Replaced refractory bricks in Primary –F04201
ISO 9001:2015 PROJECT PHOTOS BLASTING – PAINTING - COATING
Blasting and Painting for structures and equipment - 2016 - PVCFC
Blasting and Painting for pipe racks and equipment – 2017, 2018 - PVCFC
Blasting and Painting for pipe racks - PVCFC
Hot zinc spray coating for steel structures at Our work shop
WRAPPING FOR UNDERGROUND PIPELINE -2015 NGHI SON REFINERY PROJECT
WRAPPING FOR UNDERGROUND PIPELINE -2015
Wrapping Chan May’s Jetty legs
POWDER COATING PRODUCT
ISO 9001:2015 PROJECT PHOTOS INSULATION
Insulation installation for pipeline – Tam Dao 05
Insulation installation for Pipeline and Fittings - PVCFC
Insulation installation for turbine using concrete 2016, 2018 -PVCFC Insulation Jacket for steam turbine PVCFC
ISO 9001:2015 PROJECT PHOTOS MAINTENANCE & REPAIR STATIC AND ROTATING EQUIPMENTS
TURNAROUND 2015 - PVCFC
Disassemble and Assemble high pressure equipment 2015 – Turnaround – PVCFC
TURNAROUND 2016 - PVCFC
Centrifugal Pump disassemble and maintenance 2016 - PVCFC
Replace packing for CO2 absorber/stripper – Turnaround 2016 PVCFC
Replace packing for CO2 absorber/stripper – PVCFC
Repair – replace tank’s bottom 2017- PVCFC
Maintenance, blasting, painting and Cladding for blower - PVCFC
Cladding inside damper - PVCFC
Fabricate and replace Flexible joints for air ducts - PVCFC
Repair maintain heat exchangers/ high pressure equipment 2017- PVCFC
Repair burner distribution panel for secondary reformer 2018 – PVCFC
Maintenance and Cleaning for tank and special equipment – Vietsovpetro
Maintenance Oil separator skid
Maintenance and repair drilling tower - Vietsovpetro
Unloading/Loading Catalyst for Heat Exchanger - PVFCCo
Unloading/Loading Catalyst for HTER - PVFCCo
Maintenance Reactor R5002 – PVFCCo 2018, 2019
Remove stud-bolts of flange 18” 1500#, Replaced lip seal
Re - installation Spools, Flange – Tightening bolts
Removed Studbolts and Blind Flange BOILER –E 5000 –2018, 2019 -PVFCCo
Replace Diaphragm gasket
REMOVED SPOOLS, HEAD COVER & TUBE BUNDLE HTER –PVFCCo -2018, 2019
Transferred From Shell to Transport Container
Lift down and transferred to Vung Tau’s Work Shop for Repair
TRANSFERRED TO BACK PHU MY FERTILIZER PLANT FOR RE - INSTALLATION Repair HTER - PVFCCo
Repair Tube Bundle of HTER at workshop Cutting the Head of Transport Container by grinding machine
Repair Tube Bundle of HTER at workshop Inspection and cutting Parts of deformation
Repair Tube Bundle of HTER at workshop
Repair Tube Bundle of HTER at workshop
Re-install tube bundle of HTER
Repair HTER - PVFCCo
Installation Top Cover HTER & Tightening Bolts
Repair HTER Team
ISO 9001:2015 PROJECT PHOTOS OFFSHORE
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126