CONSTRUCTION AND FINISHES OF MARASSI BRIDGES 3.4&5 Rapidly growing its good standing, RME was entrusted by EMAAR Misr with the construction of Bridges 3, 4 and 5 among a new bridges system developed by RME. The project is located at Marassi, North Coast, where RME is responsible for all aspects of conducting, completing and ensuring the construction of the three Bridges. The completion period is meant to be within 12 months, during which RME is committed to the highest quality and safety standards.
MALL OF EGYPT BRIDGE R ME has been assigned by the armament forces for the construction of the direct bridge that access off Al Wahat highway that will facilitate the traffic for this crowded junction to get in & out the mall of Egypt smoothly. The project total area is 20,800m2 and 1,810m lengths.
NEW CAIRO CAPITAL BRIDGE Continuing in supporting our country development, RME has been selected by the armament forces for the construction of the New Cairo Capital Bridge with a total of 105m length and 75m width.
CAIRO-ALEX ROAD BRIDGES Being famed for high quality and dedication, and having acquired noticeable experience in the area of bridges construction, RME has been selected to carry out the construction of 4 crossing bridges at Cairo- Alexandria Road. This project is considered amongst the biggest transportation projects in Egypt. Thus, it requires highly professional qualifications and expertise to achieve the best results.
ALGERIA NEW AUTOROUTE Based on its the formidable fame even outside the Egyptian market, RME has been contracted by Cojaal, a Japanese large consortium, to carry out construction of 46 bridges and 8 culverts in Setif, Algeria. Despite the aggressive geographical nature of the project’s location, RME proved itself qualified by successfully executing the project within 30 months and at the highest quality standards and safety regulations.
SOKHNA PORT-BASIN 1 - IRON OXIDE PELLETS TERMINAL CIVIL WORKS (A) In cooperation with DP World, RME has been awarded the turnkey construction of the iron oxide Pellets Terminal. This Import Terminal is needed in order to import the raw materials of Iron Oxide Pellets. The terminal will be located in Sokhna Port and the project execution period is to last for 7 months.
ALOULA INDUSTRIAL PARK INFRASTRUCTURE NETWORKS R ME is contracted for the underground utilities for AL OULA INDUSTRIAL PARK project located in 6th of October city, including water, drainage, irrigation, electricity and road network.
REHABILITATION & CONSTRUCTION OF MAPUTO CITY COASTAL PROTECTION In cooperation with MCA Mozambique, M.CoutoAlves, S.A & M. CoutoAlves, Vias, S.A, RME was assigned to carry out the execution of rehabilitation and construction of Maputo city coastal protection. This project was concerned with obtaining new configuration system in Maputo’s South Coast as well as developing criterion for in both south and south west zones. RME’s role was represented in the construction of 7 groynes system, nourishments of sand between groynes, toe of protection and rehabilitation of existing sea walls, groynes and revetments.
MARASSI AND UPTOWN CAIRO INFRASTRUCTURE WORKS ( EMAAR ) In recognition of RME’s proficiency, reliability and excellence, RME is acting as the main contractor for the construction of several water structures for Emaar in Uptown Cairo and Marassi north coast on a turnkey basis. RME scope included the construction of several 5000 as well as 10000m3 tanks in addition to several pumping stations and complete plants for the sewage, water & irrigation networks. EMAAR, along with TURNER, the Project Manager, described these projects, RME in charge of, as one of the most successful parts of the whole projects carried out and completed in time and within the agreed upon budget.
NAGAA HAMMADI BARRAGE At the very beginning of its operations, RME was able to leave a positive impression as a highly qualified contractor. RME was sub-contracted by Vinci-Bilfinger Berger and OCI JV to carry out civil construction works for one of the largest water structure projects operated by the Egyptian Government in cooperation with KFW.
COMMERCIAL & SPECIAL BUILDINGS Among its comprehensive construction services, ROWAD Modern Engineering provides construction services for commercial, corporate and administrative buildings. Over the years, RME established a firm foothold in the area of commercial and special buildings both nationally and internationally. RME is best known for its high-end finishing and compliance with top construction standards. From our keenness to contribute to our society’s development, we serve various sectors as RME has conducted construction projects including educational facilities, shopping malls, hotels and restaurants and many others. Thanks to our expertise and modern technologies, we are able to build commercial and special facilities that comply with local & international markets’ standards. In addition, we excel in conducting projects of any size and anywhere in the MENA region.
NEW GIZA UNIVERSITY Succeeding in executing the civil and electromechanical works in Phase 1 of the construction of New Giza University in the highest quality and within the time-frame agreed upon, RME was assigned with the same works for Phase 2. It is worth mentioning that the areas of both phases, 1 and 2, are 20,000m2 and 20,660 m2, respectively, while the project completion periods for both phases were, 8 and 10 months.
POINT 90 MALL Located in New Cairo, Point 90 Mall Project was assigned to RME to carry out all construction tasks and works due to its wide-fame as an experienced professional contractor.
WESTOWN ENTERTAINMENT HUB RME is entrusted with the execution and completion of this project. Acting as the main contractor, RME is further responsible for remedying any defects related to the civil works, MEP and infrastructure works pertaining to Westown Entertainment Hub.
TWIN TOWERS NEW ADMINISTRATION & SHOW ROOM BUILDINGS Arabian Group is one of the new Egyptian developers established in 1990. For its very first investment, Arabian Group choose RME as their main contractor to carry out the construction of a new administration & retail complex. The project is located in 6th of October city and include TOYOTA show rooms, two new administration buildings in addition to two medical center towers. The project total duration was 36 months.
PKG# 53 VILLAGE F (WEST) “SIERRAS” PHASE I – UPTOWN CAIRO Owned by the well-known Emaar, Uptown Cairo Project is a world-class residential complex established in Egypt. Believing on RME’s wide experience and professional know-how, RME was appointed to carry out the construction works of Village F (West) “Sierras”, Phases 2 and 3 on a total area of 65,000 m2 comprising 11 buildings.
MAXIM MALL Located in New Cairo, Maxim Mall is considered one of the greatest shopping centers in Cairo. It is established on an area of 40,000m2 and encompasses 400 stores including hypermarkets, food courts, international cafes and restaurants. RME was proud to carry out the electromechanical works and finishing of this large establishment.
(M) PORIUM RME undertakes the construction works of Civic Center and Pool Facility of Villages F, M, L, K & J (west) at Marassi, North Coast. In this project, RME is responsible for the turnkey construction of facility management building, Mosque, Retail Shopping Building, Generator Room, four (4) Pool Facility Buildings and Anchor Shop. Furthermore, RME is entrusted with all infrastructure works, Roads, Parking Areas as well as fences and gates.
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- 136
- 137
- 138