meeting critical timetables of the oil sector; subcontractor to Samsung Engineering and LukOil Mid East Limited.
www.77insaat.com 77 İnşaat ve 86 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
WATER SYSTEM Scope of work covers provision of all opnrogjoecintg REPAIR PHASE 1 construction and design activities for new PROJECT, water supply wells, performing drilling, DJIBOUTI installation, and appropriate technical testing for six (6) pilot boreholes, an existing production water supply well cleaning and rehabilitation study to assess the existing condition of current wells at Camp Lemonnier, Djibouti. Upon completion of the boreholes and water production analysis, the government will select a minimum of three (3) locations for construction of new production water supply wells. After that connection of new water wells to the raw water distribution system and updating the ROWPU Industrial Controls System (ICS) at Camp Lemonnier, Djibouti with appropriate technical testing will be executed.
www.77insaat.com 77 İnşaat ve 88 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
50'-0\" [15240] TANK DIA ELECTRICAL BRACKET FOR BEACON 13'-11\" [4242] ARC ℄ 25'-0\" [7620] TOWER SQ @ TL TANK VENT TANK VENT ROOF CAP FIELD NOTE: ROOF HATCH ROOF FINGERS CREW FOREMAN MUST CHECK TYP 316 [5] ⅊14\" [6] AIR TERMINAL @ HIGHEST ROOF KNUCKLES FOUNDATION: 14 [6] 2\" [51] POINT ON TANK INSIDE TANK LADDER LAP TYP (W/ SAFETY DEVICE) DIAMETER = 50'-03 8\" [15250] HWL EL - 150.00' [45720] ROOF HATCH ROOF LADDER SQUARE = 25'-0316\" [7625] (W/ SAFETY DEVICE) NOTE: HWL SHELL MANWAY W/ DAVIT ROOF FINGER SECTIONS TO BE LAPPED 1\" [25]. 37'-3\" [11354] HEAD RANGE GROUND ASSEMBLIES TO BE SEAL WELDED. BG 100% 18 [3] 10'-912\" [3289] REVISED ITEMS NOTED SHELL #2 18 [3] Revision Description SHELL LADDER (W/ SAFETY DEVICE) ⅊14\" [6] 8'-0\" [2438] Copyright © 2017 by Phoenix Fabricators & Erectors, LLC All rights reserved. SHELL #1 ⅊14\" [6] LWL INSIDE SHELL LADDER (W/ SAFETY DEVICE) BALCONY INSIDE TANK LADDER ⅊5 8\" [16] 7'-5\" [2261] (4) ELECTRICAL BRACKETS FOR W/ SAFETY DEVICE ⅊14\" [6] OBSTRUCTION LIGHTS EQ SPA ON HANDRAIL ⅊3 8\" [10] 30\" [762] BALCONY & HANDRAIL BOWL KNUCKLES BOWL FINGERS TOWER LADDER (W/ SAFETY DEVICE) RISER RODS (TOP BAY SAG ±2\" [51]) WINDAGE ROD (214\"Ø [57]) COLUMN (.344\" [9]) RISER ROD & 11'-012\" [3366] W8X48 STRUT 0° BG 100% 45° AB/ST 4/5/19 18 [3] Rev. By Rev. Date ROOF HATCH EXTERIOR RING #1 & #2 16\"Ø INLET OVERFLOW TO GRADE LWL 150'-0\" [45720] INSIDE RISER LADDER 18 [3] ⅊12\" [13] 12/05/18 (W/ SAFETY DEVICE) 18 [3] WINDAGE ROD (212\"Ø [64]) BG 100% RISER HANDRAIL SIPHON ASSEMBLY COLUMN (.406\" [10]) ELECTRICAL BRACKET FOR AIR TERMINAL ⅊5 8\" [16] 500,000 GALLON ELEVATED WATER STORAGE TANK Date: (LOCATE @ HIGHEST POINT) RISER ROD & GENERAL ELEVATION NAVFAC W8X48 STRUT CAMP LEMONNIER, DJIBOUTI Drawn By: JB Checked By: ST 112'-9\" [34366] RISER SHELL & ROOF LADDER RISER (W/ SAFETY DEVICE) WELDING DETAILS WINDAGE ROD (212\"Ø [64]) COUPLING W/ PLUG 14\" = 1'-0\" 90° TOWER LADDER W/ SAFETY DEVICE 270° COUPLING W/ PLUG COLUMN (.500\" [13]) ELECTRICAL ST CONDUIT RISER ROD & W8X48 STRUT COUPLING PHOENIX NAME PLATE RISER MANWAY Engineer: ALUMINUM LADDER GATE ELECTRICAL BRACKET FABRICATORS AND ERECTORS, LLC 16\"Ø [406] INLET COLUMN (.563\" [14]) (4) ELECTRICAL BRACKETS FOR BEACONNORTH Avon, Indiana - Sebree, Kentucky WINDAGE ROD (212\"Ø [64]) FOR OBSTRUCTION LIGHTS 12\"Ø [305] TANK INSIDE TANK LADDER OVERFLOW (W/ SAFETY DEVICE) TOF EL - 0.00' [0] 10'-0\" [3048] 180° JOB. No. GROUT 1\" [25] THICK UNDER TANK ELEVATION REMOVABLE LADDER SECTION TANK ORIENTATION 3720 ALL BASE PLATES NOT TO SCALE 316\" = 1'-0\" SHEET T-01 FY18 WATER SYSTEM The work includes a Base Bid package opnrogjoecintg REPAIR PHASE 2 which includes the installation of 0.5 MG PROJECT, steel elevated water storage tank, booster DJIBOUTI pump system, booster pump building, site improvements, 300 mm pipe, fiber optic cable, pump control systems, and appurtenances. Bid Option 1 includes the installation of various sizes of waterline to replace existing infrastructure, while Bid Option 2 includes the installation of two fire pump systems, two fire pump buildings, site improvements at the two sites, 300 mm replacement pipe, fire communication systems, control valves with vaults, and appurtenances and incidental related work.
www.77insaat.com 77 İnşaat ve 90 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
SURFACE 5,000 BBL surface facility & flowline civil pcoromjepclet ted FACILITY works and electromechanical installation BINA BAWI, ERBIL, for OMV Company. IRAQ
www.77insaat.com 77 İnşaat ve 92 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
REFINERY All infrastructure and civil works of pcoromjepclet ted INFRASTRUCTURE & refinery with capacity of 30,000 BBL. CIVIL WORKS BAZIAN, SULEYMANIYAH IRAQ
www.77insaat.com 77 İnşaat ve 94 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
LSA ANACONDA Construction of the 13 EA, 500.000 cporomjepclet ted WATER STORAGE & Gallon capacity Water Storage Tanks, POL TANKS 4 EA, 250.000 Gallons capacity-Fuel IRAQ tanks with pump house/control room and underground transfer tanks as a subcontractor of Perini Management Services Inc. at LSA Anaconda IRAQ.
www.77insaat.com 77 İnşaat ve 96 Pipeline & Taahhüt A.Ş. SSttoeeral ge Tanks
SPEICHER FUEL Construction of the 8 EA 400,000 Gallons cporomjepclet ted RESERVE TANKS capacity bolted, 1 EA 200,000 Gallons IRAQ capacity fuel tanks, containment dikes and gravel roadways, concrete truck stands and security fencing around the tank farm as a subcontractor of Perini Management Services Inc. at Camp Speicher Tikrit.
www.77insaat.com 77 İnşaat ve 98 Buildings & Facilities Taahhüt A.Ş. Energy Projects Energy Investment Projects Dams & Water Structures Runways & Aprons Pipeline & Steel Storage Tanks Other Projects
07 Other Projects
www.77insaat.com 77 İnşaat ve 100 POrtohjeercts Taahhüt A.Ş.
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130