PRO:ZERO Fast Boats for Professionals Proven technology P roZ ero O f fsh o re b oats
At Tuco we specialize in fast boats for professionals. Every day we work to set the standard in innovative lightweight maritime constructions and supreme material technology. We strive to deliver durable solutions that reflect and support the development of a safe, sustainable and prosperous future in maritime logistics. Customers can rely on Tuco as a loyal partner that draws on intimate market knowledge, expert craftmanship and years of experience with successful deliveries to ensure more than just customer satisfaction. #weloveworkboats
PRO:ZERO The ProZero series is a range of fast boats designed specifically for professional use. They are built to endure the harsh conditions of operations on open sea while providing the operator with an ideal work environment. With advanced design and sophisticated application of composite materials, the ProZero series offers the customer significant commercial benefits and enhance overall vessel performance and energy efficiency. The ProZero range covers Offshore, Workboats and vessels for Security & Defense. #weloveworkboats
PRO:ZERO 7.5m frc mrk3 7.5m FRC MRK3 The 7,5 m FRC is a third-generation design built around the already well proven ProZero 7,5-meter Fast Rescue Boat. The first two iterations of the 7,5-metre FRC design have been developed and tested thoroughly during the ProZero development project for which Tuco received funding under the Horizon2020 SME Instrument programme. This development project ended in 2018, but Tuco Marine has continued to refine the project results and implement them in the ProZero series. The third generation FRC represents the highest level of refinement yet. Low weight Cutting weight and adding value. Low weight design lifts the value chain.
P R O : Z E R O 7.5m FRC MRK3
Design: 2019 | 5000-01-19 FENDER: TANKS: SECURITY EQUIPMENT: The fender is made from closed cell polyethylene Fuel tank (130 liter). Manual bilge pump. Length overall, approx.: 7.7 m foam. It is non-deflatable and features a solid core Electrical emergency pump in bilge, manual that cannot lose buoyancy or absorb water. Any ELECTRICAL SYSTEM & LIGHTING: start, in the bilge and in the engine room. Beam overall, approx.: 2.86 m damage is strictly cosmetic keeping crew safe. The All electrical wiring in marine cable. Fire extinguisher on starboard side of fender system absorbs major impacts and retains Isolation transformer with earth plate for steering console. Draft, approx. (without sterndrive): 2.36 m integrity and shape. The ProZero fender profile protection against galvanic corrosion. 2 x lifebuoys. gives substantially more interior room than a Crew: 2 persons comparable RIB. NAVIGATION & ELECTRONIC EQUIPMENT DELIVERY: Electric engine controls. Complete engine instru- All boats are launched, tested and calibrated Capacity: 14 persons DECK: ments with RPM, temperature, oil pressure and and has gone through a scrupulous quality Deck is self-bailing. voltmeter for start batteries supplied by engine control at the yard in Denmark. Maximum Load (incl. persons): 1310 kg Stowage for SOLAS equipment and mooring manufacturer. Delivery, hand over, test drive and technical equipment. 1 x start battery and 1 x consumption battery review with customer at yard in Denmark. All Engine: 1 x Water jet Mooring bites. Fuel gauge. boats are delivered with a complete owner’s Single point lifting hook (optional equipment). Control panel for all lighting and other electrical manual. OPERATIONAL FEATURES: Self-righting system. equipment. Speed (lightweight): 27 kts. Metallic arch. Fixed VHF (optional equipment) GENERAL: Speed (full load): 20 kts. Seats for crew. Magnetic Compass The boat is built as standard according to the Steering console with all around railing. technical specification and our general quality DESCRIPTION Painter hook (optional equipment). standard. The specification is valid when being The boat has been built to meet the SOLAS printed. Details in construction, design and requirements for fast rescue boats TECHNICAL: equipment can be changed as a result of the experience from the use of the boats. The HULL, DECK AND SUPERSTRUCTURE: ENGINES, PROPULSION, STEERING & quality and the equipment standard, however, The boat is made of a combination of glass- and MANOUVERING are equivalent at least to this specification. The carbon fibber as sandwich construction with 1 x Diesel inboard engine. hull and structure have a 2 years’ warranty from PVC as core material. This core material act 1 x Water jet (Option 1). the date of delivery. The equipment and devices as a natural buoyancy reserve material, due 1 x Stern drive (Option 2). fitted in the boat have a 1 year’s warranty from to its lightweight and zero water-absorption. the date of delivery. Moreover, the sandwich construction avoids the use of internal stiffeners, increasing the usable internal space. Possibility of twin engine and drive installation for redundant propulsion system. Main switches with separate battery systems for start and consumption. Battery charger with indicator. Navigational lights. Working lights. Searchlight.
PRO:ZERO workboats 7.5m FRC MRK3
Optimizing operations PRO:ZERO Attending to the human factor. Functional, and ergonomic console layout arranged to maximize the use of state-of-the-art operations management and situational awareness electronic aids. deck layout
Materials The carbon fibre materials technology secures ultra-high levels of strength and durability at a very low structural weight. The new design presents a very large deck area which will accommodate large payloads or up to 16 persons. New bow and fender configurations have been added for improved safety during transfer operations across the bow. As standard the FRC features a single water jet installation, but twin water jet installations are availa- ble upon request. Unmatched strength Confront the elements withcon- fidence. Built for strength, safety and durability.
