THE STRIP SHOPPING MALL    RME is proud to act as the turnkey contractor for the Strip Mall. This project is owned by  AUTOVILLE, which is a unique one-stop destination for car enthusiasts and their families. It is  located on Dahshour Road and beautifully designed by renowned architects Skidmore, Owings  & Merrill LLP. The projects’ period was 16 months.
CAIRO INTERNATIONAL AIRPORT  BUILDING 2    Being renowned for high quality, experience and excellence in providing construction  services for vast projects, particularly national landmark projects, RME was assigned with the  construction of Buildings A&C, Bridge Construction, Connecting tunnel between terminals &  Air side infrastructure works. Subcontracted by LIMAK INSAAT (a Main Contractor for TB2  Project), RME has proven a remarkable record achieving advanced level in terms of quality  and time.
CAIRO AMERICAN COLLEGE    Located in the heart of MAADI, Cairo American College is a world-  class education facility. Its environment encourages the students  to express their opinions, passions and showcase their talents.  Believing in the importance of raising fearless generations who are  able to contribute to the development of our society, RME acted as  the turnkey contractor in the completion of the new middle school  and library-building project in a period of 13 months.
THE INTERNATIONAL SCHOOL  OF PAKISTAN    Internationally, RME undertook the construction of the International School  of Pakistan. The School is to be built on an area of 23,000 m2 and it is  to encompass 5 buildings on a built up area of 16,000 m2. The buildings  comprise nursery and elementary school, high and middle schools for girls  and boys, auditorium and library building, gym and prayer hall, in addition to  playgrounds, utilities and landscapes.
HYPER ONE MARKET – ELSOLYMANIA    Being one of the mega FMCG chains in Egypt, RME is proud to carry out the civil and electromechanical  works for the construction of Hyper One Solimanya. RME understands the importance of time to such a  great store as Hyper One, thus, we are highly committed to the delivery date of the project at the highest  quality of construction works. The project is located in Cairo-Alexandria Desert Road and is built on a total  area of 30,000 m².
N,DJAMENA GRAND HOTEL    Continuing its global expansion, RME has been awarded the civil works for  N’djamena Hotel located in the capital of The Republic of Chad. The project  encompasses 5 different zones including the Hotel, Service Building, Reception  Hall, Conference Room and the Political Center. The Project is built up on a total  area of 38,000 m2 coping with the most modern techniques, RME carried out the  project using precast in-situ beams and slabs.
EEE TOWERS, EKO ATLANTIC  ISLAND (NIGERIA)    Internationally, extending our long term partnership with CFE, RME is  assigned by CFE to cooperate in the construction of four towers in Eko  Atlantic Island, Nigeria.
CARREFOUR CAIRO FESTIVAL CITY    Among the projects entrusted to RME for construction comes Carrefour hypermarket in Cairo Festival  City. RME is responsible for the construction, completion and maintenance of the fit out and finished of  Carrefour new branch in Cairo Festival City.
ALGIERS METRO CONTROL BUILDING    Based on their previous fruitful cooperation in Egypt, Vinci has developed its sustainable  relation with RME by appointing RME as its sole subcontractor in the construction  operations of this project. RME was assigned with the construction of the control  Buildings, transformers buildings, workshop buildings & the complex buildings of  Algiers Metro.
PORT GHALEB MAIN MOSQUE    Port Ghaleb is considered as one of the most well-known luxurious touristic projects in the Red Sea,  Egypt. Among its projects in the area of communities, RME was entrusted with the construction of  the main mosque in such new community which it has successfully completed in the highest quality  and according to the atheistic standards. RME was the main contractor of this project as it was  responsible for all civil, MEP and finishing works.
Monument restoration  & structural repair    ROWAD Modern Engineering has special dedication to monuments  restoration and history preservation services. Throughout it growth journey,  RME has left its noticeable mark in the field of historic building restoration.  At RME, we understand that monuments restoration is a very critical process  that requires special care and attention, thus, we pride ourselves on our  extensive expertise in various monument restoration areas. Our services  encompass stabilization, excavation, and cleaning of sites, risk control and  management in ageing buildings as well as the comprehensive restoration of  different kinds of structures including wooden, marble and metal.  Moreover, monuments restoration needs special repair materials and  equipment. Thanks to our years of experience working on various restoration  projects, we were able to build up wide professional experience and know-  how with regards to the most suitable equipment to be used. In addition,  we are keen on using the highest quality of materials and equipment to  achieve the best results contributing to preserving our precious history and  monuments.  In cooperation with governmental bodies and international consultants, we  carry out deep, sweeping architectural and historical research in advance  with the aim to ensure the historical structures are accurately and diligently  restored. It is worth mentioning that RME has worked on the restoration of 15  antiquity sites so far.
EL EINY SCHOOL & MOSQUE    Located behind El-Azhar Mosque and established in 1411, El Einy School & Mosque is an antique building comprising a mosque and  a school for El-Azhar student. Contently, RME took responsibility for repairing such historical building which required restoration works  from several aspects. Among such works, RME was required to protect this establishment and prevent its collapse by injecting its walls  with a new mortar, which RME carefully selected to be compatible with the original materials of the building. In addition, RME was  accountable for restoring the building to its first condition as well as many other responsibilities including restoration and treatment of  decorated and non-decorated timber, grout restoration, metal, marble and stone materials repair in addition to the replacement of the  damaged stones with other new good ones.
EL SET WASEELA HOUSE    Located in El- Azhar district, El Set Waseela House was established in 1664 and belonged to Waseela Khatun. This architectural piece  of art is divided into two parts from the inside, one comprising the reception and the other including the internal rooms. Proudly, RME  has successfully restored the whole building to its original condition displaying the different architectural art that distinguish this building.  Furthermore, RME was able to fill the undesirable spaces, repair the damaged parts, stones, red bricks, decorated timber as well as  the decorated ceiling.
AHMED IBN SHAABAN MOSQUE    Located in El-Batneya area in Old Cairo, this beautiful mosque was established  by Judge Ahmed Hafiz Pacha who ruled Egypt during the period from 1590 until  1584. Through several steps, RME was able to restore the great building to its  first condition. These steps included restoration of stones, timber doors and  windows, iron windows, repair of marble columns, granite columns as well as  the decorated ceiling.
Reinforced Earth Systems    Renowned for its multi-sector services, ROWAD Modern Engineering performs  projects for the Reinforced Earth Systems Sector including retaining walls  infrastructures projects and commercial compounds. In carrying out such projects,  RME tends to add flexibility and aesthetic architecture through the implementation  of soil reinforcement by Geo Grid material technology. In addition, we offer our  valuable clients services that help them reduce cost and time and improve quality.
UPTOWN CAIRO    Located in El-Batneya area in Old Cairo, this beautiful mosque was established by Judge Ahmed Hafiz Pacha  who ruled Egypt during the period from 1590 until 1584. Through several steps, RME was able to restore the great  building to its first condition. These steps included restoration of stones, timber doors and windows, iron windows,  repair of marble columns, granite columns as well as the decorated ceiling.
PORTO SOKHNA    In recognition of RME’s proficiency and wide experience in the Geogrid systems, Amer Group has selected  RME for the construction of the retaining walls for Port Sokhna
SODIC WESTOWN ANCHOR WALL    RME has proven a remarkable record cooperating with SODIC in many projects and continuing with SODIC Westown Project by  constructing the Anchor Block for the villas and landscape.
MALL OF EGYPT LOCK & LOAD WALLS    Located in 6th of October city, Mall of Egypt is a mega mall being developed by Majid Al Futtaim (MAF) properties  in Cairo, RME has appointed the construction of retaining wall for the Mall bridge using Lock + Load System.
Our Presence    Egypt    Address: 1 Mahata Square, Maadi Palace,  Postal code: Maadi 11431  Cairo, Egypt.  Tel.+202 235 81 518  Fax: +202 235 88 037  Email: [email protected]    Qatar  rd Floor , Kia Motors Showrooms ,    Al Rayyan Road, Asaad – Doha.    Tel: +97444553043    Fax: +97444553049    Email: [email protected]    Algiers    Address: Lotissement 11 December 1960, No 32, El Biar.    Tel/fax: +21321945578    Email: [email protected]    Mozambique    Address : MCA-MOçAMBIQUE,S.A.    Avenida do Zimbabwé,no1214  Bairro Sommerschield  Cidade de Maputo-Moçambique  Tel: 00258844107204  Email: [email protected]    Libya    El Seyaheya District, Tripoli.    Tel/fax: +218 9183 42 035    Email: [email protected]    Chad    Address : Quartier Ndjari, BP1717    N’djamena-Tchad    Tel: 0023560636301    Email: [email protected]
                                
                                
                                Search
                            
                            Read the Text Version
- 1
 - 2
 - 3
 - 4
 - 5
 - 6
 - 7
 - 8
 - 9
 - 10
 - 11
 - 12
 - 13
 - 14
 - 15
 - 16
 - 17
 - 18
 - 19
 - 20
 - 21
 - 22
 - 23
 - 24
 - 25
 - 26
 - 27
 - 28
 - 29
 - 30
 - 31
 - 32
 - 33
 - 34
 - 35
 - 36
 - 37
 - 38
 - 39
 - 40
 - 41
 - 42
 - 43
 - 44
 - 45
 - 46
 - 47
 - 48
 - 49
 - 50
 - 51
 - 52
 - 53
 - 54
 - 55
 - 56
 - 57
 - 58
 - 59
 - 60
 - 61
 - 62
 - 63
 - 64
 - 65
 - 66
 - 67
 - 68
 - 69
 - 70
 - 71
 - 72
 - 73
 - 74
 - 75
 - 76
 - 77
 - 78
 - 79
 - 80
 - 81
 - 82
 - 83
 - 84
 - 85
 - 86
 - 87
 - 88
 - 89
 - 90
 - 91
 - 92
 - 93
 - 94
 - 95
 - 96
 - 97
 - 98
 - 99
 - 100
 - 101
 - 102
 - 103
 - 104
 - 105
 - 106
 - 107
 - 108
 - 109
 - 110
 - 111
 - 112
 - 113
 - 114
 - 115
 - 116
 - 117
 - 118
 - 119
 - 120
 - 121
 - 122
 - 123
 - 124
 - 125
 - 126
 - 127
 - 128
 - 129
 - 130
 - 131
 - 132
 - 133
 - 134
 - 135
 - 136
 - 137
 - 138