COMPANY PROFILE - Electrical works - Plumbing works - HVAC - Building Construction - General Trading CREATIVE HOUSE CONTRACTING ... www.chc-bh.com
TEAMWORK “Coming Together Is a Beginning Keeping Together Is Progress Working Together Is Success” - Henry Ford -
Who We Are Creative House contracting originally in kingdom of Bahrain since 2019. We Specialized in: ● Electrical works ● Plumbing works ● HVAC (heating, ventilation And Air Conditioning) ● Building Construction ● General Trading We Apply these activities on: ● Multi-storey buildings ● Villas ● Offices ● Retail shop Fit-out ● Restaurants . 3
Organizational Chart GENERAL MANAGER PM ENGINEER SITE ENGINEER ELECTRICAL ENGINEER MECHANICAL ENGINEER DESIGN ENGINER FORMAN FORMAN FORMAN DRAFTSMAN 2 LABOURS ELECTRICAL MANPOWER MECHANICAL MANPOWER 6 STAFF 6 STAFF 6 STAFF 4
Vision & Mission Vision We looking forward to providing our services distinctively and with high efficiency, to gain a good evaluation from customers for the company. Mission To b u i l d l o n g t e r m r e l a t i o n s h i p s w i t h our customers and clients and provide exceptional customer services by performing the basis of the project management techniques 5
What we have • Technical Department Duties here include preparation of detailed bill Of quantities and project evaluation as per the Consultant design drawings and specifications. • Design & Drafting Department This department consists of innovative Engineers and skilled draughtsman capable of delivering concept designs, engineering designs, shop drawings and built drawings for all mechanical, electrical and plumbing projects 6
Fire Fighting Fire Fighting System Design and installation for all fire fighting systems • Sprinklers System (Dry & wet Systems) • ESFR SYSTEM • Hose Real Cabinet System • Rack Systems • Supply & Installation for Fire Fighting pumps • Fire alarm systems • FM200 System • Kitchen Hood System (Chemical Systems) • Piping Network • CO2 System 7
HVAC Scope of Duct Works: • Fabrication of GI Duct • Installation & Insulation • Fixing of Duct • Air outlets • Machine connection • Volume Control Damper and Fire Damper • Sound Attenuators and Fans • Light test and smoke test for duct Scope of Machine Unit Works: • Installing of indoor machine • Installing of outdoor machine • DX Machines works (FCU's) • DX Machines works (CU's) • Copper Piping 8
Electrical Works • LV Panels / Rooms • Cables And Wire • Cable Tray And Trunking • Under Floor Trunking • Low Current System • CCTV System • SMTV System • Isolators • Wiring Accessories • Fire Alarm System • Lighting Control System 9
Plumbing Our highly skilled plumbers team are experienced in home and commercial plumping With excellent knowledge of kitchen plumping and bathroom plumping . • Installation and extension of domestic water pipes . • Installation and extension of sweet water pipes . • Installation and extension of sewage pipes . • Installation and extension of drainage pipes for air conditioners • Installation of bathroom sets , washbasins and sinks. Scope of Chilled Water Pipe Works: • Chilled Water Pipe installation • Supports • MI threaded fittings • Butt weld fitting with insulation including Canvas cloth vapor barrier, including all fittings, accessories, Valves 10
OUR PROJECTS CIVIL WORKS | ELECTRICAL WORKS | PLUMBING WORKS FIRE PROTECTION | ELV SYSTEM AND HVAC
OUR PROJECTS 12 14 STOREY BUILDING HIDD Journey Development Full Supervision & MEP Works
OUR PROJECTS 14 STOREY BUILDING HIDD Journey Development Full Supervision & MEP Works 13
OUR PROJECTS 14 SANAD SQUARE (Forty-six Stores And Ramez Mall)
OUR PROJECTS Sanad Journey Development Electrical works, Plumbing works , Fire protection , ELV system and HVAC 15
OUR PROJECTS 16 8 STOREY BUILDING BU QUWAH Journey Development ELECTRICAL WORKS
OUR PROJECTS 8 STOREY BUILDING BU QUWAH Journey Development ELECTRICAL WORKS 17
OUR PROJECTS 18 14 STOREY BUILDING Hidd AR RealState Project Engineer and Site Supervisor
OUR PROJECTS 14 STOREY BUILDING Hidd AR RealState Project Engineer and Site Supervisor 19
OUR PROJECTS 20 FIVE STOREY BUILDING Seef District ARSAN RealState
OUR PROJECTS Civil work Electrical works, Plumbing works , Fire protection , ELV System And Air Conditioning 21
OUR PROJECTS 22 14 STOREY BUILDING HIDD AL JEERAN DEVELOPMENT
OUR PROJECTS Electrical works, Plumbing works , Fire protection , ELV System And HVAC 23
OUR PROJECTS 24 RIFFA SQUARE RIFFA Journey Development
OUR PROJECTS Electrical works, Plumbing works , Fire protection and ELV System 25
OUR PROJECTS 26 3 STOREY VILLA ARAD Electrical works, Plumbing works, ELV System & Air Conditioning
OUR PROJECTS 2 STOREY VILLA East Hidd Civil Works, Elec. works, Plumbing works, ELV System & Air Conditioning 27
OUR PROJECTS 28 2 STOREY VILLA Hidd Civil Works, Electrical works, Plumbing works & Air Conditioning
OUR PROJECTS HOTEL MAIN HALL Seef District Civil, Elec., Plumbing works , Fire protection , ELV System & Air Conditioning 29
OUR PROJECTS 30 MUH CAFE Juffair Square Impact Interior Full MEP works
OUR PROJECTS MUH CAFE Juffair Square Impact Interior Full MEP works 31
OUR PROJECTS 32 AHMET USTA RIFAA Journey Development TurnKey
OUR PROJECTS AHMET USTA RIFAA Journey Development TurnKey 33
OUR PROJECTS 34 AL-QURAISHI OFFICE Bahrain Bay Impact Interior MEP Works
OUR PROJECTS AL-QURAISHI OFFICE Bahrain Bay Impact Interior MEP Works 35
OUR PROJECTS 36 E-Goverment Conference Room RIFAA Impact Interior MEP Works
OUR PROJECTS ELECTRICAL SUBSTATION HIDD/RIFAA Impact Interior MEP Works 37
OUR 3D DESIGN 38
OUR 3D DESIGN 39
OUR 3D DESIGN 40
OUR 3D DESIGN 41
OUR 3D DESIGN 42 FIVE STOREY BUILDING
Tel.: 00973 36263322 Fax: 00973 35073322 www.chc-bh.com - [email protected] Kingdom of Bharain - Alhidd
Search
Read the Text Version
- 1 - 44
Pages: