Speculative Distribution Center                                 Alovats and Alovats North, Elizabeth, NJ240,000 SF - Alovats             These two speculative office/warehouse facilities designed by M+H Architects983,320 SF - Alovats North       for Greenfield Builders complete the development at the Cranbury South River2007 - Both Buildings            Road and Costco Way Intersection. The buildings of contrasting size provide anConstruction Costs: $28 Million  attractive variety of potential lease space in a desirable location near the New                                 Jersey turnpike. Barnes & Noble and USA Facilities, previously constructed and                                 occupied, round out the foursome of the development.
New Speculative Office and Warehouse            KTR Northeast Business Park, Washington Township, NJ905,000 SF  This 905,000 SF speculative office/warehouse structure designed by M+H for KTR2007        Capital Partners provides first class office and distribution space to potential            tenants. The site provides ample dock capabilities with large car and trailer            parking capacity. The multiple tenant design with 36’ clear height structure            provides desirable flexibility for a wide range of potential end users.
New Office/Warehouse Building Shell              Middlesex Center Boulevard, South Brunswick, NJ1,401,500 SF  This project, for IDI, is part of a newly created warehouse district that includes2006          three buildings, contains a 1.35 Mil. SF foot warehouse facility in South Brunswick,              NJ, and which was designed to be occupied by two tenants. The building contains              two identical 675,600 SF bulk distribution centers, each with its own main              entrance. The building’s interior features include bar joist for a 36’ clear height              and 50’ x 50’ column spacing. Precast load bearing concrete wall panels clad the              building because they offered cost, durability, and speed benefits. Erection of the              panels took only 30 days. The precast concrete walls were finished with reveals              cast into the panels, and they were painted on site after erection.
New Operations, Call Center & Distribution Facility                                                                        DM Management, Tilton, NH450,000 SF Distribution, 40,000 SF Ofc.  This is a high tech multi-function facility for D M Management, the1998                                     corporate structure for a women’s clothing mail order service.Construction Costs: $14 Million          The building houses the offices within a two story vaulted and skylit structure that                                         is attached to the operations and distribution center by a two story link. This link                                         encloses a multi-purpose dining area that overlooks a landscaped patio. Above                                         the dining area is a fitness center that has views of the New Hampshire landscape                                         through skylight dormers.                                         The building is also equipped with its own call center to receive incoming orders.                                         The call center is central to the facility and allows immediate handling of the orders                                         directly to the distribution center. The distribution center handles the order via a                                         sophisticated material handling system that speeds the delivery of the selection                                         to the customer. The shipping and receiving area is immediately adjacent to and                                         within the 450,000 SF distribution center. The building is constructed of tilt-up                                         concrete with a standing seam metal roof over the office and dining link.                                         1999 	 DBIA - National Design-Build Award                                         1998	 NNECPA - Concrete Award for Outstanding Tilt-up Concrete Construction
Automotive Parts Distribution Facility                                                      Ford HVC, Cranbury, NJ300,000 SF                         Ford Motor Company’s new high velocity parts distribution facility is strategi-2004                               cally located to provide quick access to dealerships and auto service centers forConstruction Costs: $10.8 Million  fast delivery of repair parts. The design responds to Ford’s requirements and                                   interior storage system to ensure that orders can be received, filed, packaged and                                   shipped within a very short timeframe.                                   The building is constructed of precast concrete panels and steel roof framing.                                   Shipping and receiving docks are configured for maximum efficiency and heavy                                   traffic flow.
New Transaction Services Facility & Expansion                                                                            Citi, Urbandale, IA168,720 SF                             On at tight budget and up against a six-month deadline, Citi wanted to build a2005-Phase I, 2008-Phase II            state-of-the-art facility to house its 600 Citi employees, as well as automatedConstruction Costs: $21 Mil., Phase I  equipment for printing statements, opening mail and processing payments. This                                       building completes phase I of three phases of a new business park located in                                       suburban Des Moines, Iowa. As a precaution, this transaction services facility                                       utilizes technologically advanced security measures such as retina scanning and                                       other anti-terrorism safeguards.                                       With the use of innovative construction techniques to keep costs low and aesthetics                                       high, M+H delivered a 168,720 SF building that is high tech, high security and high                                       class, setting the architectural standard for a brand new business park.                                       In late 2008, M+H and Clayco completed another project for Citi in Urbandale,                                       this time on a Payment Processing Center Expansion.                                       2007	 TCA Tilt-Up Concrete Association                                       	 Tilt-Up Achievement Award - Office Division
New Distribution/Warehouse Facility, and Expansion                                                                                   Amscan, Chester, NY526,566 SF - Building One                This building is a new 526,566 SF distribution and warehouse facility built in the351,894 - Expansion                      Catskill Mountains for Amscan, “The Party People.” Approximately 18,000 SF of2001 and 2006                            the facility accommodates office space and the remaining 508,566 SF is used asConstruction Cost: $19.5 Mil. Bldg. One  distribution/warehouse space. It supplements operations of four other distribu-                                         tion centers across the country and includes a series of multi-level pick modules,                                         a three-level mezzanine and an intricate sortation and conveyor system. The                                         building is used to sort, pack and ship the company’s line of party products.                                         Constructed of tilt-up concrete panels, the single-story building features a dark                                         gray reflective glass curtainwall system and a canopied main entrance.                                         In 2006, we completed a 351,894 SF single story addition to the original project,                                         which included additional pick modules, storage racks for products, and 20 addi-                                         tional loading docks.
Distribution Center                                 Sweetheart Cup, Baltimore, MD1,034,000 SF                     Located near one of Sweetheart Cup’s largest manufacturing plants, this distri-2000                             bution center of over a million square feet facilitated the stockpiling of cups,Construction Costs: $23 Million  until they are needed, for mega-clients such as McDonald’s, Wendy’s and others.                                 The warehouse incorporates a smoke evacuation system, high-pile storage, an                                 automated pick system and pallet wrap stations.
Speculative Office/Distribution Facility                          LogistiCenter, Allentown, PA595,000 SF  This project is a new, single story, speculative office/distribution building with2003        cross-docks, two drive-in doors and provisions for rail-access at the northeast            building corner. The building construction utilizes exterior load-bearing pre-cast            panels and steel joist girder/bar joist roof framing and is located on a 69.8-acre            parcel in Lower Nazareth Township, PA.
New Refrigerated Storage Building                                           Save-a-Lot, Winchester, KY397,330 SF                       Save-A-Lot, Ltd. is a division of SuperValue Foods, the nation’s second largest1997                             food wholesaler. This state-of-the-art distribution facility provides 287,000 SF ofConstruction Costs: $14 Million  28’ clear height dry goods storage and 100,000 SF of temperature-zoned perish-                                 able goods storage, ranging from 55° F coolers to -10° F freezers.                                 Separate dry and cold dock areas are situated to allow efficient movement                                 of product. A 10,000 SF “Class A” office component includes break                                 rooms, conference rooms, dispatch area and employee cafeteria. Built                                 entirely of tilt-up concrete panels, the low-temp areas utilized the                                 Thermo-Mass systems for insulated panels.
New Fulfillment Center                                   Disney, Jonesville, SC512,195 SF                       Disney Direct Marketing Services, Inc. built a new, 512,000 SF fulfillment center1998                             in Jonesville, South Carolina to support its dramatically improved catalog andConstruction Costs: $15 Million  website sales. The warehouse and office are constructed of tilt-up concrete                                 panels, steel roof and interior framing. The warehouse has incorporated state-of-                                 the-art material handling equipment, conveying systems and racking.                                 The one-story 20,904 SF office/support area provides central security, cafeteria,                                 kitchen, locker room for 912 lockers, training room, computer room, toilets,                                 administrative offices and a small outlet store. Satellite offices, toilets and break                                 rooms are dispersed throughout the warehouse facility.
Distribution Facility with Office Space                                                   Buske Lines, Houston, TX170,000 SF                        This project is a new, single story, 170,000 SF warehouse and office building2002                              located in Houston, Texas for BUSKE Lines, Inc. Approximately 165,000 SF isConstruction Costs: $5.1 Million  warehouse space, with a clear height of 39’. Approximately 5,000 SF of office                                  space is located on 2 levels of the building.                                  Construction consists of painted concrete tilt-up panels, steel roof structure with                                  T.P.O. roofing, aluminum framed windows with insulated tinted glazing, sheet                                  metal faced wall panels at office area with prefinished sheet metal fascias.                                  Sitework includes concrete paving and walks, landscaping and flagpoles.
Distribution Facility                                  Neuman Distributors, Teterboro, NJ332,350 SF                        This project was a new, 332,350 SF distribution facility for the Morris Companies,1999                              which was leased to Neuman Distributors for storage, sorting, packaging andConstruction Costs: $9.8 Million  distribution of pharmaceutical products. The facility was designed to meet appli-                                  cable U.S. Food and Drug Administration requirements and includes a secured                                  vault for narcotic medications, a refrigerated area for perishable drugs, a 3-level                                  pick mezzanine, extensive material handling and conveyor systems and 14,500 SF                                  of office space.                                  1998 	 New Jersey Chapter of the American Concrete Institute                                  	 Merit Award - Tilt-Up
New Distribution Center and Expansion                                        Dick’s Sporting Goods, Pittsburgh, PA383,000 SF - New Building - 1999     This first facility, finished in 1999, is a state-of-the-art distribution center for214,000 SF - Expansion - 2005        Dick’s Clothing and Sporting Goods retail outlets in the Pittsburgh, PA region.Construction Costs: $11.1 Mil.- New  Automated material handling equipment serves 70 shipping dock doors and 35$9 Mil.- Expansion                   receiving dock doors.                                     The tilt-up concrete structure houses approximately 160,000 SF of storage area in                                     addition to the shipping and receiving space, and 7,500 SF of office/staff support                                     area.                                     A 214,000 SF expansion to this facility serving an additional 65 shipping and 35                                     receiving dock doors was completed in 2005.