BANNER RAIL - FRAME ASSEMBLY Step One: Slide clear Hanging Clips onto suspension loops and insert into the T-Slot at the top of the extrusion. Step Two: Insert silicone edge of graphic into the extrusion and slide until centered with the extrusion. Step Three: Snap End Caps onto both sides of the extrusion. Components: Step Four: Suspend Banner Rail to ceiling, adjusting suspension points as needed. End Cap Hanging Clip #2403 #2405 6945 Northpark Blvd, Suite A - Charlotte, NC 28216 | 704.579.5800 | www.SEGSYSTEMS.com
Search
Read the Text Version
- 1 - 1
Pages: