Important Announcement
PubHTML5 Scheduled Server Maintenance on (GMT) Sunday, June 26th, 2:00 am - 8:00 am.
PubHTML5 site will be inoperative during the times indicated!

Home Explore IITM Brochure 3

IITM Brochure 3

Published by pchoche, 2020-11-04 07:12:48

Description: IITM Brochure 3

Search

Read the Text Version

DATA CENTERPRASA Case Study 2017-2018 India Largest Data Centre for Super Computers www.prasa-pl.com

THE INITIATIVE.. Scan the Below QR Code to Read the Complete News The Ministry of Earth Sciences (MoES), Govt. of India, dedicated to providing world-class infrastructure for weather, climate, ocean, and seismological services to the citizens of India, decided to strengthen its supercomputing facility by procuring country’s largest supercomputing infrastructure. Accordingly, the tender was floated for the world’s leading supercomputing manufacturers like IBM, Cray, HP, Dell, Atos, Fujitsu, etc. Out of the prequalified bidders, CRAY Inc. won the bid to supply and implement approximately eight petaflops computer systems along with the required Data Center (DC) infrastructure for the same. The project was implemented at 2 sites viz. IITM, Pune & NCMRWF, Noida in INDIA. “Timely implementation of the passive infrastructure of the data center was extremely crucial for the success of the project.... and PRASA showed the expertise and agility to handle such a complex project” - Sudhakar Yerneni, Country Manager, India PRASA'S CONTRIBUTION We are proud to share that out of the intense competition amongst the world’s leading data center service providers like Vertiv, Schneider, IBM, and HCL; PRASA was selected as the Data Centre partner by Cray to build the complete turn-key DC for housing the Cray supercomputers. PRASA's Responsibility: s Precision Cooling solution design and implementation § Removal of the old data center components s Fire security, suppression design, and implementation § Design of the new data center s Chiller Plant Manager (CPM) design, automation and s Transformer sizing and implementation implementation s Diesel generator sizing and implementation s BMS reporting and notification implementation s Electrical design, specification, and implementation s Architectural design, making of DC reception and BMS room s UPS sizing and implementation s Chiller plant design and implementation s Chiller water piping design and implementation § Completion of the whole project in less than 120 days § Facility Management Services for the period of 6 years DATA CENTRE SIZE TRANSFORMERS: DIESEL GENERATORS: UPS CHILLERS Site 1: 2500kVA (2.5MVA) x 3 Nos. Site 1: 1750kVA (1.75MVA) x 3 Nos. Site 1: 1250kVA (1.25MVA)x 3 Nos. Site 1: 220 TRx 6 Nos. 1500kVA (1.5MVA) x 1 No. 1500kVA (1.5MVA) x 1 Nos. Site 2: 800kVA (0.8MVA) x 3 Nos. Site 2: 240 TRx 4 Nos. Site 2: 2500kVA (2.5MVA) x 2 Nos. Site 2: 1250kVA (1.25MVA) x 3 Nos. PAC 750kVA (0.75MVA) x 1 No. 750kVA (0.75MVA) x 1 Nos. Site 1: 10 TR x 9 Nos. CPM: BMS Site 2: 10 TRx 9 Nos. Chiller Plant Manager implemented for chillers Advanced Monitoring System with LIVE reporting, Alarms, to run in N+N config. with zero manual intervention and Notification on cell phones have been incorporated.

Standard data centers generally have an average IT load of 8 to 10kW per rack, but this data center infrastructure was to be designed for supercomputers. Cray supercomputers rack load is 77kW, which demanded an extremely precise and dense cooling design using closed loop chilled water solution. PRASA, with its illustrious experience of building more than 80 data centers, took up the task and executed it within the stipulated time. This was a challenging task as a dense data center like this was never designed before by any data center service provider in India. PRASA'S CONTRIBUTION The project demanded data center to be designed for a rack load of 77kW each. With a total count of more than 30 computer racks and more than 20 storage racks, the data center design turned out to be extremely complex and dense. Especially, the cooling solution had to be precise and needed a redundancy of N + N to maintain an uptime of above 99.5%. PRASA, with the team of Certified Data Center Professionals (CDCP), ensured a precise cooling solution design comprising of 220TR chillers for the Pune site and 240TR chillers for the Noida site. We coupled with ‘Vertiv’ to build Dx type precision air conditioners for aircooled storage racks. The total IT load exceeding 3.5MW, also demanded a robust power supply solution with India’s first ever 1250kVA x multiple numbers modular UPS installation from Schneider Electric. In order to maintain the uptime of above 99.5%, the electrical design was defined for parallel bus redundancy in order to ensure preventive maintenance without any downtime. DATA CENTER WITH PUE OF 1.27 In a tropical country like India, it is extremely difficult to reduce the energy consumption required for cooling. MoES wanted to make sure that the design of the data center should be the most energy efficient and demanded to maintain a Power Utilization Efficiency (PUE) of less than 1.4. This fundamentally demanded a very expository approach for the product selection in the process of designing and implementing the data center. PRASA, through its tight techno-commercial supply chain management, made sure that the latest technology in the world is selected and deployed at the sites. With Swegon Blue Box’s dual air-cooled inverter chiller that has screw compressor to deliver precisely chilled water flow piping design, we made sure to achieve a PUE of 1.27 (certified by MoES) and satisfied the customer's expectations. To further reduce the energy consumed by the chillers during summer, additional adiabatic kits have been installed. DESIGN TO COMMISSION IN 120 DAYS The complete project had a stringent timeline of completion. This involved removal of existing data center components which were to be disposed of. Also, we had to ensure that the implementation of the complete NEW setup is done in less than 120 days. As 5 existing storage racks were to be kept live, it created a huge challenge for us to implement the new data center solution in the same premises. We isolated the 5 storage racks with its own dedicated cooling while the new data center implementation was going on beside sit. With a team of more than 150 personnel working at the site round the clock, we made sure we execute and commission the project in less than 120 days(certified by MoES). The project started in the month of September 2017 and was successfully handed over to MoES in the month of December 2017.

PUNE PRASA 001, Casablanca Building, Opp. Karishma Society, For More Details Visit Our Sangam Press Road, Kothrud, Pune 411 038, Maharashtra, Website Scan the Below QR Code +91 - 2025446690 | +91 - 2025434958 [email protected] | [email protected] MUMBAI Opal Square, Plot No C-1, Office No- 1205, 12th Floor S.G. Barve Road, Opp Railadevi TMC Office, Next to Satkar Grande hotel, Wagle Estate, Near Mulund Checknaka, Thane West 400604 +91-8806667972 | [email protected] KOLHAPUR “ADINATH”, 9th ‘A’ Road, Opp. Shirol Sangh, Jaysingpur, Dist. Kolhapur 416101, Maharashtra, India. +91-2322227639 | +91-8806667986 [email protected] HYDERABAD Plot No.47, 48, 49, Street No 1, 2nd Avenue, Patrika Nagar, Sy. No. 77/P, Madhapur, Seri Lingampalli (M), Ranga Reddy, Dist. Hyderabad, Telangana State-500081 +91-9100080018 | [email protected] AHMEDABAD B404, B wing, 4th floor, Amrapali Lakeview Building, Vastrapur, Ahmedabad, Gujarat 380015 +917600823253 [email protected] BANGALORE Metropolis Office Park Plot No: 128-P2, EPIP ZONE, Adjacent to Ginger Hotel, Industrial Area, Whitefield, Bengaluru, Karnataka 560066 +918882023456 | [email protected] DELHI Building No.55, Panchkuian Road, Connaught Place, New Delhi 110001 +011-23561195 | [email protected] CANADA C/o Invest Ottawa, 7 Bayview Road, Ottawa,ON K1Y 3B5, Canada +1-613-828-6274 | +1-613-501-9923 [email protected] www.prasa-pl.com


Like this book? You can publish your book online for free in a few minutes!
Create your own flipbook