77 İnşaat ve Taahhüt A.Ş. “Architecture is the learned game, correct and magnificent, of forms assembled in the light.” Le Corbusier
Following its establishment in 1988, 77 Group developed a reputable record in a very short period of time by successfully completing contracts undertaken in various construction projects mainly in earthworks, asphalt roads, motorways, tunnels, bridges, viaducts, piling, hydraulic structures, aprons, airfield runway repairs, troop billeting, life support and accommodation camps; ABOUT US www.77insaat.com 77 İnşaat ve 2 Taahhüt A.Ş.
TS facilities and buildings including mainly military barracks, aviation hangars, an air operation center, waste management and various other infrastructure projects in the civil sector; as well, refinery infrastructure, surface facilities, oil well pad infrastructure works, oil well hook up piping and the installation of oil field electromechanical equipment in the oil & gas sector. 77 Construction Co. was established in Iraq in 1998, which has developed fast and has become one of the most prestigious companies in the construction and the oil & gas sectors, having very important contributions to the reconstruction efforts of Iraq during and after the war. Subsequent to the company’s success in Iraq, in 2009, 77 Construction Co. was awarded its first project in Afghanistan. In a very short period of time, the company has completed more than fifteen construction projects in various types and different locations across Afghanistan. 77 Construction has expanded to Africa with a military housing project, Bachelor Headquarters in Djibouti; as well the success of the group was appreciated by the Libya Government and international contractors in Libya. 77 Group motto is to achieve a permanent quality and timely completion of contracts undertaken. 77 Group companies have a good standing record of finished contracts with no default record. 77 Group has adhered to the contribution of local participation in international projects as a main principle and is open to cooperate with local and international companies in realization of construction projects worldwide.
www.77insaat.com 77 İnşaat ve 4 77 Group has based its quality policy on establishing unlimited customer Taahhüt A.Ş. satisfaction with all parties served and thus aiming to realize the projects undertaken in conformity with specifications and standards of the contract, providing economical solutions and timely completion with full compliance to Health and Safety standards. In parallel to this policy 77 Group has successfully completed all of its contracts so far without any conflict with its customers, which has placed 77 Group companies among the leading and most sought companies in its sector. Efforts of “77 Construction” on quality system have been awarded with ISO 9001, 14001 & OHSAS 18001 Certificates.
QPUOALLIICTYY
www.77insaat.com 77 İnşaat ve 6 Buildings & Facilities Taahhüt A.Ş. Energy Projects Energy Investment Projects Dams & Water Structures Runways & Aprons Pipeline & Steel Storage Tanks Other Projects
01 Buildings & Facilities
77 İnşaat ve 8 BFaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
P920 BACHELOR This project includes the construction In addition to the 125 2+0 Navy Units the cporomjepclet ted QUARTERS, CAMP of a 6,000 square meter (64,583 square building includes an Entrance Vestibule, LEMONNIER, foot) three story building for use as a Entrance Lobby, Interior Corridors, Public DJIBOUTI permanent party military Bachelor Toilets, Laundry Room(s), Multi Purpose Quarters (BQ). The building contains Room(s), Housekeeping/Janitor Closet(s), 125 double occupancy 2+0 Navy Units. Vending space, Recycling space, Enclosed The BQ will be constructed at Camp Stairs and facility support spaces including Lemonnier in Djibouti, Africa. Mechanical Rooms, Electrical Rooms and Telecommunications Rooms to provide a complete and functional BQ. Mechanical systems include plumbing, fire protection, and heating, ventilating, and air conditioning (HVAC) systems. Electrical systems include information systems, cable TV, wiring for telephone and local area network (LAN) data, a building alarm system for fire and mass notification, lighting and power.
77 İnşaat ve 10 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
REHABILITATION, The Scope of Works awarded to The Scope of Potential Works to be opnrogjoecintg DEVELOPMENT AND 77 Insaat ve Taahhut A.S. awarded to FURNISHING OF SUWAYRAH AIR BASE, :: Civil, Structural, Masonry works to 77 Insaat ve Taahhut A.S. IRAQ complete 221 buildings (Contract Amount: 66,000,000 USD) :: Steel Structure, Architectural & (Duration:18 Months) Finishing Works to complete :: Electrical Works to complete 221 buildings 221 buildings (Potential Contract Amount: (Contract Amount: 24,842,500 USD) 66,900,000 USD) (Duration: 25 Months) (Duration: 21 Months) :: Site Preparation, Civil, Landscaping & Road Works for Suwayrah Air Base Project (Potential Contract Amount: 28,330,000 USD) (Duration: 18 Months)
Figure: Form and rebar works for FPS founda CONTRACTORS QUALITY CONTROL REPORT (QCR) PROJECT: EDI ‐ Various Base Impr DAILY LOG OF CONSTRUCTION Romania BRYAN 77 CONSTRUCTION JV CONTRACT NUMBER:W912GB17 Figur Figure: Excavation for Storm Drainage Man 77 İnşaat ve 12 FBaucilidlitiinegss &Figure: Pond excavation works Taahhüt A.Ş. www.77insaat.com
ation wall rove MK, DATE: 09 July 2019 7C0019 DAILY QC PICTURES re: Continue installation of FPS reinforced concrete walls nholes VARIOUS BASE The contract will consist of the design The project also includes fire protection ponrogjoecintg IMPROVEMENTS, and construction of new Multi Modal and alarm systems installation for inhabited MIHAIL Improvements, and new Fuel Storage facilities. The Fuel Storage Capacity will KOGALNICEANU Capacity. The Multi Modal will include include all work necessary to provide AIR BASE, all work necessary to provide a new rail containment for bulk fuel tanks, truck load/ ROMANIA spur with load/off-load capabilities, off-load stands, an operations building and staging areas, and wash facilities as road repair/realignment. Construction well as a new airfield terminal and includes area fire and lightning protection operations center consisting of a ready systems. Supporting facilities include site building, shipping and receiving facility, development, connectors for additional storage yard, marshalling areas, and fuel receipt capability, utilities and improvements to the existing access connections, perimeter security, lighting, road along the inside perimeter of the paving, walks, curbs, gutters, storm compound. Supporting facilities include drainage, landscaping, fencing, and site development, utilities, perimeter signage. The business goals of the contract security devices, lighting, paving, walks, are to provide real property repair, curbs, and gutters, storm drainage, environmental work, force protection landscaping, fencing, and signage. work, utility infrastructure, design build, and construction service.
77 İnşaat ve 14 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
BADRA CPF PHASE-2 Project includes design and construction pcoromjepclet ted CIVIL & BUILDING of civil works for LPG Storage, Heating WORKS Medium, Refrigeration, Gas Train B, GAZPROM PROJECT, GTG, Gas Train A, Under Ground, Road IRAQ & Paving Works, Sulphur Storage, SRU & Pits.
77 İnşaat ve 16 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
cporomjepclet ted F-16 SUPPORT Under the Foreign Military Sales (FMS) case, 1- AIRCRAFT MAINTENANCE HANGAR 7087N AREA=8,301 sq.m FACILITIES PACKAGE IQ-D-SAG, the Iraqi Ministry of Defense (MOD) #6, BALAD AIR BASE, has requirements for design and construction of 2- SQUADRON HEADQUARTER 7011N AREA=3,926 sq.m IRAQ eleven (11) new facility buildings including; new F-16 Facility Standard Design site adaptation 3- AIRCRAFT APRON SUNSHADE 7002N AREA=3,263 sq.m facility buildings, and associated utilities and infrastructure for Iraq Air Force (IQAF) located on 4- POWER CHECK PAD AREA=1,996 sq.m Balad Air Base (AB) in the Salah ad Din Province, Iraq. This design build project consists of new 5- FUEL CELL MAINTENANCE 7086N AREA=924 sq.m facilities and infrastructure for the Iraq Air Force in order to support their newly acquired F-16 6- MISSILE MAINTENANCE FACILITY 2550N AREA=476 sq.m aircraft. Contractor shall construct the new facilities and associated infrastructure. All facilities shall 7- AIRCRAFT WASHRACK 7008N AREA=407 sq.m be constructed in accordance with all applicable building codes and internationally recognized 8- FIRE PUMP HOUSE 7080N AREA=152 sq.m standards. 9- HYDRAZINE FACILITY 7029N AREA=98 sq.m 10-LATRINES 6566N, 6505N, 6350N AREA=84 sq.m 11-BOOSTER PUMP HOUSE 7011N, 7087N AREA=63 sq.m 12-Underground Utilities 13-2 CST Tank with Capacity 350 M3 Each 14-Service Roads and Parking Lots (13,000 Sqm)
77 İnşaat ve 18 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
BARRACKS 15-18 The Project is defined as construction cporomjepclet ted PROJECT, BAGRAM of contingency standard design concrete AIRFIELD, masonry unit (CMU) barracks. Facilities AFGHANISTAN include four (4) barracks 15-18, to provide housing for 640 military personnel. Supporting facilities include electrical, water, and sewage distribution systems, mechanical systems, information systems, site improvements, roads, drainage, and parking at Bagram Airfield (BAF), Afghanistan
77 İnşaat ve 20 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
BARRACKS 19-23 The Project is defined as construction of The project package has one (1) barracks cporomjepclet ted PROJECT, BAGRAM contingency standard design as building sited separately from the other AIRFIELD, determined to be concrete masonry unit four (4) barracks buildings. The four AFGHANISTAN (CMU) barracks. Facilities include five (5) (4) barracks buildings are planned for barracks 19-23, to provide housing of 800 collocation in the current area of the military personnel. Supporting facilities Supply Support Area (SSA) which is to be include electrical, water, and sewage relocated and demolished. distribution systems, mechanical systems, information systems, site improvements, roads, drainage, and parking at Bagram Airfield (BAF), Afghanistan.
77 İnşaat ve 22 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
WASTE MANAGEMENT The Design/Build Solid Waste pcoromjepclet ted COMPLEX PROJECT, Management Complex project consists BAGRAM AIRFIELD, of primary facilities to include an 8 AFGHANISTAN ton per day incinerator unit, a medical incinerator, a covered storage and sorting facility with a recycling facility, hazardous waste storage, compost facility, concrete ash holding area, waste management office, vector control facility, scale house, multi use facility, maintenance building, CSO building and antiterrorism measures. The supporting facilities include electricity, information systems, water, sewer, gas, site improvements, evaporation pond and concrete roads & pads.
77 İnşaat ve 24 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
pcoromjepclet ted UMMC P-341 PROJECT, 1) OPERATIONS GROUP communications, exterior fencing, 6) EMSG HEADQUARTERS AND BAGRAM AIRFIELD, electrical outlets, and electrical connection AFGHANISTAN COMMAND AND CONTROL to base grid power TOWN HALL: Construction of a 557 SM blast and Project includes the construction FACILITY: 4) BRAVO AREA LIGHTING: ballistic proof concrete facility to serve of seven (7) projects in Construction of two story concrete Design and construction/installation as the Expeditionary Mission Support Bagram Air Field. building. Facility will include all site of Area Lighting on BRAVO Apron at Group Headquarters as well as the Wing’s preparation, concrete foundation and Bagram Air Base in Afghanistan. Work Town Hall. Work includes interior and The scopes of work of the UMMC pavement for parking, HVAC, exterior will include utilities, intrusion detection exterior plumbing, HVAC, electrical, Program-341 projects are; and interior lighting, Intelligent Facility system, and communications equipment, force protection, fire alarms, and exterior interior finishes, communications, exterior raised flooring and all necessary site meeting area. fencing, and utilities connection to base preparation, mast foundations, high mast grid power. lights, cables, conduit, and all associated 7) NETWORK CONTROL CENTER utilities. Work will include all necessary 2) TACTICAL FIGHTER SQUAD site preparation, mast foundations, (NCC): OPS: Construction of a concrete facility. high mast lights, cables, conduits, and Design and construction of a Network Facility will include all site preparation, associated utilities. Control Center (NCC) building concrete foundation and pavement for with adequate power, cooling, dust parking, HVAC, exterior and interior 5) TACTICAL FIGHTER AMU: resistance, and space to handle inter base lighting, interior finishes, communications, Construction of a one story communications support throughout the exterior fencing, electrical outlets, and pre-engineered steel framed building. AOR. Facility will include but not limited electrical connection to base grid power Facility will include all site preparation, to, site work, concrete facility, utilities, and concrete foundation and pavement for intrusion detection and communication 3) FLIGHT LINE FIRE STATION: parking, HVAC, exterior and interior equipment. Construct pre-engineered steel framed lighting, interior finishes, communications, building. Facility will include all exterior fencing, electrical outlets, and site preparation, concrete foundation and electrical connection to base grid power. pavement for parking, HVAC, exterior and interior lighting, interior finishes,
77 İnşaat ve 26 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
ENTRY CONTROL The project is defined as the construction cporomjepclet ted FACILITY-1 PROJECT, of an Entry Control Facility at Bagram BAGRAM Air Field (BAF). Primary facilities include AIRFILED the entry control facility with inspection AFGHANISTAN area/material transfer point, guard towers, fencing, lighting, roads and building information systems. Supporting facilities include all required utilities, site improvements, information systems, and antiterrorism measures. Additionally, the project will include a Design Build Administration facility.
77 İnşaat ve 28 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
CONSTRUCTION OF Construction of four two story barracks, cporomjepclet ted BEDDOWN BARRACKS, two latrines and a DFAC in Bagram BAGRAM AIRFIELD, Airfield-Afghanistan. Four reinforced AFGHANISTAN concrete barracks have the same design with a cloased area of 2375m2. Two latrines have a total closed area of 390m2 and the reinforced concrete DFAC has a total cloased area of 2754m2.
77 İnşaat ve 30 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
DESIGN AND Construct a munitions storage complex Providing heating, ventilation and air-conditioning cporomjepclet ted CONSTRUCT at Balad AB, Iraq to include, munitions (HVAC) systems. It also includes the delivery to MUNITIONS storage facilities, munitions maintenance site, erection, setting to work, adjusting, testing, STORAGE AREA, facilities, administrative facilities, storage balancing and handing over in perfect operating IRAQ pads, revetments, lightning protection, and running condition all of the HVAC equipment roads, utilities, fencing, site work, interior including all necessary associated mechanical fire detection and alarm systems, interior works at LSA Anaconda. telephone & data system, Exterior Communication Ductbank System and multiple power generators.
77 İnşaat ve 32 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
CONSTRUCTION OF Scope of work consists of general site cporomjepclet ted TROOP BILLETING preparation, grading and excavation, AND SUPPORTING site storm water management, 2,175m FACILITIES, FOB road construction, 32ea 21’x40’ bunker PAYNE, construction, 105ea 20’x32.5’ tent AFGHANISTAN installation, 14ea latrine and 14ea shower containers construction, 1ea laundry building construction, 1ea 875m2 DFAC construction for 1,000 personnel, installation of water & waste water systems and power generation and distribution system.
77 İnşaat ve 34 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
CONSTRUCTION OF Scope of work consists of general site cporomjepclet ted TROOP preparation /grading & excavation), site BILLETING AND storm water management, 1,163m road SUPPORTING construction, 20ea 21’x40’ bunker FACILITIES, construction, 80ea 20’x32.5’ tent installation, FOB GERONIMO, 12ea latrine and 12ea shower containers AFGHANISTAN construction, 1ea laundry building construction, 1ea 750m2 DFAC construction for 500 personnel, installation of water & waste water systems and power generation & distribution system.
77 İnşaat ve 36 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
DESIGN AND Design build for the North & South cporomjepclet ted CONSTRUCT NORTH & Control Points includes: road paving SOUTH ENTRY and hardstands for vehicles, installation CONTROL POINT AND of force protection wall and barriers, TRUCK LANE PYPASS installation of vehicle barriers, ROAD, chain link security fence, including pedestrian gates and vehicle gates, test fire BALAD AIR BASE pit reconstruction, search areas and search IRAQ canopy for vehicles, buildings and facilities for Entry Control Point operations, electrical prime power generation and distribution, communications connections and distribution, area lighting at LSA Anaconda, Balad, Iraq.
77 İnşaat ve 38 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
AVIATION OPERATION Construction of a new facility to support pcoromjepclet ted FACILITY BAGHDAD, aviation operations of the DoS IRAQ Diplomatic Security Service in Baghdad International Airport, Iraq. The project includes a flight operation area supporting several helicopters and two fixed wing aircraft, one hangar, restrooms, concrete aprons, force protection, elecrical system, water storage and distribution system and Sewage collection & storage systems.
77 İnşaat ve 40 FBaucilidlitiinegss & Taahhüt A.Ş. www.77insaat.com
AIR OPERATION Design and Construction of an air oper- pcoromjepclet ted CENTER - BAGHDAD, ation center to support 85 personnel with IRAQ an operation floor and multiple support offices in Baghdad, Iraq. The facility has a 1,550 square meter floor area.
www.77insaat.com 77 İnşaat ve 42 Buildings & Facilities Taahhüt A.Ş. Energy Projects Energy Investment Projects Dams & Water Structures Runways & Aprons Pipeline & Steel Storage Tanks Other Projects
02 Energy Projects
77 İnşaat ve 44 EPrnoejregcyts Taahhüt A.Ş. www.77insaat.com
RENOVATE PRIME :: Renovate/repair/update/overhaul 77 Construction Company provides cporomjepclet ted POWER/ ELECTRICAL Prime Power Plant systems to provide all labor and materials to conduct DISTRIBUTION/ 25.5 MW generator capacity with assessments, surveys, and develop detailed FEEDERS AND STEP infrastructure. final engineering design documents, DOWN :: Provide prime power to existing and technical specifications, and analysis of TRANSFORMER new facilities, extend prime power and the electrical loads, coordination, and BUILDING, BALAD, associated infrastructure as noted arc flash protection. Also 77 CC provides IRAQ herein. construction services necessary for the :: Extend new 11kV feeders from Base demolition and reconstruction of a Step Down Facility, (Bldg. 5010), to complete and operational electrical system. existing Prime Power Plant to provide In addition to this 77 CC constructs 32 MVA capacity in each feeder. building enclosures around the three :: Provide demolition and replacement existing switchgear lineups at the of 11kV/33kV equipment and cables Prime Power Plant Site, constructs an at Step Down Building 5010 to provide administrative area at Control Room A, 32 MVA capacity performs site improvements to fences :: Provide new underground cables from and roads, and provides non 11kV/33kV the 33kV switchgear to the Iraqi related renovations to Step-Down Bldg. Ministry of Electricity (MoE) 33kV 5010. overhead towers. Final connection to tower conductors by MoE.
77 İnşaat ve 46 EPrnoejregcyts Taahhüt A.Ş. www.77insaat.com
POWER PLANT New Compound Power Plant and Main * Construction of UTL-2 (new power plant) REPLACEMENT AND Office Telephone Exchange Building * Construction of UTL-3A (central office/telephone excange) UTILITY Construcion Works; Rehabilitation of * Removal of electrical equipment in UTL-1 (existing power plant) INFRASTRUCTURE existing power plant Building that will * New 11kV loop site electrical distribution. (at site) UPGRADES, MASTER be used as a Warehouse and Central * Underground fuel tank installation and connections. (at site) PLAN Cooling Center. SOW is including NOB, * Dedicated site fire main distribution system (at site) IMPLEMENTATION U.S. NOX1, NoX2 GCP Annex, GCP-WHA, * Sanitary Sewer Line (at site) EMBASSY BAGHDAD, RSO-WHA, GMP, REC, CMR, DCM, * Storm sewer line (at site) IRAQ MSGQ , SDA-1 to 6, DFAC, South Gym, * Water System (at site) Water Plant / Storage Building Optional * Waste water treatment plant effluent treatment, distribution and storage Renovation Works; New 11kV Medium * Telecom (at site) Voltage Ring Line, Multi type Under- * Landscape, roads... ground Fuel Storage Systems Installation, * New site domestic hot water distribution system to selected existing buildings New Fire Extinguishing System, New Domestic Hot Water System, the New (at site only) Cold Water System, New Perimeter * New site chilled water distribution system to selected existing buildings (at site only) Lighting System ,Sanitary Sewage Lines, * Chiller installation to UTL-1 Storm Sewage Lines, Rehabilitation of * 8 COGEN Heat recovery equipment installation to UTL-2 Site Telecom System, Rehabilitation * Rehabilitation of the existing power plant (UTL-1) to warehouse and chiller plant of plumbing system; Landscaping and * New perimeter security lighting system Irrigation System. * Additional 2 COGEN Heat Recovery Equipments at UTL-2 together with required equipments and piping. cporomjepclet ted
www.77insaat.com 77 İnşaat ve 48 Buildings & Facilities Taahhüt A.Ş. Energy Projects Energy Investment Projects Dams & Water Structures Runways & Aprons Pipeline & Steel Storage Tanks Other Projects
03 Energy Projects Investment
77 İnşaat ve 50 EPrnoejregcyts Taahhüt A.Ş. www.77insaat.com
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130