Disassemble and Assemble high pressure equipment 2015 – Turnaround – PVCFC

TURNAROUND 2016 - PVCFC

Centrifugal Pump disassemble and maintenance 2016 - PVCFC

Replace packing for CO2 absorber/stripper – Turnaround 2016 PVCFC

Repair – replace tank’s bottom 2017- PVCFC

Repair maintain heat exchangers/ high pressure equipment 2017- PVCFC

Repair burner distribution panel for secondary reformer 2018 – PVCFC

UNLOADING CATALYST 2018 –PVFCCO

 LOAD LOADING CATALYST 2018 –PVFCCO

REACTOR –R5002 –PVFCCo 2018,2019



REMOVED STUDBOLTS, SPOOLS, FLANGES 18’’#1500 REMOVED OLD LIP SEAL

Replaced new lip seal

Re - installation Spools, Flange – Tightening bolt

Removed Studbolts and Blind Flange BOILER –E 5000 –2018, 2019 -PVFCCo

Removed Old Diaphragm gasket

Intallation New Diaphragm Gasket and welding seam

Re - installation Blind Flange – Tightening bolts

REMOVED SPOOLS, HEAD COVER & TUBE BUNDLE HTER –PVFCCo -2018, 2019

Transferred From Shell to Transport Container

Lift down and transferred to Vung Tau’s Work Shop for Repair

Cutting the Head of Transport Container by grinding machine

Inspection and cutting Parts of deformation



REPAIR TUBE BUNDLE

TRANSFERRED TO BACK PHU MY FERTILIZER PLANT FOR RE - INSTALLATION

Re – Installation Tube bundle

Installation Top Cover HTER & Tightening Bolts

ISO 9001:2015 PROJECT PHOTOS OFFSHORE

REPLACE TUBES FOR CONDENSER ON TBVN FPSO - 2017 – CUU LONG JOC

REPLACE TUBES FOR CONDENSER ON TBVN FPSO - 2017 – CUU LONG JOC

COMPOSITE LINING FOR BOTTOM ROOM OF RONG FIELD GAS COMPRESSOR PLATFORM - 2017 - VSP GAS ENTERPRISE

REPAIR INSULATION FOR TOP ROOM OF RONG FIELD GAS COMPRESSOR PLATFORM 2017 - VSP GAS ENTERPRISE

REPLACE TUBE BUNDLE AND OFFSHORE INSTALLATION 2018 -CLJOC

OFFSHORE INSTALLATION PRODUCTION HEATER ON TBVN 2018 -CLJOC

OFFSHORE INSTALLATION PRODUCTION HEATER ON TBVN 2018 -CLJOC

OFFSHORE INSTALL ATION SAFETY ITEMS ON STT 2018 – CLJOC

OFFSHORE INSTALL ATION SAFETY ITEMS ON STT 2018 – CLJOC

CLEANING AND PAITING INSIDE COMPRESOR VESSELS (CCP) OF CENTRAL GAS COMPRESSOR PLATFORM 2018 - VSP GAS ENTERPRISE



ERECTION SCAFFOLDING AND REPAIR INSSULATION – STV –CPP - 2019 CLJOC



INSTALLATION AIR DUCT FOR BATTERY ROOM SVNE 2019 -CLJOC

THE REPLACEMENT OF WHP-A’S HELIDECK SAFETY NETTING FRAMES - 2019 -CLJOC

FABRICATION GAS COOLER OF WHP-MT1 – BDPOC -2019

INSTALLATION GAS COOLER ON WHP-MT1 – BDPOC -2019

CONTACT INFORMATION ISO 9001:2015 Should you have any enquiries, please feel free to contact us: Kim Thiet Production Trading Service Company Limited Address: No. 12/8F/11, Road no. 8, Zone 4, Hiep Binh Phuoc ward, Thu Duc district, HCMC. Tel: 028 22 535 939 Fax: 028 22 539 789 Email: [email protected]