248 X. DIESEL LOCO SHED, ERODE 1. History Of The Shed Diesel Loco Shed, Erode was started in February, 1966 with 2 supervisors and few technicians as a satellite shed for Diesel Loco Shed, Gooty. It emerged as an independent Shed on 18.05.1966. The Shed was initially planned to accommodate 40 locos, commissioned with a modest holding of 17 WDM2 Locomotives and became the first built Broad Gauge Diesel Loco Shed in South India established for maintenance of Broad Gauge Diesel Locos. A kind of unparalleled record was established by Diesel Loco Shed, Erode when the locos based in this Shed went all the way to Delhi and returned without any enroute detention, working Superfast Trains. It was originally planned to home 40 locos, and extended to 80 locos during 1971. Subsequently holding was enhanced to 100 locos in 1979. Extension of heavy repair bay was done in 1981 to enable maintenance of this holding and augmentation work for holding 50 additional HHP locos at the estimated cost of 22.4 crore has been completed in March 2019. This Shed has bagged the Shield at Railway Board level for “Best Maintenance” consecutively five times since the inception of the shield from 1973 to 1977 and subsequently the Shield was discontinued. The Shield is still available with the Shed. The role of this Shed in ironing out the teething problems faced in WDM2C (redesignated as WDM3A) locos when uprated from WDM2 locos, WDG3A locos during introduction and WDM3D locos with the uprate benefits of WDM3A& WDG3A locos are highly remarkable. This shed had taken a lot of effort in tuning up these locos to the road conditions by bridging the gap between the production and
249 maintenance aspects through the in-house modifications and improvements.Traditionally this Shed has been a practical school for the diesel fraternity as Officers, Supervisors and Staff from all over the Diesel Sheds used to visit the Shed to learn the maintenance practices being followed by the Shed. Consequent to introduction of uni-traction, this shed started maintaining AC locomotives also from March 2018. Initially, 05 AC locomotives to type WAG7 were inducted by the shed. Gradually the basic requirement such as Infrastructure for AC loco maintenance, training of staff and material requirement was established. Presently, 91 AC locomotives are maintained by this shed and 31 Diesel Locos are under operational. 2. Loco Holding - as on SEP-2021 WDM WDG WDM WD DSL WA WA WAG5 WA AC TOTA S6 Loco G7 P1 P-4 Loco L 3D 3A 3A HA s s 51 25 04 02 -- 57 28 28 10 91 148 3. Outage of Diesel Locomotives as on SEP-2021 Freight Target Pro.Target Actual %age 2021-22 Apr 21to Apr 21 Improvement w.r. to target (upto Sep 21 to Sep-21) Sep 21 + 63.83 % Diesel 1.41 1.41 2.31 + 8.13 % Locomotives Electric 42.95 42.95 46.44 Locomotives Power Plan: AC Locos Diesel Locos Description 91 Nil 57 Loco holding Nil Locos Hired 1 Surplus loco under GRS 26
250 Shunting Locos Nil 24.6 Locos in inferior service Nil 0.0 30 Effective Loco holding 91 4 Locos under heavy repair 3 Locos net available 88 5.4 Locos in M/E/P Link 26 0 ChgShg/BT/Spl 8 0 Overlapping Nil 0 Locos in pass link Nil Locos available for freight 42.93 Locos under minor repair 7.47 Goods outage 46.53 5. Lube oil consumption Year Lube oil consumption in KLs 361.585 2018-19 204.135 2019-20 62.016 2020-21 2021-22 (upto Aug- 13.17 2021) 6. Scrap disposal in Tonnes Year Ferrous Non –Ferrous Total 2018-19 266.775 126.831 393.606 71.363 479.175 2019-20 407.812 56.344 273.674 2020-21 217.33 115.197 10.42 2021-22 (upto Sep-21) 104.777 7. (i) Performance – April to September 2021. SL. Performance Target for Prop. Actual No. Parameters 2021-22 (Apr-Sep’21) Target Freight Outage- (Apr- 2.31 1.0 Percentage more than Sep’21) target- Diesel Loco 1.41 1.41
251 Freight Outage- 1.1 Percentage more than 42.95 42.95 46.44 target-AC Loco 2 Ineffective percentage Dsl:10% 10% 6.31% AC:10% 10% 7.31% 3 SFC (Pass) 3.69 % 3.69 % 4.14 (a) Lts/1000 GTKM 3 SFC (Goods) 2.07 % 2.07 % 2.03 % (b) Lts/1000 GTKM 4 Lube oil consumption 2.30 % 2.30 % 3.69 % (Lts/ 100 EKM) 7 (ii) Annual performance Agreement (MOU) for the FY 2021-22 :Ref: RB letter no. 2021/E&R/2(2)/1dated 26.07.2021 Percentage of Asset Percentage of Asset Sl Key Failure in 2019-20 Failure in 2021-22 Improve- no ment % Performance No of Loco AF No of Loco AF/ Indicators cases holding / cases holding Loco loco 1 Asset Reliability (Average increase in asset reliability improvement over last year 2019-20 (2020-21 being a pandemic year 2019-20 is taken for assessment) b) Diesel Loco failure (Improvement: 64 100 0.64 2 36 0.11 82.8% 5%) c) Electric Loco failure (Improvement: 10 30 0.33 13 91 0.285 13.6 % 5%)
252 XI. MEDICAL DEPARTMENT SALIENT FEATURES Medical Department of Salem Division came into existence on 01.11.2007. There are 02 Sub-Divisional Hospitals One at Erode and one at Podanur and four Health Units at Salem, Karur, Mettupalayam and Coonor providing medical care to a population of 46000 Railway beneficiaries. A new 50 bedded Divisional Hospital was constructed at Erode at a total cost of Rs 5.76 crores and started functioning from 29.03.2016 onwards. A new hospital building is proposedfor construction at an approximate cost of One crore at Sub- Divisional Hospital, Podanur under GM-OOT basis. HONORARY VISITING SPECIALISTS Honorary Visiting Specialist is appointed in SDH/ED in the field of Ophthalmology in November – 2019 and is continuing. REFERRAL HOSPITAL The following 09hospitals are empaneled for treating Railway beneficiaries under Cashless Treatment Scheme in Emergency. S.No. Name of the empanelled Currency of 1 Hospital recognition 2 SreeAbhirami Hospital, 3 Coimbatore 15.12.2019 to 4 14.12.2021 Revathi Hospital, Tiruppur. 15.12.2019 to 14.12.2021 Dr. GC Hospital, Karur. 15.12.2019 to 14.12.2021 Sudha Institute of Medical 15.12.2019 to
253 Science, Erode. 14.12.2021 5 Vinayaka Institute of 15.12.2019 to Medical Science, Salem. 14.12.2021 6 Gokulam Hospital, Salem. 15.12.2019 to 14.12.2021 7 Shanmuga Hospital , 15.12.2019 to Salem. 14.12.2021 8 Universal Hospital, Salem. 04.06.2021 to 03.06.2023 9 Universal Hospital, Salem. 04.06.2021 to 03.06.2023 PERFORMANCE OF MEDICAL DEPARTMENT – JAN- 2021 to SEPT -2021 Total no. of Out- Patient treated 70116 Diagnostic investigations done 23818 No.of patients referred to referral hospital 7014 Total Mandays lost due to RMC 51105 Mandays lost due to IOD 2178 No. of employees examined (PME) 740 No. of Candidates examined 35 Total No. of In-patients treated 184 LENGTH OF JURISDICTION Erode - 141Kms. Salem - 364Kms. Podanur - 84Kms. Mettupalayam - 35Kms. Karur - 122Kms. Coonoor - 45Kms. SERVICES PROVIDED Primary Health care. Prevention of diseases. Promotive Health care (Health education). Disaster Management. Medical Examination.