Deck layout The boat has been designed to offer best in class maximized deck areas, enabling optimized operations, load carrying, and passenger capacity. Swift support Rest assured and focus on the job. Our skilled technicians are always prepared to offer support.
PRO:ZERO Supeeqruioiprmmeantterials fibre reinforced High s“tLreonregmthi,plsouwmmdaoilnotresnitaanmceet, consectetur adipiscing composites Cleverecliht,osiceedsdoof meiuastemroiadlstienmcrpeoarseinpciedrifdourmntauntcleabore et and prdoodluocretivmitayg. nFiabaelriqrueian. fUortceendimcoamdpmosinitiems hvaenveiam, quis great sntoresntrgutdh-etxoe-wrceitigathiot nrautilola,mphcyosliacbalosrtisabniilsitiyuatnadliquip mfvoeorslsmdeialnsreneg.xupfefrlaeaecxhctieobunmirldiintmeygr.oitTtdhhioneisfcvamoosnlatuskapeenqtsaduttaedhtuev. emrDaliubthileisegsahsPuelrytoceaZiltielrturrumoarcetdidvooelolorre in fugiat nulla pariatur.“ eu Safe and durable Improved safety is also a benefit of using composites. Diteroppantoeesltspsupstreodvieinos tthhneatPatrhoeZle“sraonsdewriiecsh”h-atyvpeebceotmtepr os- energyeabxsotrptrionacapeaciqty cuomipparemd toefonr intstance oalfutmhein“viLuesomsre.eTlmihsiisbpsemuttemearndpsortleohsraetsrivttheaedmsintertut,hccetounorscaeclcaintseitoteungrroiatfdyipiscing collisioenlitw, sitehdodbojeecituss.mThoedstaenmdpwoirchinpcaidniedluancttsutalsaabore et closeddcoellol,rseomthagant ainatlihqeuea.vUentteonfima caodllimsioinnimwhveerneiam, quis the ounteorstsrkuind iesxceorcmitpatrioomniuselldam, wcaotelarbionrtiaskneisisi ut aliquip acponanndfeicnlrerweeexdwipllearasaentuhcdrfeofisnoemkbrd.mesfutrroiltuldpiconteencvdooenwtlursahpeteqtiaorutenaeatwsv. eDhaliiusctihiemsssasielueattrsceiatlihllruueummrveienddsuosomleololrre in eu fugiat nulla pariatur. Excepteur sint occaecat cupida- Workitnagt ntoogneptrhoeirdent, sunt in culpa qui officia deserunt At Tucmo,owlleitcaanriemfuildlyedsrtalwaboourut mall.”th“e potential inherent in these materials and we continuously work together with the Danish Technical University amongst others to verify the mechanical properties and advantages of composites. Unmatched strenght Confront the elements with con- fidence. Built for strenght, safety and durabilility.
Why Carbonfibre Composites PRO:ZERO Many people are not aware of the advantages of Impacts/safety materials carbon fibre composites over aluminium, so here composites we will highlight some of them. Composite boats are much safer than aluminium boats. When aluminium boats are subjected to Life Span impacts, the hull is often penetrated. A simple drop test clearly shows the improved safety of a sand- Composite boats have longer life span due to their wich composite hull structure. By dropping a 12-kilo non-corrosive nature and the capacity of the ma- weight from 5 meters of height onto an aluminium terials to dampen vibrations and protect against hull plate, the hull plate will be penetrated. Conse- structural degradation. Fast going aluminium boats quently, there is a risk of water ingress and both have a maximum lifespan of 15 to 20 years before crew and boat are exposed to danger. vibrations starts generating cracks in the welding/ The same test performed on a sandwich panel shows plate connections. The relative difference in stiffness that only the outer skin of the structure is penetrated between welded connections and plating means that while the core material absorbs the remaining en- forces cannot be transferred to and from the plating ergy, leaving the inner skin undamaged This means without creating cracks over time. no risk of water ingress and less danger to boat and crew members. weight Paints and surfaces Generally, carbon fibre composite boats are 30% lighter than comparable aluminium boats. This Aluminium surfaces need constant maintenance translates into less fuel consumption and higher since any minor scratches or compromises to the speeds. Carbon fibre itself is known for its impressive paint will expose the aluminium. Under such cir- strength-to-weight ratio which is higher than all other cumstances the aluminium will start to oxidize, and materials used in boatbuilding. Although carbon fibre more paint will start peeling off and result in further is four times stronger than high-grade steel, it weighs surface degradation. only 25% as much. With composites, scratches are purely cosmetic and no repaint or maintenance is needed. Type Density Tensile Young Low-grade Strenght Modulus Applications kg/m3 Steel Mpa Gpa During the last century, carbon fibre has been the 7750 preferred material for any high-end application. 150-1500 210 Giant steps forward in the use of carbon fibres, not only in the space industry but also more generally in Steel High-grade 7600-8000 200-2000 190-205 the commercial aerospace industry, has led to signif- icant developments in carbon fibre production and Aluminium Alloy 2700-2800 34-500 lowering of prices. Better availability has led to an extended use of carbon fibre in more industrial ap- Glassfiber E-glas 2540 2400 73 plications – including high-speed marine applications which leaves aluminium in second place in the race Carbon fibre T700 1770 5300 235 for high-performing, durable maritime solutions.
