BLASTING – PAINTING - COATINGPROJECT PHOTOSISO 9001:2015

Blasting and Painting for structures and equipment - 2016 - PVCFC

Blasting and Painting for pipe racks and equipment – 2017, 2018 - PVCFC

Blasting and Painting for pipe racks - PVCFC

Hot zinc spray coating for steel structures at Our work shop

WRAPPING FOR UNDERGROUND PIPELINE -2015NGHI SON REFINERY PROJECT

WRAPPING FOR UNDERGROUND PIPELINE -2015

Wrapping Chan May’s Jetty legs

POWDER COATING PRODUCT

INSULATIONPROJECT PHOTOSISO 9001:2015

Insulation installation for pipeline – Tam Dao 05

Insulation installation for Pipeline and Fittings - PVCFC

Insulation Jacket for steam turbinePVCFCInsulation installation for turbine using concrete 2016, 2018 -PVCFC

PROJECT PHOTOSMAINTENANCE & REPAIRSTATIC AND ROTATING EQUIPMENTSISO 9001:2015

TURNAROUND 2015 - PVCFC

Disassemble and Assemble high pressure equipment 2015 – Turnaround –PVCFC

TURNAROUND 2016 - PVCFC

Centrifugal Pump disassemble and maintenance 2016 - PVCFC

Replace packing for CO2 absorber/stripper – Turnaround 2016 PVCFC

Replace packing for CO2 absorber/stripper – PVCFC

Repair – replace tank’s bottom 2017- PVCFC

Repair maintain heat exchangers/high pressure equipment 2017- PVCFC

Repair burner distribution panel for secondary reformer 2018 – PVCFC

Maintenance and Cleaning for tank and special equipment –Vietsovpetro

Maintenance Oil separator skid

Maintenance and repair drilling tower - Vietsovpetro

Unloading/Loading Catalyst for Heat Exchanger - PVFCCo

Unloading/Loading Catalyst for HTER - PVFCCo

Maintenance Reactor R5002 – PVFCCo 2018, 2019

Remove stud-bolts of flange 18” 1500#, Replaced lip seal

Re - installation Spools, Flange – Tightening bolts

BOILER –E 5000 –2018, 2019 -PVFCCo Removed Studbolts and Blind Flange

Replace Diaphragm gasket

REMOVED SPOOLS, HEAD COVER & TUBE BUNDLEHTER –PVFCCo -2018, 2019

Transferred From Shell to Transport Container

Lift down and transferred to Vung Tau’s Work Shop for Repair

TRANSFERRED TO BACK PHU MY FERTILIZER PLANT FOR RE - INSTALLATIONRepair HTER - PVFCCo

Cutting the Head of Transport Container by grinding machineRepair Tube Bundle of HTER at workshop

Inspection and cutting Parts of deformationRepair Tube Bundle of HTER at workshop

Repair Tube Bundle of HTER at workshop

Repair Tube Bundle of HTER at workshop

Re-install tube bundle of HTER

Repair HTER - PVFCCo

Installation Top Cover HTER & Tightening Bolts

Repair HTER Team

OFFSHOREPROJECT PHOTOSISO 9001:2015

REPLACE TUBES FOR CONDENSER ON TBVN FPSO - 2017 – CUU LONG JOC

REPLACE TUBES FOR CONDENSER ON TBVN FPSO - 2017 – CUU LONG JOC

COMPOSITE LINING FOR BOTTOM ROOM OF RONG FIELD GAS COMPRESSOR PLATFORM - 2017 - VSP GAS ENTERPRISE

REPAIR INSULATION FOR TOP ROOM OF RONG FIELD GAS COMPRESSOR PLATFORM 2017 - VSP GAS ENTERPRISE