254 Surface sanitation. Prevent food adulteration under FSSAI. ARMESCALE I at Erode. ARME SCALE II at Salem, Podanur, Karur and Coonoor. Management of COVID-19 JAN-2021 TO SEPT-2021. “Passengers and employees entering Railway establishments screened for COVID 19 is 5600 No. of person found positive for COVID is 368. All COVID positive cases combined with suspected cases are thoroughly examined and COVID test done at Railway empanelled hospitals. The mortality is very marginal due to anti-COVID measures. The mortality among employees is well avoided and the alarming pandemic situation is well controlled. Adequate nos. of oxygen cylinders N-95 masks, face shields , hand gloves , oximeters are available in stock in salem division to meet any eventuality. Indents have been placed for procurement of 10 nos. of oxygen concentrators and will be procured shortly. Major stations like, Salem and Erode are identified and provided with quarantine facilities for suspected contacts of COVID among employees and others. Sanitizers being prepared indigenously at ELS/ED and DSL/ED are procured and liberally supplied among departmental staffs. N.95 masks are supplied with protective gloves to frontline staff and Health Education is given to create awareness to avoid serious consequences of COVID contact.
255 Cleaning Contract Particulars - SA Division as on 01-09-21 Sl.No Name of the Tendere Manpower Date of Date of Name & Remarks 1 work & location commen completi address of 2 d value Currently on 3 Comprehensive (includi ce on the quotation 4 cleaning contract ng GST) 30-11- contractor basis from 5 under SBD at 2024 01.12.20 for Coimbatore Station Cleaning M/s KHFM 30 days at Railway station 28-02- Hospitality Rs. Rs Team 01-12- 2021 and Facility 7,66,679/- Comprehensive 13,23,30, Manager:1, 2020 Management cleaning contract 612.51/- Supervisor 31-08- Services Ltd., Rs. at Salem Railway s:5, 2024 No1, Nirma 12,43,256/- station for four Driver:1, Plaza, per month years Labourers: 30.04.23 Makwana from Comprehensive (Rs 77 Road, 01.02.2021 cleaning contract 31.10.21 Marol Naka onwards under SBD at 27,56,888 Andheri East, Erode Railway /- Mumbai Due to station per Covid-19 M/s Arunai pandemic the Comprehensive month) Computers regular cleaning contract Form, No-22, contract has at Mettupalayam Rs Labourers: 01-03- PillaiyarKovil been Railway station 3,68,48,7 50 2019 street, Pudur, withheld to 86/- for Supervisor Vaniyambadi- obtain Cleaning contract two years s:2 01-09- 635902 reduction in at Tiruppur 2020 contract Railway station on (Rs Team M/s Tharu value on quotation basis 15,35,366 Manager:1, 01.05.20 and Sons, Supervisor 21 Karipayi /- s:4, Road, per Labourers: Rajagiri Post, month) 69 South Kalamassery, Rs LAB-11 Ernakulam, 13,15,84, Sup-1 Kerala. 437/- M/s Arunai for four Computers Form, No-22, years PillaiyarKovil (Rs street, Pudur, 27,41,342 Vaniyambadi- /- per 635902 month) M/s Arunai Rs. Computers 70,92,336 Form, No-22, PillaiyarKovil /- for 2 street, Pudur, yrs. Vaniyambadi- Rs. 635902 2,95,514 per month Rs. Lab-8 07.09.20 4,61380/ Sub- Nil 21 -
256 resumption of passenger traffic Due to Covid-19 pandemic the regular M/s Asian contract has 6 Cleaning contract Rs. Lab-7 18.09.20 06.12.21 Associates, been at Karur Railway 4,55,980/ Sup –NIL 21 SF.No. 517-B withheld to station on , Poonga obtain quotation basis - Nagar , reduction in Pugalur(PO), contract KRR-639113 value on resumption of passenger traffic Rs M/s Arunai 28,87,127 Computers 7 Garbage removal /- for two Labourers: 01-08- 31-01-22 Form, No-22, contract at PTJ years (Rs 2 2019 PillaiyarKovil 1,20,296/ Supervisor: street, Pudur, - per Nil Vaniyambadi- month) 635902 8 Garbage removal Rs Driver:1 09-09- 08-09- M/s Arunai contract at ED 37,94,589 Labourers: 2020 2022 Computers /- for two 4 Form, No-22, years PillaiyarKovil Rs street, Pudur, 1,58,107/ Vaniyambadi- - per 635902 month 9 Garbage removal Rs Driver:1 09-09- 08-09- M/s Arunai contract at ED 42,76,108 Labourers: 2020 2022 Computers /- for two 4 Form, No-22, years PillaiyarKovil (Rs street, Pudur, 1,78,171/ Vaniyambadi- - per 635902 month)
257 WATER SAMPLES (JAN-2021to SEP -2021) BACTERIOLOGICAL 97 1. No. of samples tested 71 2. No. of found fit 6451 RESIDUAL CHLORINE 3337 1. No. of samples tested 2. No. of found fit 05 NIL FOOD SAMPLES COLLECTED UNDER FSSAI 1. No. of samples collected 2. No. of found adulterated STAFF STRENGTH. Designation Sanctioned Regular Contract Vacancy DOCTORS 10 07 -- 02 (ON STUDY LEAVE)-01 DHO 01 01 -- VACANT AHO 01 01 -- -- -- HEALTH INSPECTORS 17 17 -- -- PHARMACISTS 12 10 -- 2 MATRON NURSING SISTER 07 07 -- -- STAFF NURSE LAB SUPT. 06 06 -- -- RADIOGRAPHER DRESSER 01 01 -- -- HOSPITAL 02 02 -- -- ATTENDENTS 02 02 -- -- COOKS MIDWIFE 06 01 -- 05 SAFAIWALAS 28 27 -- 01 02 NIL -- -- 01 NIL -- -- 86 65 -- --
258 EXPENDITURE TOWARDS PURCHASE OF DRUGS From JAN- 2021to SEP - 2021 : 385 Total No. of PO received from Hd. Qrs. : 342 Total No. of PO complied with : Rs. 1,43,67,667/- Total amount passed REIMBURSEMENT OF MEDICAL EXPENSES No. of reimbursement of medical expenses claim received during JAN 2021 to SEPT 2021 - 446. No. of reimbursement claims settled - 104 cases Total pending cases till SEPT 2021– 342 cases. Erode Hospital STAFF STRENGTH Department Category Sanctioned Actual Vacancy 3 Nil MEDICAL Doctors 3 6 Nil Nursing Staff 6 4 Nil 2 Nil Pharmacist 4 1 Nil 2 4 Lab Supdt. 2 1 7 2 Radiographer 6 Dresser 8 1 Hospital 9 Attender HKA 9 Podanur Hospital STAFF STRENGTH Department Category Sanctioned Actual Vacancy MEDICAL Nil Doctors 22 1 Nursing Staff 32 1 Nil Pharmacist 36 Nil Lab Supdt. 11 2 4 Radiographer 1 1 Dresser 31 Hospital 95
Attender 259 3 4 HKA Nil 1 7 1 Nil Record sorter 1 Office 1 Nil 1 superintendent 1 Ambulance Driver HU/Salem STAFF STRENGTH Department Category Sanctioned Actual Vacancy Doctors 3 3 Nil Nursing Staff 1 1 Nil 3 2 1 Pharmacist 5 5 Nil Hospital MEDICAL Attendant 6 5 1 Housekeeping 3 3 Nil Assistant Ministerial Staff Karur Hospital STAFF STRENGTH Department Category Sanctioned Actual Vacancy Doctors 1 Nil 1 Pharmacist 1 1 Nil MEDICAL Hospital 1 1 Nil Attendant Housekeeping 2 Nil 2 Assistant
260 HU/MTP STAFF STRENGTH Department MEDICAL Category Sanctioned Actual Vacancy 1 HU/ONR Doctors 1 Nil Nil 1 1 Pharmacist 1 1 Nil Hospital 2 1 1 Attender Housekeeping assistant STAFF STRENGTH Department Category Sanctioned Actual Vacancy MEDICAL 1 Nil Pharmacist 1 1 Nil Hospital Attender 1 1 1 Housekeeping 2 assistant
261 XII. OPERATING DEPARTMENT In Southern Railway, Salem Division having the distinction in existence of both MG and BG Lines. It is the UniqueDivision in Indian Railway which consists of all three tractions (i.e. AC, Diesel & Steam) and Loco Sheds for all three traction. Loco Sheds Traction Station AC Erode Erode Diesel Coonoor Steam SA Division is the major Unloading Division which contributes 34 %(Highest) in Terminal Detention in Southern Railway. Major Junctions in SA Division are SA, ED, IGU, PTJ, CBF, MGSJ, OML & KRR. Major Station is CBE. Major Yard is Erode. Major Goods Terminals are IGU, TEMP&MCSI. It has the boundaries with MAS, PGT, TPJ & MDU Divisions and SBC Division in SWR zone. The Interchange points of the Division is as follows.
262 1. Divisional Interchange Points Divisions IC Points MAS JTJ PTJ (Via MDKI) PGT PTJ (Via CNV) DG MDU TP VRI TPJ 2. Zonal Interchange Points Divisions IC Points SBC (SWR Zone) JTJ ‘A’ Cabin OML SA Division consists of 81 Stations. Section wise particulars are as follows - Sections Tot KM Block IBS Halt Total Station JTJ - ED 175.87 09 02 32 ED - PTJ 117.03 21 03 01 18 ED - TPJ 136.33 14 - 04 20 KRR - DG 70.63 16 -- -- 03 SA - VRI 138.27 03 -- 07 15 SA - KRR 85.15 08 -- 01 06 SA - 37.47 05 01 -- 05 MTDM CBF - 33.34 04 -- 02 04 MTP PTJ - 18.00 02 -- -- -- CNV MTP - 45.88 -- -- -- 08 UAM Total 857.96 08 13 17 111 81
263 Of which it is further classified as Classifications Class Class Class Class Special Class ‘A’ ‘B’ ‘C’ ‘D’ Stations 17 NIL No of Stations NIL 81 13 Stations Block stations 81 Control boards IBS 13 Manned by CNC 2 Train halts 15 Total 111 Three Boards SA, CBE, KRR No of Trains Handled in SA Division are as follows Exp./Pass trains runs per day in Both 150 Directions Freight trains runs per day in Both 55 Directions Safety Category Staff Strength of SA Division is S.No Category Sanction Actual on Roll Vacancy Including 1 TI / SMR / SM 413 370 2 Guards 298 247 SNP 3 Shunting Staff 723 538 43 4 CHC/Dy.CHC/SC 28 25 51 1,462 1,180 185 Total 03 282
264 3. Important Customers S.No Company Commodity Serving Inward Outward Station Chettinad Cement Corporation Coal Cement PALM, VRQ 1 Limited, (Palaiyam and Virarakkiyam) 2 India Cement Corporation Ltd, Coal Cement SGE (Sankaridurg) 3 JSW Steel Limited, Coal, Steel MCRD (Mecheri Road) Iron ore Tamilnadu Electricity Board 4 (TANGEDCO) Coal TEMP (Mettur Dam) 5 Sanmar Chemplast, (Mettur Coal MTDM Dam) 6 Madras Aluminium Company Coal MTDM Ltd, (MALCO)(Mettur Dam) 7 Salem Steel Plant, Salem Steel SA 8 IOC, BPCL& HP POL,LPG POL PLMD, IGU, SGE PLMD, 9 Food Corporation of India (FCI) FG FG CBF, NMKL, CHSM, SA 10 Tamilnadu Newsprint and Paper Coal PGR Ltd, Pugalur 11 Container Corporation Ltd Container Container IGU (CONCOR) 12 SKM Animal Feeds and Foods DOC, DOC, ED, CVD (India) Pvt Ltd, Erode Maize Animal Feeds
265 4. Important Loading Points. S.No Stations Commodity 1 Palaiyam Cement Virarakkiyam Cement 2 Cement Steel 3 Sankaridurg Containers, POL 4 Mecheri Road Containers 5 Irugur 6 Salem Market 5. Goods Terminals Stations Commodity MTDM, MCRD, KPPR, MAP, SA, Coal, Food grains Wheat, DOC, SAMT, ATU, CHSM, ED, PY, TUP, Cement, Fertilizer, Paddy, Rice, IGU, PLMD, CBF, MTP, NMKL, KRR Iron ore,Iron & Steel, Lime Stone, Dolamite & POL 6. Year wise Comparison of Important Operating Indices Particulars 2009- 2010- 2011- 2012- 2013- 2014- 2015- 2016 2017 2018 2019 2021- 2010 2011 2012 2013 2014 2015 2016 - - - - 2020- 2022 Loading (in Wgn) 2021 upto Loading (in MT) 2017 2018 2019 2020 Sept’ 21 25,81 26,89 32,81 22,82 22,54 18,60 12,14 12,830 12,361 25,572 53,331 51,97 27,62 4 5 4 4 7 0 6 0 9 1.590 1.581 2.011 1.386 1.293 0.967 0.556 0.604 0.677 1.451 2.994 2.828 1.451 Avg Rakes 722 730 827 526 510 483 524 363 357 599 1179 1,185 621 Detentio Ter Det 13:44 14:48 12:39 11::18 08:59 n (LDG) (hh:min 17:35 21:48 22:28 23:52 24:13 16:35 20.17 14.23 3,825 4,394 4,206 4,364 2726 ) 15:12 13:21 15:10 19:15 15:48 1,213 1,493 2,121 1,751 1834 Avg Rakes 3,918 4,223 4,518 4,177 4,896 5,110 4,869 4,149 1.34 1.45 2.15 1.85 1.53 Detentio Ter Det 492 464 470 635 576 n (hh:min 16:45 19:21 20:27 23:08 21:48 15:57 13:45 15.11 446 407 405 407 475 (ULDG) ) Wagon Holding 1,400 1,614 1,724 1,838 1,935 1,531 1,208 1,298 Wagon Turn 1.27 1.4 1.43 1.61 1.67 1.28 1.15 1.43 Round EKM AC 488 496 508 552 463 438 451 460 DSL 443 446 449 522 388 331 364 411
266 OUTAGE AC 24 24 25 26 29 27 25 21 19 22 24 26 34 DSL 15 15 17 18 19 15 10 08 09 11 12 02 01 552 641 593 550 695 INWARD 556 622 639 597 718 739 693 604 874 964 848 872 1,056 RELEASES/Day 968 1,028 1,096 1,044 1,114 1,140 999 873 1,095 1,243 1,138 1,272 1454 1,243 1,363 1,418 1,353 1,391 1,419 1,197 1,040 1,096 1,241 1,138 1,271 1450 LOADED 1,241 1,360 1,416 1,354 1,398 1,419 1,197 1,034 30 29 28 46 51 RECEIPTS/Day 26 26 26 26 27 27 28 29 88 83 77 96 96 Wagon Receipts @ IC Points/Day Wagon Despatch @ IC Points/Day AVG Speed (in KMPH) Punctuality (in %) 85 89 91 92 93 93 89 90 7. Loading Performance – Apr’ 21 to Sept’ 21 (wt in MT) Apr’ 21 to Sept’ 21 % of variation over Commodity Target Previous Current Target Previous Year Year Year Cement 0.431 0.314 0.338 - 21.68 07.58 Steel 0.130 0.180 0.184 41.45 02.37 POL 0.791 - 05.61 Container 0.030 0.617 0.747 - 60.27 21.04 Others 0.212 0.005 0.012 - 18.88 143.42 TOTAL 1.594 0.064 0.171 - 08.91 167.08 1.180 1.452 23.10 8. Customer wise Loading – In Tonnes Customer Loading Commodity Apr’ 19 – Apr’ 20 – Apr’ 21 Station Mar’ 20 Mar’ 21 – Sept’ 21 Chettinadu Cement PALM 424,617 389,756 157,890 Corp Ltd. Chettinadu Cement Cement VRQ 182,529 173,997 77,865 Corp Ltd. India SGE 276,407 234,684 101,824 Cements Ltd Jindal Steel MCRD Iron & Steel 317,483 269,447 183,887 Works
267 BPCL IGU POL 1,506,031 1,456,573 746,603 SAMT Container IGU Multiple 7,171 7,664 3,358 Corporation Commodity 677 5,673 8,560 Container Corporation 9. Rail vs. Road Co-Efficient (Apr’ 21 to Sept’ 21) Customer Total Desp. Desp, % of Rail Co- Dispatch By Rail by Road efficient Chettinadu Cement Corp Ltd. 1,002,998 157,896 845,102 15.74 PALM 431,856 77,865 353,991 Chettinadu Cement Corp 268,503 166,631 18.03 Ltd. VRQ 490,540 101,872 310,423 India Cement Corporation 180,117 37.94 Ltd, SGE 36.72 JSW Steel Limited, MCRD 10. Coaching Terminals Station No. of Platform Capacity Pit line No. of Rakes originating (Bogie length) capacity maintained (Bogie length) trains Platform Number MSPC PSPC 12345 Pit-line No. Primary 1A 61 2 3 Secondary Exp Pass CBE 21 1 26 26 26 26 23 23 26 26 -- 13 -- 4 ED 1 -- 26 25 23 18 -- -- 26 10 - 4 -- 0 SA 1 2 21 24 24 26 26 24 -- -- -- -- -- KRR -- 1 24 24 26 26 26 -- -- -- -- -- 1 MG Pass. -- MTP 1+ 13+ 8 6 -- -- -- 1(MG) 1 8 24 -- -- -- -- -- 7 MG ONR -- MG -- 3 5 5 -- -- -- -- UAM -- 4 5 -- -- -- -- -- -- -- -- -- MTDM -- -- 10 -- -- -- -- -- -- -- -- --
268 11. Punctuality Performance Head 2018-19 2019-20 2020-21 2021-22 (Up to Sept’ 21) MAIL / EXP 78.80 75.05 -- MSPC -- -- 96.13 -- 96.13 ALL TRAINS 78.80 75.05 95.08 95.08 12. Sidings(Apr’ 21 - Sept’ 21) STATION LOADING(In Wagons) UNLOADING(In Rakes) Monthly Capa Monthly Commodity Capacity Avg.wags Commodity city Avg. Rakes TEMP/MTDM - -- - 6 Rakes 133 Coal 486 STEEL 2 Rakes MCSI/MCRD 30 BOST 1 Rake 65 Coal, Iron ore, -- - Lime stone,etc MTDC / - -- Iron &Steel MTDM 43 BRN 262 6 Coal SSP/SA 20 BCN -- Cement IGSG/SGE -- - 2 Rakes 7 Iron &Steel IOC/SGE - 200 - 1 Rake 416 1 Rake 0.3 Coal -- Cement 2362 Cement 1 Rake 7 POL -- TNPL/PGR - -- - 1 Rake 16 Coal, Lime -- POL 1 Rake stone 309 Food Grains CCC/VRQ 42 BCN 1 Coal, Slag 42 BCN 105 - CCC/PALM - 3 Coal,Slag IOC/HPCL/ - Container IGU 50 BTPN 1 Rake 3 F.Oil,HSDetc BPOI / IGU Container 70 BCN -- -- -- FCI/PLMD - 3 Rakes 8 Food grains - 1 Rake 1 POL, LPG BPCL/PLMD 1 Rake 6 Food grains 80 BLC FCI/CBF 1 Rake 8 Container CONCOR/ 30 BLC IGU ¾ Rake 3 Container CONCOR/ SAMT
269 Progress of Ongoing Traffic Facility Works (Sept’ 21) No Station Work Cost San. Progress Type in Year lacs Ongoing Works A new work has been sanctioned in LAW 2018-19 to cover S&T cost of Augmenting the CSL of running work (Rs. 65.30 lines (Rd 1 & 2) to lakh) which will be 1 LP 715 m each LAW 50 2015-16 executed by PWP Division. Earth work, PF extension work and Mast erection work are under progress TC & SWR are under preparation at Proj./HQs. Provision of CRS sanction to be Additional Loop at processed by Proj/ TPT on UP line as HQs 2 TPT common loop with 949 2019-20 work PF and FOB (Umbrella 60 % of earth completed work) remaining is under progress. 30 % of PF fencing work has been completed. Rs 3 Crores has been allotted for
270 the FY 21-22 on Re-appropriation. Funds will be utilized in full. ESP approved . . Provision of ML SIP is under approval at HQs. Crossover at SA end Detailed estimate to convert Rd-4 as prepared and 3 DST Common Loop for GM 249 2021-22 tender floated. (OOT) Tender will be mobility of Traffic. opened for Civil – 08.10.21, S&T – 06.10.21 and TRD – 19.10.21. Project Works 1 OML-MTDM Doubling PB Doubling of Track between MCRD and MTDM was commissioned on 16.10.2020. Doubling of Track between OML and MCRD was commissioned on - 2012-13 30.03.21. SIP of SA Jn. is under approval at HQs. Revised ESP of MGSJ Jn was approved by CPDE on 19.07.21. ESP of stage-1 is under approval at HQs..
271 2 ED-KRR & SA- Doubling PB 2250 2020-21 SIP for stage – II KRR-DG (Cr.) was approved by HQs on 23.08.21. 3 CHSM- New line PB 64.50 KALLAKURICHI. (Cr.) Day wise programme for stage – II work has been submitted by CN . It is under process at Division. LB/PB/Discon. Requested for Stage II from 01.11.21 onwards. OML Stage - III is under approval at HQs. Earth work between OML – SA is under progress. Construction of EI building at SA & MGSJ are under progress. Final Location Survey is under process. It is a part of Gauge conversion work between Cuddalore-Salem projects. Out of 2 Major bridges, 1 Major bridge is almost in the finishing stage. Out of 13 Minor
272 bridges, 5 Minor bridge works are in progress. Out of 4 RUB, 2 RUB works are in progress Earth works in Government Porambokku land is in progress. Improvement of Existing CHSM Station yard. BT Apron work for Goods Platform was completed. Rising of PF 2 & 3 from M/L to H/L completed and Rising of PF.1 is under progress. 14. Highlights of Operating Branch The highest inward release of SA Division in recent times is 756 wagonsper day in May 2021. (Previous highest was 779 wagons in May’ 19) 2,726 Inward Rakes were released during 2021-22. SA Division contributes 33.52 % over SR. During Pandemic period, 42 Oxygen Specials were handled from the month of May’ 21. M/s JSW/MCRD has unloaded 84 Rakes (4,865 Wagons) in June’ 21 is the best ever performance in their unloading. And also they loaded 40,536 Tonnes (3rd highest) of Iron & Steel and fetched the earning of 5.99 Crores in this month which is also the best ever performance in Loading.
273 Following LCs was converted in to interlocked/Closed 2021-22 S.No LC Nos Section Date of Remarks intrdn 1. 92 & 93 KEY-TPT 29.04.21 2. 117-A MVPM-DC UP 29.04.21 3. 76 MTNL YD 05.05.21 Closed 4. 121-C CV - EFD 27.07.21 5. 3 ED - CVD 27.07.21 6. 13 CBF - PLMD 15.09.21
274 XIII. PERSONNEL DEPARTMENT Sanction & Actual of staff strength as on 01.10.2021 Sl.No Department Sanction Actual Vacancy 1% 160 135 25 1.60 1 Personnel & Schools 0.51 27.12 2 General 51 49 2 8.06 Administration 4.44 3.56 3 Engineering 2712 2105 607 7.06 806 644 162 8.98 4 Commercial 444 364 80 4.98 356 278 78 1.93 5 Electrical -GS 4.48 2.67 6 Electrical-TRD 1.61 4.06 7 Electrical-TRS 706 635 71 15.18 (ELS/ED) 16.3 8 Electrical-Running 898 868 30 498 469 29 9 Mechanical-C&W 193 164 29 10 Mechanical-Loco 11 Mechanical-DSL 448 379 69 (Mech) 12 Mechanical-DSL 267 222 45 (Elecl) 13 Medical 161 123 38 14 Signal & 406 342 64 Telecommunication 15 Transportation 1518 1250 268 9624 8027 1597 Grand Total
275 Vacancy position of specified safety categories Sl. Sanctioned Actual Vacancies No. Category strength strength DRQ wherever Operating applicable PQ 1 SMs/SS 412 371 -7 29 -6 7 2 Controllers 28 25 -24 53 3 Guards 298 248 08 56 4 Gateman (Traffic) 0 0 -29 5 Pointsman 392 384 0 6 Loco Pilots 478 422 18 Asst. Loco 398 7 pilots/Diesel/Elec. 369 0 Safety Inspector/ 11 HQ Controlled 8 Counsellor HQ Controlled Shunting Masters/ HQ Controlled HQ Controlled 9 Jamadar 48 30 Safety 10 Helpers/Khalasis 0 0 1 SSE(P.Way) Civil Engineering 39 2 JE (P.Way) 61 48 3 SSE(Bridges) 35 2 4 JE(Bridges) 2 1 5 SSE(Works) 1 8 6 JE(Works) 4 5 6 7 Track Maintainer Gr.I 238 204 34 475 365 110 8 Track Maintainer Gr.II 475 455 20 9 Track Maintainer 1046 698 348 0 Gr.III 7 25 10 Track Maintainer Gr.IV 11 Blacksmith-Sr.Tech
12 Blacksmith-I 276 3 10 13 Blacksmith-II 3 -1 14 Blacksmith-III 13 6 -2 15 B.smith Helper 2 1 7 4 15 19 SUB TOTAL 8 1 1 16 Welder-Sr.Tech 34 0 4 17 Welder-I 2 5 -4 18 Welder-II 4 4 4 19 Welder-III 1 6 9 20 Welder Helper 8 16 14 15 0 2 SUB TOTAL 30 1 3 21 Sr.Tech (Rivetter) 2 2 -2 22 Rivetter I/ 4 3 -2 23 Rivetter II/ 0 13 8 24 Rivetter III/ 1 19 81 25 Bridge Helper 21 0 16 28 8 24 SUB TOTAL 16 1 4 26 Sr.Tech (STM) 32 32 -23 27 Tech. I (STM) 5 41 21 28 Tech II (STM) 9 29 Tech. III (STM) 62 18 HQ controlled S&T 7 2 SUB TOTAL 20 9 1 SSE/Signal 2 JE/Signal 180 173 -13 20 73 68 5 Technician(Signal 3 Maintainer) 01 -1 4 Telecom Maintainer 81 42 39 1 Safety 6 5 Inspector/Counsellor Mechanical 36 1 38 12 2 Safety 20 6 Helpers/Khalasis 01 -1 1 SSE/C&W 2 JE/C&W Safety 3 Inspector/Counsellor
4 SSE/Loco 277 2 5 JE/Loco 6 Fitter/DSL Sheds 2 2 HQ controlled 7 Tech C&W 3 8 Tech Millwright 518 495 -42 65 9 Tech Welders 287 10 Crane Driver 0 289 -31 29 11 Fitter Loco 23 3 0 Chemical & 32 Met.Asst/Lab Supt. 18 5 12 (CMA) 12 13 SSE/DSL (Mech & Ele) 14 JE/DSL(Mech & Ele) 32 Safety 14 6 HQ controlled 15 Helpers/Khalasis HQrs Controlled post Safety Inspector/ 1 Counsellor 30 22 4 4 2 Tower Wagon Driver 3 SSE(TRD) 247 171 76 4 JE (TRD) Electrical 5 SSE (TRS) 6 JE(TRS) 11 7 Loco Inspectors 8 Tech AC sheds 12 9 3 9 Tech TL/AC 31 22 1 8 Safety 10 Helpers/Khalasis 25 25 HQs controlled post 21 20 1 25 23 2 443 430 1 12 132 120 2 10 437 326 111
278 Manpower Planning Target of 1% Surrender in Sanctioned strength for 2021 -2022 Financial Year DEPARTMENT Sanc. Target No.of Balance Strength 1% on posts yet to be Personnel & Schools as on 1st sanc. surrendered surrendered General Strength Administration April 3 (June 94 Engineering 2020 2 21) Commercial 160 1 3 52 27 2713 8 821 4 Electrical -GS 444 4 356 Electrical-TRD 706 7 Electrical-TRS 898 9 (ELS/ED) 498 5 Electrical-Running 193 2 448 Mechanical-C&W 4 267 Mechanical-Loco 161 3 411 2 Mechanical-DSL (Mech) 1518 4 Mechanical-DSL (Elecl) 9646 15 Medical 97 Signal & Telecommunication Transportation Grand Total Surrender of Posts fromApril 2021 to October 2021 April 2021 to October post creation NIL Creation of posts from April 2021 to October 2021 April 2021 to October post creation NIL
279 Appointments APPOINTMENTS MADE Category RR RR CG LARSGES SCOUT TOTA L BCAS S 1 Tech- 1 III/Welde 1 Engineerin r 1 g NA 1 4 Khalasi 1 2 JE /DRG 1 3 Mech(Loco) CMA 4 5 Mech(DSL) TECH-III 1 1 12 Electrical Tech-III 2 31 S&T Tech- 3 III/Tele TNC 5 Operating SM 1 PM B 10 2 TOTAL 10 19 2 Conduct of Adalats – Period- 2021 Adalat No. of No. of No. of Balance no. conducted adalats Grievances Grievances of conducted received disposed off Grievances to be 77 disposed off Grievance 6 70 7 Adalat TOTAL 6 77 70 7
280 Court Case Details No.of cases pending Reply statement No.of cases Tota pending for CA H S C Tota Filed <6 < 3 Less l implementatio T C CPl CAT/H Mo mon than n C n but 3 90 4 ths less mont than h 6 Mth s 70 22 0 0 92 80 0 7 3 *2 cases to be decided by Tribunal on jurisdicsion grand Status of Work Study Reports Sl. No Dept Year of study Number of posts Recommend Actual Balance to be ed as surrenders surrendered surplus made 1. Engineering 2019-2020 6 0 6 2. Commercial 2020-2021 15 3 12 . 3. Mechanical 2020-2021 4 4 TOTAL 25 3 22 PNM with SRMU Date of Meeting Old New Total Closed 29.12.2020 & Subjects Subjects 30.12.2020 82 30 112 76
281 Details of Settlement Cases ONR NR YEAR DEATH V. TOTAL SUPERANNUATION TOTAL RTD 2010-11 61 118 179 222 401 2011-12 52 86 138 281 419 2012-13 58 91 149 314 463 2013-14 43 79 122 327 449 2014-15 49 112 161 322 483 2015-16 24 99 123 304 427 2016-17 37 91 128 291 419 2017-18 33 80 113 279 392 2018-19 21 62 83 237 320 2019-20 16 29 45 215 260 272 359 2020-21 29 58 87 133 179 2021-22* 27 19 46 TOTAL 450 924 1374 3197 4571 * Up to 30.09.2021 Highlights of Performance - April 2021 to September 2021 Dr. B.R. Ambedkar’s 130 birth anniversary was celebrated at Divisional office on 15.04.2021 maintaining social Distance. Covid Vaccination camp for the benefit of officers and staff of Salem Division was conducted on various days and various locations. On the eve of International Yoga day on 21.06.2021, Essay and Quiz competition on Yoga was conducted at Railway Senior Secondary
282 School, Erode.Yogasanas were performed by Instructors, Trainees at MDDTI/ED. In connection with the Celebration of 75th anniversary of India’s Independence day on 30.06.2021, 20 employees and wards were participated in the cultural programme on Thirukkural recitation and Poem writing on the topic “Peace and India”. Online Grievance Adalat was conducted for employees working at IGU- CBE-PTJ on 15.07.2021, 36 grievances received and 30 Disposed and for employees working at ED area on line grievance Adalat was conducted on 29.07.2021 and 6 grievances were received and 2 disposed. As per PCPO/MAS letter No.P(W) 378/IRCC/2021 Dated 21.04.2021 Virtual poster making competition and talk on Dr.A.P.J.kalam was conducted in Salem Division inconnection with the Celebrations of the 75th Anniversary of India’s Independence during July 2021. Officers, Staff and family members of Salem Division participated in the rendering of the National Anthem of India and uploaded the recitation uploaded in the website from 10.08.2021 to 15.08.2021. 75th Independence Day celebrations was conducted on 15.08.2021, Covid Warriors were honoured during the occasion. As per PCPO/MAS letter No.P(W) 378/IRCC/2021 Dated 21.04.2021 in connection with the Celebrations of the 75th years of India’s Independence celebrations, Elocution competition on the topic of NEW EDUCATION POLICY TO IMPROVE THE LITERACY IN INDIA was conducted to the students of Railway Senior Secondary School, Erode Swachhta pledge was administered by DRM on 16.09.2021 to all Branch officers and staffs. Cleanliness drive was conducted in Personnel Branch on 18.09.2021 On line Grievance Adalat to the staff working in Tirupur area was conducted on 28.09.2021 and 9 Grievances collected.
283 Assistance required Sl. Assistance Reference No. Date Addresse Copie No required d to d to Filling up of DRM’s personal 1 one APO discussion with PCPO - - post at the on 05.10.2016 at PCPO earliest HQ/MAS- Request for convert the 02 Gazetted work 2 charged SA/P.213/Creat./WC 09.05.201 posts of /PRO 6 PRO/SA & RA/SA to revenue posts
284 XIV. SAFETY DEPARTMENT A) ANALYSIS OF ACCIDENT STATISTICS SINCE 2007-08 (UPTO SEPT-2021) S Class 200 200 200 201 201 201 201 201 201 201 201 201 201 202 202 l. 7- 8- 9- 0- 1- 2-13 3- 4- 5- 6-17 7- 8- 9- 0- 1- N o 08 09 10 11 12 14 15 16 18 19 20 21 22 Conseque 1 ntial 02 3 1111121 0 1 0 0 0 Accident Other 2 Train 33 6 0420120 1 1 0 0 1 Accident 3 Indicative 1 3 2 0 000 030 0 0 1 0 0 Accident 4 Yard 1 12 5 10 6 2 9 7 7 2 0 2 0 1 1 Accident Total 5 2 16 11 11 5 10 9 1 3 1 4 1 1 2 0 4 5 Unusual 12 0 1001340 1 1 0 0 0 Incident Total 6 2 16 12 11 5 11 1 1 3 2 5 1 1 2 2 2 8 B) ANALYSIS OF CONSEQUENTIAL ACCIDENT AND NON-CONSEQUENTIAL ACCID STATISTICS SINCE 2007-08 S 200 200 200 201 201 201 201 201 201 201 201 201 201 202 202 l. Class 7- 8- 9- 0- 1- 2- 3- 4- 5- 6- 7- 8- 9- 0- 1- N 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 o Conseque 1 ntial 02 3 1111121 0 1 0 0 0 Accident Non- 2 conseque 5 18 13 10 10 4 9 8 12 2 1 3 1 1 2 ntial accident Total 5 20 16 11 11 5 10 9 14 3 1 4 1 1 2 3 Unusual 1 2 0 1 001340 1 1 0 0 0 Incident Total 6 22 16 12 11 5 11 12 18 3 2 5 1 1 2
285 C) DETAILS OF ACCIDENTS FOR 2019-20 Sl. Description Station Total No. Nil 1. TRAIN ACCIDENT Nil 1 (a) CONSEQUENTIAL ACCIDENT PTJ (b) OTHER TRAIN ACCIDENT Nil 2. INDICATIVE ACCIDENT Nil Train No.22645 Ahilaya Nagari super-fast Exp. passed PTJ down starter signal 14A at danger on 13.11.19(SPAD) 3 YARD ACCIDENT 4. UNUSUAL INCIDENTS D) DETAILS OF ACCIDENTS FOR 2020-21 Sl. Description Station Total No. 1. TRAIN ACCIDENT (a) CONSEQUENTIAL ACCIDENT Nil (b) OTHER TRAIN ACCIDENT Nil 2. INDICATIVE ACCIDENT Nil 3 YARD ACCIDENT 1 While pulling out Empty rake of BTPN from oil siding to Road 2 of SGE, the three pair of wheels of leading bogie of leading Loco No. SGE 27437/WAG 7/ED has derailed at point no.52A- Trap switch at 18:42hrs at SGE yard. E) DETAILS OF ACCIDENTS FOR 2021-22 (UPTO SEPT-2021) Sl. Description Station Total No. Nil 1. TRAIN ACCIDENT Nil (a) CONSEQUENTIAL ACCIDENT 1 (b) OTHER TRAIN ACCIDENT LCR-BQI Up line Derailment of wagon no. SEBOXNM/10069760074 of EBR/N goods at km 294/25-29 between LCR-
286 CBE Nil 1 BQI up line on 27.06.2021 2. INDICATIVE ACCIDENT 3 YARD ACCIDENT Train No: 02673Spl Empty rake shunting movement with Loco No: 37179 towards shunting neck, first pair of loco wheels derailed at 12.45Hrs in Point No: 145 at CBE yard F) SAFETY DRIVES Year No. of Safety drives No. of Safety drives ordered conducted 2014-15 13 13 2015-16 2016-17 20 20 2017-18 10 10 2018-19 13 13 2019-20 2020-21 16 16 2021-22 18 18 11 11 6( upto Sept 21) 6 G) SAFETY DRIVE IN 2021-22 S. Drive Ordered Description Drive period No Nos. by From To Special safety Drive regarding 1/2021- \"Rolling down of 1 2022 RB Train - 13.04.2021 27.04.2021 Counseling of GLP\" Special Safety Drive on 'Summer 2/2021- 2 2022 RB Precautions - 29.04.2021 13.05.2021 Worksite Precautions\". 3 3/2021- RB Special Safety 25.05.2021 08.06.2021 2022 Drive on
287 ''Derailment at Station Yards\" 4/2021- Special Safety 2022 Drive on 'Signal 4 RB Passing at 15.06.2021 29.06.2021 Danger'. Special Safety Drive on 5/2021- \"Inspections and 5 2022 RB maintenance of 16.07.2021 30.07.2021 Points and Crossings\" Special Safety 6 6/2021- RB Drive on \"To 11.08.2021 26.08.2021 2022 Ensure safe train operations\". H) CALENDAR DRIVE IN 2021-22 S. Drive Ordered Description Drive period No Nos. by From To Working at Non 16.01.2021 25.01.2021 1 1 PCSO/MAS interlocked Level crossings Precaution to avoid break 2 2 PCSO/MAS binding/wheel 16.02.2021 25.02.2021 shelling in LHB 16.03.2021 25.03.2021 16.04.2021 25.04.2021 regarding 16.05.2021 25.05.2021 3 3 PCSO/MAS Precautions to avoid SPAD. Hot Axle/Warm 4 4 PCSO/MAS box (coaching stock). Monsoon 5 5 PCSO/MAS precautions – Monsoon patrolling.
288 Working of track 6 6 PCSO/MAS machines and 16.06.2021 25.06.2021 tower wagon. Disconnection and 7 7 PCSO/MAS Reconnection of 16.07.2021 25.07.2021 points and crossing 8 8 PCSO/MAS Work site 16.08.2021 25.08.2021 protection. 9 9 PCSO/MAS Shunting 16.09.2021 25.09.2021 precautions. Joint inspection 10 10 PCSO/MAS of points and 16.10.2021 25.10.2021 crossings I) DIVISIONAL SAFETY DRIVE IN 2021-22 S. Drive Ordered Description Drive period No Nos. by From To Safety precautions to be followed by the staffs while 1 1 DRM/SA working on 07.06.2021 21.06.2021 track/near the track Precaution to be taken during communication/ 2 2 DRM/SA 13.10.2021 27.10.2021 signal failures, obstructions in LC gates.
289 XV. SIGNAL & TELECOMMUNICATION DEPARTMENT 1. Routes No. of Stations (incl : IBS) Route 49 19 B 20 D 8 E 96 S3 1 TOTAL 6 Standard of Interlocking 66 7 STD I 1 STD I R 81 STD II R RI Special TOTAL (Excl: IBS – 15Nos) 2. Signaling Assets 28 43 EI 02 RRI PI 08 15 (04 EI) LQ IBS 96 TOTAL 3. Status of Data logger No. of No. of No. of No. of Data Work in Station IBS Progress Route Station Logger -- Sanctioned Commissioned -- -- B 35 2 35 37 D 19 0 19 19 E 19 1 19 20 S3 8 Not Applicable
290 4. Installation of RTU Route No. of No. of IBS No. of LC Remarks Station gates -- B- 12 5 -- -- D - - 44 -- E - - 51 S3 - - - 5. A) Progress of Works – Executed by SA Division Sanction Sl Description of Item No. in latest cost Outlay No works current Year & (in Remarks 2021-22 Allocation 1000s) (in 1000s) a) Road Safety Works (PH-29) Commissioned 14 LC gates out of 18. 4 Gates closed due to LUS. Final bills and Salem variations Division - BG- under process. Interlocking 1 of level PB73 23980.019 10000 Estimate crossing RE- revised for gates (18 5000 catering TRD Nos) requirements. Works to be deleted in this FY. Required less fund compared to BG. Salem Commissioned 2 Division - PB74 103697.456 5000 18 LC gates Interlocking out of 19. 1 of level Gate closed
crossing 291 due to LUS. gates (19 Final bills and Nos) 27721.802 variations under process. Salem Works to be Division - deleted in this Remote FY.Required terminal unit less fund compared to at interlocked BG. level crossing 3 gates and PB85 3000 Supply portion PB86 completed. strengthening PB94 Installation pending due of networking to lack of Huts to central which are to data logger be constructed server by Engg. at few LCs. Works to be deleted in this FY. Salem Division - Integrated Contract power supply terminated for non- due to lack of 4 blanking of 99999 10000 progress. This signals and RE-NIL has to be earth leakage deleted in this detectors at FY. level crossings Salem BG- 21 LC gates Division - 38000 commissioned. 5 Interlocking 173797 7 LC gates of level RE- closed due to 20000 crossing LUS. AS
292 gates (26 MADE Nos) pending. Pending works are to be attended. Estimate to be revised for inclusion of two gates (LC 67 & 175). Required less fund compared to BG. Provision of P.O released for 10 Mini Mini IPS at IPS. Hut mid-section BG- 100 construction interlocked RE- 6 LC gates (11 LAW97/UW3 21320 12500 not yet 22304 started. Nos) over Tender floated Salem for IPS Division. installation. Provision and Networking of LOA issued on RTU at Engg. 17.06.2020. Interlocked Supply portion gates in SA, completed & PGT & TVC BG- rest of the 7 Divisions & LAW97/UW4 100RE- work progress. in Networking of 4100 RTUs with Work to be Data loggers deleted in this in TPJ FY. Division
293 Sl Description of Item No. Sanction Outlay Remarks N works in latest (in o cost & current 1000s) Year Allocatio n (in 2021-22 1000s) SA Division - Work Replacement of SMs completed slide with control BG&RE physically, 9 panel at interlocked PB85 9964 -1500 final bill LC gates in JTJ-ED - CBE and SA - sent to MTDM sections Accounts. b) Traffic Facilities Works (PH 16) Provision of Work additional loop at portion: 10 TPT on Up line as PB57 94871 RE- Tender 20000 awarded on common loop with 09.09.2021. PF and FOB Store portion: All the non- stock items are indented. Material to be collected from Work shop. Foreclosure sanctioned. Tender to be Lalapet - BG-0 re-floated. RE- Engg. has 11 Modification of PB8 7560 7560 issued LOA signalling for CSL arrangements. increasing work on May 2021 and it
294 discharged. S&T contractor is not interested to carry out the work. Processing to be done for closing the work. c) Signal & Telecommunication (PH 33) Salem & 5 Nos of IPS Thiruvananthapura supplied. P.O released m Divisions: BG- for 9 IPS. Replacement of LAW 5000 LOA issued 12 existing obsolete 872/UW 24644 RE- on 10.02.21 IPS on age-cum- 7 15100 for work portion. condition basis (SA- 11 & TVC 6 – Total - 17 stations) Revised estimate Improvement to sanctioned Power supply for Tender to be Signalling & LAW BG- floated. TC 4150 minutes 13 replacement of Over 874/UW 13800 RE- prepared aged Secondary 6 12510 and IPS cells in Salem modules to Division be indented. Provision of BPAC Materials supplied using HASSDAC BG-886 and with UFSBI in RE- HASSDAC 14 lengthy block LAW666 9131.243 2286 installed in 3 Block section over Salem sections. Division
295 Work in progress, Circuit submitted to HQ for approval. This will be completed before RE work. SA Division: Work Provision of completed Automatic Fire final Detection & Alarm measureme 15 system for Relay room/ Power room LAW661 20920 1800 nt to be in ADSTE/SA LAW664 19525 recorded. section (15 stations LAW665 10903 1500 Work to be on \"B' Route) LAW662 16289.49 deleted in BG- SA Division: 2500 this FY. Provision of RE- Automatic Fire 8000 Work Detection & Alarm BG- completed 16 system for Relay room/ Power room final in ADSTE/ED measureme section (14 stations nt to be on \"B' Route) recorded. Provision of Work to be Automatic Fire deleted in Detection & Alarm this FY. system for Relay 17 room/ Power room Re-tendered at 7 stations (more than 100 routes- B on Route)over Salem 02.08.2021. Division Negotiation bid to be 18 Salem Division : opened. This has to be completed in this FY. Work is
Improvement of 296 4000 completed at Railnet Networking RE- SA, ED and arrangements over 5 5701 Salem Division BG- KRR. Work 1200 RE- to be started 9825 at CBE. This can be 800 BG- deleted in 4900 this FY. RE- 7223 Final measureme nt completed Replacement of old and Final Track feed variation chargers, Track 24485 statement 19 relays and Point LAW668 also control relays, Point prepared. Rodding over Salem Stores division portion to be indented.Thi s can be deleted in this FY. Salem Division - Final measureme Provision of nt is in 20 Computer based LAW669 6760.825 progress. Large Format This can be Display System in Control Office completed in this FY. Salem Division: SDH Replacement of installation outlived SDH/STM- by RCIL 21 1, PD-MUX LAW667 24829.11 completed. equipment with 2 UPS & chargers between printer for JTJ-SA-ED-PTJ, NMS to be SA-KRR, SA-VRI, supplied.
Search
Read the Text Version
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- 136
- 137
- 138
- 139
- 140
- 141
- 142
- 143
- 144
- 145
- 146
- 147
- 148
- 149
- 150
- 151
- 152
- 153
- 154
- 155
- 156
- 157
- 158
- 159
- 160
- 161
- 162
- 163
- 164
- 165
- 166
- 167
- 168
- 169
- 170
- 171
- 172
- 173
- 174
- 175
- 176
- 177
- 178
- 179
- 180
- 181
- 182
- 183
- 184
- 185
- 186
- 187
- 188
- 189
- 190
- 191
- 192
- 193
- 194
- 195
- 196
- 197
- 198
- 199
- 200
- 201
- 202
- 203
- 204
- 205
- 206
- 207
- 208
- 209
- 210
- 211
- 212
- 213
- 214
- 215
- 216
- 217
- 218
- 219
- 220
- 221
- 222
- 223
- 224
- 225
- 226
- 227
- 228
- 229
- 230
- 231
- 232
- 233
- 234
- 235
- 236
- 237
- 238
- 239
- 240
- 241
- 242
- 243
- 244
- 245
- 246
- 247
- 248
- 249
- 250
- 251
- 252
- 253
- 254
- 255
- 256
- 257
- 258
- 259
- 260
- 261
- 262
- 263
- 264
- 265
- 266
- 267
- 268
- 269
- 270
- 271
- 272
- 273
- 274
- 275
- 276
- 277
- 278
- 279
- 280
- 281
- 282
- 283
- 284
- 285
- 286
- 287
- 288
- 289
- 290
- 291
- 292
- 293
- 294
- 295
- 296
- 297
- 298
- 299
- 300
- 301
- 302
- 303
- 304
- 305
- 306
- 307
- 308
- 309
- 310
- 311
- 312
- 313
- 314
- 315
- 316
- 317
- 318
- 319
- 320
- 321
- 322
- 323
- 324
- 325
- 326
- 327
- 328
- 329
- 330
- 331
- 332
- 333
- 334
- 335
- 336
- 337
- 338
- 339
- 340
- 341
- 342
- 343
- 344
- 345
- 346
- 347
- 348
- 349
- 350
- 351
- 352
- 353
- 354
- 355
- 356
- 357
- 358
- 359
- 360
- 361
- 362
- 363
- 364
- 365
- 366
- 367
- 368
- 369
- 370
- 371
- 372
- 373
- 374
- 375
- 376
- 377
- 378
- 379
- 380
- 381
- 382
- 383
- 384
- 385
- 386
- 387
- 388
- 389
- 390
- 391
- 392
- 393
- 394
- 395
- 396
- 397
- 398
- 399
- 400
- 401
- 402
- 403
- 404
- 405
- 406
- 407
- 408
- 409
- 410
- 411
- 412
- 413
- 414
- 415
- 416
- 417
- 418
- 419
- 420
- 421
- 422
- 423
- 424
- 425
- 426
- 427
- 428
- 429
- 430
- 431
- 432
- 433
- 434
- 435
- 436
- 437
- 438
- 439
- 440
- 441
- 442
- 443
- 444
- 445
- 446
- 447
- 448
- 449
- 450
- 451
- 452
- 453
- 454
- 455
- 456
- 457
- 458
- 459
- 460
- 461
- 462
- 463
- 464
- 465
- 466
- 467
- 468
- 469
- 470
- 471
- 472
- 473
- 474
- 475
- 476
- 477
- 478
- 479
- 480
- 481
- 482
- 483
- 484
- 485
- 486
- 487
- 488
- 489
- 490
- 491
- 492
- 493
- 494
- 495
- 496
- 497
- 498
- 499
- 500
- 501
- 502
- 503
- 504
- 505
- 506
- 507
- 508
- 509
- 510
- 511
- 512
- 513
- 1 - 50
- 51 - 100
- 101 - 150
- 151 - 200
- 201 - 250
- 251 - 300
- 301 - 350
- 351 - 400
- 401 - 450
- 451 - 500
- 501 - 513
Pages: