PROJECT HIGHLIGHTS 2021 EDIT ION
PROJECT HIGHLIGHTS 2021 EDIT ION AUTOMOTIVE & 5 19COMMERCIAL & MUNICIPAL 47 PARKING DECKS RETAIL BUILDINGS OFFICE & 57 RECREATION 71 RELIGIOUS 77 MEDICAL SPACE RESIDENTIAL & 81 SCHOOLS & 89 97WAREHOUSES, HOSPITALITY UNIVERSITIES CONVENTION HALLS, DISTRIBUTION CENTERS 1203 SPRING CREEK PLACE, SPRINGVILLE, UTAH 84663 801-489-5663 WWW.CURECRETE.COM
AIRLINES Project Highlights AUTOMOT IVE & PARKING DECKS
6
classic depot by Floortech d.o.o. Vienna, AUSTRIA (2020) / RetroPlate, RetroPel / Conmat The specification for this classic car depot in Vienna, (2,500 m2) of concrete was polished with a salt n’ pepper Austria originally called for an epoxy coating on the finish. concrete floor. However, the owner and architect were made aware of the long-term benefits and characteristics This polished concrete floor serves as the perfect of polished concrete and the RetroPlate System, as well backdrop for showcasing the numerous classic cars it as the excellent oil repellency properties of RetroPel. houses. These floors are not only beautiful and high-end, they are durable and strong, and well-protected from Floortech d.o.o. polished and protected this concrete potential motor leaks and spills. floor, and the results are impeccable. More than 27,00 ft2 7
8
9
preston garage by Cuviello Concrete USA / RetroPlate / Todd Guntner & Travis Gold 10
jinlong bus by Hua Can New Green Materials Technology Co. Ltd Xiamen City, CHINA (2020) / Ashford Formula / Hua Can New Green Materials Technology Co. Ltd 11
pohanka volkswagen dealership by Master Applications Salisbury, Maryland, USA / RetroPlate / Todd Guntner & Travis Gold 12
13
denso solution auto repair & maintenance service factory by Cosmo Trade & Service Co., Ltd Okayama City, JAPAN (June 2020) / RetroPlate, RetroGuard, RetroPel / Cosmo Trade & Service Co., Ltd 14
15
parking lot by SAPCON & TEC-CRETE Monterrey, MEXICO (July 2020) / Ashford Formula / Ashford Formula de Mexico This parking garage in downtown Monterrey, Mexico had The first step in restoring the concrete floor was to install been built many years before. As is evident in the before polymeric concrete on the surface to eliminate the photos, the concrete floor was in very bad shape. The roughness and create a smooth, drivable floor. surface was brittle and very course, and prone to even more damage with normal use. The repaired floors were then treated with the Ashford Formula to ensure the durability and longevity of the SAPCON and TEC-CRETE were awarded the contract to concrete floor - ensuring it was densified, hardened and repair the concrete floor and ensure that it was not only dustproofed for the life of the concrete. usable, but also safe for drivers. 16
17
dallas arts district PARKING GARAGE Dallas, TX, USA / Ashford Formula / Rhonda Clinton & Cass Rochelle In the Dallas Arts District in Texas there are two adjoining parking garages which have been densified using the Ashford Formula. The first parking garage was built in 1985 - an HKS Architects project - where Ashford Formula was used as a stand alone cure to densify, harden and dustproof the concrete floor in a single, permanent application. The second parking garage, which was a joint venture with the City of Dallas, was wet cured following the initial application of Ashford Formula. This photo, taken a few years ago, highlights how well the concrete floors have performed, even after decades of use. The Ashford Formula has protected and provided a durable surface for both parking garages, has provided excellent chemical resistance, ease of maintenance, and long term performance. The overarching goal was to provide a safe, durable and long lasting floor surface that was also attractive enough to complement the beautiful art on the walls leading into the Meyerson Symphony Center. Both parking garages are proof of the long term benefits of Ashford Formula. Not only has it protected the concrete from heavy vehicular traffic, but has stood the test of time both in performance and appearance. 18
Project Highlights COMMERCIAL & RETAIL
costco Las Rozas by Durotec Glasstone, SL Madrid, SPAIN (July 2020) / Ashford Formula, CreteFill, RetroGuard, RetroPel, CreteClean Plus / Curecrete Europe, SL 20
21
dallas GROCERY STORE by BNR Concrete Polishing Flower Mound, TX, USA / RetroPlate, RetroGuard / Rhonda Clinton & Cass Rochelle BNR Concrete Polishing of Frisco, Texas polished Formula when it was first constructed. As a result, it 42,730 ft2 (3970 m2) of concrete floors at this grocery provided a good and hard surface with which to use store with the RetroPlate System. The floors were a the RetroPlate system when a more design-conscious Class A cream finish, polished to a Level 3 with 1500 and reflective floor was desired. With the expertise of grit diamonds. BNR’s team, these aged floors were transformed and made to look “new” with an incredible and beautiful This floor was originally densified with Ashford shine! 22
23
hungry hippo by BUE Enterprise BRUNEI (April 2019) / Ashford Formula & RetroPlate / BUE Enterprise Hungry Hippo is a family café and imaginative indoor The floors of this Hungry Hippo Cafe were both densified playground for kids located in Brunei. At Hungry Hippo, and polished with Ashford Formula and RetroPlate, and kids have the freedom to play, learn, imagine and create. It completed in 2019 by BUE Enterprise. The exceptional also boasts a café with a delicious assortment of drinks and properties and characteristics of both products provide snacks for both kids and adults. While other restaurants may durability and aesthetic appeal to the floor, along with ease not cater to kids, this family café is for everyone! of maintenance to keep the floors looking great! 24
finish line shoe store by Artlow Systems DeKalb, IL, USA (2020) / Ashford Formula / Bob Donahue & Jennifer Burke 25
jab gym by BUE Brunei Pavo Point, Bandar Seri Begawan, BRUNEI (February 2020) / Ashford Formula & RetroPlate / BUE Brunei Jab Gym was the first boutique boxing gym in Brunei to Ashford Formula and RetroPlate were both used in Jab Gym combine fitness, lifestyle and luxury. At just under 10,000 to accomplish the design firm’s aesthetic and performance ft2 (929 m2), this industrial-luxe gym was conceptualized by goals. Both products bring durability and strength to the London-based design firm, Keane. The firm used materials concrete floors, while the RetroPlate system provided a such as exposed concrete and black metal to convey a higher-end, more design-conscious appeal, where higher feeling of power and grit, while using luxury accents like reflectivity and shine were desired. Italian marble and bespoke detailing. 26
27
costco bundamba by Transitions Polishing & Grinding Bundamba, QLD, AUSTRALIA (April 2019) / Ashford Formula, RetroPlate, RetroPel / Green Concrete Products 28
29
heavy duty equipment dealership & shop by Concrete Reflections Kamloops, BC, CANADA (January 2020) / RetroPlate / Vince Harker & Kyle Harker The floors of this brand new, heavy duty equipment appearance. The Concrete Reflections team did an dealership and shop received the RetroPlate Concrete exceptional job polishing 25,000 ft2 (2,323 m2) of floors in Polishing System and were polished with a salt and pepper this building, taking just 10 days to finish the job. 30
31
32
Repco warragul by Green Concrete Products Warragul, VIC, AUSTRALIA / RetroPlate / Green Concrete Products 33
walmart by Concrete Reflections Victoria, British Columbia, CANADA (2019) / RetroPlate / Vince & Kyle Harker 34
35
bunnings box hill cafe by CFMGT Pty Ltd Box Hill, VIC, AUSTRALIA (July 2020) / RetroPlate / Green Concrete Products LOGISTICS CENTER by Admire Concrete Kansas City, MO, USA / Ashford Formula / Andy Forbes 36
bunnings warragul by Green Concrete Products Warragul, VIC, AUSTRALIA (February 2020) / Ashford Formula / Green Concrete Products 37
Rent a Space by Rylex Flooring Marsden Park, NSW, AUSTRALIA / Ashford Formula / Green Concrete Products 38
bunnings REYNELLA, SA by Green Concrete Products Old Reynella, SA, AUSTRALIA (October 2019) / RetroPlate / Green Concrete Products bunnings bennetts green by Dynamic Flooring Windale, NSW, AUSTRALIA (July 2020) / Ashford Formula / Green Concrete Products 39
Bunnings kangaroo flat extension Kangaroo Flat, VIC, AUSTRALIA (May 2020) / Ashford Formula / Green Concrete Products reece bayswater by Seal Plex Bayswater North, VIC, AUSTRALIA / Ashford Formula / Green Concrete Products 40
Bunnings kembla grange by Rylex Flooring Kembla Grange, NSW, AUSTRALIA (June 2020) / Ashford Formula / Green Concrete Products komeri by Cosmo Oil Co. Ltd. Mizusawa, Oshu City, Iwate, JAPAN (September 2020) / Ashford Formula / Cosmo Oil Co. Ltd. 41
menards Muscatine, Iowa, USA / Ashford Formula / Mark & Patti Tisinger 42
bunnings young by Rylex Flooring Young, NSW, AUSTRALIA (August 2020) / Ashford Formula / Green Concrete Products 43
floor & decor by DelRod Concrete Polish Webster, TX, USA / RetroPlate, CreteFill Pro 85, RetroGuard / Rhonda Clinton & Cass Rochelle More than 93,000 ft2 (8,640 m2) of concrete in this Floor & With effective team work and cooperation by everyone Decor store was polished using the RetroPlate System. For involved, DelRod Concrete Polish was able to successfully the DelRod Concrete Polishing team, this project proved deliver a polished concrete floor with fine aggregate and a to be a challenge as the concrete floor was in very bad level 2, satin sheen. RetroGuard and CreteFill Pro 85 joint condition at the start. A lot of work needed to be done in a filler were also utilized on this project - making this floor short period of time, while also working around other trades. durable, well-protected, and beautiful! 44
Bunnings melton east by Rylex Flooring Melton East, VIC, AUSTRALIA (November 2020) / Ashford Formula / Green Concrete Products 45
Project Highlights MUNICIPAL BUILDINGS
mapleton fire station by Brak Carman & Sons Mapleton, UT, USA / RetroPlate, RetroPel / Curecrete Distribution, Inc. In 2019, Curecrete celebrated an incredible 70 years of The fire station floor had a thick coating on its surface. Ashford Formula and 20 years of RetroPlate! The entire Before any work could be done on the floor, Brak and year was spent reflecting on our history as a company, his sons needed to remove the coating entirely to get the incredible accomplishments of our global network, to the bare concrete surface. After much patience, and and the outstanding performance of these two flagship slow and steady work, they were finally able to remove products. the coating and proceed with the RetroPlate Concrete Polishing System. But celebrating wasn’t all Curecrete did that year. Curecrete wanted to give back to the local community After the concrete floor had be been ground, densified and sought out a municipal facility that could benefit from and polished, RetroPel was applied to the floor as using our products, not to mention the manpower of our an additional layer of protection, which provided excellent team. Curecrete donated both the products and water and oil repellency from ambulances and fire the labor to densify and protect the Mapleton City Fire trucks that constantly drive in and out of the garage. Station in Mapleton, Utah, while our Technical Support Specialist and Floor Restoration Expert, Brak Carman and Needless to say, the fire station floor not only looks great, his sons, ground and polished the floors. but is well protected for many years to come! 48
49
BEFORE 50
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- 136