PRO:ZERO droptest: composite Composite hull structure • Dropping a 12,5 kg load from 6 m height. • 25mm sandwich panel with PVC core. • A controlled release mechanism lets the load falls straight down and ensures reproducibility of results. result: Absorbs the impact • Only the outer skin of the hull structure is pen- etrated – No water intake, no immediate risk for boat and crew. • The sandwich core absorbs the energy from the impact and the inner skin remains undamaged. • The vessel can return safely to harbour with no risk for crew and vessel. droptest * Image shows penetration of only the frontside of the sandwich composites vs aluminium panel because the inner core absorbed the impact
droptest: aluminium PRO:ZERO Aluminium hull plating • Dropping a 12,5 kg load from 6 m height. • 5 mm aluminium hull plate. • A controlled release mechanism lets the load falls straight down and ensures reproducibility of results. result: Water intake • Impact on the aluminium hull plating results in immediate water intake with crucial risk for crew and boat. • Damage like this requires instant attention. * Image shows full penetration of the aluminiums plate droptest composites vs aluminium
quality assurance Quality comes first Quality is a keyword at Tuco Marine Group. In our pursuit of excellence, it is crucial that the quality is under complete control. We work nonstop to ensure that our products and services not only fulfill, but surpass quality requirements. Our skilled employees secure high quality at every step in the manufacturing process by performing systematic measurements and continuous monitor- ing of raw materials, components, assemblies and finished products. quality assurance
Workshop and instructions PRO:ZERO Professional training – skilled instructors We can provide a variety of operations and mainte- nance courses that can accommodate clients from a number of sectors including Wind, Maritime, Oil & Gas and Military. Teaching is performed by our expert instructors, who have trained more than 8000 people. A selection of ProZero courses: • Introduction to materials • Introduction to basic techniques • Safety • STCW - Personal Survival Techniques • STCW - Proficiency in Fast Rescue Boats • STCW - Proficiency in Fast Rescue Boats Refresh Contact us at [email protected] for more info. two day workshop included
PRO:ZERO easy access to hook The ProZero design ensures easy access to the lifting hook from the front deck or through a passageway in the cabin. Safety railing is mounted so that the hook operator can focus fully on the job at hand. Certified and safety approved lifting mechanisms can be fitted according to customer preference. Low consumption Minimized operating costs and improved environmental impact. For a sustainable and prosperous future. Robust hook mechanisms Safe and easy access
Launch and Recovery PRO:ZERO Not taking any risks Launch and recovery of Daughter Crafts is an area that requires exceptional vigilance. The ProZero series is carefully designed to secure maximum safety and reli- ability for the users in these high-risk situations, and special care is taken in the design process to ensure accessibility to hooking points. Lighter overall solution Due to the lightweight construction of the ProZero Daughter Crafts, less stress is exerted on the lifting equipment. This allows fitting of lighter davit equip- ment which benefits the overall naval architecture and saves resources that enable clients to pursue their real goals. Light weight solutions lift the entire value chain. We work closely with a number of leading equipment manufacturers and we are happy to include custom- ized LARS solutions for individual clients. Low weight Cutting weight and adding value. Low weight design lifts the value chain.
PRO:ZERO Sturdy railings Optimal work space and safety
Safety onboard PRO:ZERO The foredeck is a large, skid proof cargo deck that is reachable by crane from the turbine or mothership. The helmsman can maintain a clear view of the cargo and deck crew while loading/unloading. robust railings Sturdy railings are installed around work areas to ensure the safety of the personnel. The railings can be removed to accommodate over- sized cargo and to provide easy access and transfer. Lashing points Dedicated cargo zones with lashing points are installed on deck to secure cargo during operations. The deck has been reinforced to accommodate the added load. Lifting equipment The ProZero Daughter Crafts can be equipped with a hydraulic crane for easy handling of equipment and cargo. Different onboard cranes are available to ensure compliance with local regulations. Flexible construction Construction with a purpose. Know-how and expert engineer- ing at the service of unique client demands.
PRO:ZERO High speed rescue The ProZero Fast Rescue Daughter Craft (FRDC) are specifically designed for fast launch and recovery from davits offshore and Emergency Response, Search and Rescue and Patrol operations away from a mothership. All ProZero Daughter Craft feature the exceptional vacuum-infused ProZero composite hull for optimal strength and responsive handling at speed, even in very aggressive conditions. Our 11m ProZero FRDC can accommodate up to 12 passengers or 24 emer- gency survivors. All our Daughter Craft are rigorously tested to ensure their self-righting capability in all conditions and are constructed to be virtually unsinkable. ProZero Daughter Craft are available in a range of lengths with different propulsion systems and with cus- tomizable configurations to suit the client’s specific requirements. 11m Fast Rescue Daughter Craft
PRO:ZERO hull and material 11m Fast Rescue Daughter Craft
Hull Engine Beds Within the machinery space and tank space the main longitudinals are built Hull Construction and Materials up and profiled to form engine beds to suit the specified engines. Construc- The composite structure is designed, calculated and built to the requirements tion is of box section with tapping strips along their upper faces to accept of DnV Craft 2.20 & 2.21, furthermore it complies with requirements from the engine feet. The tapping strips are mild steel the full width of the bed SOLAS. Careful attention is constantly paid to weight control and detailed and suitably abraded before inclusion in to the laminate. design, to produce a robust and sea-kindly craft fit for the demanding role of ERRV operations. In view of the operational requirements, weight refinement Fuel Tanks is not taken to the minimum limits allowed by classification rules, but is The fuel tanks are positioned amidships port and starboard. The tanks are carefully considered to combine robust construction with efficient operation. constructed of composite and bonded in to the hull to become an integral part of the hull construction. Baffles are fitted inside the tank to prevent The main hull shell is a one-piece moulding produced in surging. Large tank lids are fitted in the top face of the tanks for easy access accordance with the hull construction drawing. The hull shell shall have for cleaning the tanks. The tank lids are molded from composite and are pigmented gel coat above and below the waterline. secured in place with a strong back. The first two laminates are of powder bound chopped strand mat reinforce- Bulkheads ment impregnated with resin. Subsequent laminate is applied as dry fabrics The vessel is to be fitted with structural watertight bulkheads dividing up the and core material, and infused in one operation with vinylester resin. In vessel as follows: general, the complete structure is built as sandwich laminate, but in specific areas core is replaced with additional laminate. • Forepeak The hull frames, stringers and longitudinals are built from of a combination • Tank / technical compartment of bi-directional fibers and uni-directional reinforcement, impregnated with vinylester resin, over foam sections. • Engine Room Adequate limber holes are fitted throughout the craft to allow bilge water to Main bulkheads are constructed from composite board and fully bonded to drain. Under the main engines limber holes are omitted so the framing will the structure. Furthermore, the vessel is strengthened with open frames, to form a drip tray. ensure hull and deck support, to comply with relevant rules. Throughout the structure compartments are finished in gel coat. Efficient and proven hull Matchless strength-to-weight and Primary stiffening is to be by longitudinal engine beds and the fuel tank seaworthiness. Shaping first-class construction. Deck joint knees are bonded in at each frame. All deck knees etc. hulls with precision technique and shall taper in to frames as gradually as possible. Stiffeners are formed in WR cost-effective production. with uni-direction tapes (UDT) reinforcement as necessary on stiffener faces. A general arrangement plan is provided, together with details of the proposed hull, and the arrangement for the rest of the vessel.
P R O : Z E R O 11m frb - frdc
Design: 2019 | 5000-03-54 FENDER: TECHNICAL: NAVIGATION & ELECTRONIC EQUIPMENT: The fender is constructed of closed cell ENGINES, PROPULSION, STEERING etc. Complete engine instruments supplied by Length overall, approx.: 11 m polyethylene foam with a solid core that cannot 2 x Inboard diesel engine engine manufacturer. lose buoyancy or absorb water. The solid 2 x Waterjets Control panel for all lighting and other electrical Beam overall, (with fender): 3.5 m construction of the fender ensures the safety of equipment. the vessel and its crew. TANKS: 1 x Magnetic compass. Capacity: 26 passengers The fender system absorbs impacts and retains 2 x Structural diesel tanks with hatch and filling integrity and shape. protection with a combined capacity of 500 L. SECURITY EQUIPMENT: Maximum Load: 1 .000 kg 3 x Bilge pumps. DECK: ELECTRICAL SYSTEM & LIGHTING: Fire extinguishers. Engines: 2 x inboard diesel Handrails placed to allow safe passage around All electrical wiring in marine cable. An optional automatic fire extinguisher system the cabin and on deck. Shore power with control lamp, marked fuses, can be fitted in engine room. OPERATIONAL FEATURES: 6 x Mooring bites. earth connection. Maximum speed: +35 kts (with 2 persons) 12-volt electrical system. DELIVERY: Speed (cruise): 20 kts CABIN & COCKPIT: 2 x start batteries and 1 consumption battery. All boats are launched, tested and calibrated 2 x Dampened seats in the cabin for crew Main switches with separate battery systems for and has gone through a scrupulous quality DESCRIPTION: personnel + seats for 15 passengers. The start and consumption. control at the yard in Denmark. Delivery, hand The ProZero Fast Rescue Daughter Craft (FRDC) forecabin has seats for 9 passengers and room Battery charger with indicator. over, test drive and technical review with are specifically designed for fast launch and on the floor for one passenger. Navigational lights. customer at yard in Denmark. All boats are recovery from davits offshore and Emergency Optionally a toilet can be installed in the Led lights in cabin and cockpit. delivered with a complete owner’s manual. Response, Search, Rescue and Patrol operations cabin but will affect the maximum number of away from a mothership. passengers. A lifting hook is mounted on the cabin roof with HULL, DECK AND SUPERSTRUCTURE: a safe working load of 8 tons. A step is installed The boat is made of a combination of glass and on the cabins starboard side, used to reach the carbon fibre as a sandwich construction with lifting hook for inspection and operation. PVC as core material. This core material act Windscreen vipers installed on front windows. as a natural buoyancy reserve material, due Defreeze system for windows with hot air to its lightweight and zero water-absorption. blowers. Moreover, the sandwich construction avoids the use of internal stiffeners, increasing the usable internal space and offers a natural insulation capability, improving the comfort in the cabin and manned compartments.
PRO:ZERO deck 11m Fast Rescue Daughter Craft
Deck Hatches Deck hatches are of a robust reliable type with adequate securing clips for Superstructure & Arrangement both internal and external The superstructure is a one-piece moulding, manufactured in accordance with opening, and fitted as shown in the GA drawing. superstructure construction drawing. It is laminated to the main deck. The All hatches are to have notices “Keep closed at sea “. wheelhouse top shall incorporate a core to provide necessary stiffness. Windows & Portlights The design of the ProZero cabin ensure a huge amount of daylight, this also All windows will be to ISO standard with clear glass in glued into the structure improve the personal comfort. / mounted in anodised aluminium frames. The configuration and number to be as shown on the GA drawing The width of the windscreen mullions will be kept to the minimum to maximi- ze forward visibility. All windows are to be fixed type and are single glazed. Minor Fabrications and Mouldings Windscreen Wipers Generally, as many parts of the crafts structure as possible, will be formed in Heavy Duty pantograph wipers will be fitted to the forward-facing screens. composite and bonded together to avoid corrosion issues. A number of smal- ler minor fabrications will be required and these will generally be fabricated in Anchors and Cables marine grade 316 stainless steel. Seat plinths, console, and engine ventilation Appropriately sized anchors will be supplied in accordance with the code of boxes are composite molded. practice. Doors Bollards A heavy-duty aluminum alloy framed weather-tight door is to be fitted in the A set of six bollards will be fitted. Two bollards fitted forward and aft and two aft bulkhead of the superstructure. The door contains a window to obtain aft bollards midships. visibility and is fitted with an effective seal, for both watertight integrity and Bollards will be manufactured from cast stainless steel. noise. All doors will be fitted with robust and substantial stainless steel hook backs. Fendering The fender is constructed of closed cell polyethylene foam. Not deflating with Mast solid core that cannotlose buoyancy or absorb water. Damage is strictly The mast is a composite moulded mounted at the aft end of the cosmetic keeping crew safe. superstructure. Fender system absorbs major impacts and retains integrity and shape. The mast is fitted with brackets to carry all the navigation lights, VHF anten- nas, GPS, reflector, AIS, Radar, etc. The fender system will be bonded to the hull using a polyurethane adhesive system. Lifting / painter Gear The boat is designed to be equipped with a hook for centerpoint hoist. Handrails External and internally, handrails will be fitted as necessary, to allow crew to The boat is designed to be equipped with a painter hook in the bow move around the vessel easily and with safety. Generally, all grab and guard rails will be 30mm diameter and manufactured from either stainless steel or Alternative the vessel is to be lifted with slings by a boat hoist. aluminium tube.
PRO:ZERO mechanical and propulsion 11m Fast Rescue Daughter Craft
mechanical and propulsion Engine Controls and Monitoring Engine and gearbox control installed at helmsman’s position in wheelhouse. Main Engines and Gearboxes Vessel is designed to suit several engine installations with or with-out gear- Standard instruments from engine supplier, will be installed at the steering boxes. console. The vessel is delivered with double Bukh S270 engines with ZF63 gearboxes. Controls for remote operation of fuel valves and discharge of the fire extingu- ishing system will be brought together to a single point in the form of an They will be arranged for electric start, be fitted with alternators, cooling water emergency panel. Clear instructions for operation of the systems will be dis- pumps and associated intake strainers and pipe work. played by the panel. The engines and gearboxes will be mounted on the correctly selected resilient Waterjets mounts, aligned to the output half-couplings. Particular attention will be paid Waterjets will be fitted and connected to the main engine / gearboxes with a to the size of the mounts and their securing bolts. cardan shaft. The machinery will be installed in accordance with the manufacturer’s The vessel is delivered with a pair of Alamarin AJ245 water jets. recommendations and the installation is to be approved by them upon com- pletion. Contact Tuco Marine for design review for special drive setup. Care and attention will be paid to providing a durable machinery installation The waterjets will be controlled from the console in the wheelhouse. with adequate support of piping and cable runs whilst minimizing weight gain. Dedicated handle for operation of each jet bucket, to obtain high Guards are fitted to rotating machinery as is required by health and safety maneuverability. legislation. Engine Removal Each engine will be fitted with a alternator. Engine removal will be through deck hatches in the aft deck. Each hatch is located directly above each engine and it will be possible to lift the engine Torsional couplings are fitted between the engine and gearbox / adaptor directly off the engine bed in a straight lift. flange. ch jet bucket, to obtain high maneuverability. Care will be taken to ensure that pipework for systems are adequately sized and incorporate the minimum number of 90° elbows. Contact Tuco Marine for design review for a special engine / drive setup. Flexible construction Construction with a purpose. Know-how and expert engineering at the service of unique client demands.
PRO:ZERO systems 11m Fast Rescue Daughter
systems Bilge System Each compartment will be fitted with a remotely mounted, electrically Fuel System operated, submersible bilge pump and a dedicated strum box. Each pump will Fuel filters will be fitted to supply each main engine. have its own dedicated overboard discharge. The fuel system will enable each engine to be fed independently from each A dedicated manual bilge system is installed in each watertight compartment. tank. One pump will be fitted above deck and connected with valves to bilge system. Fuel hoses to engines from tanks and return lines will be ISO – 7840 (marine hose). To reduce the likelihood of fire, care and attention will be paid to shiel- All bilge suctions will be fitted at the lowest part of the bilge and fitted with a ding of fuel lines and filters. strum box. Engine Cooling A bilge alarm system will be fitted which will monitor all compartments. Cooling water will be drawn through hull mounted intakes, or supplied from jet (depending on jet model), fitted with correctly sized scoops. Intakes will be Sanitation fitted with isolating valves and clear top type strainers, one serving each engi- Optionally a toilet can be installed in the cabin. This will affect the maximum ne. Waste cooling water will be injected into stainless steel spray heads in the number of passengers on board. exhaust system to provide exhaust cooling. Accommodation Ventilation Exhaust System The cabin is naturally ventilated with fresh air, through dorade vents fitted in Each main engine will be fitted with fabricated stainless steel exhaust risers the roof. terminating with water injection spray heads. The stainless steel risers will be insulated. Heating Two demister blower units will be fitted; one connected to each of the main Approved nitrile diesel exhaust hose will connect each engine to an exhaust si- engine FW cooling system. lencer. The exhaust will then lead aft to terminate on the transom. All compo- site spigots will be fitted with stainless steel sleeves to avoid the spigots being Fire Detection and Extinguishing crushed. The silencers will be suitably supported, and all hoses An optional fire extinguishing system can be fitted to protect the engine double clamped with stainless steel hose clamps. space. The control panel will be located in the wheelhouse at the emergency panel. Clear instructions on the operation of the system and the fire flaps will Engine Room Ventilation be posted next to the panel. Air for combustion and ventilation in the machinery space is drawn from a pair of ProZero air intake fitted with fire flaps. Portable fire extinguishers will be supplied to meet the Code requirements. Fire flaps will be operated from open deck. Cathodic Protection An earthing plate is to be fitted to the hull. All relevant electrical systems are Swift support connected to this plate. Rest assured and focus on the job. Our skilled technicians are always Sacrificial zinc or aluminum anodes are fitted to the jet drive. Anodes will be prepared to offer support. sized for a two-year lifespan.
PRO:ZERO electrical systems 11m Fast Rescue Daughter
electrical systems Instrumentation Digital combined voltage and current meters will be fitted monitoring each General battery. The primary electrical system on the vessel will be 12v DC which will be distri- buted through a main switchboard located in the tank space. DC Equipment The DC equipment fitted will include the following: The electrical system will be a two poled protected two-wire, insulated return - Interior lights system throughout. Three banks of batteries are charged by main engine - Portable hand light driven alternators or. - Navigation lights - Windscreen wipers The supply to all equipment will be cable and/or flexible cord, insulated in fire - Bilge pumps retardant sheathing, to IEC 332-3. All wiring is to be carried in trunking and/or - Defroster blower conduit. Trunking and conduit will be secured in an approved manner using junction boxes and accessories for all internal circuits in watertight com- Shore System partments and mounted as high as possible within the vessel. Where wiring A 240v AC 16 amp shore supply socket will be fitted on the aft superstructure penetrates bulkheads or deck heads appropriate glands are used. All external to supply the battery charger. fittings will be of the highest waterproof marine quality. Additional a 42v – 12v DC/DC converter will be installed to charge with DC All wiring on main engines and gearboxes is in proprietary cable. It will be ade- power. quately protected from mechanical damage and will be substantially clipped and where necessary protected. The wiring will be routed to avoid contact Illumination with high temperature surfaces of the engine. Internal lighting will be a mix of combined white/red LED fittings and white LED strip lights. All circuits and switchgear to be labelled to show their function, sockets will be clearly marked with their voltage. Navigation Lights The following navigation lights will be fitted: 12v DC System - Port The vessel will be fitted with three banks of batteries supplying 12v DC. - Stbd - Stern There will be one engine starting bank for each engine and one service bank. - Anchor - Masthead All batteries will be AGM gel type and will be charged through blocking diodes by the main engine alternators. Secondary charging will be from shore supply All navigation lights will be LED type. via a 240v – 12v DC battery charger. Alternative a 42v – 12v DC/DC transfor- mer. Searchlight/Deck lights LED flood lights will be fitted to illuminate the deck area. The engine starting and service batteries will be secured in battery boxes in the tank space which are vented to atmosphere. Furthermore, a 12V/12V DC/DC converter will be installed to charge emergen- cy battery (GMDSS). Relevant equipment is connected to GMDSS bank accor- ding applicable rules.
PRO:ZERO layout 11m Fast Rescue Daughter
layout Signage Suitable SOLAS/MCA approved signage is to be used throughout. General The layout of the vessel is to comply with the GA drawings. Signs and decals applied to the craft topsides, deck and superstructure as All accommodation areas will have sharp corners eliminated to prevent injury necessary. Final configuration will be confirmed with customer. to personnel in extreme sea conditions. Suitable and adequate hand rails and hand holds are provided for safe passage throughout the vessel whilst at sea. Vessel name and port of registry will be affixed to the transom (vinyl letters). The quality of fit-out is to a high standard. All surfaces to be finished to a high standard, to provide a low maintenance finish. Generally, all fittings will be painting and finishes best quality marine grade aluminum or stainless steel, and all fasteners of A4 quality. External Finish External hull is in GelCoat finish. Forepeak Access will be via a bulkhead hatch on the main deck. External superstructure is in GelCoat / painted Forward compartment The deck is painted with non-slip screed applied. Access to forward compartment, below deck, is from a deck hatch mounted in the floor of the front cabin. Internal Finish Wheelhouse: Tank Space - Composite painted. Access to the tank space is from the cabin through a deck hatch. Forward compartment: - All composite surfaces – TopCoat finish The main 12v DC and 240v AC distribution boards are contained in this space Tank space: along with the three battery banks which are in ventilated battery boxes. - All composite surfaces – TopCoat finish Engine space: Engine Room - All composite surfaces – TopCoat finish Access to engine room is from a large flush hatch installed on the aft deck. Please refer to GA for further details. The engine room arrangement is arran- Colour Scheme ged to allow good easy access to engines for maintenance and repairs. Hull in high visible color (orange or yellow) according to SOLAS, alternative to be agreed with client. Wheelhouse The vessel is fitted with a central steering position. A non-glare instrument Decals panel will be positioned across the wheelhouse immediately behind the wind- To be agreed with client, in compliance with rules. screens and fitted with all instrumentation and controls as specified. Flexible construction The wheelhouse finish is painted composite. Construction with a purpose. Know-how and expert engineer- The deck will be treated with antiskid surface, for safe passage. ing at the service of unique client demands. Dedicated seats for steering position and crew member. Other seats are foldable seats and benches with cushions. Please refer to GA for further de- tails.
PRO:ZERO trials, testing and training 11m Fast Rescue Daughter
trial and testing If any defective workmanship of the Builders and/or materials shall be discovered in the Hull, machinery or equipment (except as hereinafter provi- Trial Program ded) of the craft within eighteen months after the Final Acceptance Inspection, fair wear and tear excepted, and if written notice of the defect is given to the Trials will be conducted in the waters around Faaborg, Denmark. Builders within 14 days of the discovery (or is posted within 14 days of arrival A comprehensive set of trials will be undertaken according to the customer at the next port of call, if discovery is made while the craft is on passage), the and builder requirements. Builders at their option shall either repair and make good the defects on the This will include, but is not limited, to: craft or pay to the Purchaser a sum to be agreed before any repair work is put in hand. • Speed trials over an accurately measured nautical mile. • Maneuverability and steering at various speeds. Spares • Monitoring of engine performance for a period of 1-2 hours. During the fit out of the vessel a materials schedule will be maintained. From • Full inspection of the entire vessel. that schedule, a list of consumable spares will be created detailing manufactu- • Testing of all systems and functions. rers, part numbers, etc. Based on the clients anticipated annual hours running the schedule will also A trial program will be developed during the build of the vessel and will be detail quantities required to support the craft for one year. issued 4 weeks prior to trials taking place. documentation and drawings Warranty The following warranty applies for up to 12 months from acceptance: Manuals Subject to the conditions set out below and otherwise expressly set out herein A full set of manufacturers’ manuals including recommended maintenance the Builders warrant to the Purchaser that the Boat will be of satisfactory qu- and training programs will be provided. A bespoke vessel specific manual will ality and reasonably fit for any purpose made known to the Builder in writing be provided. prior to Agreement whether or not such purpose is one for which the Boat is commonly supplied and will correspond with the Specification or any variation Drawings addition or modification thereto. The Builders further warrant that the Boat A full set of drawings will be supplied electronically (pdf format) and in hard will be free from defects in materials and workmanship for a period of twelve copy form. This will cover the General Arrangement, Machinery Arrangement, months from the time of customer acceptance. The warranty is subject to the Steering Arrangement, Docking Plan, Safety Plan, System Arrangements and following conditions: Diagrams, Electrical Wiring Diagram, all “as fitted”. Other drawings deemed appropriate may also be provided. A) The Builders shall be under no liability in respect of any defect in the Boat arising from the Specification supplied provided or varied by the Purchaser. Trial Data A copy of the trials data will be provided on completion of trials which will B) The Builders shall repair (or replace at their discretion) any defect in the cover the Pre-launch trials, Harbour trials and Sea trials. workmanship materials or equipment or their failure to correspond with the Certification Specification where the defect or failure was not apparent on reasonable The vessel will be delivered complete will all relevant certificates. inspection at the Final Acceptance Inspection or within a reasonable time thereafter. C) The Purchaser shall notify the Builders in writing immediately on discovery of any alleged defect and the Builders or their agent shall have the right to inspect the Boat including the right of sea trials to enable the Builders or their agent to examine or assess the extent of the alleged defect. The expense of any such trial shall be borne by the Builder if the defect is shown to be one of workmanship or materials.
PRO:ZERO interior design Previous model The interior has been designed to provide the user with maximal comfort and spacious working condi- tions. Ergonomic seats ensure a comfortable ride, noise insulation eases communication and large windows afford ample light and great visibility. Comfortable cabin Attending to the human factor. Functional, bright and ergonomic working conditions with noise insu- lation for ease of communication. Noise insulation Effortless communication
PRO:ZERO Comfortable ride Air suspended seats
PRO:ZERO Serial Production 0 weeks 5 weeks 10 weeks 15 weeks 20 weeks Merging unparalleled quality with cost-efficiency and prompt delivery Production design and sourcing: Construction with fiber-reinforced composites is Hull production: highly suited for serial production. Tuco has devel- oped an exceptionally efficient modular production Superstructure production and outfitting: method to fully exploit the advantages inherent in Hull outfitting: composite materials. To guarantee product excellence and quality uniform- Technical installations: ity across our range of vessels, female moulds are FAT and HAT testing: applied in the production of all ProZero hulls. This permits a very high degree of accuracy and consist- Seatrials and delivery: ency in the manufacturing process so that every single hull lives up to our rigorous quality standards. Produc- tion using high quality moulds outperforms any other building technique in terms of cost-effectiveness. Our modular production method enables us to integrate specific design requests and we cooper- ate closely with all involved stakeholders to deliver uncompromising quality and excellent products without sacrificing short delivery times. Short lead time Efficient production platform
Service and supply PRO:ZERO Far and wide – support is always within reach Full support The reliability and speed of our products is echoed in Skilled service team our range of support services. We are committed to act fast whenever a customer needs us. We appreci- ate the significance of constant operational capacity, and Tuco Marine’s Spare Parts and Service Team helps to intercept unexpected downtime and keep productivity at a maximum. The team is staffed by some of the most skilled technicians in the industry and they work to ensure the highest possible level of technical support for our clients. Integrating the best equipment Beyond that, we have long-lasting relationships with OEMs. We collaborate with key vendors from the early design phase to integrate the best features into the building process. This way we create a safer and more comfortable boat for the crew. Our extensive product knowledge and our unique ties with the industry allows us to offer a high degree of availability and coverage – we extend our support far beyond what you might expect from a boat- builder. Swift support Rest assured and focus on the job. Our skilled technicians are always prepared to offer support.
PRO:ZERO Propulsion options The ProZero Daughter Crafts can be delivered with Move forward different propulsion systems according to cus- You choose how tomer needs. IPS Water Jet Sterndrive Further propulsion options are available: Shaft drives Outboards
easy connect fender 2015 2017 PRO:ZERO Close connections New The Easy Connect fender is optimized for safety and functionality Easy Connect Fender The Easy Connect fender is designed for enhanced grip in order to facilitate landing and safe transfer operations at stationary installations. The fender is made of closed cell polyethylene foam with a non-deflatable solid core that maximizes durability and landing grip. The standard Easy Connect fender is equipped with a high friction surface. Low friction surface is available upon request. The Easy Connect fender is bolted to the hull which allows easy replace- ment if damaged or substitution if an alternative landing profile is required. Easy replacement Old and upgrade Upgrade kit available Upgrading to the Easy Connect fender is quick and efficient. The Easy Connect fender is composed of only three individual sections, which reduces cost and time required for upgrading.
PRO:ZERO Escorting Offshore wind farms into the 2009 future Tuco Marine’s ties with the wind industry is practically as old as the industry itself. With our state-of-the-art range of ProZero Daughter Crafts for SOV deploy- ment, we demonstrate our unbroken commitment to the sector. Building on the AluGuard series, Tuco Marine’s first range of service boats, the ProZero series represents the quintessence of a tried, per- fected and validated technology. Paving the seaway The robust and agile ProZero DCs are built to provide the best possible support in connection with transfer operations between Wind Service Operation Vessels (SOV) and wind turbines. The scale and remoteness of modern-day offshore wind farms requires accommodation of crew and tech- nicians on SOVs. The ProZero design represents a direct response to the demands of this sector where transport of personnel and cargo between SOVs and wind turbines requires increasing attention to safety, dependability and efficiency. The ProZero Daughter Crafts carry crew and tech- nicians to their destination with confidence and strengthen the value stream for the operators. Efficient and proven hull Matchless strenght-to-weight and seaworthiness. Shaping first-class hulls with precision technique and cost-effective production. Offshore wind farms A shared history of progress
PRO:ZERO 2018 ProZero daughter crafts Proven technology
PRO:ZERO Meeting the demands for safe transfer *2015 Design The 11m DCW Offshore Transfer is a fast transfer 11m boat designed specifically for transporting personnel. Daughter Craft It is a highly versatile and flexible vessel that is designed to meet the high safety and operational requirements for this type of boat. In addition to its purpose as a fast crew and passenger transporter, it is also capable of performing a range of other tasks where agility and efficiency is important. The design allows for easy access from both fore and aft deck with an emphasis on quick, but safe accom- modation of passengers in the cabin and cargo on the foredeck. Particular measures have been taken to develop the specialized boarding area at the bow fender, or optionally at the side fender, to guarantee safe passage for crew and personnel. For daughter craft versions, the safe launch and recov- ery mechanism can be altered according to individual specifications and can be fitted for both single point hoisting or access to a stern garage on a mothership. Besides improved comfort, efforts have been made to secure a high level of redundancy to keep the vessel operational and fit as a stand-alone unit that is capable of carrying out transfer operations to and from shore. *2019 Design
P R O : Z E R O 11m dcW - offshore transfer
Search