197 7. Performance Highlights (April’ 2021 – September’ 2021).  Effective working of ED Goods Train examination point ensured even during lock down period.Anaverage of 75%of sick wagons are beingattended in the rake itself without detaching from the formation. ERODE Goods Yard Performance TREND OF SICK WAGON DETACHMENT AT ED YARD YEAR 2021- 22 800 684 506 700 623 567 629 567 600 190 174 196 96 96 93 500 MAY AUG SEP 400 300 179 194 181 94 96 101 200 JUN JUL 100 0 APR NO. OF RAKES CHECKED NO. OF SICK ATTENDED AT YARD NO. OF SICK WAGONS DETACHED  IOH attention to126 ICFcoaches & SS1 schedules to38 LHBcoaches were attended at CBE depot up to SEPTEMBER during the 2021-22.  Ferrous scrap to a total quantity of 54.178 Tonnes (65.7 %) upto SEPT 2021 against the target of 81 Tonnes were handed over to Stores Department.  Transporting Harvester Tractor Machines by BOMN/DBKM wagons by 7 trains to various destinations from Chinna Salemfrom 12thOct 2020.

198  20 Nos. of parcel Cargo Express Trains are operated to PTNR (13), RJT (2) & NGC (5) stations from 29.08.2020 onwards. 8. Major Works in progress a. Works in progress (PH42) PB/LAW No. Name of the Physical progress 2021-22 work Engg :Work Awarded on 22.11.2019 : Shed extension work completed, pitwork ED: Creation of yet start. Electrical: Work Awarded on 10.03.2020. IOH facilities Mech: whiting jacks recieved at ED: with two pitlines Commissioned on 05.03.2021. Further 727 of one coach Indents under process. Total booking 21- 22: 2619 (000's) length at Erode Detailed Estimate sanctioned on 03.03.2020 Sick line. Engg: LOA issued for an amount of Rs. 1.52 Cr. on 17.06.2020. Work for CBE: Extension Extension portion : Not yet commenced. of IOH shed with Elec: LOA issued on 05.10.2020. 729 one coach length Mech: Indent for T&P under process. Total booking 21-22 : 2882 (000's) pitline in Road 3 Engg:Tender opened on 18.08.2021 under Erode: Creation TC.Elec: LOA issued on 18.11.2020-work not commenced. of dedicated water supply 899 facilities to camtech booster pumps

199 Engg LOA issued on 11.12.2019 for Rs.1.95 Crores.work not yet started. Structural Drawing to be approved by HQ 925/ UW1 Mettupalayam: returned with remarks. 915 POH Facilities for Elec: LOA issued on 11.02.2020. Work not NMR coaches. yet started. Mechanical M&P, T&P procurement under process.IGBT welding sets received by Depot. Fork lift received commissioned. Total booking 21-22 : 1580 (000's) Engg: CC pathway between Rd 10 & 11, 11 & 12, 12&13 , 13 & 14, 14 & 16 completed. Rd 15 removed and Rd 14 slewed. Electrical Compressor Modernization of commissioned at SA end on 04.03.2021. Erode yard with Compressor pipeline laying work: provision of completed.CC cross pathway work concrete apron of completed at SA end and CBE end 660 m x 23 m • Compressor room work at CBE end with 30 T under progress. capacity Goliath • Elec: Electric cable laying and brackets Crane and sick for street light & LED light completed. attention Installation of panel for welding plant facilities in the completed. 3 High Mast installed and yard itself. Welding Panel provided with power plug. • Mech: Procurement of M&P items completed except supply of 02 sets of 25T Jamalpur jacks. Minor Engg & electrical work under progress .

200 920 Upgradation of Engg: LOA issued on 22.01.2019. Work 936/UW5 Pit started at ED from 03.06.2019. 1025/UW4 lines:Provision of Engg work completed at ED including T focused LED type catwalk and Deepening of pitlines. lighting repairs Extension of L type catwalk upto 24 coach to damaged length completed. catwalks & Electrical lights provided in 24 & 10 Drainage coach pitline. Arrangements at CBE: Extension of L type catwalk pending. ED & CBE Electrical works completed at CBE. State of the Art Running Detailed Estimate Sanctioned on Maintenance for 12.11.2020. Engg : MG Heritage LOA issued on 24.08.2021,Mechanical Locomotives at ONR. indent under Progress.Elec : LOA issued on 23.07.2021 Setting of Quick watering LOA issued on 11.11.2019,Re arrangement at appropriation for funds for 1.59 Cr vetted SA stn by Divisional Finance/SA advised to HQ on 13.08.2021, Revised QAP 40 HP Pump on 16.08.2021. Work not yet commenced by firm. b. Works in progress (PH41) PB/LAW Name of the work Physical progress No. PO issued on 07.07.2021 for Rs, 2021-22 2020-21: Wheel Profile 17.70 lakhs, Awaiting supply. Measurement system with Commissioned on 28.08.2021 1204 dia: measurement (DMP) 2017-18 - TIG welding plant 1189 (DMP)

201 1190 Procurement of new EIMWB Installation work under progress 1188 at Erode under replacement from 19.07.2021.work nearing account(DMP) completion. Stamping done on 14.09.2021 Syn. Lifting Jacks for LHB coaches type III of Jamalpur Awaiting supply from Jamalpur (set of Nos., 15 ton each) at workshop. CBE(GMP) 1191 PO issued on 22.12.2020 for 11 Automatic computerised axle HABD at various division. box temperature monitoring All 11 locations commissioned system for various divisions (GMP) July 2021 1083 Coimbatore Depot: CNC Under Floor wheel lathe with Sanctioned in 2021-22 under winch (shed) (HQMP) RB M&P: Leading parameter sent to HQ 03.06.2021 , Layout plan approved by DRM/SA.Indent placed by HQ to 1211 Inflatable Air Bag (Set of 2 COFMOW 04.08.2021 nos) (GMP) Detailed Estimate sanctioned on 01.06.2021, Indent to be placed by Depot, awaiting clarification from HQ .Kept in abeyance 9. LOCATION OF HABD IN SALEM DIVISION Sl.No Location Sectio KM Commissioned on Depot n jurisdiction 1 SA LC 109, JTJ- 317/16-18 13-11-2019 SA TNT-KPPR SA (DN) 2 ED LC 121 A, SA- 384/6-8 24-10-2019 ED ANU-CV (DN) ED 26-06-2020 ED 3 ED LC 124, IGU- 394/10-12 TPM-ED (UP) ED 4 IGU LC 140, ED- 461/21-23 07-11-2019 CBE SNO-SUU IGU (DN)

202 5 KRR LC 39, TPJ- 67/600- 9-11-2019 ED VRQ-KRR ED 700 24-04-2021 SA 26-04-2021 ED 6 LC 179, SXT- SA- 187/300- MPLI VRI 400 7 LC 4, VGI- KRR- 7/800 KRR DG 10. EnHM 1. PRELIMINARY AUDIT FOR IMS CERTIFICATION OF INTERCITY EXPRESS 12679/80 CONDUCTED BY M/s. QUEST – CHENNAI ON 31.08.2021. PDC-31.10.2021. 2. CONSENT TO OPERATE – STATUS SL.NO NGT STATION DATE OF CONSENT 1 COIMBATORE 17.02.2021 2 21.04.2021 3 ERODE 15.07.2021 4 KARUR 20.07.2021 5 TIRUPPUR 27.08.2021 SALEM 6 UNDER APPROVAL , WILL BE MTP OBTAINED BEFORE 30.11.2021 3. Water Recycling plants (7 Nos.) Sl.No Location CAPACITY STATUS 50KLD Installation of plant 1 KARUR STATION 100 KLD completed on 03.02.2021 50 KLD 2 SALEM JUNCTION Work in Progress Work completed under trial 3 TIRUPPUR STATION run

203 4 DRM OFFICE SALEM 50KLD Installation of plant completed on 28.04.2021 5 ERODE JUNCTION 100 KLD Work under Progress 6 METTUPALAYAM 25KLD Work Completed , Drainage STATION line to be connected 7 COIMBATORE DEPOT 400 KLD Work completed in Feb 2019 and under AMOC. 4. Supply, Installation and Commissioning of Solid Waste Management Facility (Automatic Organic Waste Composter (AOWC) with Material Recovery Facility)-6 locations at CBE, SA, ED, TUP, MTP & KRR Railway Stations  LOAs issued on 05.10.2020 for ED & 18.02.2021 for CBE & MTP.  LOAs issued on 17.06.2021for SA, TUP & KRR stations.  Work Under Progress at MTP, ED & PTJ stations 10. INNOVATION AND SYSTEM IMPROVEMENTS 1. WATER RECYCLING PLANT: As per the guidelines of National Green Tribunal, Mechanical Department of Salem Division has awarded contract for installation of 6 No’s of Water Recycling plant at 5 NGT nominated Stations and one at DRM office.

204 Out of 6 WRP, one WRP of 50KLD capacity is already installed and inaugurated by GM/SR on 03.02.2021 at Karur junction. On 28.04.2021, DRM/SA has inaugurated the 2nd Water Recycling plant of 50KLD at DRM office. 2. Alterations in pipe lines and control equipment of air suspension system as per RCFCoach Alteration Instruction (CAI):  The following TWO major modifications are carried out in coach no. SR LWSCZ 194496at Coimbatore coaching depot during April 2021.  After Modification, to check the effectiveness of the modifications, one trail run between CBE-TUP-CBE was conducted on 01.05.2021 and results were satisfactory. 1. Issue:Flexible hose pipe between Auxiliary Reservoir & leveling valve Touches with the coach body and has sharp bend. Steel pipe provided on under frame for connecting flexible hose to leveling valve has been shifted towards end of coach by 275 mm. Elbow has been provided on leveling valve to ensure smooth loop which is not touching with car body and ensures that bend Radius limits for the SAE100 hoses is not compromised. Drilling could not be done in the under frame for providing supporting brackets of shifted pipe line. Therefore, brackets were welded on the under frame.

205 OLD DESIGN NEW DESIGN 2. Issue: Failure of ferrule joint of flexible hoses for FIBA. This failure was attributable to the following root causes: - Relative movement between the bolster and the bogie frame which is constantly moving the hoses. Grazing of flexible hose with steel pipe for connection of leveling valve. Steel Pipe connected with leveling valve through flexible hose has been shifted towards coach end by 275 mm. This shifting resulted into clearance between flexible Hoses and steel pipes. Moreover, loop of flexible hose is become smoothened by providing additional male to female elbow with the metal pipe to FIBA unit.

206 ¾ “M/F ELBOW STRAIGHTPIPE LINE 5 mm PLATE ¾ “M/F ELBOW OF SIZE 950 mm WITH BRACKET 3. FITMENT OF TRANSITION TYPE CBC:  LWLRRMs manufactured before 2019 are provided with straight ‘H’ type tight lock Center Buffer Couplers. Due to straight CBC, it is unable to attach Inspection carriages which were provided with Screw couplings.  To overcome the above said difficulty, power cars at rear end (Luggage compartment end) have to be provided with Transition Type CBC.  8 numbers of Transition coupler assemblies are fitted. Coaches. Before modification After Modification 4. Installation of Hot Axle Box Detector in SA Division  With the increase in traffic density and speed of trains, the risk of running rolling stock with defects has increased manifold causing serious

207 accidents and traffic disruption. Rolling stock defects like hot axle are serious threats to Railway safety and cause derailment and even fire leading to fatal accidents.  Already 5 No’s of HABD were installed in 2019 & 2020 sanctioned under PH-41. 2 more HABD were also sanctioned under 2018-19 HQMP.  Two HABD are now installed and commissioned on 27.04.20 at 1) LC No: 179 (KM 187/300-400) between MPLI-SXT under SA-VRI section and 2) LC No: 4 (KM 7/800) between KRR-VEI under KRR-DG section. 5. COIMBATORE JUNCTION - BECOMES THE FIRST RAILWAY STATION IN SOUTHERN RAILWAY TO EARN THE COVETED PLATINUM RATING FOR GREEN RAILWAY STATIONS The Coimbatore Junction of Salem Division, Southern Railway has earned the prestigious PLATINUM RATING for Green Railway Stations awarded by the Indian Green Building Council (IGBC), part of the Confederation of Indian Industry 04.08.2021. Coimbatore Junction Railway Station, Southern Railway has earned the Platinum Rating after a stringent evaluation process (scored 83 out of 100 points) and has become the First Railway Station in Southern Railway and the Sixth Railway Station in Indian Railways to earn this prestigious rating. The five other Railway stations with Platinum Rating are Secunderabad, New Delhi, Jaipur, Visakhapatnam and Asansol.

208 6. GAUGE FOR ELASTOMERIC PAD MEASUREMENT (Item 23: As per Innovations circulated by Railway Board letter No.2012/M (N)/24 Dt.25.06.2021) A Go (46 mm) /No-Go (42 mm) gauge was developed at Erode depot for free height measurement of EM pads. Prior to this only visual inspection was done. This gauge is very handy and an unskilled person can also perform measuring of EM pad in an easy manner.

209 7. POROSITY TEST BENCH FOR HOSE PIPES (Item 21: As per Innovations circulated by Railway Board letter No.2012/M (N)/24 Dt.25.06.2021) A test bench was developed in at Erode depot with in-house resources for testing of porous holes in BP and FP air hoses. This test bench helps in finding out the minute holes which cannot be detected in RTR or SWTR. Requirements: a)Compressed air of 6 kg/cm2 for testing b)Normal water. 8. ADAPTOR HOLDING CLAMP FOR CASNUB BOGIE (Item 20: As per Innovations circulated by Railway Board Letter No.2012/M (N)/24 Dt.25.06.2021) Four sets of Adaptor (along with EM pad and crown packing if required) Holding Clamps have been manufactured at ERODE depot. This clamps avoids the conventional system of working (Holding adaptor with hands) during wheel changing which had a risk of injury.Also clamps helps in firm holding of adaptors with bogie frames and avoids canting while fitting on the CTRB wheels. The conventional system needs 4 men to work while fitting bogie on the CTRB wheels. By utilizing this clamp, it is reduced to 02 men.

210 9. SHIFTING OF PEASD ISOLATION COCK  Due to provision of bio-toilets in ICF coaches, the existing location of PEASD isolation cock in some coaches become difficult to access by the GLP. This leads to delay in isolation of PEASD and punctuality loss  For the quick and convenient operation of this Two Way isolation cock, the same have beenre-located where easily accessible to train crew without necessitating their entry to deep under the coach body.  So far PEASD isolation cocks in 53 coachesare relocatedfrom January 2021 onwards. Before Modification After Modification

211 10. Replacement of Air pipe line in pit line at CBE  14 years old air pipe line available in the pit line which affected the effectiveness of RTR/STR due to rust formation in the air pipe line was replaced by departmental staffby using pipelines for 600 mts length with 50 COAC’s, 2 Nos. of strainer and 4 ball valves.  Thereby resulting in a total saving of Rs. 2 Lakhs duly avoiding the outsourcing of activity. The system was made operational on 01.09.2021.

212 DEPOT WISE DETAILS 1.Coimbatore. 1 Holding  301 coaches (ICF-151& LHB-150) 2 Primary  12 Express trains including One Double maintenance Decker UDAY Express. 3 Secondary  1 passenger train maintenance  4 Express trains 4 OEA/PFTR trains  Average 12 trains per day 5 SS1 for LHB  12673/74 /12623/24 Cheran Express / TVC coaches at CBE mail, 12680/79 Intercity Express, 12647/48/12682/81 Kongu/Chennai Weekly Exp & 22665/66 & Exp rakes are now with LHB coaches.  During 2020-21 - 70 LHB coaches and up to sep’21 -38 coaches were undertaken SS1 at CBE. 6 Pit lines  Two pit lines with L Type Catwalk having a capacity of 26 coach length each.  Two High Pressure Jet Cleaning Pumps with pipelines available at pit lines.  An integrated coach maintenance shed with facilities of one 10/3 T EOT crane, one set 7 Sick line/IOH shed of whiting jacks, forklift, lister truck and one 3 T Electric hoist is functioning and all the IOH due coaches arising in SA division are taken for IOH from 22.06.2009 onwards with a monthly target of ‘24’ coaches.  SS 1 schedules of LHB coaches also carried out here. 8 Platforms  There are 6 BG platforms. High Pressure Jet Cleaning pumps with pipe lines are provided

9 Last Mile Works 213 2. Erode. to 3 platforms to carry out the effective cleaning of all PFTR trains.  Water Recycling Plant at CBE: WRP of 4 lakh litre capacity per day under LAW work has been completed near Pitline and functioning. 1 Holding  159 coaches  1 Exp train :- Yercaud Express 22650/49 2 Primary  2 passenger trains:- 56110& 56100 maintenance  5 trains at an average of 49 Coaches / day 3 OEA/PFTR trains  Pit line No. 1: 24 coach capacity with “T” type & “L” type catwalk 4 Pit lines  Pit line No. 2: 10 coach capacity. 5 Sick lines  3 lines of each having the length of 231 mtrs and 6 Platforms holding capacity of 11 wagons. 7 Goods yard  50 mtrs x 22 mtrs covered shed  Sick attention at an Average of 12 wagons per day.  CAMTECH design Quick watering system for Coach watering is available in PF/ED covering PF No. 1 to 4.Rolling in & rolling out examination of all pass through trains including Freight stock, Air continuity examination of all ETR, Traction change trains are being carried out in platform.High Pressure Jet Cleaning pumps with pipe lines are provided to 3 platforms (PF No.2, 3 & 4) to carry out the effective cleaning of all PFTR trains.  An average of 3.0 trains per day is certified on Premium/ Intensive examination pattern.

214  Yard Lines : Rd 07 to 18  Incoming / Through BPC : Rd 07 to 10  Train Checking lines : Rd 11 to 14.  Goods shed Lines : Rd 15 & 16  Sick vehicle grouping : Rd 17  ART Stabling line : Rd 18 - Both end exit  Crane stabling line : Rd 19 – Both end exit (covered shed) 8 MRV pit line  SPART stabling line (Both end exit)  BTC was started functioning at Erode from 06.02.1989 for training of C&W staffs.  Average of 208 staffs are being trained per month in BTC including C&W, Pro ALP, Engg, Traffic, staffs. 9 Basic training center  A “Model Room” for exhibiting C&W components is also available. C&W staffs, Guards, ALPs of Salem are given orientation training.  Air Brake Training and Refresher courses are also being conducted. A short term course on LHB is conducted for the technicians.  Newly installed Electronic In-Motion Weigh Bridge available at Erode in Road No.6.  Installed by M/s.Rice Lake Weighing Systems 10 EIMWB India Ltd, Kanchipuram Dist, Chennai. BREAK DOWN  Stamping of new EIMWBis done by Dept. Legal 11 SPECIAL AT Metrology on 14.09.2021. ERODE  Waiting for Commissioning CAMTECH 12 design Quick  140T Crane Watering System  “A” class ART  SPART  CAMTECH design Quick watering system for Coach watering is available in ED.

215 3. Mettupalayam Pit Line Two BG pit lines are available. One is 6 coaches’ length and the second 7 coaches’ length. The M.G. pit line can hold 6 N.M. Rly coaches. One rake of 56136/56137 with 4 N.M. Rly coaches per day is maintained on this pit. High Pressure Jet Cleaning pump with pipe lines are provided to 1 platform to carry out the effective cleaning of all PFTR trains. POH of N.M.R Rolling Stock There are 27 MG NMR coaches, 28 newly built ICF MG coaches and 14 wagons in NMR section. The depot undertakes IOH of N.M. Railway rolling stock’s. A small covered shed with accommodation for four coaches is available for carrying out the schedules of coaches and wagons. POH of NM Railway wagons are being under taken at MTP itself. Loco Activities The 'X' Class locomotives that arrive here from the hills are berthed in a covered shed available for the purpose of fueling and watering , the work is managed by the loco staff under the control of the SSE/C&W/MTP. Fuel Furnace oil RCD of 40 KL capacity is available at MTP itself for supplying fuel to the oil fired steam locos. NMR Museum: The Nilgiri Mountain Railway Museum was inaugurated on 07.10.2015 to exhibit heritage items of Indian Railways. 4. Salem Main Activities This depot dealing with PFTR trains from Chennai Egmore, Vridhachalam, Metturdam and Yesvantpur. En route detentions on account of C&W problems for passenger and freight trains in SA-JTJ, SA- VRI, SA-DC sections are also dealt by this depot.

216 Platforms 1 express train and 4 passenger trains are being given platform turn round maintenance &18 pass through trains are being watered. An average of ’15 KL’ fueling is carried out every day for Diesel Locos, DEMU, Power Cars of 12674/12673 Exp. An Electronic In-Motion Weigh bridge installed and commissioned at KPPR Railway Station near Salem on 22.09.2018 and it is now in working condition. 5. Mettur Thermal Power Plant Siding Main Activities  This is a wagon maintenance depot for post tippling examination of BOXN wagons catering coal to the Tamil Nadu Electricity Board. Unloading of coal is by tippling.  Receipt and dispatch of coal rakes at an average of 5 to 6 rakes per day.  Certification of loaded BRN/BOST wagons with steel plates for correct lashing before dispatch at MCSI (MCRD) siding at an average of 0.4 trains per day. Sick line  Three sick lines with a holding capacity of each 10 BOXN wagons and covered shed to accommodate 2 BOXN wagons are available.  One welding plants are available.  An average of 1 sick wagon per day is attended. 6. ONR STEAM LOCO SHED:  6 X-Class Oil Fired and 2 Coal Fired Steam Locos are maintained at ONR depot. Major Scheduled Maintenance upto Schedule IV attention is being carried out.  5 MG Diesel locos are also maintained at ONR. The Maintenance for YDM4 Locos are done by GOC shed staff at ONR.

217  A separate running cadre was formed under Sr.DME/SA for NMR section compressing CLI, LP, ALP, Fire Man & Brakes Man are being fed by the base depot ONR.  A new post of Dy.Director/Heritage/ONR was created for the maintaining the heritage of NMR section and for improvement of NMR.  RCD of 20KL of HSD oil is set up at Loco Shed ONR for fueling YDM4 and Oil-Fired Steam Locos.  New X-Class coal fired steam loco No. X-37400 manufactured by GOC workshop, arrived at MTP on 04.09.2021.  The loco will be inducted into service after conducting necessary trials in the section.

1. Coach Holding 218 S. No. Category IX. MECHANICAL Total DEPARTMENT 437 1 Bare requirement AC coaches Non AC coaches 23 81 356 2 Mechanical 460 spare 5 18 393 3 Total 86 374 requirement 86 307 4 Coach Holding *Maintenance [email protected]% for AC& 5.0% for NAC. (The above position inclusive of LHB stock of 4 rakes of Cheran Exp, 1 rake of CBE-MAS-CBE Intercity Express, 1 rake of Double Decker Exp& 1 rake of Kongu Exp (Break up; AC Coaches-46 Non AC Coaches-104) & Trains/ Spls yet to start service in post Covid19 session). 2. Primary Maintained Trains A. Express Trains S.N Depo Train No Train Name From No. of No. Total Train ot -To coache Combo of No. of s rake coache s s LFACCW-1, LACCW-1, 1 12674/ Cheran Exp CBE- 23 4 92 LACCN-5, 12673 (LHB) MAS LCN-11, CBE LGS-3, WLRRM-2 LZAC-2, 2 12680/ Intercity CBE- 22 1 22 LCZ-13 LS- 12679 (LHB) Exp MAS 4, LCB-1, WLRRM-2

219 S.N Depo Train No Train Name From No. of No. Total Train ot -To of No. of Combo coache s rake coache s s ACCW-1, 22668/ Nagercoil CBE- ACCN-2, /Tutucorin NCJ/ 3 26670 & 24 2 48 CN-12, GS- 22667/ Exp TN 6, 22669 SLR- 2,SLRD-1 4 12084/ Jan CBE- 16 1 CZACJ-2, 12083 shatabdhi MV 16 CZJ-12, Exp CZRJ-2 5 16614/ RajkotExp CBE- ACCW-1, 16613 RJT ACCN-3, 16618/ Rameswara CBE- 22 1 22 CN-14, GS- 2, 6 16617 m Exp RMM SLR- 1,SLRD-1 FACCW-1, 7 16616/ Mannarkudi CBE- 15 2 ACCN-1, 16615 Exp MQ 30 CN-5, GS- 6, SLRD- 1,SLR-1 8 12647/ Kongu Exp CBE- LACCW-1, 12648 (LHB) NZM LACCN-6, 12682/ Chennai CBE- 23 1 23 LCN-6, 12681 Exp MAS LGS-4, 9 WLRRM-2 10 22616/ Intercity CBE- CZAC-1, 11 22615 Exp TPTY 17 1 17 CZ-8, 22618/ Intercity TPTY- GS-6, SLR- 22617 Exp SBC 1, SLRD-1 LWLRRM-2, Double LWCADAC- 12 22666/2266 Decker AC CBE- 10 1 4 5 SBC Exp 10 LWCABDA (Yet to C-1 start) LSCZ-5

220 S.N Depo Train No Train Name From No. of No. Total Train ot -To coache of No. of Combo 22650/ Yercaud rake coache 13 ED 22649 Exp ED- s s FACCW-1, MAS s ACCW-2, 23 4 ACCN-2, 92 CN-13, GS- 3, SLR- 1,SLRD-1 B. Passenger Trains (Yet to start) S.No Depot Train Train From- No. of No. Total Train 1 ED No Name To coaches of No. of Combo 2 CBE rakes coaches 3 7 MTDM 13 08 56100/ Pass ED- 1 07 1 SLR, 6 GS 56101 (Yet to MTDM start) ED- 56110/ TPJ ED- 4 52 11 GS, 56109 Pass TPJ 2 SLR (Yet to start) CBE 06083 Pass CBE- 01 08 GS-06, (Yet to POY SLR 02 start)

221 C. Secondary Maintenance Trains DEPOT Train Train No. of Availability of time for No Name coaches examination* Arrival Departure Hours JAIPUR 12970 / EXPRESS CBE 12969 (Weekly on 24 18.00 09.20 15.20 CBE CBE Fridays) CBE 22475 / BIKANER 16 02.50 15.20 12.30 22476 (Weekly on Saturdays) JABALPUR EXPRESS 02198 / (Weekly on 19 03.40 19.05 15.25 02197 Mondays) Special train SILCHAR 02516/ Special 23 12.00 21.45 57.45 02515 train (Weekly on Sundays) 3. ‘X’ Class Locos in NMR section: S.No Loco YB Year of Last POH Due for Remarks 1 No. 1918 Commissioning Aug’2011 POH Under At GOC – X 1920 Dec’2015 going Undergoing 37384 Mar’2018 POH POH from Coal Nov - 1952 Fired Dec - 1952 Dec - 13.09.19 2019 Awaiting for 2 X 37391 1949 Mar’2022 Oil fired shop clearance. 3 X 1949 Working in

222 37392 passenger Oil service fired X Apr’2021 Working in 37396* FEB passenger 4 Oil 2011 March - 2011 Apr’2017 service fired X Undergoing 37397* FEB schedule IV 5 Oil 2012 March - 2012 Nov’2018 Nov’2022 from fired 14.12.2020 Under X repair. Mar’ Trailing 6 37398* MAR April - 2013 Mar’2019 2023 pinion Oil 2013 fired crank shaft changing X Working in 37399* FEB Aug’ 2020 Aug’ 2024 passenger 7 Oil 2014 April - 2014 service fired X Under Trial in Received at 37399* AUG MTP-ONR section SEP 2025 MTP on 8 Coal 2021 -- 05.09.2021. fired *Oil fired steam locos indigenously manufactured at GOC shop. 4. Performance Review – Carriage & Wagon 2019-20 2020-21 2021-22 Parameters Actual 1. COACHING Target Actual Target Actual Target Up to 30.09.21

223 Ineffective % AC 1.5 0.71 1.5 0.015 1.5 0 1.0 0.59 1.0 0.014 1.0 0 Ineffective % Non- AC 0 000 0 0 En-route Ownership 0 000 0 0 Coach Territorial 0 000 0 detachment 0 0 001 3 Secondary Territorial 0 3 313 2 Coach Ownership 6 detachment 2 212 2 27 Loss of Direct Punctuality Indirect No No No IOH IOH 280 IOH 166 IOH 126 Due Due Due SS1 Schedule for LHB No 56 No 53 No 38 (Nos) SS1 SS1 SS1 Due Due Due Brake Binding cases 3 0 03 1 II. WAGONS Wagon Ineffective 1.25 0.28 1.25 0.080 1.1 0.2 Wagon detachments 4 1 2 2 0 2 Hot axle 35311 2 Poor Brake power 0 0 0 0 0 0 Train parting 24211 1 II. SCRAP DISPOSAL 91 89.325 66 56.083 81 54.178 (in Tonnes) 5. Break Down Special at Erode Indian Railways at present is having 12 nos of 140 tons Cranes of COWANS SHELDON (ENGLAND) Old design manufactured by M/s.JESSOP Co. Ltd., Kolkata. Erode Crane is the 12th one functioning well without any major problem. A Self-Propelled Accident Relief Train (SPART) also located here.

224 IV. 140 T CRANE Particulars: Description : 140 Ton Diesel Operated Hydraulic Crane Make : COWANS SHELDON (ENGLAND) Crane No. : IR 140512 Date of Commissioning : 22.03.1992 Date of second POH : 04.2013 Due for third POH : 03.2021 V. ART Total 6 Coach and Two BRN wagons in the formation. 1. HRE Equipment Van, 2. Mechanical Tool Van, 3. Electrical & Engineering Tool Van, 4. ST Sleepers loaded BRN, 5. Engineering Rails Loaded BRN, 6. TRD Materials Van, 7. Kitchen Cum Guard Van, 8. Staff Van. Fit to run at a Max Speed of 100 Kmph. Stabled in Yard and having Both end exit through Yard. VI. SPART: 3 Coach BG High-Speed Self-Propelled Accident Relief Train (HS-SPART) stabled at MRV pit having both end exit via Mainline. Fit to run at a maximum speed of 105 kmph. Trial run is being conducted on monthly basis on 4th week of every month. SR SV (DP) 13914 SR RH 13916 SR TV (DP) 13915

225 6. EXISTING SBD CONTRACTS Sl NAME OF WORK PERIOD Value in Rs. Firm’s Name No 1,55,44,945 M/s.Hughes and Hughes Chem Pests and Rodents 2,73,54,618 Limited, Control in coaches New Delhi and Rodent control 01.01.2021 M/s.Global Agency, in yard and Bangalore 1 premises of CBE & to ED coaching depots 31.12.2024 for a period of four years Cleaning and 2 watering of coaches 17.12.2018 of platform turn to round trains at Salem depot for a 16.12.2022 period of four years AMOC of Bio-Toilets M M/s.Hughes and in coaches at CBE & 01.01.2021 Hughes Chem 3 ED coaching depots to Limited, for a period of four 31.12.2024 4,96,53,102 New Delhi years Mechanized 19.11.2018 Cleaning of PM to Trains, Cleaning of 18.11.2022 PFTR Trains, & M/s.King Security 4 Watering of pass 18.05.2020 8,41,05,459/- Guards Services through trains and to + 1,63,96,749 Private Limited, Lucknow cleaning of Depot 17.05.2021 Premises at Erode (CTS)& for a period of four further years. Limited CTS extension

226 for enroute pass 18.05.2021 through trains at an to average of 270 17.05.2022 coaches per day (41 + 2 spl trains) Cleaning of PFTR trains of BG coaches and Cleaning & Washing of NMR MG coaches and Cleaning of depot premises for a period of 4 years at MTP 01.08.2019 M/s. Tharu & Sons, 5 to 4,02,10,152 Ernakulam Cleaning of NMR 31.07.2023 MG coaches of PFTR trains, Cleaning of Steam/Diesel locos and Cleaning of loco shed area at ONR for a period of 4 years (SBD) Mechanised Cleaning and watering of coaches in PM/SM Trains, Cleaning & 6 Watering of PFTR 08.11.2019 29,24,10,903 + M/s. Tharu & Sons, 72,45,440 Ernakulam trains, OBHS in Day to trains & Depot 07.11.2023 Premises Cleaning at Coimbatore for a period of Four Years (SBD)

227 7. Performance Highlights (April’ 2021 – September’ 2021).  Effective working of ED Goods Train examination point ensured even during lock down period.Anaverage of 75%of sick wagons are beingattended in the rake itself without detaching from the formation. ERODE Goods Yard Performance TREND OF SICK WAGON DETACHMENT AT ED YARD YEAR 2021- 22 800 684 506 700 623 567 629 567 600 190 174 196 96 96 93 500 MAY AUG SEP 400 300 179 194 181 94 96 101 200 JUN JUL 100 0 APR NO. OF RAKES CHECKED NO. OF SICK ATTENDED AT YARD NO. OF SICK WAGONS DETACHED  IOH attention to126 ICFcoaches & SS1 schedules to38 LHBcoaches were attended at CBE depot up to SEPTEMBER during the 2021-22.  Ferrous scrap to a total quantity of 54.178 Tonnes (65.7 %) upto SEPT 2021 against the target of 81 Tonnes were handed over to Stores Department.  Transporting Harvester Tractor Machines by BOMN/DBKM wagons by 7 trains to various destinations from Chinna Salemfrom 12thOct 2020.  20 Nos. of parcel Cargo Express Trains are operated to PTNR (13), RJT (2) & NGC (5) stations from 29.08.2020 onwards.

228 8. Major Works in progress a. Works in progress (PH42) PB/LAW No. Name of the work Physical progress 2021-22 ED: Creation of Engg :Work Awarded on 22.11.2019 : Shed 727 IOH facilities with extension work completed, pitwork yet start. two pitlines of one Electrical: Work Awarded on 10.03.2020. 729 coach length at Mech: whiting jacks recieved at ED: Erode Sick line. Commissioned on 05.03.2021. Further Indents 899 under process. Total booking 21-22: 2619 (000's) CBE: Extension of Detailed Estimate sanctioned on 03.03.2020 925/ UW1 IOH shed with one Engg: LOA issued for an amount of Rs. 1.52 Cr. coach length on 17.06.2020. Work for Extension portion : Not pitline in Road 3 yet commenced. Elec: LOA issued on 05.10.2020. Erode: Creation of Mech: Indent for T&P under process. Total dedicated water booking 21-22 : 2882 (000's) supply facilities to camtech booster Engg:Tender opened on 18.08.2021 under pumps TC.Elec: LOA issued on 18.11.2020-work not commenced. Mettupalayam: POH Facilities for Engg LOA issued on 11.12.2019 for Rs.1.95 NMR coaches. Crores.work not yet started. Structural Drawing to be approved by HQ returned with remarks. Elec: LOA issued on 11.02.2020. Work not yet started. Mechanical M&P, T&P procurement under process.IGBT welding sets received by Depot. Fork lift received commissioned. Total booking 21-22 : 1580 (000's)

229 915 Modernization of Engg: CC pathway between Rd 10 & 11, 11 & 12, Erode yard with 12&13 , 13 & 14, 14 & 16 completed. Rd 15 920 provision of removed and Rd 14 slewed. Electrical Compressor 936/UW5 concrete apron of commissioned at SA end on 04.03.2021. 1025/UW4 660 m x 23 m with Compressor pipeline laying work: completed.CC 30 T capacity cross pathway work completed at SA end and Goliath Crane and CBE end sick attention • Compressor room work at CBE end under facilities in the progress. yard itself. • Elec: Electric cable laying and brackets for street light & LED light completed. Installation of Upgradation of Pit panel for welding plant completed. 3 High Mast lines:Provision of installed and Welding Panel provided with power focused LED plug. lighting repairs to • Mech: Procurement of M&P items completed damaged catwalks except supply of 02 sets of 25T Jamalpur jacks. & Drainage Minor Engg & electrical work under progress . Arrangements at Engg: LOA issued on 22.01.2019. Work started at ED & CBE ED from 03.06.2019. Engg work completed at ED including T type State of the Art catwalk and Deepening of pitlines. Extension of L Running type catwalk upto 24 coach length completed. Maintenance for Electrical lights provided in 24 & 10 coach MG Heritage pitline. Locomotives at CBE: Extension of L type catwalk pending. ONR. Electrical works completed at CBE. Setting of Quick Detailed Estimate Sanctioned on 12.11.2020. watering Engg : LOA issued on 24.08.2021,Mechanical arrangement at SA indent under Progress.Elec : LOA issued on stn 23.07.2021 LOA issued on 11.11.2019,Re appropriation for funds for 1.59 Cr vetted by Divisional Finance/SA advised to HQ on 13.08.2021, Revised QAP 40 HP Pump on 16.08.2021. Work not yet commenced by firm.

230 b. Works in progress (PH41) PB/LAW Name of the work Physical progress No. 2021-22 2020-21: Wheel Profile PO issued on 07.07.2021 for Rs, Measurement system 17.70 lakhs, Awaiting supply. 1204 with dia: measurement 1189 (DMP) Commissioned on 28.08.2021 1190 2017-18 - TIG welding plant (DMP) Installation work under progress from 1188 Procurement of new 19.07.2021.work nearing completion. EIMWB at Erode under Stamping done on 14.09.2021 1191 replacement account(DMP) Awaiting supply from Jamalpur 1083 Syn. Lifting Jacks for workshop. LHB coaches type III of 1211 Jamalpur (set of Nos., PO issued on 22.12.2020 for 11 15 ton each) at HABD at various division. CBE(GMP) All 11 locations commissioned July Automatic computerised 2021 axle box temperature Sanctioned in 2021-22 under RB monitoring system for M&P: Leading parameter sent to HQ various divisions (GMP) 03.06.2021 , Layout plan approved by DRM/SA.Indent placed by HQ to Coimbatore Depot: CNC COFMOW 04.08.2021 Under Floor wheel lathe Detailed Estimate sanctioned on with winch (shed) 01.06.2021, Indent to be placed by (HQMP) Depot, awaiting clarification from HQ .Kept in abeyance Inflatable Air Bag (Set of 2 nos) (GMP)

231 9. LOCATION OF HABD IN SALEM DIVISION Sl.No Location Section KM Commissioned Depot on jurisdiction 1 SA LC 109, JTJ-SA 317/16- 13-11-2019 SA TNT-KPPR (DN) 18 ED ED 2 ED LC 121 A, SA-ED 384/6-8 24-10-2019 CBE ANU-CV (DN) ED SA 3 ED LC 124, IGU- 394/10- 26-06-2020 ED TPM-ED (UP) ED 12 4 IGU LC 140, ED- 461/21- 07-11-2019 SNO-SUU (DN) IGU 23 5 KRR LC 39, TPJ- 67/600- 9-11-2019 VRQ-KRR ED 700 6 LC 179, SXT- SA-VRI 187/300- 24-04-2021 MPLI 400 7 LC 4, VGI-KRR KRR- 7/800 26-04-2021 DG 10. EnHM 6. PRELIMINARY AUDIT FOR IMS CERTIFICATION OF INTERCITY EXPRESS 12679/80 CONDUCTED BY M/s. QUEST – CHENNAI ON 31.08.2021. PDC-31.10.2021 7. CONSENT TO OPERATE – STATUS SL.NO NGT STATION DATE OF CONSENT 1 COIMBATORE 17.02.2021 2 21.04.2021 3 ERODE 15.07.2021 4 KARUR 20.07.2021 5 TIRUPPUR 27.08.2021 SALEM 6 UNDER APPROVAL , WILL BE MTP OBTAINED BEFORE 30.11.2021

232 8. Water Recycling plants (7 Nos.) Sl.No Location CAPACITY STATUS Installation of plant completed on 1 KARUR STATION 50KLD 03.02.2021 SALEM 100 KLD Work in Progress 2 JUNCTION Work completed under trial run TIRUPPUR 50 KLD 3 STATION Installation of plant completed on 28.04.2021 DRM OFFICE Work under Progress 4 SALEM 50KLD Work Completed , Drainage line to ERODE 100 KLD be connected 5 JUNCTION Work completed in Feb 2019 and under AMOC. METTUPALAYAM 25KLD 6 STATION COIMBATORE 7 DEPOT 400 KLD 9. Supply, Installation and Commissioning of Solid Waste Management Facilit (Automatic Organic Waste Composter (AOWC) with Material Recovery Facility 6 locations at CBE, SA, ED, TUP, MTP & KRR Railway Stations  LOAs issued on 05.10.2020 for ED & 18.02.2021 for CBE & MTP.  LOAs issued on 17.06.2021for SA, TUP & KRR stations.  Work Under Progress at MTP, ED & PTJ stations

233 10. INNOVATION AND SYSTEM IMPROVEMENTS 11. WATER RECYCLING PLANT: As per the guidelines of National Green Tribunal, Mechanical Department of Salem Division has awarded contract for installation of 6 No’s of Water Recycling plant at 5 NGT nominated Stations and one at DRM office. Out of 6 WRP, one WRP of 50KLD capacity is already installed and inaugurated by GM/SR on 03.02.2021 at Karur junction. On 28.04.2021, DRM/SA has inaugurated the 2nd Water Recycling plant of 50KLD at DRM office. 12. Alterations in pipe lines and control equipment of air suspension system as per RCFCoach Alteration Instruction (CAI):  The following TWO major modifications are carried out in coach no. SR LWSCZ 194496 at Coimbatore coaching depot during April 2021.  After Modification, to check the effectiveness of the modifications, one trail run between CBE-TUP-CBE was conducted on 01.05.2021 and results were satisfactory. 3. Issue:Flexible hose pipe between Auxiliary Reservoir & leveling valve Touches with the coach body and has sharp bend. Steel pipe provided on under frame for connecting flexible hose to leveling valve has been shifted towards end of coach by 275 mm. Elbow has been provided on leveling valve to ensure smooth loop which is not touching with car body and ensures that bend Radius limits for the SAE100 hoses is not compromised.

234 Drilling could not be done in the under frame for providing supporting brackets of shifted pipe line. Therefore, brackets were welded on the under frame. OLD DESIGN NEW DESIGN 4. Issue: Failure of ferrule joint of flexible hoses for FIBA. This failure was attributable to the following root causes: - Relative movement between the bolster and the bogie frame which i constantly moving the hoses. Grazing of flexible hose with steel pipe for connection of leveling valve. Steel Pipe connected with leveling valve through flexible hose has been shifted towards coach end by 275 mm. This shifting resulted into clearance between flexible Hoses and steel pipes. Moreover, loop of flexible hose is become smoothened by providing additional male to female elbow with the metal pipe to FIBA unit.

235 ¾ “M/F ELBOW STRAIGHTPIPE LINE 5 mm PLATE ¾ “M/F ELBOW OF SIZE 950 mm WITH BRACKET 13. FITMENT OF TRANSITION TYPE CBC:  LWLRRMs manufactured before 2019 are provided with straight ‘H’ type tight lock Center Buffer Couplers. Due to straight CBC, it is unable to attach Inspection carriages which were provided with Screw couplings.  To overcome the above said difficulty, power cars at rear end (Luggage compartment end) have to be provided with Transition Type CBC.  8 numbers of Transition coupler assemblies are fitted. Coaches. Before modification After Modification 14. Installation of Hot Axle Box Detector in SA Division  With the increase in traffic density and speed of trains, the risk of running rolling stock with defects has increased manifold causing serious

236 accidents and traffic disruption. Rolling stock defects like hot axle are serious threats to Railway safety and cause derailment and even fire leading to fatal accidents.  Already 5 No’s of HABD were installed in 2019 & 2020 sanctioned under PH-41. 2 more HABD were also sanctioned under 2018-19 HQMP.  Two HABD are now installed and commissioned on 27.04.20 at 1) LC No: 179 (KM 187/300-400) between MPLI-SXT under SA-VRI section and 2) LC No: 4 (KM 7/800) between KRR-VEI under KRR-DG section. 15. COIMBATORE JUNCTION - BECOMES THE FIRST RAILWAY STATION IN SOUTHERN RAILWAY TO EARN THE COVETED PLATINUM RATING FOR GREEN RAILWAY STATIONS The Coimbatore Junction of Salem Division, Southern Railway has earned the prestigious PLATINUM RATING for Green Railway Stations awarded by the Indian Green Building Council (IGBC), part of the Confederation of Indian Industry 04.08.2021. Coimbatore Junction Railway Station, Southern Railway has earned the Platinum Rating after a stringent evaluation process (scored 83 out of 100 points) and has become the First Railway Station in Southern Railway and the Sixth Railway Station in Indian Railways to earn this prestigious rating. The five other Railway stations with Platinum Rating are Secunderabad, New Delhi, Jaipur, Visakhapatnam and Asansol.

237 16. GAUGE FOR ELASTOMERIC PAD MEASUREMENT (Item 23: As per Innovations circulated by Railway Board letter No.2012/M (N)/24 Dt.25.06.2021) A Go (46 mm) /No-Go (42 mm) gauge was developed at Erode depot for free height measurement of EM pads. Prior to this only visual inspection was done. This gauge is very handy and an unskilled person can also perform measuring of EM pad in an easy manner. 17. POROSITY TEST BENCH FOR HOSE PIPES (Item 21: As per Innovations circulated by Railway Board letter No.2012/M (N)/24 Dt.25.06.2021)

238 A test bench was developed in at Erode depot with in-house resources for testing of porous holes in BP and FP air hoses. This test bench helps in finding out the minute holes which cannot be detected in RTR or SWTR. Requirements: a)Compressed air of 6 kg/cm2 for testing b)Normal water. 18. ADAPTOR HOLDING CLAMP FOR CASNUB BOGIE (Item 20: As per Innovations circulated by Railway Board Letter No.2012/M (N)/24 Dt.25.06.2021) Four sets of Adaptor (along with EM pad and crown packing if required) Holding Clamps have been manufactured at ERODE depot. This clamps avoids the conventional system of working (Holding adaptor with hands) during wheel changing which had a risk of injury.Also clamps helps in firm holding of adaptors with bogie frames and avoids canting while fitting on the CTRB wheels. The conventional system needs 4 men to work while fitting bogie on the CTRB wheels. By utilizing this clamp, it is reduced to 02 men.

239 19. SHIFTING OF PEASD ISOLATION COCK Due to provision of bio-toilets in ICF coaches, the existing location of PEASD isolation cock in some coaches become difficult to access by the GLP. This leads to delay in isolation of PEASD and punctuality loss For the quick and convenient operation of this Two Way isolation cock, the same have beenre-located where easily accessible to train crew without necessitating their entry to deep under the coach body. So far PEASD isolation cocks in 53 coachesare relocatedfrom January 2021 onwards. Before Modification After Modification

240 20. Replacement of Air pipe line in pit line at CBE  14 years old air pipe line available in the pit line which affected the effectiveness of RTR/STR due to rust formation in the air pipe line was replaced by departmental staffby using pipelines for 600 mts length with 50 COAC’s, 2 Nos. of strainer and 4 ball valves.  Thereby resulting in a total saving of Rs. 2 Lakhs duly avoiding the outsourcing of activity. The system was made operational on 01.09.2021.

241 DEPOT WISE DETAILS 1.Coimbatore. 1 Holding  301 coaches (ICF-151& LHB-150) 2 Primary  12 Express trains including One Double maintenance Decker UDAY Express. 3 Secondary  1 passenger train maintenance  4 Express trains 4 OEA/PFTR trains  Average 12 trains per day 5 SS1 for LHB  12673/74 /12623/24 Cheran Express / TVC coaches at CBE mail, 12680/79 Intercity Express, 12647/48/12682/81 Kongu/Chennai Weekly Exp & 22665/66 & Exp rakes are now with LHB coaches.  During 2020-21 - 70 LHB coaches and up to sep’21 -38 coaches were undertaken SS1 at CBE. 6 Pit lines  Two pit lines with L Type Catwalk having a capacity of 26 coach length each.  Two High Pressure Jet Cleaning Pumps with pipelines available at pit lines.  An integrated coach maintenance shed with facilities of one 10/3 T EOT crane, one set of 7 Sick line/IOH shed whiting jacks, forklift, lister truck and one 3 T Electric hoist is functioning and all the IOH due coaches arising in SA division are taken for IOH from 22.06.2009 onwards with a monthly target of ‘24’ coaches.  SS 1 schedules of LHB coaches also carried out here. 8 Platforms  There are 6 BG platforms. High Pressure Jet Cleaning pumps with pipe lines are provided

9 Last Mile Works 242 to 3 platforms to carry out the effective cleaning of all PFTR trains.  Water Recycling Plant at CBE: WRP of 4 lakh litre capacity per day under LAW work has been completed near Pitline and functioning. 2. Erode. 1 Holding  159 coaches  1 Exp train :- Yercaud Express 22650/49 2 Primary  2 passenger trains:- 56110& 56100 maintenance 3 OEA/PFTR  5 trains at an average of 49 Coaches / day trains 4 Pit lines  Pit line No. 1: 24 coach capacity with “T” type & “L” type catwalk  Pit line No. 2: 10 coach capacity.  3 lines of each having the length of 231 mtrs and 5 Sick lines holding capacity of 11 wagons.  50 mtrs x 22 mtrs covered shed  Sick attention at an Average of 12 wagons per day.  CAMTECH design Quick watering system for Coach watering is available in PF/ED covering PF No. 1 to 4.Rolling in & rolling out examination of 6 Platforms all pass through trains including Freight stock, Air continuity examination of all ETR, Traction change trains are being carried out in platform.High Pressure Jet Cleaning pumps with pipe lines are provided to 3 platforms (PF No.2, 3 & 4) to carry out the effective cleaning of all PFTR trains.  An average of 3.0 trains per day is certified on Premium/ Intensive examination pattern. 7 Goods yard  Yard Lines : Rd 07 to 18  Incoming / Through BPC : Rd 07 to 10  Train Checking lines : Rd 11 to 14.

243  Goods shed Lines : Rd 15 & 16  Sick vehicle grouping : Rd 17  ART Stabling line : Rd 18 - Both end exit  Crane stabling line : Rd 19 – Both end exit (covered shed) 8 MRV pit line  SPART stabling line (Both end exit)  BTC was started functioning at Erode from 06.02.1989 for training of C&W staffs.  Average of 208 staffs are being trained per month in BTC including C&W, Pro ALP, Engg, Traffic, staffs. 9 Basic training center  A “Model Room” for exhibiting C&W components is also available. C&W staffs, Guards, ALPs of Salem are given orientation training.  Air Brake Training and Refresher courses are also being conducted. A short term course on LHB is conducted for the technicians.  Newly installed Electronic In-Motion Weigh Bridge available at Erode in Road No.6. Installed by M/s.Rice Lake Weighing Systems India Ltd, Kanchipuram Dist, Chennai. 10 EIMWB  Stamping of new EIMWBis done by Dept. Legal Metrology on 14.09.2021.  Waiting for Commissioning BREAK DOWN  140T Crane, 11 SPECIAL AT  “A” class ART ERODE  SPART CAMTECH  CAMTECH design Quick watering system for 12 design Quick Coach watering is available in ED. Watering System 3. Mettupalayam Pit Line

244 Two BG pit lines are available. One is 6 coaches’ length and the second 7 coaches’ length. The M.G. pit line can hold 6 N.M. Rly coaches. One rake of 56136/56137 with 4 N.M. Rly coaches per day is maintained on this pit. High Pressure Jet Cleaning pump with pipe lines are provided to 1 platform to carry out the effective cleaning of all PFTR trains. POH of N.M.R Rolling Stock There are 27 MG NMR coaches, 28 newly built ICF MG coaches and 14 wagons in NMR section. The depot undertakes IOH of N.M. Railway rolling stock’s. A small covered shed with accommodation for four coaches is available for carrying out the schedules of coaches and wagons. POH of NM Railway wagons are being under taken at MTP itself. Loco Activities The 'X' Class locomotives that arrive here from the hills are berthed in a covered shed available for the purpose of fueling and watering , the work is managed by the loco staff under the control of the SSE/C&W/MTP. Fuel Furnace oil RCD of 40 KL capacity is available at MTP itself for supplying fuel to the oil fired steam locos. NMR Museum: The Nilgiri Mountain Railway Museum was inaugurated on 07.10.2015 to exhibit heritage items of Indian Railways. 4. Salem Main Activities This depot dealing with PFTR trains from Chennai Egmore, Vridhachalam, Metturdam and Yesvantpur. En route detentions on account of C&W problems for passenger and freight trains in SA-JTJ, SA- VRI, SA-DC sections are also dealt by this depot.

245 Platforms 1 express train and 4 passenger trains are being given platform turn round maintenance &18 pass through trains are being watered. An average of ’15 KL’ fueling is carried out every day for Diesel Locos, DEMU, Power Cars of 12674/12673 Exp. An Electronic In-Motion Weigh bridge installed and commissioned at KPPR Railway Station near Salem on 22.09.2018 and it is now in working condition. 5. Mettur Thermal Power Plant Siding Main Activities  This is a wagon maintenance depot for post tippling examination of BOXN wagons catering coal to the Tamil Nadu Electricity Board. Unloading of coal is by tippling.  Receipt and dispatch of coal rakes at an average of 5 to 6 rakes per day.  Certification of loaded BRN/BOST wagons with steel plates for correct lashing before dispatch at MCSI (MCRD) siding at an average of 0.4 trains per day. Sick line  Three sick lines with a holding capacity of each 10 BOXN wagons and covered shed to accommodate 2 BOXN wagons are available.  One welding plants are available.  An average of 1 sick wagon per day is attended. 7. ONR STEAM LOCO SHED:  6 X-Class Oil Fired and 2 Coal Fired Steam Locos are maintained at ONR depot. Major Scheduled Maintenance upto Schedule IV attention is being carried out.  5 MG Diesel locos are also maintained at ONR. The Maintenance for YDM4 Locos are done by GOC shed staff at ONR.

246  A separate running cadre was formed under Sr.DME/SA for NMR section compressing CLI, LP, ALP, Fire Man & Brakes Man are being fed by the base depot ONR.  A new post of Dy.Director/Heritage/ONR was created for the maintaining the heritage of NMR section and for improvement of NMR.  RCD of 20KL of HSD oil is set up at Loco Shed ONR for fueling YDM4 and Oil-Fired Steam Locos.  New X-Class coal fired steam loco No. X-37400 manufactured by GOC workshop, arrived at MTP on 04.09.2021.  The loco will be inducted into service after conducting necessary trials in the section.