MF INVEST GROUP SHPK An engineering Construction and Consulting Company MFGROUP

COMPANY PROFILE 2017 MF INVEST operates in the field of construction and design of road, buildings since 2017. MF INVEST GROUP is a company that COMPANY DESCRIPTION successfully \"MF INVEST GROUP\"implements quality operates in the works, according to the European standarts. \"MF field of construction INVEST GROUP” is committed to complete all and design of road, techincal documentation with the quality buildings, marine, civil clarity necessary to supply the informati- infrastructure and slope on necessary for the implementation stabilization projects and of various projects, which leads to other geotechnical works. the prompt and correct implementation of works, meeting the needs and requirements of the Our extensive experience project describ- and knowledge of the ed in design. construction materials market and modern construction technologies create a realistic framework for exploiting all avant-garde potential in the field of construction applications. Based on our experience in managing similar tasks, as well as in projects and works previously carried out, we have found it important to apply modern technology in design while strictly adhering to good project management rules. This will guarantee a clear management definition and responsibilities of the experts involved in the project. An Engineering Construction Email: [email protected] Address: Tirane, Kashar,Yzberisht, and Consulting Company Tel:00355 69 40 16 021 Rruga “Faik Konica”, Ndertesa 5, Hyrja 17, Apartamenti 11.1050 R

STRATEGY 1.Developing a mutually beneficial, productive and mutually beneficial cooperation relationship between the persons involved in the project. 2.Stabilize the clear lines of communication of all stakeholders to ensure effective coordination, with all these actors familiarizing themselves with the stage of project advancement and thus ensuring the fulfillment of duties and the assumption of respective responsibilities. 3.Prepare a comprehensive project planning schedule outlining the most important points in order to facilitate intervention for specific solutions and facilitate managerial activity. 4.Review the continuous development of the design stage referred to the approved schedule ndehyrjen in order to solve the immediate tasks not performed or waiting to be realized. 5.Conduct periodic meetings with all stakeholders interested in the project (technical meetings with responsible persons, site visits with the investor) in order to mobilize them for project implementation. STRONG SIDES SERVICE FOR “MF INVEST GROUP”L.t.d In order to satisfy the general and specific objectives of the project, an integrated assessment of local and international experience is necessary. The following are theessential elements that guarantee success: 1.The use of the highly acclaimed technical knowledge in the construction sector. 2.The recognition and the accomplishment of the guidelines of European and Albanian standards. 3.Application of knowledge, skills and qualifications on design and applied technology. 4.The combines between EU standards and Albanian rules during the design. 5.The harmonious communication with all factors involved and inyeared to participate and contribute to the project. 6.Application of the international operational methods.

This combined eksperence applied during the design phase suggests that international and local imput is always a potential success for our design team. Information flexibility of experts proposed in the project according to our experience, the variety of experts staff during the project phase is often a key factor in the effectiveness and performance for the beneficiaries of the project. To realize such a characterizing project is necessary the collaboration of our in groups of several experts as: Infrastructure engineer Construction engineer Hydrotechnic engineer Geological engineer Survey engineer Geotechnical engineer Electrical engineer Project manager, etc. “MF INVEST GROUP” company constantly construct the design philosophy, working on complex teams with experts from the fields of engineering mentioned above, as for examples, architects, hydrotechnic engineers, geological engineer, structural engineer, road infrastructure engineer, electrical, mechanical, hydro-sanitary, specialist of cost estimate and design of facility. Our implementation and design team as we have expressed and presented during our technical proposal would have the support of the administrative staff and all the infrastructure of “MF INVEST GROUP” who have a yearal role in the success of the project.

REFERENCES 1.School Reconstruction “ Koli Sako” , Municipality Divjake Location: Divjake, Albania Staff engaged in the design: Client: Municipality Divjake Number of employees: 35 person Time extension: 3 month Date of completion (m/year): 11.2017 Name of the collaborating(firms): Start date (m/year):08.2017 Arkonstudio shpk PROJECT The names of staff employed to project (Project DESCRIPTION Leader /Coordinator, Team Leader) and their role: The project proposed deep intervention in Dorjan Ceribashi Project Leader finishes, work on electricit Gerralda Gogaj Construction engineer grids, heating, facade and Pellump Saraci Geotechnical engineer and a facade change by Xhulian Hoxha Electrical engineer applying a thermal glass facade. Lulzim Skenderasi Survey engineer The surface of the reconstructed quantity control building is 3,000m². The building energy efficiency class before the intervenions was F. The building façade was in brick and plaster this type of layers lead to a major loos in energy. The design include the improve of the energy eficensy of the façade by applying a thermos insulation layer 10cm thick. In the terrace was added a thermo insulation layer and a hydroisolation layer and the protection layer. The construction include the substitution of all the windows by replacing the old single glass window with a plastic double glass windows. The construction include also the heating system of the building. The heating system include a pellet boiler and the radiators in each room. This system was proposed because to the high eficensy and the simplicity that minimize the maintenance cost. The construction include also the sanitary and water and sewerage network. After the reconstruction of the buildind the energy class is B.

2.Construction of panoramic “360G” tower Divjake Park Karavasta, Municipality Divjake Location: Divjake, Albania The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Date of completion (m/year): 10.2017 Dorjan Ceribashi Project Leader Start date (m/year):06.2017 Gerralda Gogaj Construction engineer Pellump Saraci Geotechnical engineer Staff engaged in the design: Xhulian Hoxha Electrical engineer Number of employees: 35 person Lulzim Skenderasi Survey engineer Time extension: 3 month quantity control Name of the collaborating(firms): Sterkaj Ltd PROJECT DESCRIPTION The project is a panoramic tower building overlooking the Divjake Karavasta Park, for firefighters' needs and for border police. The height of this tower is 36m high or 12 storeys from the ground. The construction of this tower is a protected area. During the construction we have implemented a strict protocol for a minimum environmental impact. This protocol include the use of special machineries for drilling, cutting and building the tower. The construction include the building of 24 piles in a loose sand. In this soils conditions is required the use of vibrator and the drilling machine in order to achieve the construction of the piles. The structure upper the groung is a simple reinforced concrete frame system. The surface is 1200m².

3.\"Reconstruction at “Adem Alushi” School\", Municipality Memaliaj \"Marble Painting at Adem Alushi School\", Municipality Memaliaj Location: Memaliaj, Albania Staff engaged in the design: Client: Municipality Memaliaj Number of employees: 35 Start date :2018 Date of completion: 2018 The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: PROJECT Dorjan Ceribashi Project Leader DESCRIPTION Gerralda Gogaj Construction engineer Pellump Saraci Geotechnical engineer Xhulian Hoxha Electrical engineer Lulzim Skenderasi Survey engineer quantity control The project proposed deep intervention in finishes, work on electricit grids, heating, facade and and a facade change by applying a thermal glass facade. The surface of the reconstructed building is 3,000m². The building energy efficiency class before the intervenions was F. The building façade was in brick and plaster this type of layers lead to a major loos in energy. The design include the improve of the energy eficensy of the façade by applying a thermos insulation layer 10cm thick. In the terrace was added a thermo insulation layer and a hydroisolation layer and the protection layer. The construction include the substitution of all the windows by replacing the old single glass window with a plastic double glass windows. The construction include also the heating system of the building. The heating system include a pellet boiler and the radiators in each room. This system was proposed because to the high eficensy and the simplicity that minimize the maintenance cost. The construction include also the sanitary and water and sewerage network. After the reconstruction of the buildind the energy class is C.

4.Construction of logistics point agribusiness offices and auxiliary facilities, for “Albaseed” ltd Location: Divjake, Albania Staff engaged in the design: Client: “Albaseed” Ltd Number of employees: 35 person Start date (m/Year):06.2018 Time extension 3 month Date of completion(m/Year):03.2019 The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer Pellump Saraci Geotechnical engineer Xhulian Hoxha Electrical engineer PROJECT Lulzim Skenderasi Survey engineer DESCRIPTION quantity control Alba Seed Ltd is a leader in the field of agricultural inputs sales. It invests in a building with a surface of about 2,400 m² of which 1,900 m warehouse are covered by up to 7m and 500mm are office spaces, meeting rooms. The project also envisages the external layout of the building as well as the road connecting the national road with an interval of approximately 6 500m².

5.Construction of Urban Laboratory, Municipality Divjake Location: Divjake, Albania Staff engaged in the design: Client: Vento di terra ( Italy) Municipality Divjake Number of employees: 35 person Start date (m/Year):08.2018 Time extension 8 month Date of completion(m/Year):continues The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer Pellump Saraci Geotechnical engineer Xhulian Hoxha Electrical engineer Lulzim Skenderasi Survey engineer quantity control PROJECT DESCRIPTION The project in question is a collaboration of Divjaka Municipality and the Italian Ministry of Finance. This project envisages the construction of a center to be included and a laboratory to certify the production and quality of agricultural land. As a construction it is foreseen to be built mostly with recyclable materials.energy eficensy of the façade by applying a thermos insulation layer 10cm thick.

6.Construction of refrigerator collection points for Noja Export company ltd Location: Divjake, Albania Staff engaged in the design: Client: Noja Export Ltd, AZHBR Number of employees: 35 person Start date (m/Year):08.2018 Time extension 8 month Date of completion(m/Year):12.2018 The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION The project in question is a one-person co-financing with the ARDA a scheme to subsidize collection points. As the project provides reconstruction of an old warehouse with an area of around 850m² amortized. In this object is provided and a refrigerating room with 200m³ capacity.

7.Construction of Stables for Breeding Cows for Milk Production and Ancillary Facilities, Municipality Divjake Location: Divjake, Albania Staff engaged in the design: Client: Andi Kokonesh (PF), AZHBR Number of employees: 35 person Start date (m/Year):08.2018 Time extension 8 month Date of completion(m/Year):12.2018 The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION The project in question is a co-financing of a person with the ARDA a subsidy scheme for agricultural stables. The project envisages the construction of a new stall with an area of 2 000m² and 160m² of ancillary facilities, to make thismodern stall with all ancillary facilities treated and the surrounding square with a surface of 4 500 m2.

8.Construction of air conditioning system, generator and stabilizer placement, Divjake Health Center. Location: Divjake, Albania Staff engaged in the design: Client: Municipality Divjake, IADSA Number of employees: 38 person Start date (m/Year): 112018 Time extension 1 month Date of completion(m/Year):12.2018 The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION The project envisioned the realization of the air conditioning system, the placement of the generator and stabilizer after the medical devices such as the eco and graphical equipment were burned.

9.Construction of sidewalk and canalization \"Gomsiqe\", Municipality Shkodra Location: Shkoder, Albania Staff engaged in the design: Client: Municipality Shkodra Number of employees: 35 person Start date (m/Year):01.2019 Time extension 4 month Date of completion(m/Year):05.2019 The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION This project has been indispensable for the area as it serves all residents of Velipoja. In total the length is around 450 ml and includes the closure of a canal along the national road with Ø800mm concrete pipes and the construction of a sidewalk as it was necessary for residents moving over the body of the road.

10. \"Industrial Building And 3 Storey Building + 1 Floor Underground Floor And Surrounding Walls\" Location: Tirane, Albania Staff engaged in the design: Client: LINDI-AL Ltd Number of employees: 38 person Start date (m/Year):04.2019 Time extension 4 month Date of completion(m/Year):Continues The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION The project in question envisages the construction of 4 500 m² of construction which is organized on several floors. The investment is funded by LINDI-AL Ltd itself.

11.\" Construction of sewage system for Bels village\" Loction: Selenice, Albania Staff engaged in the design: Client: Municipality Selenice Number of employees: 35 person The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION This project consisted of construction of sewage system for Bels village of Municipality Selenice.During the implementation of this project the necessary channels were opened for the extension of pipelines according to all design standards.Work was done on the installation of the required manholes according to the design and basic conditions. It was possible to send the sewerage network to each Facility.This project helped all residents of the area by creating a sewage system according to design standards. The manholes, pipelines, raiders and any other element of the water supply network were meticulously positioned according to the design project implemented by the designer.

12.\"Construction of sewage system for KASHISHT village\" Loction: Kashisht, Albania Staff engaged in the design: Client: Municipality Frakull Number of employees: 38 person The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION This project consisted of construction of sewage system for Bels village of Municipality Selenice.During the implementation of this project the necessary channels were opened for the extension of pipelines according to all design standards.Work was done on the installation of the required manholes according to the design and basic conditions. It was possible to send the sewerage network to each acility.This project helped all residents of the area by creating a sewage system according to design standards. The manholes, pipelines, raiders and any other element of the water supply network were meticulously positioned according to the design project implemented by the designer.

13.\"Drilling of drainage channels, Municipality of Frakull\" Loction: Frakull, Albania Staff engaged in the design: Client: Municipality Frakull Number of employees: 38 person The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer PROJECT DESCRIPTION This project consisted of deepening the drainage canals in Frakull commune.During the implementation of this project, the existing canals were deepened and re-opened in those segments where there were only traces, cleaning the collected materials and the vegetation which had not been cleaned for years, according to the design standards. We made sure that everything was done with precision.This project was implemented to eliminate the possibility of flooding in this area which would bring many problems to the surrounding lands but also to thelivelihood of the community.

14.\"Construction of the Car Parking in Military Camp in Zall Herr\" Loction: Tirana, Albania Staff engaged in the design: Client: Ministry of defence Number of employees: 38 person The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer Lulzim Skenderasi Pellump Saraci Survey engineer quantity control Xhulian Hoxha Geotechnical engineer Electrical engineer PROJECT DESCRIPTION The project plan the construction of a 6500m2 parking lot for military vehicles. The surface will be in asphalt. The parking lots will be covered. The structure is a steel frame.

15.\"Construction of recreative space in Patos Municipality\" Loction: Patos, Albania Staff engaged in the design: Client: Municipality Frakull Number of employees: 38 person The names of staff employed to project (Project Leader /Coordinator, Team Leader) and their role: Dorjan Ceribashi Project Leader Gerralda Gogaj Construction engineer Lulzim Skenderasi Pellump Saraci Survey engineer quantity control Xhulian Hoxha Geotechnical engineer Electrical engineer PROJECT DESCRIPTION The project include the revitalization and creating recreative areas and green surfaces, children playgroung, sewerage, water supply and road asphalt.