Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore OMEGA Brochure

OMEGA Brochure

Published by OMEGA, 2015-10-09 17:07:42

Description: OMEGA Brochure

Search

Read the Text Version

OUR WORLD IS BUILT ON MOMENTUM.As one of the largest construction engineering firms in the Chicago area, OMEGA crafts the crucial infrastructures that keep our world moving.At OMEGA, we engineer superior projects throughout northeastern Illinois—the I-90 Corridor and the Circle Interchange, among others. Timeliness, quality and responsible budgeting are OMEGA’s founding pillars—because we know what movement means to you. Movementmeans travel and commerce. It means life. And it all depends on a reliable transportation structure. Our communities never slow, and neither do we.

OUR WORK IS FAR AHEAD OF THE PACK. OUR LEADERS ARE AT THE FOREFRONT.OMEGA’s team of skilled engineers has constructed a variety of major projects to keep our world moving—from large-scale highway projects to multi- OMEGA’s team of highly educated local engineers has decades of diverse experience including complex roadway and bridgemillion dollar roadway, transit station and railroad construction projects. With a client-centric approach, OMEGA provides project consultation, quality structures. Leaders in the field, our engineers are more than well-versed in the latest technologies and groundbreaking techniques.control and engineering excellence that’s far ahead of the curve. We understand what our work means to our neighbors—we take this personally—so we’re always proactive, not reactive, throughOur services include Construction Engineering, Construction Management, Program Management, and other transit based Civil Engineering. every stage of the project. Movement is vital to the people that we serve. That’s why we always take pride in our work and the impact it has on our communities and environment. After all, we live here, too.



OUR TOOLS ARE PUSHING THE PACE.The world never slows down, so we always innovate.At OMEGA, we’ve left paper behind, using digital platforms tocoordinate and execute projects. It’s how we break from thenorm. It’s also how our clients stay ahead, with video technologykeeping them up-to-date through every step of our process.With our collaborative approach, diverseexpertise and exceptional client service,we’re creating the foundations thatkeep our community moving.3333 Warrenville Road, Suite 130Lisle, Illinois 60532 | omegaassociates.com





C RCLE TERC A GE L O ER,

CIRCLE INTERCHANGE FLYOVER,RAMP FROM NORTHBOUND DAN RYANTO WESTBOUND EISENHOWER, IDOTOMEGA is currently providing construction engineering he structure is com rised o s ans including curved s ans o steel late girders orth o arrison treet, the structure s lits intoservices for the Illinois Department of Transportation’s $60 two structures to also orm the ast ound - ram structuremillion project which includes the construction of a new he l over will consist o two oot lanes with shoulders on the inner and outer edges, generall to eet wide ro osed iersyover ramp from the orthbound Dan Ryan Expressway will e su orted drilled caissons u to eet in diameter and steel iles The structure will include aesthetic treatmentsto the Westbound Eisenhower . he over will on the proposed yover walls as well as aesthetic fencing. Lighting is included on this project consisting of high mastinclude a touchdown oint in the vicinit o the - mainline tower lighting and conventional pole lighting.etween eoria treet and reen treet he estimated length o his ro ect also includes tem orar avement or the gores and tie-ins and ermanent avement or the ram a roaches to theim rovement is , eet which includes the northwest over ridge our retaining walls are to e constructed includingram and a roaches he overall length o the structure is walls with lightweight cellular fill and drilled soldier ile walls Also included in the scope of work is roadway reconstruction,a ro imatel , eet noise walls, water main, drainage, interstate lighting, ITS, signing, traffic control and protection, landscaping, aesthetic treatments and pavement markings and all incidental and collateral work necessary to complete the improvement.

DIVERGING DIAMOND INTERCHANGE ILLINOIS ROUTE 59 FROM FERRY ROAD TO AURORA AVENUE

DIVERGING DIAMOND INTERCHANGEILLINOIS ROUTE 59 FROM FERRY ROADTO AURORA AVENUEOMEGA is currently providing construction engineeringservices on this $100 million project which includes advanceand mainline work, as well as, interchange reconstruction,add lanes, pump station removal and replacement, noisewalls, tree removal, and landscaping.The project includes utility relocations, roadway reconstruction,widening, and resurfacing of Illinois Route 59 and side streets,tra fic signals, lighting, drainage structures, sidewal s shared usepath, ADA ramps, retaining walls, and noise abatement walls. Thenew roadway will have three lanes in each direction instead oftwo, with the construction extending three and a half miles.n addition, there will be a complete reconfiguration of theexisting typical diamond interchange at I-88 into a proposedDiverging Diamond nterchange, the first such interchange inIllinois. he new configuration will enhance sa et as motoristswill not have to ma e a le t-hand turn against tra fic to accessthe Tollway going in either direction.Also included in this project is the removal andreplacement of the Illinois Route 59 bridge over the onald eagan emorial ollwa - , with two newindependent bridge structures.

IL ROUTE 59 RECONSTRUCTION FROM IL ROUTE 126 TO CATON FARM ROAD

ILLINOIS ROUTE 59 RECONSTRUCTION, Illinois Route 59 is a Strategic Regional Arterial (SRA) route in western Will County. An estimated , vehicles utili eFROM IL ROUTE 126 TO CATON FARM ROAD, IDOT llinois Route every day. These numbers are expected to rise as the communities of Plainfield, oliet, and ShorewoodOMEGA provided construction engineering services for continue to grow.the Illinois Department of Transportation’s $30 millionreconstruction of Illinois Route 59 from Illinois 126 to Caton ue to increased tra fic volumes and the condition o the roads, complete reconstruction was needed. The reconstruction project arm Road in Plainfield. reduced congestion and provided a safer roadway.The three-year project included widening of the roadway ACEC Engineering Excellence Merit Awardfrom two to four lanes (two in each direction), curb and gutter 2015 APWA Southwest Branch Transportationimprovements, left turn lanes installed at major intersections, Project of the Year Awardmedian installation, new storm sewers, new water main, new tra ficsignals, and new roadway lighting. The project was three miles inlength.

DAN RYAN EXPRESSWAY

DAN RYAN EXPRESSWAYELEVATED BRIDGE STRUCTURE FROM ROOSEVELTROAD TO 31ST STREETOMEGA provided construction engineering services for theIllinois Department of Transportation’s $45 million Dan RyanElevated Bridge Structure Rehabilitation Project. The two year ro ect involved milling and h dro-scarification o the e isting ridge dec s, artial and ull-de th ridge dec atching,removing and re lacing all e ansion oints and overla ing thebridge deck with microsilica concrete. he an an resswa carries more than , vehiclesa da , ma ing it the usiest e resswa in hicago uringconstruction, three lanes o tra fic remained o en in eachdirection at all times. The project was completed one monthahead of schedule and is expected to extend the life of theelevated bridge structures by approximately 25 years.

STEVENSON EXPRESSWAY -

STEVENSON EXPRESSWAYRESURFACING FROM I-355 TO KEDZIE AVENUEOMEGA provided construction engineering services for The project also included special striping and signage forthe $34 million, 20 mile roadway rehabilitation project. TheStevenson Expressway consists of three to four lanes in the development of peak hour HOV bus lanes on the insideeach direction with variable width shoulders and ramps andaverage daily traffic of over , vehicles. Construction shoulders for use by PACE. The schedule was aggressive andprogressed simultaneously on both inbound and outboundlanes. All of the work was completed at night to minimize com leted on time so that the service would startdisru tion to tra fic during ea tra fic hours on schedule. HACIA Mentor / Protégé of the Year Award ACEC Engineering Excellence Honor Awardhe ro ect involved avement scarification, atching andresurfacing with Stone Matrix Asphalt (SMA). The existingbridge decks were sealed and the storm sewer system wascleaned and re aired his ro ect was the first to use a a orer ormance s ecification on an resswa resur acingro ect , tons o was laced on this ro ect

EISENHOWER EXPRESSWAYRESURFACING FROM I-88 TO I-90/94

EISENHOWER EXPRESSWAYRESURFACING FROM I-88 TO I-90/94OMEGA provided construction engineering services for theEisenhower Expressway Resurfacing project for the IllinoisDepartment of Transportation. This $66 million dollar projectconsisted of the milling and resurfacing of one of Chicago’sbusiest expressways.IDOT chose OMEGA as a prime consultant to complete fourcontracts, totaling 14 miles of the project. Interstate 290 generallyconsists of three to four lanes in each direction with variablewidth shoulders. Construction took place in both directionssimultaneously inbound and outbound. Much of the work wascompleted at night to minimi e disruption to traffic duringpeak travel hours.The project also consisted of repairing nine bridges includingthe Des Plaines River Bridge and the Central Avenue Bridgeas well as entrance ramps and exit ramps. The scope of thestructure work consisted of bridge deck and approach pavementpatching and sealing, barrier wall and joint repair, expansion jointreconstruction and substructure repair.2011 HACIA Project of the Year Award2012 ACEC Engineering Excellence Honor Award2012 APWA Suburban Branch Project of the Year Award

NAGLE AVENUE BRIDGEBRIDGE REPLACEMENT OVER THE KENNEDY EXPRESSWAY & CTA TRACKS

NAGLE AVENUE BRIDGEBRIDGE REPLACEMENT OVER THE KENNEDYEXPRESSWAY & CTA TRACKSOMEGA provided construction engineering services forthe Illinois Department of Transportation. Nagle Avenueis a north-south thoroughfare that crosses over the KennedyExpressway. IDOT contracted with OMEGA to provideconstruction engineering services for the widening andrehabilitation of the Nagle Avenue Bridge and to improve theintersections located at each end of the structure. ra fic staging was a crucial com onent to the ro ectdue to the west bound expressway entrance at the northend of the bridge and an east bound exit ramp to theKennedy Expressway on the south side. The entiresuperstructure was successfully removed and replacedin stages, without closing the bridge or the expresswayram s new water main, sewers, sidewal s, tra ficsignals and lighting were also installed.





I-90 CORRIDORELGIN TOLL PLAZA TO IL 53

I-90 CORRIDOR Corridor Management services involve the complete engineering management of the corridor from the pre-construction phaseI-90 CONSTRUCTION MANAGEMENT & CORRIDOR through completion. The services include providing leadership andCONSTRUCTION MANAGEMENT SERVICES management of all engineering efforts and engineering consulting firms a ro imatel firms er orming services or the ollwaOMEGA has been chosen by the Illinois Tollway to perform Corridor in the corridor with the goal of providing the necessary continuityConstruction Management Services and Construction Management for success of the project. OMEGA’s approach to the project isServices for a section of the I-90 (Jane Adams Tollway) reconstruction to maintain engineering awareness to the Tollway’s overall goalsproject located along the corridor from the Elgin Toll Plaza (M.P. 53.8) and objectives regarding schedule, budget, public relations, theto the Illinois Route 53 Interchange (M.P. 68.2). The estimated cost traveling public, and surrounding communities. The OMEGA teamof the corridor project is $1 billion and involves up to 25 separate provides the single point of contact for the Tollway within theconstruction contracts. corridor and is responsible for making sure that complete, accurate, and consistent information is provided in a timelyThe work involved in this corridor involves the reconstruction of manner to all stakeholders.the mainline roadway, the addition of a fourth lane, reconstructionor rehabilitation of 10 major bridge structures, the construction ofretaining walls, the installation of a smart lane concept for the insidelane, as well as all other necessary work. Coordination work and publicoutreach to impacted communities, including the establishment ofemergency response procedures, is a key element of the work. Impactedcommunities/agencies include the counties of Kane and Cook, the IllinoisDepartment of Transportation, and municipalities consisting of Elgin,South Elgin, East and West Dundee, Hoffman Estates, Barrington Hills,South Barrington, Rolling Meadows, and Schaumburg.

NSMJAWA WATERMAIN RELOCATION I-90 FROM THE ELGIN TOLL PLAZA TO THE KENNEDY EXPRESSWAY

NSMJAWA WATERMAIN RELOCATIONI-90 FROM THE ELGIN TOLL PLAZA TOTHE KENNEDY EXPRESSWAYOMEGA has been chosen by the Illinois Tollway to perform JAWA 2A (the hot tap contract) has an approximate cost ofConstruction Management Services for the relocation of the $8 million dollars and includes a 90” pressure tap into theexisting Northwest Suburban Municipal Joint Action Water existing 90” feed coming out of the O’Hare pumping station.Agency (NSMJAWA) transmission main currently located onthe south side of the I-90 Right of Way from Elmhurst Road towest of Route 59. The NSMJAWA relocation contract begins atBarrington Road and extends eastward to Elmhurst Road withwork in eight major segments. This work is divided into three has an a ro imatecontracts, JAWA 1, the relocation of the majority of the water cost o million and includesmain currentl in con ict with the ro osed reconstruction the construction o aro ect, which is or a hot ta into the e isting PCCP relocated line from eastmain east o lmhurst oad, and which is or the actual of Elmhurst Road at the hotrelocation o a ortion o the e isting main itsel etween ta location to a oint westthe hot ta and the e isting mains west o lmhurst oad of Elmhurst Road where it will connect to the e isting thatThe $55 million JAWA 1 contract consists of the relocation of feeds both the northwest linea ro imatel , eet o restressed concrete c linder i e and the south loo line t alsoin si es ranging rom diameter to diameter com lete includes a connection to thewith valves and a urtenances at multi le locations along the e isting or the south looI-90 Tollway ROW at a total of eight locations. Also included running along Elmhurst Roadin this contract is the relocation o a ro imatel lo and a connection to theductile iron water main and eet o sanitar sewer northwestern transmission linerelocation for the Village of Schaumburg. along I-90.

I-90 AT IL 47 INTERCHANGE

I-90 AT IL 47 INTERCHANGEJANE ADDAMS MEMORIAL TOLLWAY FROMMILE POST 45.7 TO MILE POST 47.4OMEGA provided construction engineering services for this $37million, complete interchange, reconstruction pro ect, the firstproject to get underway as part of the Illinois Tollway’s $12 billioncapital program, Move Illinois: The Illinois Tollway Driving theFuture. This complex project involved removal of the existing outdatedbridge structure and partial access interchange while constructing a newseven lane wide bridge over I-90 with new all electronic I-PASS toll plazasservicing six new ramps, allowing full access in all directions. This projectwas constructed on an aggressive schedule to avoid any impact to theongoing 62 mile long Jane Addams Tollway mainline reconstruction.The work also included reconstruction of 1.7 miles of the existing IL 47as an all new concrete, six lane, divided highway, with roadway drainageimprovements, extension of existing box culverts for Eakin Creek,new tra fic signals at the ram s and at ahmer reeman oad,as well as a complete roadway lighting system, both on theTollway ramps and along IL 47, to enhance roadway safety. s the llinois ollwa s first “green interchange”,the project also included several newenvironmentally friendly initiatives includinggeothermal heating and cooling for the plaza uildings, re ective roo s, trellised vegetationat the buildings, bioswales and permeableramp shoulder pavement.2014 ACEC Engineering ExcellenceSpecial Achievement Award

I-88 EOLA ROAD INTERCHANGEINTERCHANGE AT EOL A BET WEEN DIEHL AND BILTER ROAD AT I- 88

I-88 EOLA ROAD INTERCHANGEINTERCHANGE AT EOLA BETWEEN DIEHLAND BILTER ROAD AT I-88OMEGA provided construction engineering services for theIllinois State Toll Highway Authority. The project scope includedthe construction of a new interchange on the Reagan MemorialTollway (I-88) at Eola Road with a construction cost of $21 million.The project was built on an accelerated schedule with constructionstarting in April 2009 and was completed by November 2009.The project consisted of the construction of a full interchange westof Eola Road on the Reagan Memorial Tollway. The west bound ramps provided access to and from Eola Road via Bilter Road. The east bound ramps provided access to and from Eola Road via Diehl Road. Three signalized intersections were included in the improvements. The construction also included: construction of four PCC pavement interchange ramps and appurtenant facilities, unmanned, I-PASS only toll plazas on both the west bound off ramp and east bound on ramp, and roadway lighting along the mainline median and along the proposed ramps. 2012 ACEC Engineering Excellence Merit Award

WAUKEGAN TOLL PLAZA OPEN ROAD TOLLING

WAUKEGAN TOLL PLAZAOPEN ROAD TOLLINGOMEGA provided construction engineering services for the IllinoisState Toll Highway Authority. The Tri-State Tollway’s Waukegan TollPlaza was reconstructed to provide three Open Road Tolling (ORT)lanes in each direction providing non-stop toll collection for I-PASSusers.The cash plaza was reconfigured to provide five booths in eachdirection. Converting mainline toll plazas to barrier-free Open RoadTolling was part of the Tollway’s Congestion-Relief Program, OpenRoads for a Faster Future, which reduced travel times by rebuilding/restoring nearly all of the toll collection system.





WACKER DRIVE VIADUCT,STREET TO RANDOLPH STREET

WACKER DRIVE VIADUCT,RECONSTRUCTION FROM MONROESTREET TO RANDOLPH STREETThis $75 million project was located in the heart ofdowntown Chicago east of the Chicago River. The projectinvolved the demolition of the existing viaduct superstructurewith partial substructure removal from the north side of MonroeStreet to the north edge of Randolph Street on Wacker Drive.The project included a new post-tensioned cast-in-placeviaduct superstructure with a latex concrete overlay, re-use ofexisting caissons, new columns, and new grade beams. Alsoinvolved was the lower level roadway reconstruction includingpaving, barrier walls, storm and sanitary sewers, water main,lighting and tra fic signals, construction o ventilation cham ers, ascule ridge fi ed s an re airs, and sidewal reha ilitation naddition, upper level roadway work included paving, sidewalks,drainage, lighting, tra fic signals, and lanters he ashington rolle unnel and the hicago reight unnel were also filledReconstruction was staged so that the upper level storefrontsand lower level dock and garage accessibility were maintainedat all times. This high visibility project received intensive localmedia scrutiny.

HALSTED STREET BRIDGEOVER NORTH BRANCH CANAL

HALSTED STREET BRIDGEOVER NORTH BRANCH CANALOMEGA provided construction engineeringservices for this $13 million project whichinvolved removing and replacing the existingbridge with a new tied-arch bridge over theChicago River, new abutments, two culvertsrunning under the approaches, pavementreconstruction, pavement resurfacing,cofferdams, driving new piles, and temporaryshoring towers. The new tied-arch bridgefeatures two full traffic lanes in eachdirection, as well as marked bike lanesin each direction, a configuration thatimproves traffic ow and safety formotorists and bicyclists.

MILWAUKEE AVENUE IMPROVEMENTS FROM KILPATRICK TO ADDISON

MILWAUKEE AVENUE IMPROVEMENTSFROM KILPATRICK TO ADDISONOMEGA provided construction engineering services forthis $7 million project located just south of the historic “SixCorners” neighborhood between Kilpatrick Avenue andKildare Avenue. The project involved full depth PCC pavementreconstruction between Kenton Avenue and Kilbourn Avenuein order to allow the etra and nion acific railroad viaductpavement to be lowered to match the latest clearance standards. his ro ect included street lighting, tra fic signals, sewers anddrainage structures, existing sewer lining, new water main,driveways, ADA compliant ramps and sidewalk, old railroad trackremoval, full depth pavement removal, bituminous pavementremoval, Class C patching, structure adjustments, reinforcedconcrete curb walls, hot mix asphalt resurfacing, pavementmar ings, tra fic signs, new tree grates, trees and landsca ingReconstruction was staged so that one lane, one way boundtra fic was e t at all times on ilwau ee venue to reventfull roadway closure. Extensive communication with Metra wasestablished from the beginning of the project to allow Metrato perform repairs to the superstructure and to the pedestrianstairs going to the station platform during Milwaukee Avenuereconstruction. Public safety and access was kept as prioritythroughout the job site at all times.

KINGSBURY STREET IMPROVEMENTSFROM NORTH AVENUE TO SCOTT STREET

KINGSBURY STREET IMPROVEMENTSFROM NORTH AVENUE TO SCOTT STREETOMEGA provided construction engineering services forthis $4.3 million streetscape improvement of the formerindustrial roadway on the Near North Side from NorthAvenue to Scott Street and Scott Street from KingsburyStreet to Halsted Street. The Kingsbury streetscape project ispart of “Building a New Chicago”, a comprehensive $7.3 billioninfrastructure renewal program. he single-trac rail line was first installed in the street inwhen the neighborhood was heavily industrial. Over the decades,the land uses changed in the area from industrial to retail,commercial and residential, and the tracks became obsolete. Theproject was funded entirely through the Tax Increment Financing(TIF) program and included complete reconstruction of theroadway pavement, curbs and gutters, driveways and sidewalks; ermanent removal o , eet o centur -old railroad trac s inthe roadway; drainage improvements; geometric improvementsat the Halsted/Scott intersection consisting of the straighteningand realignment of Scott Street; pedestrian enhancements,including wider sidewalks and barrier curb between the roadwayand sidewalk; improved operation of the Halsted Street/Scott Street intersection; new ornamental street lighting; andlandsca ing, including new trees and tree grates

CLARK STREET VIADUCT AT ROOSEVELT ROAD

CLARK STREET VIADUCT The project included the installation of drilled shaft caissons andAT ROOSEVELT ROAD steel micro-piles in an area of very poor soil, substantial retainingOMEGA provided bridge construction engineering services walls to support the entrance and exit ramp construction,for the complete reconstruction of the Clark Street Viaductsat Roosevelt Road. The structures were originally built in 1921 extensive utility relocation, including water, electric, sewer andand were in poor condition. The scope of the project includedthe creation of a grade separation, featuring Clark Street passing gas, storm sewer, concrete footings, concrete bridge piers,under the existing Roosevelt Road Bridge, with new entranceand exit ramps to access the existing elevated Clark Street and multi le ridge dec s, avement installation, tra fic signals,Roosevelt Road intersections. lighting, lanters, landsca ing, and e tensive tra fic control





STEARNS ROAD CORRIDOR,OVER THE FOX RIVER, KANE COUNTY

STEARNS ROAD CORRIDOR, The work was performed under a stringent set of environmental commitments, and OMEGA’s personnel were responsible for ensuringOVER THE FOX RIVER, KANE COUNTY permit compliance to a wide variety of government agencies including the Army Corps of Engineers. OMEGA was also instrumental in assisting theOMEGA provided construction engineering services for the Kane contractor with devising alternate methods of caisson construction andCounty Division of Transportation’s $25 million Stearns Road Contract testing due to complex geological conditions in the river bed.over the Fox River near South Elgin. The 18-month project includedconstruction of a 5-span, steel plate girder main bridge, a 2011 APWA Public Works Project Excellence Awardcombination steel truss and precast concrete pedestrian bridge 2012 ACEC Engineering Excellence Honor Awardand ramp, over two miles of new concrete pavement, signalized 2012 ACEC Engineering Excellence Eminent Conceptor Awardintersections and lighting, and extensive below ground and openchannel drainage systems.

143RD STREET RECONSTRUCTION FROM WILL-COOK ROAD TO BELL ROAD, WILL COUNT Y


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook